ACTION TRANSMITTAL No

Size: px
Start display at page:

Download "ACTION TRANSMITTAL No"

Transcription

1 ransportation dvisory Board of the Metropolitan ouncil of the win ities D: March 7, 2018 : FM: ML o ransportation dvisory Board echnical dvisory ommittee PPD BY: Joe Barbeau, enior Planner ( ) UBJ: cope hange equest for cott ounty s H 21 / H 13 ntersection Project QUD : cott ounty requests a scope change to its H 21 / H 13 ntersection Project (P # ) to adjust the project limits, change two signals to roundabouts, and adjust intersection access. MMDD M: hat the ransportation dvisory Board approve a scope change request for cott ounty s H 21 / H 13 ntersection Project (P # ) to adjust the project limits, change two signals to roundabouts, and adjust intersection access. BKGUD D PUP F : cott ounty was awarded $4,929,040 in urface ransportation Block Grant funds for the 2020 fiscal year in the oadway econstruction/modernization category of the 2016 egional olicitation. he award was to make the following changes at and near the intersection of H 21 and H 13 in Prior Lake: 1. econstruct the H 21/H 13 intersection 2. econstruct the H 21 intersection with Main venue to right-in/right-out 3. eplace and add traffic signals at the H 21 intersections with H 13 and rcadia venue 4. djust H 13 intersection with Pleasant treet to 3/4 access 5. onstruct turn lanes, trail/sidewalks, pedestrian amenities, and transit amenities Following public review, the ounty would like to make the following changes to the project s scope: hange the western limits from rcadia venue to West venue to include pavement rehabilitation work and construction of a 3/4 access intersection at Duluth venue. hange the southern limits on H 13 from Pleasant venue to Franklin rail. hange the signal at H 21 and rcadia from a signal to a roundabout. hange the signal at H 21 and H 13 from a signal to a roundabout. hange the right in/right out at Main to a 3/4 intersection for northbound traffic on Main. LHP GL PLY: Projects that receive funding through the egional olicitation process are subject to the regional scope change policy. he purpose of this policy is to ensure that the project is designed and constructed according to the plans and intent described in the original application. dditionally, federal rules require that any federally-funded project scope change must go through a formal review and P amendment process if the project description or total project cost changes substantially. he scope change policy and process allow project sponsors to adjust their projects as needed while still providing substantially the same benefits described in their original project applications. P amendment does not accompany this request because this is a 2020 project. 390 orth obert t., t. Paul, Minnesota (651) Fax (651)

2 FF LY: coring: his project scored 568 points out of 1,100 and had a 56-point scoring gap over the highest un-funded project in the oadway econstruction/modernization category (Minneapolis s 37 th venue econstruction, which scored 512). o scorers reported a significant score reduction and the project would score at least 542 points. Funding: Given the minor changes to the periphery of the project area, no alternate amounts are shown. MM MM D : t its February 22, 2018, meeting, the Funding & Programming ommittee voted unanimously to recommend approval of the scope change request. t its March 7, 2018, meeting, the echnical dvisory ommittee voted unanimously to recommend approval of the scope change request. UG QUD MPL D Funding & Programming ommittee eview & ecommend 2/22/2018 echnical dvisory ommittee eview & ecommend 3/7/2018 ransportation dvisory Board eview & pprove -

3 UY P V DV UY HGHWY, MBLY MGM, FL 600 UY L JD, M (952) Fax: (952) L J. F HY J. WK, P.. Y BM ransportation ervices Director ounty ngineer Mobility ervices/fleet Mgr. January 16, 2018 Mr. Paul ehme hair, Funding and Programming ommittee Metropolitan ouncil 390 obert treet orth t. Paul, M cope hange equest P H 21 and H 13 Dear Mr. ehme cott ounty respectfully requests that the Metropolitan ouncil Funding and Programming ommittee consider the attached cope hange request for the above referenced project. Due to an extensive public involvement process and pavement projects planned for both H 21 and H 13, there is a need to submit a scope change request. he public involvement process brought all of the stakeholders together including the Prior Lake Downtown businesses to develop a plan that was supported by the ity ouncil, residents, and downtown businesses. he pavement projects on H 13 and H 21 offer a coordination and cost savings opportunity to be realized. Please consider the requested scope change at your next available Funding and Programming ommittee meeting. incerely, nthony J. Winiecki cott ounty ngineer ; Page 3

4 cope hange equest H 21 and H 13 FY 2020 Location Map location map of the project is attached as xhibit. Project Layout layout showing the original application is attached as xhibit B. layout showing the revised project elements is attached as xhibit. urrent P Description U H 21/H 13 P LK LUDG H 21 FM D V FKL L F M 13 U WH M V GH /GHU, PL/DD FF GL H 13 & D V, ¾ H 13 & PL, U L, L/DWLK, PD D M Background cott ounty was awarded funding for the intersection of H 21 and H 13 in the 2016 egional olicitation under the Modernization category. H 21 is a Minor rterial roadway from the eastern cott ounty line to H 169. he project involves improving the intersection of H 21 and H 13 and intersections on H 21 west of H 13 to rcadia venue. oday H 13 is a two lane roadway and H 21 is a four lane undivided roadway. he intersection is split phase due to the lack of turn lanes on H 21 and historic crashes at this intersection. Public nvolvement Driven hanges Upon receiving funding the ounty started developing a design schedule that was very heavy on the public involvement process. he objective was to be context sensitive to the downtown Prior Lake businesses and community while also evaluating the regional traffic issues and needs. ver the course of the public involvement process, a total of five different concepts, including the original federal application concept were evaluated for operations and benefits and challenges. With the roundabout options there was no longer a need to relocate Pleasant further south through a wetland/poor soils for vehicle storage because of the increase in efficiency of the roundabout at H 13 and H ; Page 4

