1 Technical Recommendation M2 Version 1.3 Serial Numbering Of Smart Type Electricity Meters From January 2013 Version Status Date of Issue Reason for change Number 1.0 Superseded September 2012 Issued 1.1 Superseded August 2014 Addition of barcode requirement to section Superseded July 2015 Addition of Kaifa Technology UK to section 3 manufacturer codes 1.3 Issued Addition of Holley and inclusion of Honeywell alongside Elster (ABB) in section 3 manufacturer codes - 1 -

2 1. SCOPE This Recommendation applies to smart type electricity meters procured in the UK as from 1st Jan Such meters will be approved as conforming with the requirements of the Measuring Instruments Directive, as indicated in SI 2006 No , and will be so-called smart meters. It is intended (i) (ii) for the guidance of parties responsible for specifying the serial numbers of meters which they procure, to ensure so far a possible that each meter installed has a unique number; to assist parties in the identification of certain meter characteristics, particularly the original procurer (for instance to aid tracing of MID conformity records). This document complements Technical Recommendation M1 which remains available for conventional meters and endures for Key Operated prepayment meters operating under the Telexus system. 2. BASIC NUMBERING SYSTEM A meter serial number shall be built up of parts in the following order a) Two figures to indicate the year of manufacture b) A code letter signifying the manufacturer c) A serial number sequence of seven digits, beginning with for each year for each manufacturer An example may be thus: 13K The allocated code letters are given in Section 3. The letters and numbers shall be indelibly marked. In addition to the printed text, the serial number shall also be presented as a barcode. This should be located adjacent to the text version, be of 1D form and conform with Code 128. The sequence of serial numbers shall be allocated by the manufacturer. Where manufacturers wish to continue their own serial number systems in addition, this shall be placed inconspicuously or on interior parts of the meter. 1 The Measuring Instruments (Active Electrical Energy Meters) Regulations

3 3. MANUFACTURER CODES Company CEWE EDMI Siemens Metering Ltd (also FML/Ferranti) EM-Lite Ltd Horstmann Timers and Controls Iskraemeco (UK) Kaifa Technology UK Ltd Elster (ABB)/Honeywell Landis + Gyr (Ampy) General Electric Secure Ltd (Polymeters Response International Ltd) Sagem Itron (Schlumberger/Actaris) Holley ID C E F G H I J K L M P R S Y Remaining IDs (letters not listed in the above table) as at 1st January 2013, are available for issue by the UK Metering Forum Secretary (Gemserv Ltd). 4. USE OF THE IDENTIFICATION CODES In the MRA Data Transfer Catalogue, data item J0004 is specified as having format CHAR(10) but there are no specifications as to the format of the data item. This recommendation provides a format which ensures that serial numbers are unique. 5. MANUFACTURER REQUIREMENTS Meter manufacturers have a crucial role in ensuring the correct operation of this numbering system, with three enduring obligations: d) Manufacturers shall guarantee that no serial number using their code will be duplicated e) Manufacturers shall retain a record of the party to which a serial number range was first sold. f) Manufacturers shall retain metrology/conformity records for their meters Records for (b) and (c) should be maintained for no less than the time for which the product remains a Relevant Instrument (as per SI 1679); to ensure long term availability, ESCROW arrangements may be required

4 6. MAINTENANCE OF THIS DOCUMENT This document will be maintained by the UK Metering Forum through its Secretariat provided by Gemserv Ltd. Applications for the allocation of new codes or requests for changes to existing codes should be made in writing to Gemserv Ltd 8 Fenchurch Place London EC3M 4AJ ukmf@gemserv.com Phone

5 Appendix 1 HISTORICAL PERSPECTIVE TO THIS RECOMMENDATION A2.1 Background With a view to achieving a greater degree of standardisation for serial numbering of meters within the Electricity Industry, Engineering Recommendation M10 was issued by the Electricity Council in This made various recommendations concerning The information which could be incorporated in a meter serial number The symbols which could be used to denote the information The method of presenting the information in one composite number Not all Area Electricity Boards (the owners and providers of meters at that time) implemented the proposals of the Recommendation, apart from the fact that Boards had different computer systems, not all of which were capable of accepting one common code. Modified coding systems were therefore used albeit that the one proposed in the Recommendation was accepted by the majority. Subsequently revisions of the Recommendation were undertaken whenever necessary to bring information up to date to reflect such things as changes of manufacturer and owners. The last such revision ER M10/4 - was in 1991 to reflect changes in the structure of the Electricity Industry resulting from the Electricity Act 1989, arising from which the document was taken over by the Electricity Association, to be maintained by the (then) EA Metering Forum as Technical Recommendation M1. With the disbandment of the EA in late 2003, the document was adopted by the newly formed UK Metering Forum. Since that date there have been further changes in its structure to reflect changes as regards meter manufacturers, owners and agents in the competitive Electricity Market and the associated competitive Metering Market. However, due to an increase in the number of MAPs over recent years a weakness became exposed in M1 in that only a very limited number of MAP ID characters now remain for allocation, together with a numerical limitation on the annual meter purchases that can be accommodated. Conscious of the potentially large influx of new MAPs created by the anticipated introduction of Smart Metering, together with the probability of greatly increased purchase and fit rates, the UKMF decided to review potential future serial numbering requirements for electricity meters, updating or revising M1 as necessary; accordingly, UKMF has discussed the future of TR M1 at length over recent months. In the process, UKMF identified that the existing system is utilized in a wide variety of ways by users, for purposes somewhat beyond the basic requirement for serial numbering. It went on to examine the ultimate need for these variations, before looking at potential future options to address the issues created by the introduction of Smart metering. These options ranged from relatively minor changes to the existing system through to a wholesale new system. Finally one new system was chosen and proposed (as in the body of this Recommendation). This was agreed following extensive consultation with all affected parties

