SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SILVER JEWELLERY/ARTEFACTS FOR FINENESS MARKING AS PER IS 2112
|
|
- Agatha Anderson
- 6 years ago
- Views:
Transcription
1 Doc: STI/2112/1 October 2005 SCHEME OF TESTING AND INSPECTION FOR CERTIFICATION OF SILVER JEWELLERY/ARTEFACTS FOR FINENESS MARKING AS PER IS LABORATORY A laboratory shall be maintained Silver jewellery/artefacts which shall be suitably equipped and staffed to carry out the different tests in accordance with the methods given in the Indian Standards. 2.0 TEST RECORDS All records of analysis and tests shall be kept in Form No. 1 and Form No. 2 as enclosed with this Scheme. 2.1 Copies of any records that may be required by BIS shall be made available at any time on request. 2.2 Quality Control It is recommended that, as far as possible, statistical Quality Control (SQC) methods may be used for controlling the quality of the products as envisaged in this Scheme [See IS 397(Part 1):1972, IS 397(Part2):1985 and IS 397 (Part 3):1980]. 2.3 In addition, effort should be made to gradually introduce a Quality Management system in accordance with the Quality System Modules as per IS/ISO 9000 and as appropriate to the activities of the Silver jewellery/artefacts manufacturer. 3.0 STANDARD MARK/HALLMARK The Standard Mark which is one of the components of the Hallmark under this scheme and, as given in Column(1) of the First Schedule of the licence shall be marked on each Silver jewellery/artefacts by the Assaying and Hallmarking Centre, provided always that the Silver jewellery/artefacts to which this mark is applied conforms to every requirement of the specification. For this purpose the BIS certified Silver jewellery/artefacts (licensee) shall submit each batch of Silver jewellery/artefacts to the Assaying and Hallmarking Centre with each piece of silver article to be marked with silver manufacturer s/retailer s logo (along with identification mark of item manufactured to BIS and year of marking approved by BIS), at appropriate place, who shall then assay the Silver jewellery/artefacts as per the sampling plan duly approved by BIS and then laser mark the Hallmark. (See Clause 3.1) 3.1 Marking The following information shall be given on each Silver jewellery/artefacts by Assaying and Hallmarking Centre/ retailer or manufacturer: a) The Standard Mark; b) Fineness ( 999 & 925) as applies; c) Assaying and Hallmarking Centre's Logo d) Silver jewellery/artefacts manufacturer s logo
2 e) Code letter for the year of marking (as communicated by BIS) Only linear designs shall be permitted The jewellery/artefacts shall be as defined in IS LEVELS OF CONTROL 4.1 For Silver medallion/ artefact Manufacturers Control Unit - A control unit is defined as a) and/or b) given below: a) Silver jewellery/artefacts having same fineness manufactured using same raw material i.e. fine silver, in one process. b) Silver jewellery/artefacts having same fineness got manufactured using same raw material i.e. fine silver and solder by the same artisan for a maximum period of 15 days The analysis and tests, as indicated in Table 1 and at the levels of control specified therein, shall be carried out on the production of Silver jewellery/artefacts which are covered by this scheme and appropriate records and charts maintained in accordance with Para 2 above. 4.2 For Silver jewellery/artefacts Retailers Control Unit - A control unit is defined as given below: Finished silver jewellery/artefacts having same fineness accepted after testing for fineness, from one artisan / supplier at a time The analysis and tests as indicated in Table 2 and the levels of control specified there in shall be carried out on the silver jewellery/artefacts procured which is covered by this scheme and appropriate charts and records maintained in accordance with Para 2 above. 4.3 All the production which conforms to the declared purity when tested as per IS 2113 and covered by this licence shall be offered for hallmarking to BIS recognized Assaying and Hallmarking Centres. 4.4 In order to promote hallmarking of Silver jewellery/artefacts the coverage under hallmark by the retailer / licensee shall be as decided by the BIS from time to time 4.5 The identity of each control unit shall be separately maintained till test results are obtained. 4.6 All articles of silver jewellery/artefacts shall pass for declared fineness. However, if any sample does not conform to the declared fineness the control unit shall be rejected for the purpose of offering for hallmarking. It may however be downgraded to next lower permitted fineness. 4.7 On the basis of tests and analysis results, the decision regarding conformity or otherwise, of a control unit to the given requirement shall be made.