5 During the public involvement process there were safety concerns with the intersection of H 21 and Duluth venue approximately 420 feet west of rcadia. With the roundabout now planned at rcadia instead of a signal, the intersection of Duluth venue to the west can be converted from a full access to a ¾ access. he ity of Prior Lake also hired an independent consulting firm to conduct an evaluation of the alternatives. n the end, the ity of Prior Lake and the public supported the changes to roundabouts vs signaled intersections, the ¾ access at both Duluth and Main. he layout has been to the MnD layout review committee for comments. ehabilitation rea n late 2016, the ounty s design group started investigating the right maintenance fix to road flooding being experienced on H 21 near West venue in recent years. n 2017 through analysis it was discovered the pavement had sunk three feet vertically and shifted over one foot horizontally over the last 25 years which is the cause of the recent road flooding. Due to efficiencies in project delivery of this maintenance rehabilitation project, and avoiding multiple closures, the ounty proposes to increase the western limits of H 21 from rcadia to West venue (approx. 1,500 feet) to be included into the project. MnD Pavement Project MnD has a programmed 14.4 mile reclamation project scheduled on H 13 from H 21 south planned for n attempting to coordinate with MnD on these projects, the ounty has agreed to add a section of the H 13 reclamation work from the H 21/H 13 project limits to where MnD s project will end. his additional work would make logical termini for each project. cope hange lements he requested elements for the scope change is for the following: hange the western limits from rcadia to West venue to include pavement rehabilitation work and intersection at Duluth. hange the southern limits on H 13 from Pleasant venue to Franklin rail. hange the ignal at H 21 and rcadia from a signal to a roundabout. hange the ignal at H 21 and H 13 from a signal to a roundabout. hange the right in/right out at Main to a ¾ intersection for northbound traffic on Main ; Page 5

6 Proposed P Description hanges U H 21/H 13 P LK LUDG H 21 FM D W V FKL L F M 13 U WH M V GH /GHU, ¾, PL/DD FF GL UDBU H 13 & D V, ¾ H 13 & PL, U L, L/DWLK, PD D M ummary his project still completes the work within the original application. he ounty does not request additional Federal funds. he project does change the scope from signals to roundabouts and increases limits due to pavement needs. ost stimate H 21/H13: $6,800,000 Paving H 21: $ 343,508 Paving on H 13: $ 80,000 urrent P Funding: L $6,654,204 FHW $4,929,040 H $1,725,164 Proposed P Funding: L: $7,223,508 FHW: $4,929,040 H: $2,294, ; Page 6

7 DF 110 DK 5/31/2016 For valuation Purposes V V MH L riginal pplication M 30 F M 48 Q 110 D V M M 30 F M M 48 Q M 30 F M M 48 Q M M 48 Q 15 Q 75 M 30 F M 30 F M 30 F M M 48 Q M 30 F GL K BLVD) ( Q 15 Q 15 Q 48 Q M M M M M 30 F 80 M F M 30 F 48 Q 15 Q M 3 0 F 15 Q M 48 Q M M M H M 30 F M P M 30 F 105 P M 30 F 30 F M 48 Q M 48 Q M M M 48 Q M 30 F M FUU PK & PL L 105 M V LD D V D UY, M ( G L PJ L H K BL 21 VD ) M 30 F M 48 Q M M 48 Q M L PL M M 48 Q M V F K M 30 F 15 Q 48 Q M M 30 F M 115 LGD M 30 F M M 48 Q MH L 95 DWY DWLK UB/ MD/ DVWY BUMU L FGU 1 LDPG PLMY DG P 1 #### #### G WLL FF GL 0 L F H HULD 13 MLL D VLY....H. 21 H GL L P LK, M ; Page 7

8 50 P D L M PPL X G MM 1 3 M M V D PPFLD JWL HV FL P LK PUBL LBY MX GL K V L M H VG GYPY HLL G PD P LK PL DP. 40 V V D V W DK X G LM PJ V V P LK Y HLL UY PVM D DHMLW U H G V H: \\ \D\M\fi gures\project Fi gures_ml WKG_01. dgn GWD LMY D V D 2 1 U Y VKG LQU M V BL D L DU LU V H PL 2 1 GL K V U Y FG U L 4: 09: 03 PM L HDW X G G PD L M FM 50 L M PD X G 40 -H & M PM D DMY F F H 2/14/2018 U L B G H M B D B LU FF G bm i. tbl H DDL U WK H V MM 1 3 jacobbo KL F 150 L MD.H. 13 U PJ 0 pdf-col or. pl tcfg L P D L M 50 LY X G 300 H 21/H 13 DG P L F P LK, M ; Page 8

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT

CHAPTER 1: TITLE SHEET and GENERAL LAYOUT CHAPTER 1: TITLE SHEET and GENERAL LAYOUT AREA OF ENVIRONMENTAL SENSITIVITY It is important to show the areas of environmental sensitivity in the plan to make sure these areas are not impacted. These locations

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

King Mill Lambert DRI# 2035 Henry County, Georgia

King Mill Lambert DRI# 2035 Henry County, Georgia Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.