6 A2.2 Legal Requirements Historically there were no legal requirements to mark a meter with a serial number. However, product standards against which meters are type approved under the direction of the UK s Legal Metrology Authority - currently the National Measurement Office in the case of electricity meters - require certain markings which include a serial number [format not specified] and year of manufacture. The Measuring Instruments Directive (MID) came into force in October 2006 and was implemented through the UK legislation previously referenced. Essential Requirement 9.1 of Annex 1 to the MID requires a meter to be inscribed with certain information which includes the manufacturer s mark or name and an identity marking [type or format not specified]. Marking to this Recommendation is deemed to comply with these requirements. A2.3 Commercial Requirements Prior to the introduction of arrangements for competition in the supply of electricity in 1988, provision of meters for customers taking below 100 kw was a franchise of the Public Electricity Supplier (PES) licensed for a particular geographic area. Each PES had its metering operation and its own system of serial numbers to identify meters, most using the ER M10/4 or its principles. In this scenario the chances of two meters having the same serial number were effectively non-existent. In 2000 the PESs were split into Supplier and Distribution Network Operator (DNO). In the main PES meter assets were transferred to the respective DNO although one PES sold its metering operation with its assets. Suppliers are now free to contract with a metering service provider other than the incumbent ex-pes franchisee which means that, in any geographic area, there may be several owners of meters. In this scenario it is important to ensure that meter serial numbers allocated are unique and no two meters have an identical reference. Trading in the competitive market involves a unique number relating to each supply point the Meter Point Administration Number associated with standardised message exchanges through a Data Transfer Network. These include provision for a data item J0004 for a meter serial number of 10 characters, the format of which is not specified (see previous reference to the MRA and WP76). During work through Elexon to produce a Code of Practice 9 for metering of small scale embedded generation, there was discussion about specifying the format of such a serial number to increase the information contained in it, particularly as it was known that there had been relevant work by European groups considering possibilities of pan-european electricity trading to standardise on a meter reference system across Europe which would have up to 16 characters. In the event the European work was not universally adopted and the Elexon Code did not specify any enhanced format

P292 Amending Supplier & Meter Operator Agent responsibilities for smart Meter Technical Details

P292 Amending Supplier & Meter Operator Agent responsibilities for smart Meter Technical Details Stage 01: What stage is this document in the process? Amending Supplier & Meter Operator Agent responsibilities for smart Meter Technical Details This Modification Proposal seeks to enable changes to Supplier

More information

Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate)

Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate) API Manual of Petroleum Measurement Standards TR 2570 EI Hydrocarbon Management HM 56 Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate) First Edition, October 2010

More information

DISTRIBUTION DESIGN CATALOGUE

DISTRIBUTION DESIGN CATALOGUE DISTRIBUTION DESIGN CATALOGUE Section 15 LM Low Voltage Metering HPC-1DC-07-0015-2014 For application to Horizon Power Electricity Distribution Networks Document Control Author Name: Paul Savig Position:

More information

Engineering Recommendation M30 Issue Standard Electricity Network Operator Electricity Smart Meter Configurations

Engineering Recommendation M30 Issue Standard Electricity Network Operator Electricity Smart Meter Configurations PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Recommendation M30 Standard Electricity Network Operator Electricity Smart Meter s www.energynetworks.org PUBLISHING AND

More information

(Text with EEA relevance)

(Text with EEA relevance) L 149/16 14.6.2018 COMMISSION IMPLEMTING REGULATION (EU) 2018/868 of 13 June 2018 amending Regulation (EU) No 1301/2014 and Regulation (EU) No 1302/2014 as regards provisions on energy measuring system

More information

IMPLEMENTING AGREEMENT NON-NUCLEAR ENERGY SCIENTIFIC AND TECHNOLOGICAL CO-OPERATION

IMPLEMENTING AGREEMENT NON-NUCLEAR ENERGY SCIENTIFIC AND TECHNOLOGICAL CO-OPERATION IMPLEMENTING AGREEMENT between the Department of Energy of the United States of America and the European Commission for NON-NUCLEAR ENERGY SCIENTIFIC AND TECHNOLOGICAL CO-OPERATION In accordance with the

More information

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of

More information

Comments from CEN CENELEC on COM(2010) 245 of 19 May 2010 on "A Digital Agenda for Europe"

Comments from CEN CENELEC on COM(2010) 245 of 19 May 2010 on A Digital Agenda for Europe Comments from CEN CENELEC on COM(2010) 245 of 19 May 2010 on "A Digital Agenda for Europe" Agreed by CEN and CENELEC Members following a written consultation process 1 European standardization to support

More information

MT174 Three-phase Electricity Meter Technical Specification

MT174 Three-phase Electricity Meter Technical Specification MT174 Three-phase Electricity Meter Technical Specification Author: David Spalding Revision: 0.2 Release date: 23 October 2012 Copyright Notice Copyright 2012 Iskraemeco UK Ltd All information in the document