3 5.0 In respect of all other clauses of the specification the manufacturer shall maintain appropriate controls and checks to ensure that the Silver jewellery/artefacts conforms to the various requirement of the specification. 6.0 REJECTION A separate record shall be maintained giving information relating to the rejection/reprocessed control units of Silver jewellery/artefacts which do not conform to the specification. Such material shall in no case be stored together with those conforming to the declared fineness. 7.0 SAMPLES The licensee shall supply, free of charge, the sample or samples required in accordance with the Bureau of Indian Standard (Certification) Regulations from his premises, factory or showroom. The remnant, if any, of tested Silver jewellery/artefacts shall be returned to the manufacturer. 8.0 REPLACEMENT Whenever a complaint is received soon after the Silver jewellery/artefacts with the Hallmark have been purchased and used, and if there is adequate evidence that the product have not been misused, the same shall be replaced free of cost by the licensee in case the complaint is proved to be genuine. The final authority to judge conformity of the Silver jewellery/artefacts to the Indian Standard shall be with BIS. 8.1 In the event of any claim being filed by the consumer against the above Mark and not conforming to the declared fineness as per the relevant Indian Standard, entire liability arising out of such non conforming Silver jewellery/artefacts shall be of licensee or the Assaying and Hallmarking Centre as proved by the investigation carried out by BIS, and BIS shall not in any way be responsible in such cases. 9.0 ALTERATIONS TO HALLMARKED ARTICLE 9.1 Alterations to hallmarked Jewellery/artefacts shall not be allowed in any form or manner. 9.2 However the following may be allowed: a) Repair of hallmarked article with not more than 1 g silver or 10% of the weight of the article which ever is less with silver of same standard of fineness as of the article. b) Coating of not more than 1 micron at any point on the article with silver of the same standard of fineness as of the article. 10. STOP MARKING 10.1 The submission of Silver jewellery/artefacts for hallmarking by the Assaying and Hallmarking Centre shall be stopped under intimation to BIS, if at any time, there is some difficulty in maintaining the conformity of the Silver jewellery/artefacts to the specification or the testing equipment goes out of order. The marking may be resumed as soon as the defects are
4 removed under intimation to BIS. The information regarding resumption of marking shall also be sent to BIS. The submission of Silver jewellery/artefacts for hallmarking shall be stopped immediately if directed to do so by BIS for any reason. The marking may be resumed only after permission by BIS. 11. DISPLAY REQUIREMENTS Licensee shall have a separate counter for hallmarked Silver jewellery/artefacts and SHALL clearly display the following information at prominent place of the sales outlet: (see Form 3 also) a) Hallmarked sillver jewellery/artefacts available here b) BIS Licence No. CM/Lc) Hallmark illustration and definition of each component 925 Hallmarking Centre s Mark Manufacturer s Mark Year Code SILVER PURITY OR FINENESS MARK The relationship of Grades of silver with Fineness (purity) as specified in IS 2112 Grade Fineness } } Fine silver } } } Silver Alloys for silver Jewellery and artefacts } } Magnifying Glass (at least 10x magnification )for viewing Hallmark available Complete name and address Hallmarked jewellery / artefacts to be differentiated through special counter/tag /label etc 12. DATA ON QUANTITY HALLMARKED The licensee shall send to BIS as per the enclosed Performa 1 statement of quantity produced marked and exported by him and the trader value thereof duly authenticated by a chartered accountant at the end of each year of the licenses.