More information

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14. 14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic

More information

BOARD OF DIRECTORS MEETING MINUTES

BOARD OF DIRECTORS MEETING MINUTES Board Voting Members Present: BOARD OF DIRECTORS MEETING MINUTES Osage Centre Cape Girardeau, MO Mr. Drew Christian, Southeast Missouri Regional Planning & Economic Development Commission (SEMO RPC) (alternate

More information

Maintenance of Traffic sequence of operations including any phasing and detour maps;

Maintenance of Traffic sequence of operations including any phasing and detour maps; All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise

More information

X X X X X X. ! Proposed Signalized HIGHWAY 55 PEDESTRIAN CROSSINGS

X X X X X X. ! Proposed Signalized HIGHWAY 55 PEDESTRIAN CROSSINGS HIGHWY 55 PEDESTRIN CROSSINGS» This graphic depicts walking distances to proposed signalized intersections along Olson Highway if existing unsignalized crossings are closed. Farwell Mpls College Prep Charter

More information

Preparing for an Uncertain Future:

Preparing for an Uncertain Future: : for a Greater Baltimore Region DRAFT Maximize2040 is an initiative of the Baltimore Regional Transportation Board, the metropolitan planning organization for the Baltimore region. 1 SCENARIO THINKING:

More information

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 13SN0501. Church #9509 LP. Clover Hill Magisterial District Southwest line of Midlothian Turnpike

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 13SN0501. Church #9509 LP. Clover Hill Magisterial District Southwest line of Midlothian Turnpike MG: yan amsey February 19, 2013 P pril 16, 2013 P P Time emaining: 100 days TFF QUT LYI OMMTIO 130501 hurch #9509 LP lover Hill Magisterial istrict outhwest line of Midlothian Turnpike QUT: mendment of

More information

Update: July 20, 2012

Update: July 20, 2012 Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms

More information

2015 GDOT PowerPoint. Title Page

2015 GDOT PowerPoint. Title Page Cartersville MPO Regional Travel Demand Model Update Joint Policy Committee (PC) and Technical Coordinating Committee (TCC) Meeting May 20, 1 BACKGROUND Federal legislation requires Long-Range Transportation

More information

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO.

September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO C ADDENDUM NO. Department of Public Works Transportation Division September 6, 2018 CITY OF BERKELEY SHATTUCK RECONFIGURATION AND PEDESTRIAN SAFETY PROJECT SPECIFICATION NO. 17-11090-C ADDENDUM NO. 3 Dear Bidder: The

More information

COMMITTEE OF THE WHOLE MEETING JUNE 26, 2017

COMMITTEE OF THE WHOLE MEETING JUNE 26, 2017 REPORT #ENG-2017-37 COMMITTEE OF THE WHOLE MEETING JUNE 26, 2017 INTRODUCTION OF PARKING AND TRAFFIC BY-LAWS IN THE VICINITY OF SIDEROAD 10 AND THE 11TH LINE, TOWN OF NEW TECUMSETH RECOMMENDATION That

More information

RESOLUTION OF THE GOVERNING BOARD OF THE NORTHEAST OIDO AREAWIDE COORDINATING AGENCY

RESOLUTION OF THE GOVERNING BOARD OF THE NORTHEAST OIDO AREAWIDE COORDINATING AGENCY RESOLUTION OF THE GOVERNING BOARD OF THE NORTHEAST OIDO AREAWIDE OORDINATING AGENY WHEREAS, the Northeast Ohio Areawide oordinating Agency (NOAA), the Metropolitan ning Organization (MPO) for the five

More information

Attachment #2 PPW133-07

Attachment #2 PPW133-07 Attachment #2 PPW133-07 Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements

More information

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia

Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia PROJECT OVERVIEW S.P. 6935-89 is on T.H. 169 from 0.07 miles west of CR 109 in Mt. Iron to Hoover Road in Virginia

More information

This page is intentionally left blank

This page is intentionally left blank This page is intentionally left blank This page is intentionally left blank MnDOT Metro District Fact Sheet Mpls./St. Paul District Offices: Roseville-Water's Edge (HQ), Golden Valley, Oakdale mndot.gov/metro/

More information

MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on

MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on MINUTES OF THE METROPOLITAN PLANNING ORGANIZATION MEETING HELD SEPTEMBER 24, 2014 AT 4 P.M. The Metropolitan Planning Organization met on September 24, 2014, at 4 p.m., in the Council Chambers of the Municipal

More information

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr

FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING. FM 1103 I-35 to Rodeo Dr FARM TO MARKET 1103 OPEN HOUSE PUBLIC MEETING March 29, 2016 FM 1103 FROM: I-35 TO: RODEO DR COMAL & GUADALUPE COUNTY OPEN HOUSE PUBLIC MEETING March 29, 2016 5:00 p.m. 7:00 p.m. Barbara C Jordan Intermediate

More information

Operating Standards Attachment to Development Application

Operating Standards Attachment to Development Application Planning & Development Services 2255 W Berry Ave. Littleton, CO 80120 Phone: 303-795-3748 Mon-Fri: 8am-5pm www.littletongov.org Operating Standards Attachment to Development Application 1 SKETCH PLANS

More information

Exit 61 I-90 Interchange Modification Justification Study

Exit 61 I-90 Interchange Modification Justification Study Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.