More information

LAW ON TECHNOLOGY TRANSFER 1998

LAW ON TECHNOLOGY TRANSFER 1998 LAW ON TECHNOLOGY TRANSFER 1998 LAW ON TECHNOLOGY TRANSFER May 7, 1998 Ulaanbaatar city CHAPTER ONE COMMON PROVISIONS Article 1. Purpose of the law The purpose of this law is to regulate relationships

More information

EDS LV ELECTRICAL SERVICE DRAWINGS

EDS LV ELECTRICAL SERVICE DRAWINGS Document Number: EDS 08-2110 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-2110 LV ELECTRICAL SERVICE DRAWINGS EPN, LPN, SPN This standard details the drawings for service positions and connection

More information

ISO INTERNATIONAL STANDARD. Nomenclature Specification for a nomenclature system for medical devices for the purpose of regulatory data exchange

ISO INTERNATIONAL STANDARD. Nomenclature Specification for a nomenclature system for medical devices for the purpose of regulatory data exchange INTERNATIONAL STANDARD ISO 15225 First edition 2000-09-15 Nomenclature Specification for a nomenclature system for medical devices for the purpose of regulatory data exchange Nomenclature Spécifications

More information

In practice, the question is frequently raised of what legislation applies to clamping devices that are intended to be used on machines.

In practice, the question is frequently raised of what legislation applies to clamping devices that are intended to be used on machines. VDMA Position Paper (Version from 22 nd June, 2017) Machine tools and manufacturing systems Precision Tools Clamping devices for use on machines This position paper is intended as information on how clamping

More information

Identification and recording of 'hot' sites - joint procedure for Electricity Industry and Communications Network Providers

Identification and recording of 'hot' sites - joint procedure for Electricity Industry and Communications Network Providers PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Recommendation S36 Identification and recording of 'hot' sites - joint procedure for Electricity Industry and Communications

More information

RADIO SPECTRUM COMMITTEE

RADIO SPECTRUM COMMITTEE EUROPEAN COMMISSION Information Society and Media Directorate-General Electronic Communications Radio Spectrum Policy Brussels, 7 June 2007 DG INFSO/B4 RSCOM07-04 Final PUBLIC DOCUMENT RADIO SPECTRUM COMMITTEE

More information

Demand Side Response Methodology (DSR) for Use after a Gas Deficit Warning (GDW) Background. Draft Business Rules

Demand Side Response Methodology (DSR) for Use after a Gas Deficit Warning (GDW) Background. Draft Business Rules Demand Side Response Methodology (DSR) for Use after a Gas Deficit Warning (GDW) Draft Business Rules Version 0.1 Following the broad consensus of Workgroup 0504 meeting 3 (WG3), held on the 10 September

More information

Fact Sheet IP specificities in research for the benefit of SMEs

Fact Sheet IP specificities in research for the benefit of SMEs European IPR Helpdesk Fact Sheet IP specificities in research for the benefit of SMEs June 2015 1 Introduction... 1 1. Actions for the benefit of SMEs... 2 1.1 Research for SMEs... 2 1.2 Research for SME-Associations...

More information

Wind. Farms. Purpose. recording Offshore. wind farms. the Transmission. the flows of voltages. the onshore. measuree and record. Agents.

Wind. Farms. Purpose. recording Offshore. wind farms. the Transmission. the flows of voltages. the onshore. measuree and record. Agents. Guidance Settlement Metering for Offshore Purpose Wind Farms This guidance note clarifies the Balancing and Settlementt Code (BSC) requirements for measuring and recording flows of electricity for Settlement

More information

Statement on the Authorisation of Short Range Devices in 870 to 876 MHz and 915 to 921 MHz

Statement on the Authorisation of Short Range Devices in 870 to 876 MHz and 915 to 921 MHz Statement on the Authorisation of Short Range Devices in 870 to 876 MHz and 915 to 921 MHz Statement Publication date: 02 April 2014 Contents Section Page 1 Summary 2 2 Introduction 3 3 Review of Responses

More information

ElectraLink s response to the ENA Open Networks Project Consultation on Phase 2 Work Programme.

ElectraLink s response to the ENA Open Networks Project Consultation on Phase 2 Work Programme. . 3rd Floor Northumberland House 303-306 High Holborn London WC1V 7JZ Tel: 0207 432 3000 www.electralink.co.uk ElectraLink s response to the ENA Open Networks Project Consultation on Phase 2 Work Programme.

More information

Intimate Communications Hub Interface Specification Report to Secretary of State

Intimate Communications Hub Interface Specification Report to Secretary of State Intimate Communications Hub Interface Specification Report to Secretary of State DCC V1.0 28/02/14 Page 1 of 14 Executive Summary 1. DCC is required in accordance with the terms of its Licence to produce,

More information

(ECC/DEC/(07)04) (2007/98/EC)

(ECC/DEC/(07)04) (2007/98/EC) ELECTRONIC COMMUNICATIONS COMMITTEE ECC Decision of 21 December 2007 on free circulation and use of mobile satellite terminals operating in the Mobile-Satellite Service allocations in the frequency range

More information

Guide on the General and Administrative Aspects of the Voluntary System of Modular Evaluation of Measuring instruments

Guide on the General and Administrative Aspects of the Voluntary System of Modular Evaluation of Measuring instruments WELMEC 8.8, 2017 Guide on the General and Administrative Aspects of the Voluntary System of Modular Evaluation of Measuring instruments For information: The amendments in this guide (red) are available

More information

ISO Transition Update Question and Answers

ISO Transition Update Question and Answers ISO 19650 Transition Update Question and nswers In December 2018 the first two international standards were published by the International Organization for Standardization (ISO) aimed at Building Information

More information

Joint ILAC CIPM Communication regarding the. Accreditation of Calibration and Measurement Services. of National Metrology Institutes.