5 PERFORMA I PROFORMA FOR OBTAINING QUANTITY HALLMARKED DETAILS (Period to be covered by the Report being... to... )* Name of Licensee CM/L No. Name of Articles(s) IS No. Variety 1.1 Brand/Trade/Name(s) of Hallmarked jewellery/artefacts 2. Total production of the article(s) licensed for hallmarking 2.1 Total production of the article(s) conforming to Indian Standard 3. Production covered with Hallmarking and its approximate value a) Quantity b) Value Rs. 3.1 Brand Name used on articles Hallmarked a) Quantity covered with Hallmark *Information to be filled up by BO before forwarding to the licensee. Note: In case a clause is not applicable, suitable remarks may be given against it. b) Concession rounded off in whole rupees as obtained by applying unit rates given in (a) 4. Quantity not covered with Hallmark. If any, and the reasons for such non-coverage 4.1 Brand Name under which non hallmarked jewellery/artefacts were sold 5. Quantity Exported with Hallmark and its value 5.1 Brand Name under which Hallmarked jewellery/artefacts are exported 6. Authentication by Chartered Accountant
6 TABLE 1 LEVELS OF CONTROL TO BE MAINTAINED BY SILVER JEWELLERY/ARTEFACTS MANUFACTURER AS PER IS 2112 (Clause 4.1.2) Test Details Levels of Control Clause Requirement Test Methods No. of Samples Frequency Remarks 5.1 Material Silver 6.1 & IS 2112 One Each Ingot/Slab or lot of known purity This test may not be carried out if silver Ingot/Slab is accompanied by test certificate. 5.4 Fineness i) Checking for Homogeneity IS: % of total number of jewellery/artefacts ( minimum one sample) Each Control unit The purity shall be ensured at the soldered portion also. ii)assaying One sample from the above 10% Assaying to be done in duplicate from the above sample as per IS: 2113
7 TABLE 2 LEVELS OF CONTROL TO BE MAINTAINED BY SILVER ARTEFACT RETAILER AS PER IS 2113 (Clause 4.4.2) Test Details Test Methods Levels of Control Clause Requirement Clause Reference No. of Samples Frequency Remarks 5.4 Fineness i) Checking for Homogeneity By non-destructive method (touch stone or XRF) - Silver jewellery/artefacts Each Control unit. ii) Assaying 7 IS 2113 One Each control unit i) Assaying to be done in duplicate from the same sample ii) Assaying as per IS 2113:2002 is permitted from outside laboratory however the records with identification of samples and control unit from which it is drawn is to be mentioned
8 FORM 1 (Clause 2) Date (1) Supplier of silver articles Control unit No. Declaration of fineness by supplier Quantity received (weight and/or by number Fineness found after in-house checking of all the silver article Homogeneity Check Quantity Name of the Assaying Centre Test results Remarks (Accepted /Downgraded Accepted Downgraded (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
9 FORM 2 (Clause 2) Date `(1) Lot No. Silver articles pertains to control unit number(s) Quantity of silver articles forwarded to A&HM centre (Weight and/or number) Name of Assaying and Hallmarking Centre Declaration of Fineness by the silver manufacturer Hallmar ked with fineness as given in col 6 Quantity of silver articles Down graded and Hallmarked Rejected Hallmarking charges paid to center (Rs.) (2) (3) (4) (5) (6) (7) (8) (9) (8) (9) Remarks
CMD-II (Legal) Our Ref: CMD-II (Legal)/16: Oct 2014
CMD-II (Legal) Our Ref: CMD-II (Legal)/16:16014 27-Oct 2014 Subject: Tentative STI for (MECHANICALLY WOVEN, DOUBLE-TWISTED, HEXAGONAL WIRE MESH GABIONS, REVET MATTRESSES AND ROCK FALL NETTING (GALVANIZED
More informationSCHEME OF TESTING AND INSPECTION FOR CERIFICATION OF TEXTILE-VEST, COTTON, PLAIN (SINGLE JERSEY) KNITTED ACCORDING TO IS 4964:2003 (Fourth Revision)
DOC:STI/4964/5 SCHEME OF TESTING AND INSPECTION FOR CERIFICATION OF TEXTILE-VEST, COTTON, PLAIN (SINGLE JERSEY) KNITTED ACCORDING TO IS 4964:2003 (Fourth Revision) 1. LABORATORY- A laboratory shall be
More informationत न ब. BUREAU OF INDIAN STANDARDS Hallmarking Department, BIS. Subject: Draft BIS Hallmarking Regulations for comments
त न ब ल र व, ए 11 प ल 2017 व :- ट प पव वलए ए ल र व वन द त न ब ( ए ) व वन 2016 प न त त त क ए ए ए ल र व वन द, व त ज न ट प पव वलए प स ट प पव, कद ल जट ए hallmarking@bis.gov.in 28/04/2017 त ज ज त लग :- ऊप क
More informationANNEX F HM/AHC/F March 2014 BUREAU OF INDIAN STANDARDS ASSESSMENT OF RECOGNIZED ASSAYING AND HALLMARKING CENTRE.