More information

Automated Machine Guidance An Emerging Technology Whose Time has Come?

Automated Machine Guidance An Emerging Technology Whose Time has Come? Lou Barrett Page 1 Automated Machine Guidance An Emerging Technology Whose Time has Come? Author: Lou Barrett Chairwoman AASHTO TIG AMG Minnesota Department of Transportation MS 688 395 John Ireland Blvd.

More information

IOWA CITY WASTEWATER TREATMENT PLANT RELOCATION PROJECT NORTH PLANT SALVAGE AND DEMOLITION PHASE CITY OF IOWA CITY FEBRUARY, 2015

IOWA CITY WASTEWATER TREATMENT PLANT RELOCATION PROJECT NORTH PLANT SALVAGE AND DEMOLITION PHASE CITY OF IOWA CITY FEBRUARY, 2015 IOWA CITY WASTEWATER TREATMENT PLANT RELOCATION PROJECT No Record Drawing Comments by Veit for this Sheet! FOR FEBRUARY, 2015 VEIT Record Drawings Demolition Project Manager: Jason Mueller Demolition Superintendent:

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins February

More information

FREMONT COUNTY. APPLICATION FOR ZONE CHANGE #2 USE DESIGNATION PLAN (Requires Subsequent Approval of ZC #2 Final Designation Plan) 1.

FREMONT COUNTY. APPLICATION FOR ZONE CHANGE #2 USE DESIGNATION PLAN (Requires Subsequent Approval of ZC #2 Final Designation Plan) 1. FREMONT COUNTY APPLICATION FOR ZONE CHANGE #2 USE DESIGNATION PLAN (Requires Subsequent Approval of ZC #2 Final Designation Plan) 1. Project Name: 2. Applicant: Address: City: State: Zip Code: Telephone

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW

More information

Memorandum 1.0 Highway Traffic Noise

Memorandum 1.0 Highway Traffic Noise Memorandum Date: September 18, 2009 To: Chris Hiniker, SEH From: Stephen B. Platisha, P.E. Re: Updated CSAH 14 Noise Analysis The purpose of this memorandum is to provide the results of the revised traffic

More information

NOW LEASING NOW LEASING DOWNTOWN VANCOUVER GRANVILLE ISLAND

NOW LEASING NOW LEASING DOWNTOWN VANCOUVER GRANVILLE ISLAND TO 25,300 SQUARE FEET OF NEW BUILD PREMISES IN THE WESTSIDE OF VANCOUVER 1296 W BROADWAY Burrard Street Burrard Bridge Granville Street Bridge DOWNTOWN VANCOUVER GRANVILLE ISLAND W 4th Avenue W 6th Avenue

More information

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN *** IMPORTANT INFORMATION ~ Please

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL Engineering Design Services for the Preliminary Engineering of Lake Nepessing/Davison/Genesee Intersection Improvements Sections 1, 2, 11 and 12 of Elba Township Lapeer County, Michigan

More information

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 09SN0164. Chesterfield County Board of Supervisors

STAFF S REQUEST ANALYSIS AND RECOMMENDATION 09SN0164. Chesterfield County Board of Supervisors pril 21, 2009 P May 27, 2009 B TFF EQUET LYI D EMMEDTI 090164 hesterfield ounty Board of upervisors Midlothian Magisterial District orth line of Midlothian Turnpike EQUET: onditional Use Planned Development

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Abstract This paper describes the follow up to a pilot project to coordinate traffic signals with light

More information

Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida

Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida Enrique Gonzalez-Velez Civil and Environmental Engineering University of South Florida Background Objective Introduction Roadway Lighting Literature Review Study Area Data Illuminance, Crash, and Roadway

More information

DATE: April 22, 2016 (CPR Details Revised & Dated April 22, 2016)

DATE: April 22, 2016 (CPR Details Revised & Dated April 22, 2016) Minnesota Department of Transportation Office of Materials & Road Research 1400 Gervais Avenue, MS 645 Maplewood, MN 55109 Memo TO: FROM: Design Engineers Maintenance Engineers Materials Engineers Resident

More information

Noise Impact Analysis. NW Bethany Boulevard Improvement Project NW Bronson Road to NW West Union Road. November Washington County.