Joint ILAC CIPM Communication regarding the. Accreditation of Calibration and Measurement Services. of National Metrology Institutes. Joint ILAC CIPM Communication regarding the Accreditation of Calibration and Measurement Services of National Metrology Institutes 7 March 2012 Authorship This document was prepared by the International

More information

South African Distribution Code

South African Distribution Code South African Distribution Code Metering Code Version 6.0 July 2014 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact: Mr.

More information

AIA Continuing Education

AIA Continuing Education AIA Continuing Education Hall & Company is a Registered Provider with the American Institute of Architects Continuing Education Systems. Credit earned based on the completion of this program will be reported

More information

EUROPEAN ETS TELECOMMUNICATION July 1997 STANDARD

EUROPEAN ETS TELECOMMUNICATION July 1997 STANDARD EUROPEAN ETS 300 719-2 TELECOMMUNICATION July 1997 STANDARD Source: ETSI TC-RES Reference: DE/RES-04005-2 ICS: 33.020 Key words: Paging, private, radio Radio Equipment and Systems (RES); Private wide area

More information

Overview of Metering Assurance in the Capacity Market

Overview of Metering Assurance in the Capacity Market Public Overview of Metering Assurance in the Capacity Market 21 February 2017 Iain Nicoll EMRS Tushar Singh EMR Delivery Body Joy Nnamani EMRS Matthew Johnson ESC What we will cover today? Topic Roles

More information

Consequential BSC changes resulting from the Smart Programme

Consequential BSC changes resulting from the Smart Programme 139/13 Consequential BSC changes resulting from the Smart Programme Meeting Name Supplier Volume Allocation Group Meeting Date 4 September 2012 Purpose of paper Summary For Information This paper gives

More information

AS This is a free 6 page sample. Access the full version online. Australian Standard GAUGING OF METRIC SCREW THREADS

AS This is a free 6 page sample. Access the full version online. Australian Standard GAUGING OF METRIC SCREW THREADS AS 1014 1986 Australian Standard GAUGING OF METRIC SCREW THREADS This Australian standard was prepared by Committee ME/28, Screw Threads. It was approved on behalf of the Council of the Standards Association

More information

NZFSA Policy on Food Safety Equivalence:

NZFSA Policy on Food Safety Equivalence: NZFSA Policy on Food Safety Equivalence: A Background Paper June 2010 ISBN 978-0-478-33725-9 (Online) IMPORTANT DISCLAIMER Every effort has been made to ensure the information in this report is accurate.

More information

Mr Hans Hoogervorst International Accounting Standards Board 1 st Floor 30 Cannon Street London EC4M 6XH. MV/288 Mark Vaessen.

Mr Hans Hoogervorst International Accounting Standards Board 1 st Floor 30 Cannon Street London EC4M 6XH. MV/288 Mark Vaessen. Tel +44 (0)20 7694 8871 15 Canada Square mark.vaessen@kpmgifrg.com London E14 5GL United Kingdom Mr Hans Hoogervorst International Accounting Standards Board 1 st Floor 30 Cannon Street London EC4M 6XH

More information

Working Party 5D. Radiocommunication Study Groups 参考資料 2

Working Party 5D. Radiocommunication Study Groups 参考資料 2 参考資料 2 Radiocommunication Study Groups Source: Document 5D/TEMP/357(Rev.1) Document IMT-ADV/24-E 27 July 2010 English only Working Party 5D PROCESS AND THE USE OF GLOBAL CORE SPECIFICATION (GCS), REFERENCES

More information

Pan-Canadian Trust Framework Overview

Pan-Canadian Trust Framework Overview Pan-Canadian Trust Framework Overview A collaborative approach to developing a Pan- Canadian Trust Framework Authors: DIACC Trust Framework Expert Committee August 2016 Abstract: The purpose of this document

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 4.12.2010 Official Journal of the European Union L 319/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 9 November 2010 on modules for the procedures for assessment of conformity, suitability

More information

Consultation on Proposed National Rollout of Electricity and Gas Smart Metering

Consultation on Proposed National Rollout of Electricity and Gas Smart Metering Consultation on Proposed National Rollout of Electricity and Gas Smart Metering RESPONSE FROM: Elster Metering Ltd RESPONSE SUBMISSION DATE: 12 th December 2011 DOCUMENT TYPE: Consultation Paper REFERENCE:

More information

Alternatives to Ex Ante Disclosure

Alternatives to Ex Ante Disclosure Alternatives to Ex Ante Disclosure Presented by Michael A. Lindsay Partner, DORSEY & WHITNEY LLP ANSI Legal Issues Forum: Patented Technology in Standards October 13, 2011 1 Overview Policy for ex ante