ANNEX F HM/AHC/F 11.3.2 March 2014 BUREAU OF INDIAN STANDARDS ASSESSMENT OF RECOGNIZED ASSAYING AND HALLMARKING CENTRE Report on Surveillance Assessment 1. General i) Name & address of the Assaying and
More informationPROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA
PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval
More informationPrecious Metal Articles Act
Issuer: Riigikogu Type: act In force from: 01.07.2014 In force until: mitte jõustunud Translation published: 07.04.2014 Amended by the following acts Passed 22.01.2003 RT I 2003, 15, 85 Entered into force
More informationHALLMARKING DEPARTMENT. Our Ref: HMD/14: Sub: Formats for Hallmarking Scheme Assaying & Hallmarking Centre Activity
HALLMARKING DEPARTMENT Our Ref: HMD/14:1 30.1.2008 Sub: Formats for Hallmarking Scheme Assaying & Hallmarking Centre Activity Modified Proforma for Processing of Application for grant of recognition to
More informationCORESTA RECOMMENDED METHOD N 47
CORESTA RECOMMENDED METHOD N 47 CIGARS - SAMPLING (January 2000) 0. INTRODUCTION Existing national standards, rules, regulations and laws were taken into account when preparing this CORESTA Recommended
More informationर ख र षण द लम /DOCUMENT DESPATCH ADVICE एमट ड 10/ट -1, 73,MTD 10/T-1, 73 date
ट ल फ क स : 23231085 Please Contact at Telefax 23231085 E-mail: mtd@bis.org. in य प च ल म म द DRAFT IN WIDE CIRCULATION बह म य ध त ओ प व षय दम त, ए ट ड 10 र ख र षण द लम /DOCUMENT DESPATCH ADVICE एमट ड
More informationUnofficial Translation
Notification of the National Broadcasting and Telecommunications Commission on Criteria and Procedures for Granting A Permit to Manufacture, Import, Sell, or Offer for Sale or Install Receiver, Apparatus
More informationDNVGL-CG-0214 Edition September 2016
CLASS GUIDELINE DNVGL-CG-0214 Edition September 2016 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that it is prohibited by
More informationGetting Your Items Hallmarked
Getting Your Items Hallmarked With us, it s easy to get your items hallmarked. That s because we ve made it so with our simple, 5-step process: 1. Register 2. Group items into same fineness 3. Complete
More informationODISHA CONSTRUCTION CORPORATION LTD. (A GOVT. OF ODISHA UNDERTAKING) CENTRAL WORKSHOP,RASULGARH, BHUBANESWAR (ODISHA)
ODISHA CONSTRUCTION CORPORATION LTD. (A GOVT. OF ODISHA UNDERTAKING) CENTRAL WORKSHOP,RASULGARH, BHUBANESWAR-751010 (ODISHA) TENDER DOCUMENT FOR SUPPLY OF HEX HEAD BOLT, NUT, SCREW, WASHER, CONICAL HEAD
More informationINDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR , INDIA
INDIAN INSTITUTE OF TECHNOLOGY KHARAGPUR- 721302, INDIA No. IIT/ISE/RO WATER PURIFIER/2018-19/1 Date: 18.04.2018 Last date for submission: Friday, May 11,2018 at 3:00 PM Time &Date for Opening: Friday,
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment
More informationA LAW DECREE NO. 23 OF 1980
A LAW DECREE NO. 23 OF 1980 PERTINENT TO THE SUPERVISION AND CONTROL OVER PRECIOUS METALS AND GEMS ====================================== Having seen the Amiri Decree issued on 4th Ramadan, 1396 H. corresponding
More informationOFFICIAL GAZETTE OF THE REPUBLIC OF KOSOVA / No. 2 / 21 JANUARY 2012, PRISTINA LAW NO. 04/L-154 ON PRECIOUS METAL WORKS
OFFICIAL GAZETTE OF THE REPUBLIC OF KOSOVA / No. 2 / 21 JANUARY 2012, PRISTINA LAW NO. 04/L-154 ON PRECIOUS METAL WORKS Assembly of Republic of Kosovo, Based on Article 65 (1) of the Constitution of the
More information001: 2007 CEB STANDARD
001: 2007 CEB STANDARD ALUMINIUM RE-DRAW RODS FOR ELECTRICAL PURPOSES CEYLON ELECTRICITY BOARD SRI LANKA Specification for ALUMINIUM RE-DRAW RODS FOR ELECTRICAL PURPOSES CEB Standard 001: 2007 CEYLON ELECTRICITY
More informationDNVGL-CP-0338 Edition October 2015
CLASS PROGRAMME DNVGL-CP-0338 Edition October 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class
More informationTAMIL NADU GOVERNMENT GAZETTE
TAMIL NADU GOVERNMENT GAZETTE EXTRAORDINARY PUBLISHED BY AUTHORITY No: 976] CHENNAI, WEDNESDAY, DECEMBER 29, 1999 Margazhi 14, Pramathi, Thiruvalluvar Aandu-2030 Part III Section 1 (a) General Statutory
More informationUK Broadband Ltd Spectrum Access Licence Licence Number: Rev: 4: 11 January 2018
Wireless Telegraphy Act 2006 Office of Communications (Ofcom) Licence Category: SPECTRUM ACCESS 3.6GHz This Licence replaces the licence issued by Ofcom on 05 April 2013 to UK Broadband Limited. Licence
More informationTaylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES
SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working
More information.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal
City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings
More informationMMTC LIMITED JAIPUR RO
MMTC LIMITED JAIPUR RO TENDER NOTICE FOR DISPOSAL OF ASSAYING & HALLMARKING UNIT for BULLION (GOLD SILVER) Tender No.: MMTC/JPR/02/15-16 Date: 16/06/2015 Sealed Tenders from bidders having good standing