Noise Impact Analysis. NW Bethany Boulevard Improvement Project NW Bronson Road to NW West Union Road. November Washington County. Noise Impact Analysis NW Bethany Boulevard Improvement Project NW Bronson Road to NW West Union Road Washington County November 2011 Prepared for: Washington County Department of Land Use and Transportation

More information

Moorhead / Dilworth Fixed Route Expansion Study

Moorhead / Dilworth Fixed Route Expansion Study Moorhead / Dilworth Fixed Route Expansion Study Prepared for: MATBUS Prepared by: Fargo Moorhead Metropolitan Council of Governments April 2014 Introduction With growth in southeast Moorhead and Dilworth,

More information

SARATOGA SPRINGS HOUSING AUTHORITY THURSDAY, OCTOBER 18, 2018 STONEQUIST APARTMENTS 2:30 P.M. MINUTES

SARATOGA SPRINGS HOUSING AUTHORITY THURSDAY, OCTOBER 18, 2018 STONEQUIST APARTMENTS 2:30 P.M. MINUTES SARATOGA SPRINGS HOUSING AUTHORITY THURSDAY, OCTOBER 18, 2018 STONEQUIST APARTMENTS 2:30 P.M. MINUTES PRESENT: ABSENT: ALSO PRESENT: Joanne Foresta, Chair Joy King Lu Lucas, Vice Chair Michelle Roddy Ann

More information

The Shoppes at Forney Crossings

The Shoppes at Forney Crossings F M 548 U.S. HWY 80 U.S. HWY 80 F M 688 F M 548 COOL SPRINGS F M 1641 F M 548 TROPHY BUGLE CALL PHESANT WHITE PORCH SPINAKER The Shoppes at Forney Crossings 18' 14'-8" 18' 15'-8 1 2 " 14' 7' 23'-0" 21'-0"

More information

DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3

DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3 DEVELOPMENT SERVICES SITE PLAN SUBMITTAL 2.2.3 Unified Development Code (UDC) Article 2, Applications, Procedures and Criteria provides the steps for applying the Unified Development Code standards to

More information

Update on Traffic Results and Findings

Update on Traffic Results and Findings Los Angeles County Metropolitan Transportation Authority Update on Traffic Results and Findings presented to the Corridor Advisory Committee February 16, 2017 Traffic Presentation Topics 2 Traffic Volumes

More information

DESIGN PUBLIC HEARING

DESIGN PUBLIC HEARING DESIGN PUBLIC HEARING JUNE 22, 2016 AT TOWN HALL AUDITORIUM 11 TOWN HOUSE ROAD WESTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DEMOLITION OF LEGACY TOLL PLAZAS ALONG I-90 DISTRICT 6 PLAZAS 14, 15 AND 55

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 II xhibit -40, udget Item ustification heet: 2014 rmy ate: pril 2013 ppropriation / udget ctivity / udget ub ctivity: 2034: rocurement of mmunition, rmy / 01: mmunition / 44: etworked unitions -1 ine Item

More information

Automated Machine Guidance

Automated Machine Guidance Design Manual Chapter 5 - Roadway Design 5H - Automated Machine Guidance 5H-1 Automated Machine Guidance A. Concept Automated machine guidance (AMG) for grading is a process in which grading equipment,

More information

City of Sparks. Fiscal Year 2008 Strategic Plan Progress Report

City of Sparks. Fiscal Year 2008 Strategic Plan Progress Report City of Sparks Strategic Plan Progress Report Vision & Priorities Vision Statement: To be a city which embraces the changing needs and expectations of our citizens through respect for people, preserving

More information

Chairman called regular meeting to order; Mr. Lawson led all in attendance in Prayer and pledge of allegiance.

Chairman called regular meeting to order; Mr. Lawson led all in attendance in Prayer and pledge of allegiance. The Brooks County Board of Commissioners met for its Monthly Workshop and Regular Monthly Meeting on Monday, March 5, 2012 at 5:00 p.m. in the Commissioners Meeting Room located at the Brooks County Office

More information

MINUTES MALIBU PUBLIC WORKS COMMISSION REGULAR MEETING MAY 23, 2018 MULTI-PURPOSE ROOM 3:30 F.M.

MINUTES MALIBU PUBLIC WORKS COMMISSION REGULAR MEETING MAY 23, 2018 MULTI-PURPOSE ROOM 3:30 F.M. MINUTES MALIBU PUBLIC WORKS COMMISSION REGULAR MEETING MAY 23, 2018 MULTI-PURPOSE ROOM 3:30 F.M. CALL TO ORDER ROLL CALL Chair Palmer called the meeting to order at 3:34 p.m. The following persons were

More information

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION 220 Clay Street Cedar Falls, Iowa 50613 General Information: Applications for developing a commercial, multi-family, or residential (in an overlay

More information

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation

Appendix D. Traffic Noise Analysis Report. I-94 St. Michael to Albertville Minnesota Department of Transportation Appendix D Traffic Noise Analysis Report I-94 St. Michael to Albertville Minnesota Department of Transportation Traffic Noise Analysis Report I-94 St. Michael to Albertville Project SP 8680-172 Report

More information

TRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey

TRAFFIC IMPACT STUDY. PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey TRAFFIC IMPACT STUDY PROPOSED AMENDED MASTER PLAN AMENDED - H - ZONE Village of Ridgewood Bergen County, New Jersey Prepared For: The Valley Hospital 223 North Van Dien Avenue Ridgewood, New Jersey 07450

More information

HEARD COUNTY BOARD OF COMMISSIONERS MEETING MARCH 24, :30 P.M. The Heard County Board of Commissioners held a Commissioners Meeting on

HEARD COUNTY BOARD OF COMMISSIONERS MEETING MARCH 24, :30 P.M. The Heard County Board of Commissioners held a Commissioners Meeting on HEARD COUNTY BOARD OF COMMISSIONERS MEETING MARCH 24, 2009 6:30 P.M. The Heard County Board of Commissioners held a Commissioners Meeting on March 24, 2009 at 6:30 p.m. in the courtroom of the Heard County

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

GLS REGION V PLANNING & DEVELOPMENT COMMISSION GENESEE COUNTY ADMINISTRATION BUILDING 1101 BEACH STREET, ROOM 223. Tuesday, July 28, :00 P.M.