More information

EXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1

EXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1 EXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1 Medina Jordan & Howard Jeffrey Skanska ABSTRACT The benefits of BIM (Building Information Modeling) in design, construction and facilities

More information

1 st MEETING OF THE IHO COUNCIL

1 st MEETING OF THE IHO COUNCIL C1-3.1 1 st MEETING OF THE IHO COUNCIL Monaco, 17-19 October 2017 REPORT OF THE IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE C1-3.1 - P a g e 3 REPORT OF THE HYDROGRAPHIC STANDARDS AND SERVICES COMMITTEE

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 62287-1 First edition 2006-03 Maritime navigation and radiocommunication equipment and systems Class B shipborne equipment of the automatic identification system (AIS) Part 1:

More information

Engineering Recommendation G22

Engineering Recommendation G22 PRODUCED BY THE ENGINEERING DIRECTORATE OF THE ENERGY NETWORKS ASSOCIATION Engineering Recommendation G22 Issue 3 Mains Signalling Systems Operating on the Low-Voltage Supply in the Frequency Range 3kHz

More information

Absolute Block. Uncontrolled When Printed Document to be part superseded by GKRT0055 Iss 1 and GKRT0077 Iss 1 (published on 07/09/2013)

Absolute Block. Uncontrolled When Printed Document to be part superseded by GKRT0055 Iss 1 and GKRT0077 Iss 1 (published on 07/09/2013) Signatures removed from electronic version Submitted by... Richard Genner Nominated Responsible Manager Approved by... Philip Wiltshire Chairman, Train Control & Communications Subject Committee Approved

More information

Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences

Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences Statement Publication date: 06 January 2011 Contents Section Page 1 Executive summary 1 2 Introduction 2 3 Assessment of

More information

SMB/5835/SBP. TC13 Scope

SMB/5835/SBP. TC13 Scope SMB/5835/SBP STRATEGIC BUSINESS PLAN (SBP) IEC/TC OR SC: SECRETARIAT: DATE: 13 Hungary 2015-09-25 A. STATE TITLE AND SCOPE OF TC TC13 Electrical energy measurement and control TC13 Scope Standardization

More information

GUIDANCE ON THE COSPAS-SARSAT INTERNATIONAL 406 MHz BEACON REGISTRATION DATABASE

GUIDANCE ON THE COSPAS-SARSAT INTERNATIONAL 406 MHz BEACON REGISTRATION DATABASE E ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 GUIDANCE ON THE COSPAS-SARSAT INTERNATIONAL 406 MHz BEACON REGISTRATION DATABASE MSC.1/Circ.1210/Rev.1 21 November

More information

Market Access and Environmental Requirements

Market Access and Environmental Requirements Market Access and Environmental Requirements THE EFFECT OF ENVIRONMENTAL MEASURES ON MARKET ACCESS Marrakesh Declaration - Item 6 - (First Part) 9 The effect of environmental measures on market access,

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

Plain bearings Wrapped bushes

Plain bearings Wrapped bushes BRITISH STANDARD BS ISO 3547-3:2006 Plain bearings Wrapped bushes Part 3: Lubrication holes, grooves and indentations ICS 21.100.10 National foreword This British Standard was published under the authority

More information

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT)

Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) Page 1 Electronic Communications Committee (ECC) within the European Conference of Postal and Telecommunications Administrations (CEPT) ECC RECOMMENDATION (06)05 ON THE PROVISION OF INFORMATION ON THE

More information

ELECTRONIC COMMUNICATIONS COMMITTEE

ELECTRONIC COMMUNICATIONS COMMITTEE ELECTRONIC COMMUNICATIONS COMMITTEE ECC Decision of 28 October 2005 on harmonised frequencies, technical characteristics, exemption from individual licensing and free carriage and use of digital PMR 446

More information

THE LABORATORY ANIMAL BREEDERS ASSOCIATION OF GREAT BRITAIN

THE LABORATORY ANIMAL BREEDERS ASSOCIATION OF GREAT BRITAIN THE LABORATORY ANIMAL BREEDERS ASSOCIATION OF GREAT BRITAIN www.laba-uk.com Response from Laboratory Animal Breeders Association to House of Lords Inquiry into the Revision of the Directive on the Protection

More information

ISO/TR TECHNICAL REPORT. Intelligent transport systems System architecture Privacy aspects in ITS standards and systems

ISO/TR TECHNICAL REPORT. Intelligent transport systems System architecture Privacy aspects in ITS standards and systems TECHNICAL REPORT ISO/TR 12859 First edition 2009-06-01 Intelligent transport systems System architecture Privacy aspects in ITS standards and systems Systèmes intelligents de transport Architecture de

More information

Response to. Second Consultation on Possible National Rollout Scenarios for the Smart Metering Cost Benefit Analysis (CER/10/197)

Response to. Second Consultation on Possible National Rollout Scenarios for the Smart Metering Cost Benefit Analysis (CER/10/197) Response to Second Consultation on Possible National Rollout Scenarios for the Smart Metering Cost Benefit Analysis (CER/10/197) 14 January 2011 Introduction Given the national significance of the Smart