More informationUnparallel Quality System INDIA GOVERNMENT MINT, MUMBAI
Unparallel Quality System at INDIA GOVERNMENT MINT, MUMBAI () INDIA GOVERNMENT MINT, MUMBAI (A UNIT OF SPMCIL) 185 GLORIOUS YEARS Contents: About India Government Mint Mumbai Activities at IGM Mumbai Our
More informationPS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS
SECURITY CLASS: UNCLASSIFIED COML. CLASS: UNCLASSIFIED DOCUMENT IDENTIFIER SUBJECT: IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS MATERIAL ENGINEERING & TECHNOLOGY DEVELOPMENT
More information(Non-legislative acts) DECISIONS
4.12.2010 Official Journal of the European Union L 319/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 9 November 2010 on modules for the procedures for assessment of conformity, suitability
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information
More informationELIO POMA Precious Metals Laboratory Chamber of Commerce I.A.A. of Vicenza, IT
ELIO POMA Precious Metals Laboratory Chamber of Commerce I.A.A. of Vicenza, IT Since 1984 he has been the technical director of the Precious Metals Testing Laboratory of the Vicenza Chamber of Commerce,
More informationA. Action Submittals: Written and graphic information that requires Architect's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationTECHNICAL SPECIFICATION OF LT SHACKLE BOLT (G. I. BOLT) WITH NUT AND SPRING WASHER
TECHNICAL SPECIFICATION OF LT SHACKLE BOLT (G. I. BOLT) WITH NUT AND SPRING WASHER 1.0 SCOPE: This specification covers the manufacture, testing at works and supply of G. I. Bolts with Nut and Spring Washer
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationUSER S MANUAL VAF POWER METER TRINITY. VAF Operational Manual
USER S MANUAL VAF POWER METER This document contains the latest technical information about VAF which is a microcontroller based Power Meter. The unit is tested against the latest "MTE" Standard Model
More informationMULTIPLE ENTRY CONSOLIDATED GROUP TSA USER AGREEMENT
MULTIPLE ENTRY CONSOLIDATED GROUP TSA USER AGREEMENT Dated CORNWALL STODART LAWYERS PERSON SPECIFIED IN THE ORDER FORM (OVERLEAF) CORNWALL STODART Level 10 114 William Street DX 636 MELBOURNE VIC 3000
More informationType Approval JANUARY The electronic pdf version of this document found through is the officially binding version
STANDARD FOR CERTIFICATION No. 1.2 Type Approval JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The content of this service
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More informationAGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation
AGREEMENT on UnifiedPrinciples and Rules of Technical Regulation in the Republic of Belarus, Republic of Kazakhstan and the Russian Federation The Republic of Belarus, Republic of Kazakhstan and the Russian
More informationJune 2014 For any information or queries relating to fundraising for headspace, please contact:
Fundraising Guidelines QLD June 2014 For any information or queries relating to fundraising for headspace, please contact: headspace Terms and Conditions for Conducting a Fundraising Event in Queensland
More informationSteel wire for general fencing purposes
BRITISH STANDARD BS 4102:1998 ICS 77.140.65 NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAW Specification for Steel wire for general fencing purposes Committees responsible for this
More informationA. Action Submittals: Written and graphic information that requires Engineer's responsive action.
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationAmateur Radio Club Licence
Amateur Radio Club Licence Amateur Radio Club license is issued to a bonafide Amateur Radio society, club or a school, college, or an institution or a university in India, which has the aim of investigations
More informationTENDER (OPEN & SHORT TERM TENDER OF 07 DAYS)
TENDER (OPEN & SHORT TERM TENDER OF 07 DAYS) Name of Scope of Work: Paper based Drafting, Designing, Printing, Publication and Supply work (Digital and Offset printing only) TERMS AND CONDITIONS The undersigned
More informationTENDER (OPEN & SHORT TERM TENDER OF 07 DAYS)
TENDER (OPEN & SHORT TERM TENDER OF 07 DAYS) Name of Scope of Work: Paper based Drafting, Designing, Printing, Publication and Supply work (Digital and Offset printing only) TERMS AND CONDITIONS The undersigned
More information012: 2015 CEB SPECIFICATION GALVANIZED STEEL WIRE (EXCEPT SHIELDING WIRE FOR TOWER LINE APPLICATION)
012: 2015 CEB SPECIFICATION GALVANIZED STEEL WIRE (EXCEPT SHIELDING WIRE FOR TOWER LINE APPLICATION) CEYLON ELECTRICITY BOARD SRI LANKA Telephone: +94 11 232 8051 Fax: +94 11 232 5387 CONTENTS Page 1.0
More informationApplication for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID
Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID Company (applicant): hereby applies to RISE Research Institutes of Sweden AB, as Notified
More informationDo I have to hallmark all gold or silver articles I produce or sell?