GLS REGION V PLANNING & DEVELOPMENT COMMISSION GENESEE COUNTY ADMINISTRATION BUILDING 1101 BEACH STREET, ROOM 223. Tuesday, July 28, :00 P.M. Genesee-Lapeer-Shiawassee Region V Planning and Development Commission ROOM 223 1101 BEACH STREET FLINT, MICHIGAN 48502-1470 TELEPHONE (810) 257-3010 FAX (810) 257-3185 DEREK BRADSHAW FISCAL OFFICER GLS

More information

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016. GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 23, 2016 Mr. Nathaniel Strosberg, Town Planner

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

PRIME COMMERCIAL/RETAIL LAND FOR SALE NORTH JEFFERSON BUSINESS PARK SEQ FRENCH VALLEY PKWY & JEFFERSON AVE TEMECULA, CA

PRIME COMMERCIAL/RETAIL LAND FOR SALE NORTH JEFFERSON BUSINESS PARK SEQ FRENCH VALLEY PKWY & JEFFERSON AVE TEMECULA, CA French Valley Pkwy PP HIGHIGH: ough Graded Vacant Parcels JFF V B V MI V I-1 Freeway Visibility djacent to existing southbound French Valley Parkway oned Uptown emecula pecific Plan (P-14) - Uptown ports

More information

Kevin McShane Transport Planner The Studio 555 Lisburn Road BELFAST BT9 7GQ. Tel /

Kevin McShane Transport Planner The Studio 555 Lisburn Road BELFAST BT9 7GQ. Tel / Kevin McShane Transport Planner The Studio 555 Lisburn Road BELFAST BT9 7GQ Tel 00442895 609798 / 00447872 386516 email mcshanek@btinternet.com Our Ref 13-106 20 January 2015 Ms Nicole Thompson DoE Strategic

More information

Welcome Public Open House

Welcome Public Open House Peachland Study Welcome Public Open House Preliminary Review of Alternate & Existing Route Options Peachland Study Open House Purpose & Objectives 1. Present possible options for meeting the current and

More information

Campus Circulation Improvements. Thursday, March 17, 2016 Pre-Proposal Conference

Campus Circulation Improvements. Thursday, March 17, 2016 Pre-Proposal Conference Campus Circulation Improvements Thursday, March 17, 2016 Pre-Proposal Conference Meeting Agenda Part I: General, Part II: Submittal, Part III: Project I. General Welcome Introductions Questions: efrere@uncc.edu

More information

VIRTUAL TOURS, EVENTS CALENDAR, AND ADDITIONAL INFO AT HARTMANARENA.COM

VIRTUAL TOURS, EVENTS CALENDAR, AND ADDITIONAL INFO AT HARTMANARENA.COM H PK VUL U, V LD, D DDL F HM.M hartmanarena.com 85. HM DV PK Y, K 6747 LPK WLD FBLL W KD H BLK M UK H U HM & FD L JK KH WLG HL PF Floor Dimensions eiling Height eating apacity 200 x 85 /7,000 sq. feet

More information

PINELLAS SUNCOAST TRANSIT AUTHORITY 3201 SCHERER DRIVE, ST. PETERSBURG, FL FAX

PINELLAS SUNCOAST TRANSIT AUTHORITY 3201 SCHERER DRIVE, ST. PETERSBURG, FL FAX PINELLAS SUNCOAST TRANSIT AUTHORITY 3201 SCHERER DRIVE, ST. PETERSBURG, FL 33716 WWW.PSTA.NET 727.540.1800 FAX 727.540.1913 BOARD MEETING MINUTES MAY 24, 2017 Chairperson Rice called the May 24, 2017 Board

More information

Parallel and Perpendicular Lines on the Coordinate Plane

Parallel and Perpendicular Lines on the Coordinate Plane Did You Find a Parking Space? Parallel and Perpendicular Lines on the Coordinate Plane 1.5 Learning Goals Key Term In this lesson, you will: Determine whether lines are parallel. Identify and write the

More information

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE) MUST be qualified under Minnesota Department of Transportation Prequalification Program - Work Type 15.1 Subsurface Utility Engineering The first section, Work Type Definition, provides a detailed explanation

More information

SCOPE OF WORK AND DELIVERABLES T.H.