More information

UK Broadband Ltd Spectrum Access Licence Licence Number: Rev: 4: 11 January 2018

UK Broadband Ltd Spectrum Access Licence Licence Number: Rev: 4: 11 January 2018 Wireless Telegraphy Act 2006 Office of Communications (Ofcom) Licence Category: SPECTRUM ACCESS 3.6GHz This Licence replaces the licence issued by Ofcom on 05 April 2013 to UK Broadband Limited. Licence

More information

Patient Choice and Resource Allocation Policy. NHS South Warwickshire Clinical Commissioning Group (the CCG)

Patient Choice and Resource Allocation Policy. NHS South Warwickshire Clinical Commissioning Group (the CCG) Patient Choice and Resource Allocation Policy (the CCG) Accountable Director: Alison Walshe Director of Quality and Performance Policy Author: Sheila Browning Associate Director Continuing Healthcare Approved

More information

The Eco-Patent Commons

The Eco-Patent Commons A leadership opportunity for global business to protect the planet The Initiative: The Eco-Patent Commons is an initiative to create a collection of patents that directly or indirectly protect the environment.

More information

Reflections on progress made at the fifth part of the second session of the Ad Hoc Working Group on the Durban Platform for Enhanced Action

Reflections on progress made at the fifth part of the second session of the Ad Hoc Working Group on the Durban Platform for Enhanced Action Reflections on progress made at the fifth part of the second session of the Ad Hoc Working Group on the Durban Platform for Enhanced Action Note by the Co-Chairs 7 July 2014 I. Introduction 1. At the fifth

More information

Technical Assistance. Programme of Activities

Technical Assistance. Programme of Activities Technical Assistance Programme of Activities 2011-2012 July 2011 The present programme of technical assistance activities reflects the decisions taken at the fifth meeting of the Conference of the Parties

More information

Designated Institutes participating in the CIPM MRA

Designated Institutes participating in the CIPM MRA Designated Institutes participating in the CIPM MRA Expectations and nomination form Version 1.2 Contents 1. Introduction... 1 2. Designated Institute in Appendix A of the KCDB... 2 2.1. Designation of

More information

EDS FAULT LEVELS

EDS FAULT LEVELS Document Number: EDS 08-1110 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 08-1110 FAULT LEVELS This standard provides guidance on the calculation, application and availability of

More information

SHARED TENANT SERVICE (STS) ARRANGEMENTS

SHARED TENANT SERVICE (STS) ARRANGEMENTS Southwestern Bell Telephone 2nd Revised Sheet 1 Company d/b/a AT&T Missouri Replacing 1st Revised Sheet 1 37.1 Definition of Service 37.1.1 Shared Tenant Service (STS) Arrangements are the provision of

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 1167.2:1999 Australian/New Zealand Standard Welding and brazing Filler metals Part 2: Filler metal for welding AS/NZS 1167.2:1999 This Joint Australian/New Zealand Standard was prepared by Joint

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

VAR Voltage and Reactive Control

VAR Voltage and Reactive Control VAR-001-4 Voltage and Reactive Control A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-4 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are

More information

European Regulatory Approach to Orbital / Spectrum Registrations

European Regulatory Approach to Orbital / Spectrum Registrations Efficient Use of Orbit / Spectrum by Satellite Systems Gerry Oberst 12 June 2008 Hogan & Hartson LLP. All rights reserved. THEME Proposed changes to the EU Electronic Communications Regulatory Framework

More information

Draft performance standards for shipborne "BeiDou" BDS receiver equipment

Draft performance standards for shipborne BeiDou BDS receiver equipment IMO NAV 59 Summary Report Introduction The 59th session of the IMO Sub-Committee on Safety of Navigation (NAV 59) was held from 2nd to 6th September 2013, at the IMO headquarters in London. This briefing

More information

A. Introduction. VAR Voltage and Reactive Control

A. Introduction. VAR Voltage and Reactive Control A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-4.2 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are monitored, controlled, and maintained

More information

INTERNATIONAL TELECOMMUNICATION UNION DATA COMMUNICATION NETWORK: INTERFACES

INTERNATIONAL TELECOMMUNICATION UNION DATA COMMUNICATION NETWORK: INTERFACES INTERNATIONAL TELECOMMUNICATION UNION CCITT X.21 THE INTERNATIONAL (09/92) TELEGRAPH AND TELEPHONE CONSULTATIVE COMMITTEE DATA COMMUNICATION NETWORK: INTERFACES INTERFACE BETWEEN DATA TERMINAL EQUIPMENT

More information

RECOMMENDATION ITU-R M.541-8*

RECOMMENDATION ITU-R M.541-8* Rec. ITU-R M.541-8 1 RECOMMENDATION ITU-R M.541-8* OPERATIONAL PROCEDURES FOR THE USE OF DIGITAL SELECTIVE-CALLING EQUIPMENT IN THE MARITIME MOBILE SERVICE (Question ITU-R 9/8) (1978-1982-1986-1990-1992-1994-1995-1996-1997)

More information

VAR Voltage and Reactive Control. A. Introduction

VAR Voltage and Reactive Control. A. Introduction VAR-001-5 Voltage and Reactive Control A. Introduction 1. Title: Voltage and Reactive Control 2. Number: VAR-001-5 3. Purpose: To ensure that voltage levels, reactive flows, and reactive resources are

More information

Getting the evidence: Using research in policy making

Getting the evidence: Using research in policy making Getting the evidence: Using research in policy making REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 586-I Session 2002-2003: 16 April 2003 LONDON: The Stationery Office 14.00 Two volumes not to be sold

More information

TBT Provisions in RTAs: Do they go beyond the TBT Agreement?