Do I have to hallmark all gold or silver articles I produce or sell? {beginslide id="1" title="answer"} No. There are weight exemptions according to the Law. These are below 1.0 g for gold and below 3
More informationPlant Client Contract Code Document ID Contract No. TECHNICAL SPECIFICATIONS DC SHUNT Rev 00 Page 1 of 2
TECHNICAL SPECIFICATIONS Rev 00 Page 1 of 2 0 IFI Release for Enquiry 14/12/18 SSS 14/12/18 HGG 14/12/18 RBU - Rev. Status Description Date Prepared Date Checked Date Approved AC Based on: PIN-QMC-03-F101
More informationUCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationGypsy Statement of Limited Warranty. Part 1 General Terms
Gypsy Statement of Limited Warranty Part 1 General Terms This Statement of Limited Warranty includes Part 1 General Terms, and Part2 Warranty Information. The warranties provided by PROVO CRAFT AND NOVELTY,
More informationSECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.
SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in
More informationPresident of the Russian Federation
DECREE OF THE PRESIDENT OF THE RUSSIAN FEDERATION NO. 742 OF JUNE 21, 2001 ON THE PROCEDURE FOR THE IMPORTATION INTO AND EXPORTATION FROM THE RUSSIAN FEDERATION OF PRECIOUS METALS AND PRECIOUS STONES In
More informationUK Broadband Ltd - Spectrum Access 28 GHz Licence Company Registration no: First Issued 22 July Licence Number: /01/18
Office of Communications (Ofcom) Wireless Telegraphy Act 2006 SPECTRUM ACCESS LICENCE 28 GHz This Licence replaces the version of the licence issued by Ofcom on 18 February 2016 to UK Broadband Limited.
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationBank of England Framework for the Testing of Automatic Banknote Handling Machines
Bank of England Framework for the Testing of Automatic Banknote Handling Machines 1. Introduction Maintaining confidence in the currency requires that cash users trust the physical integrity of the Bank
More informationDEPARTMENT OF ARCHITECTURE
DEPARTMENT OF ARCHITECTURE Web : www.nitt.edu Phone : 0431-2503001 Short Tender Notification No.: NITT/ARCH/04/2012/ DRAWING TABLE Dated : 19-04 -2012 (Retender Those previously quoted for this tender
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationTHE KENYA POWER AND LIGHTING CO. LTD. SPECIFICATIONS for IMPULSE VOLTAGE TEST EQUIPMENT
THE KENYA POWER AND LIGHTING CO. LTD SPECIFICATIONS for IMPULSE VOLTAGE TEST EQUIPMENT NAME DESIGNATION SIGNATURE DATE Compiled by Ephantus Nyagah Ag. Senior Engineer Checked by Eng. Thagichu Kiiru Deputy
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More information1 SERVICE DESCRIPTION
DNV GL management system ICP Product Certification ICP 4-6-3-5-CR Document number: ICP 4-6-3-5-CR Valid for: All in DNV GL Revision: 2 Date: 2017-05-05 Resp. unit/author: Torgny Segerstedt Reviewed by:
More informationUNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General
More informationCHAPTER 583. FLOP POKER
Ch. 583 FLOP POKER 58 583.1 CHAPTER 583. FLOP POKER Sec. 583.1. Definitions. 583.2. Flop Poker table physical characteristics. 583.3. Cards; number of decks. 583.4. Opening of the table for gaming. 583.5.
More informationEast Central College
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationSECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationSECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationFiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines
Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third
More informationDelhi Regional Office, F-8-11 Flatted Factory Complex, Rani Jhansi Road, NEW DELHI ===========================================================
Delhi Regional Office, F-8-11 Flatted Factory Complex, Rani Jhansi Road, NEW DELHI 110055 =========================================================== MMTC/DRO/SMVDSB/REF/03/2017-18 Date: 22 nd.dec. 2017
More informationBusiness reform Action Plan Rec # 299 to 303 Certification of Electrical Installation by Electrical inspectorate
Business reform Action Plan 2017- Rec # 299 to 303 Certification of Electrical Installation by Electrical inspectorate Statutory requirements for electrical work execution and electrical safety approval
More informationCULTURAL ARTS ORDINANCE
YUROK TRIBE 190 Klamath Boulevard Post Office Box 1027 Klamath, CA 95548 Phone: 707-482-1350 Fax: 707-482-1377 CULTURAL ARTS ORDINANCE SUMMARY The Yurok Tribal Council is considering adopting a cultural
More informationSouth African Distribution Code
South African Distribution Code Metering Code Version 6.0 July 2014 This document is approved by the National Energy Regulator of South Africa (NERSA) Issued by: RSA Grid Code Secretariat Contact: Mr.