SCOPE OF WORK AND DELIVERABLES T.H. Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. s 27, 73 and 289 in Moose Lake S.P. 8821-200 PROJECT OVERVIEW The project is located in Moose Lake, Carlton County s on TH 27, 73, and 289. TH 27 RP 245.044

More information

Preemption Versus Priority

Preemption Versus Priority Port 1 MMU Preemption Versus Priority BIU Why Interrupt a Signalized Intersection There are several reasons to interrupt a signalized intersection from the normal operation of assigning right-of-way. Some

More information

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E.

EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM. James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. EVALUATING AN ADAPTIVE SIGNAL CONTROL SYSTEM IN GRESHAM James M. Peters, P.E., P.T.O.E., Jay McCoy, P.E., Robert Bertini, Ph.D., P.E. ABSTRACT Cities and Counties are faced with increasing traffic congestion

More information

Jointing Rural Intersections

Jointing Rural Intersections Design Manual Chapter 5 - Roadway Design 5G - PCC Pavement Joints 5G-4 Jointing Rural Intersections This section describes how to joint rural intersections by following the guidelines outlined in Iowa

More information

DIVISION PAVEMENT MARKINGS AND MARKERS

DIVISION PAVEMENT MARKINGS AND MARKERS DIVISION 61 66 PAVEMENT MARKINGS AND MARKERS 66.01 SCOPE: The purpose of these specifications is to describe the minimum requirements of the City of Chesapeake for pavement markings and shall be in addition

More information

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B

Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B Move In Directions for First-year and Transfer Students Douglass Campus Gibbons Residence Hall A & B General Instructions: Print directions and name of assigned building. Place the name of your residence

More information

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere

Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Detail Design For Pavement Rehabilitation on Trunk Highway 14 From Tracy to Revere Section 1 Introduction and Intersection Information State Project (SP) 6401-37 on MN Highway 14 SP 6401-37 is a Bituminous

More information

Improving the Safety and Efficiency of Roadway Maintenance Phase II: Developing a Vision Guidance System for the Robotic Roadway Message Painter

Improving the Safety and Efficiency of Roadway Maintenance Phase II: Developing a Vision Guidance System for the Robotic Roadway Message Painter Improving the Safety and Efficiency of Roadway Maintenance Phase II: Developing a Vision Guidance System for the Robotic Roadway Message Painter Final Report Prepared by: Ryan G. Rosandich Department of

More information

DRAFT ORDINANCE NO. An ordinance amending Section of the Los Angeles Municipal Code by amending the zoning map.

DRAFT ORDINANCE NO. An ordinance amending Section of the Los Angeles Municipal Code by amending the zoning map. F I. n ordinance amending ection 12.04 of the os ngeles unicipal ode by amending the zoning map. P F I F I F: I 1. ection 12.04 of the os ngeles unicipal ode is hereby amended by changing the zone classifications

More information

CTA Blue Line Forest Park Branch Feasibility/Vision Study

CTA Blue Line Forest Park Branch Feasibility/Vision Study CTA Blue Line Forest Park Branch Feasibility/Vision Study Overview of the Blue Line Feasibility / Vision Study!! PURPOSE! Determine long-term vision! Coordinate transit & highway improvements!! PROCESS!

More information

CHAPTER 28 ACTIVATING/DEACTIVATING A SIGNAL

CHAPTER 28 ACTIVATING/DEACTIVATING A SIGNAL CHAPTER 28 ACTIVATING/DEACTIVATING A SIGNAL ACTIVATING/DEACTIVATING A SIGNAL Activating a traffic control signal requires careful planning and coordination between the project engineer, the contractor

More information

Updated: April 7, 2016

Updated: April 7, 2016 Updated: April 7, 2016 Hwy 36 to Lexington Ave. Add a lane in each direction Recommend a MNPASS Lane Several spot improvements to roadway included Concrete pavement Noise walls will be evaluated Replace

More information

DATE: May 16, C.agd

DATE: May 16, C.agd DATE: May 16, 2016 05169C.agd TO: FROM: Honorable Mayor Members of the City Council Tim Loose, P.E., City Engineer Mike Waltman, P.E., Asst. City Engineer AGENDA ITEM: 9C Wellhead Protection ******************************************************************************

More information

Memorandum. Dear Ms. Allen,

Memorandum. Dear Ms. Allen, RhoadesPlanningGroup Memorandum To: Shannon Allen, AICP, Principal Planner From: Rhoades Planning Group Date: June 10, 2015 Re: Response to Incomplete Letter, 1900 Fourth Street Dear Ms. Allen, This letter

More information

TABLE OF CONTENTS 1200 PLAN PREPARATION

TABLE OF CONTENTS 1200 PLAN PREPARATION 1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4

More information

Grading, Erosion and Sediment Control (GESC) Checklist

Grading, Erosion and Sediment Control (GESC) Checklist Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Planner of the Day 303-660-1393 Grading, Erosion and Sediment Control (GESC) Checklist A complete Grading, Erosion and Sediment

More information

Model Deployment Overview. Debby Bezzina Senior Program Manager University of Michigan Transportation Research Institute

Model Deployment Overview. Debby Bezzina Senior Program Manager University of Michigan Transportation Research Institute Model Deployment Overview Debby Bezzina Senior Program Manager University of Michigan Transportation Research Institute Test Conductor Team 2 3 Connected Vehicle Technology 4 Safety Pilot Model Deployment

More information

Road signs Specifications

Road signs Specifications AS 1743:2018 AS 1743:2018 Road signs Specifications This Australian Standard was prepared by Committee MS-012, Road Signs and Traffic Signals. It was approved on behalf of the Council of Standards Australia

More information

Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc.

Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc. HIGHWAY PROJECT EXPERIENCE Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc. Alpha provided survey services to prepare a base plan of an approximately 2900

More information

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW

Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Article 4 PROCEDURES for PLOT PLAN and SITE PLAN REVIEW Section 4.01 Purpose It is the intent of this Article to specify standards, application and data requirements, and the review process which shall

More information

CALL TO ARTISTS DOWNTOWN SYLVA MURAL PROJECT SYLVA, NORTH CAROLINA

CALL TO ARTISTS DOWNTOWN SYLVA MURAL PROJECT SYLVA, NORTH CAROLINA CALL TO ARTISTS DOWNTOWN SYLVA MURAL PROJECT SYLVA, NORTH CAROLINA The Town of Sylva and the Sylva Public Art Committee invite artists or artist teams to submit qualifications for an artist to develop

More information

Stage 2a Examination: Policy SWDP 45 Directions for Growth Outside the City Administrative Boundary

Stage 2a Examination: Policy SWDP 45 Directions for Growth Outside the City Administrative Boundary South Worcestershire Development Plan Stage 2a Examination: Policy SWDP 45 Directions for Growth Outside the City Administrative Boundary 1.0 Environment Agency (EA) 1.1 EA comments: The EA want the footnote,

More information

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801 2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax

More information

THE SCHOOL BUS. Figure 1

THE SCHOOL BUS. Figure 1 THE SCHOOL BUS Federal Motor Vehicle Safety Standards (FMVSS) 571.111 Standard 111 provides the requirements for rear view mirror systems for road vehicles, including the school bus in the US. The Standards

More information

BOROUGH OF UPPER SADDLE RIVER PLANNING BOARD MEETING MINUTES THURSDAY, SEPTEMBER 28, 2017

BOROUGH OF UPPER SADDLE RIVER PLANNING BOARD MEETING MINUTES THURSDAY, SEPTEMBER 28, 2017 BOROUGH OF UPPER SADDLE RIVER PLANNING BOARD MEETING MINUTES THURSDAY, SEPTEMBER 28, 2017 Mr. Virgona called the meeting to order at 8:05 p.m. The following statement was read: Pursuant to The Open Public

More information

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County

Using Multimodal Performance Measures to Prioritize Improvements on US 101 in San Luis Obispo County Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 4-24-2015 Using Multimodal Performance Measures to Prioritize Improvements on US 101

More information

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site

Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation web site CCH ioneer anor Skilled Nursing Facility Questions June, 0 A-Wyoming Can you please issue the most recent Soils Report as prepared by Strata? Updated Soils Report to be posted to Christenson Corporation

More information

Locate Request Information

Locate Request Information Locate Request Information NOTE: DO NOT USE any apostrophes ( )or quotation marks ( ) in Web Ticket Entry. Doing so may hamper the transmission of tickets to the utilities and locators. Limit per Ticket

More information

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013

Legislative Joint Transportation Committee Meeting. Arkansas Convention Center Texarkana Thursday, November 21, 2013 Arkansas State Highway and Transportation Department Legislative Joint Transportation Committee Meeting Arkansas Convention Center Texarkana Thursday, November 21, 2013 Recent Voter Approved Programs November

More information

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008

DE 8 Concept Plan and Operations Study. City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 DE 8 Concept Plan and Operations Study City of Dover Safety Advisory and Transportation Committee Meeting December 1, 2008 Purpose Develop a concept plan describing the aesthetic qualities of the corridor

More information

BOARD OF SELECTMEN REGULAR SESSION MEETING MINUTES Monday, August 3, :00 PM Veterans Memorial Bldg. Room Main Street, Millis, MA 02054

BOARD OF SELECTMEN REGULAR SESSION MEETING MINUTES Monday, August 3, :00 PM Veterans Memorial Bldg. Room Main Street, Millis, MA 02054 BOARD OF SELECTMEN REGULAR SESSION MEETING MINUTES Monday, August 3, 2015 7:00 PM Veterans Memorial Bldg. Room 229 900 Main Street, Millis, MA 02054 CALL TO ORDER: Sel. Smith called the meeting to order

More information

City of Surrey Adaptive Signal Control Pilot Project

City of Surrey Adaptive Signal Control Pilot Project City of Surrey Adaptive Signal Control Pilot Project ITS Canada Annual Conference and General Meeting May 29 th, 2013 1 2 ASCT Pilot Project Background ASCT Pilot Project Background 25 Major Traffic Corridors

More information

CONCEPT REVIEW GUIDELINES

CONCEPT REVIEW GUIDELINES Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES

More information

Design of Roundabouts using Corridor Models (Part 1 of 2)

Design of Roundabouts using Corridor Models (Part 1 of 2) AUTODESK CIVIL3D Design of Roundabouts using Corridor Models (Part 1 of 2) Dynamic vertical modeling By Jack Strongitharm Civil 3D Technical Sales Manager UK and Ireland jack.strongitharm@autodesk.com

More information

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level) INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication

More information