TBT Provisions in RTAs: Do they go beyond the TBT Agreement? TBT Provisions in RTAs: Do they go beyond the TBT Agreement? Xinyi Li Trade Policies Review Division, WTO Secretariat 12 th ARTNeT Capacity Building Workshop December 2016 1 Motives and Objectives TBT

More information

GROUND ROUTING PROTOCOL FOR USE WITH AUTOMATIC LINK ESTABLISHMENT (ALE) CAPABLE HF RADIOS

GROUND ROUTING PROTOCOL FOR USE WITH AUTOMATIC LINK ESTABLISHMENT (ALE) CAPABLE HF RADIOS GROUND ROUTING PROTOCOL FOR USE WITH AUTOMATIC LINK ESTABLISHMENT (ALE) CAPABLE HF RADIOS October 2002 I FOREWORD 1. The Combined Communications-Electronics Board (CCEB) is comprised of the five member

More information

(3r d session of the GRE Informal Group. Visibility, Glare and Levelling (VGL), July, 2016)

(3r d session of the GRE Informal Group. Visibility, Glare and Levelling (VGL), July, 2016) GRE-VGL-03-01 Rev.1 (3r d session of the GRE Informal Group Visibility, Glare and Levelling (VGL), 18-19 July, 2016) Draft updated Terms of Reference and Rules of Procedure for the "Informal Working Group

More information

Publishing date: 23/07/2015 Document title: We appreciate your feedback. Share this document

Publishing date: 23/07/2015 Document title: We appreciate your feedback. Share this document Publishing date: 23/07/2015 Document title: We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document Share this document REPORT ON UNIT

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 19 May 2014 (OR. en) 9879/14 Interinstitutional File: 2013/0165 (COD) ENT 123 MI 428 CODEC 1299

COUNCIL OF THE EUROPEAN UNION. Brussels, 19 May 2014 (OR. en) 9879/14 Interinstitutional File: 2013/0165 (COD) ENT 123 MI 428 CODEC 1299 COUNCIL OF THE EUROPEAN UNION Brussels, 19 May 2014 (OR. en) 9879/14 Interinstitutional File: 2013/0165 (COD) T 123 MI 428 CODEC 1299 NOTE From: To: General Secretariat of the Council Council No. prev.

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 62055-51 First edition 2007-05 Electricity metering Payment systems Part 51: Standard transfer specification (STS) Physical layer protocol for one-way numeric and magnetic card

More information

Draft ETSI EN V1.3.1 ( )

Draft ETSI EN V1.3.1 ( ) Draft EN 300 659-2 V1.3.1 (2000-09) European Standard (Telecommunications series) Access and Terminals (AT); Analogue access to the Public Switched Telephone Network (PSTN); Subscriber line protocol over

More information

EMPOWERING THE BOARD TO MEET THE GROUP S STRATEGIC OBJECTIVES

EMPOWERING THE BOARD TO MEET THE GROUP S STRATEGIC OBJECTIVES NOMINATION AND GOVERNANCE COMMITTEE REPORT EMPOWERING THE BOARD TO MEET THE GROUP S STRATEGIC OBJECTIVES The Committee ensures the Board comprises individuals with the necessary skill, knowledge and experience

More information

World Radiocommunication Conference 2019 (WRC-19)

World Radiocommunication Conference 2019 (WRC-19) International Telecommunication Union World Radiocommunication Conference 2019 (WRC-19) www.itu.int/go/wrc-19 Agenda and Relevant Resolutions (revised 15 August 2017) ITU 2016 All rights reserved. No part

More information

Airwave Service Government Security Classifications Guidance

Airwave Service Government Security Classifications Guidance Airwave Service Government Security Classifications Guidance Author: John Stark, Head of Communications Security Home Office Airwave Management Team john.stark@homeoffice.gsi.gov.uk 07718 805804 Enquiries:

More information

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis

Company Directive STANDARD TECHNIQUE: SD5F. Relating to connecting multiple small low voltage connections with limited network analysis Company Directive STANDARD TECHNIQUE: SD5F Relating to connecting multiple small low voltage connections with limited network analysis Policy Summary This document specifies the procedure for connecting

More information

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS

SPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized

More information

QUALITY CONTROL INSTRUCTIONS

QUALITY CONTROL INSTRUCTIONS QUALITY CONTROL INSTRUCTIONS QCI NO. 100 REVISION E SPC PROCEDURE WRITTEN BY: R. Zielinski DATE: 2/3/92 APPROVED BY: APPROVED BY: Department Manager Quality Assurance Manager DATE: DATE: SF 118 1 CHANGE

More information

Technical Support, End User License & Warranty Information

Technical Support, End User License & Warranty Information Technical Support, End User License & Warranty Information How to get Technical Support Pazzles provides free Technical Support for your Inspiration Vūe for a period of 1 year from the date of purchase.