More informationArqiva Limited - Spectrum Access 28GHz Licence Company Registration no: First Issued 30 January Licence Number: /01/17
Office of Communications (Ofcom) Wireless Telegraphy Act 2006 SPECTRUM ACCESS LICENCE 28GHz The spectrum authorised under this Licence was formerly authorised under licences issued by Ofcom on 05 July
More informationSEI Certification Program Manual
Safety Equipment Institute SEI Certification Program Manual Section 29: Industrial Protective Clothing and Equipment Program 0 of 6 SEI Certification Program Manual Section 29: Industrial Protective Clothing
More informationCHAPTER 592. CRISS-CROSS POKER
Ch. 592 CRISS-CROSS POKER 58 592.1 CHAPTER 592. CRISS-CROSS POKER Sec. 592.1. Definitions. 592.2. Criss-Cross Poker table physical characteristics. 592.3. Cards; number of decks. 592.4. Opening of the
More informationSECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS
SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationTERMS OF SALE. Quotations & Orders
Quotations & Orders 1. Quotation is in USD unless otherwise indicated and is based on information provided to SolarPath Inc. at time of quotation, i.e. location, application, operating profile, etc., and
More informationSCANNING ELECTRON MICROSCOPE (SEM) INSPECTION OF SEMICONDUCTOR DICE. ESCC Basic Specification No
Page 1 of 24 SCANNING ELECTRON MICROSCOPE (SEM) INSPECTION OF SEMICONDUCTOR DICE ESCC Basic Specification Issue 2 February 2014 Document Custodian: European Space Agency see https://escies.org PAGE 2 LEGAL
More informationThe surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample.
SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX A2. SOLAR KEYMARK SURVEILLANCE TEST Normative annex. Version of 2012-09-09. 1 Introduction This document gives a brief description of the procedure of the so called
More informationam- Harrahs CHESTER CASINO & RACETRACK RECEIVED IRRC 2BIFEB (U A <*3<* February 7,2011
am- Harrahs CHESTER CASINO & RACETRACK RECEIVED IRRC 2BIFEB (U A
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.
More informationSECTION SUBMITTAL PROCEDURES
SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply
More informationThe GMFI Process. Design Intent Document Preparation. Enroll in GMFI Program. Image Consultation. You are here. Design Intent Document.
Enroll in GMFI Program Image Consultation Design Intent Document Preparation Preliminary Drawings Final Drawings Design Intent Document You are here. 1-2 Construction Documents Services performed by dealer
More informationTECHNICAL SPECIFICATION FOR G. I. WIRE (4MM)
1. SCOPE: TECHNICAL SPECIFICATION FOR G. I. WIRE (4MM) This Specification provides for manufacture, testing before dispatch at manufacturer's work and supply and delivery of 4mm solid heavily coated Galvanized
More informationTECHNICAL INSTRUCTIONS: FOUNDRY. Page 1 of 8
TECHNICAL INSTRUCTIONS: FOUNDRY. Page 1 of 8 SPECIFICATION FOR M.S. FABRICATED MOULDING TIF 717 BOXES ( WITH BUSHES ) Rev: 01 1.0 SCOPE: 1.1. This specification covers the requirements of moulding boxes
More informationEMERGENCY RESPONDER RADIO SIGNAL PERMIT APPLICATION
CITY OF LACEY Community & Economic Development Department 420 College Street SE Lacey, WA 98503 (360) 491-5642 CASH OR CHECK ONLY PLEASE EMERGENCY RESPONDER RADIO SIGNAL PERMIT APPLICATION FOR INSTALLATION/MODIFICATION
More informationLOCOMOTIVE ENGINEERING DEPTT.