More information

European Charter for Access to Research Infrastructures - DRAFT

European Charter for Access to Research Infrastructures - DRAFT 13 May 2014 European Charter for Access to Research Infrastructures PREAMBLE - DRAFT Research Infrastructures are at the heart of the knowledge triangle of research, education and innovation and therefore

More information

Ref: CS05/320/F December 2005

Ref: CS05/320/F December 2005 Ref: CS05/320/F510-511-530-480 20 December 2005 To: 406 MHz Beacon Manufacturers, Agents & Developers, C-S Beacon Type Approval Test Facilities, Beacon Component Manufacturers, Cc: International Civil

More information

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS SECURITY CLASS: UNCLASSIFIED COML. CLASS: UNCLASSIFIED DOCUMENT IDENTIFIER SUBJECT: IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS MATERIAL ENGINEERING & TECHNOLOGY DEVELOPMENT

More information

Drawing Management Standard

Drawing Management Standard Record Number: R0000393979 Version Number: 1.0 Date: December 2015 Authorisations Action Name and title Date Prepared by TasNetworks 23/12/2015 Reviewed by David King With input from Rick Stevens, Jeshua

More information

NTAG General description. NFC Forum Type 2 Tag compliant IC with 144 bytes user memory. 1.1 Contactless energy and data transfer

NTAG General description. NFC Forum Type 2 Tag compliant IC with 144 bytes user memory. 1.1 Contactless energy and data transfer NFC Forum Type 2 Tag compliant IC with 144 bytes user memory 218632 1. General description NXP Semiconductors has developed - NFC Forum Type 2 Tag compliant IC - to be used with NFC enabled devices according

More information

Current Systems. 1 of 6

Current Systems. 1 of 6 Current Systems Overview Radio communications within the State of California s adult correctional institutions are vital to the daily safety and security of the institution, staff, inmates, visitors, and

More information

FOR DESIGNERS OF EQUIPMENT PART 1: INTRODUCTION

FOR DESIGNERS OF EQUIPMENT PART 1: INTRODUCTION Ministry of Defence Defence Standard 00-25 (PART 1)/Issue 2 30 September 1987 HUMAN FACTORS FOR DESIGNERS OF EQUIPMENT PART 1: INTRODUCTION This Defence Standard supersedes Def Stan 00-25 (Part 1) Issue

More information

ASSEMBLY - 35TH SESSION

ASSEMBLY - 35TH SESSION A35-WP/52 28/6/04 ASSEMBLY - 35TH SESSION TECHNICAL COMMISSION Agenda Item 24: ICAO Global Aviation Safety Plan (GASP) Agenda Item 24.1: Protection of sources and free flow of safety information PROTECTION

More information

Draft executive summaries to target groups on industrial energy efficiency and material substitution in carbonintensive

Draft executive summaries to target groups on industrial energy efficiency and material substitution in carbonintensive Technology Executive Committee 29 August 2017 Fifteenth meeting Bonn, Germany, 12 15 September 2017 Draft executive summaries to target groups on industrial energy efficiency and material substitution

More information

RECOMMENDATIONS OF THE INFORMATION & COMMUNICATIONS TECHNOLOGY SECTOR

RECOMMENDATIONS OF THE INFORMATION & COMMUNICATIONS TECHNOLOGY SECTOR RECOMMENDATIONS OF THE INFORMATION & COMMUNICATIONS TECHNOLOGY SECTOR with regard to the Technical guidelines on transboundary movements of electrical and electronic waste and used electrical and electronic

More information

Annex III - 3. Memorandum of Understanding on the development of the Pan-European Transport Corridor VII (The Danube) (DRAFT)

Annex III - 3. Memorandum of Understanding on the development of the Pan-European Transport Corridor VII (The Danube) (DRAFT) Annex III - 3 Memorandum of Understanding on the development of the Pan-European Transport Corridor VII (The Danube) (DRAFT) Desiring to promote international transport of goods and passengers through

More information

BAP Product profile. 2. Pinning information. 3. Ordering information. Silicon PIN diode. 1.1 General description. 1.2 Features and benefits

BAP Product profile. 2. Pinning information. 3. Ordering information. Silicon PIN diode. 1.1 General description. 1.2 Features and benefits Rev. 5 28 April 2015 Product data sheet 1. Product profile 1.1 General description Two planar PIN diodes in common cathode configuration in a SOT23 small plastic SMD package. 1.2 Features and benefits

More information

Annex 11 to Working Party 5B Chairman s Report WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT NEW REPORT ITU-R M.[SNAP]

Annex 11 to Working Party 5B Chairman s Report WORKING DOCUMENT TOWARDS A PRELIMINARY DRAFT NEW REPORT ITU-R M.[SNAP] Radiocommunication Study Groups Source: Document 5B/TEMP/287 Annex 11 to Document 5B/617-E 29 November 2010 English only Annex 11 to Working Party 5B Chairman s Report WORKING DOCUMENT TOWARDS A PRELIMINARY

More information

FORMAT: TO BE PREPARED ON VENDOR S FORMAT IN ACCORDANCE WITH VENDOR S PDDS SYSTEM.

FORMAT: TO BE PREPARED ON VENDOR S FORMAT IN ACCORDANCE WITH VENDOR S PDDS SYSTEM. QUALITY REMARK: MED STANDARD REMARK F04 GUIDE FOR PREPARATION OF MASTER ENVELOPE DEFINITION (MED) BY DESIGN VENDORS. MED INCLUDES PRODUCT DEFINITION DATA SETS (PDDS) (FORMALLY KNOWN AS DRAWINGS) AND MODELS.

More information