SHEET 1 OF 9 SUBJECT: FOR DESIGN MANUFACTURING INSTALLATION OF FIXTURES FOR MANUFACTURING OF SHELL ASSEMBLY OF WAG7 LOCOMOTIVE Enclosures: Rev Date Prepared Rev Date Prepared Rev Date Prepared Approved
More informationJune 2014 For any information or queries relating to fundraising for headspace, please contact:
Fundraising Guidelines NSW June 2014 For any information or queries relating to fundraising for headspace, please contact: headspace Terms and Conditions for Collection in New South Wales Dear Supporter,
More informationGuideline for initial sample deliveries including initial sample test report to. Pankl Systems Austria GmbH. Systems
Guideline for initial sample deliveries including initial sample test report to, Drivetrain Systems A member of Pankl Racing Systems Copies are only valid on printing date. Page 1 of 15 1. Purpose... 2
More informationDRAFT TANZANIA STANDARD. TBS/CDC-2(4970) P3- Carbolic Soap - Specification (Revision of TZS 221:1984)
DRAFT TANZANIA STANDARD TBS/CDC-2(4970) P3- Carbolic Soap - Specification (Revision of TZS 221:1984) TANZANIA BUREAU OF STANDARDS Foreword This Draft Tanzania Standard is being developed by the Soap and
More informationPROTECTING YOUR GOODS, AND YOUR GOOD NAME
PROTECTING YOUR GOODS, AND YOUR GOOD NAME UL IS A GLOBAL, INDEPENDENT SAFETY SCIENCE COMPANY with more than a century of expertise innovating safety solutions and dedicated to promoting safe living and
More informationGENERAL ACCOUNTS & AUDIT DEPARTMENT HEAD OFFICE, 2 N.S. ROAD,KOLKATA Ref.No. HO/Gen. Accts/Silver Coins(Memento) / dated
GENERAL ACCOUNTS & AUDIT DEPARTMENT HEAD OFFICE, 2 N.S. ROAD,KOLKATA-700 001 Ref.No. HO/Gen. Accts/Silver Coins(Memento) /2014-15 dated 16.04.2014 NOTICE INVITING TENDERS FOR SUPPLYING 25000 NO.s(approx.)
More informationPOLYIMIDE INSULATED WIRES AND CABLES, LOW FREQUENCY, 600V, -200 TO +200 C BASED ON TYPE SPL. ESCC Detail Specification No.
Page 1 of 23 POLYIMIDE INSULATED WIRES AND CABLES, LOW FREQUENCY, 600V, -200 TO +200 C BASED ON TYPE SPL ESCC Detail Specification Issue 3 May 2013 Document Custodian: European Space Agency see https://escies.org
More informationACSI Art Festival Judging Sheet
Art Festival Coordinator 2017/18 7 ACSI Art Festival Judging Sheet Category Media Title of Piece Artist Statement (required for all students): In two or three sentences please describe your composition
More informationSITE PLAN Application Packet (Required For All Non-Residential Development Projects)
SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,
More informationNetwork Standard NS
Network Standard NS 21-2006 Artwork on Western Power Assets Technical Requirements for application to South West Interconnected System (SWIS) DMS #1049174 NS 21-2006 Artwork on Western Power Assets REVISION
More informationSigns and Murals - Definitions:
Signs and Murals - Definitions: Sign: Any device, structure, placard, surface, or fabric using graphics, letters, symbols, pictures, or sculptured matter designed to convey information visually and exposed
More informationNATIONAL POWER TRAINING INSTITUTE (WR) (Ministry of Power, Govt. of India) NAGPUR TENDER DOCUMENT SUPPLY OF DRAWING TABLES AND STOOLS
NATIONAL POWER TRAINING INSTITUTE (WR) (Ministry of Power, Govt. of India) NAGPUR-440022 TENDER DOCUMENT SUPPLY OF DRAWING TABLES AND STOOLS At NPTI (WR), NAGPUR, MAHARASHTRA 1 NATIONAL POWER TRAINING
More informationEE Limited - Public Wireless Network Licence Company Registration no First Issued: 26/03/93 - Licence Number: Rev: 20-10/01/17
Office of Communications (Ofcom) Wireless Telegraphy Act 2006 EE Limited - Public Wireless Network Licence PUBLIC WIRELESS NETWORK LICENCE This Licence document replaces the version of the Licence issued
More informationTHERMISTORS (THERMALLY SENSITIVE RESISTORS), NTC, RANGE 2000 TO OHMS AT +25 O C WITH A TEMPERATURE RANGE OF -60 O C TO +160 O C
Page 1 of 13 THERMISTORS (THERMALLY SENSITIVE RESISTORS), NTC, RANGE 2000 TO 100000 OHMS AT +25 O C WITH A TEMPERATURE RANGE OF -60 O C TO +160 O C BASED ON TYPE G2K7D411, G4K7D421, G10K4D451, G10K4D453,
More informationMoline Illinois CODE OF ORDINANCES. Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE
Moline Illinois CODE OF ORDINANCES Art. IX. Miscellaneous DIVISION 3. IN-BUILDING EMERGENCY RADIO SYSTEM COVERAGE SEC. 8-9300. TITLE. The title of this division shall be the Emergency Radio System Coverage
More information