1 Autodesk University How to COBie-ize Revit MEPF Models for Efficient Data Deliverables So we're going to go ahead and start-- clip myself in. I'm Birgitta Foster. PECK SUKPHISIT: And I'm Peck Sukphisit. We're going to be tag teaming this today. So how many are you-- let's try this. How many are you contractors in here? All right, how many of you are on the design team, design side? Oh, good. Is there any owners get some deliverables out of this? And then lastly, how many of guys are actually using the toolkit and delivering COBie right now? How much fun is that? I'm with you, so don't think we're here saying everything's perfect and great. But we have real world experience with it and we want to share it. There are some important pieces that are part of the workflow that some may know and some may not. There's part of a deliverable that has issues and we're helping you find options to those solutions. We are not going into the COBie toolkit, if that's what you thought. But most of the stuff we're trying to do is prepare the model so that if you already had gone ahead and what we call COBie-ize. So Peck and I came up with that term when we were working with some projects, and they didn't want the central model to be messed with so we had to pull one out. And we started doing the toolkit, so we were like, well, how do we tell the diff-- well, why don't you go ahead and COBie-ize it and we'll start looking at the exports kind of thing. So that's where the term COBie-ize came from. So we're going to go ahead and get started here. We're going to do a little introductions. PECK SUKPHISIT: Yep. Well, I'm Peck, and I have about-- over 19 years of experience in the architectural field. And right now currently I'm providing on-site BIM support for architectural engineering firm. So I've been on both sides of the fence. And I've specialized in Revit and COBie deliverable, and also BIM workflow. And for extra time, I also do college level Rivet training and AutoCAD. Well, some of you I know, so some of you know this. But I'm just going to run this real quickly. So my background, I'm a mechanical engineer. I have an MBA. But I started out with a manufacturer, and then I went into an engineering firm-- mechanical engineering there. I worked with a caterpillar dealer doing large engine-driven pump

2 packages. I've been with a general contractor, did stuff of clean clean room installations at Intel. I've been with an owner, which is with Sandia National Labs. I've been with the standards organizations. There's Building Smart Alliance out of DC. And most of my efforts right now are at the international level, where I'm the lead on the data dictionary working group. I'm on the secretary of the user comm and then I'm on the standards committee executive. This all has to do with a lot of the IFC work that's being developed. In my spare time, I work for VDCO Tech-- both of us do. And then I also am domestically involved with BIM Forum on their LOD group. And I'm also on the BIM consortium with the Corps of Engineers-- so seen a lot, been around, and actually trying to work on bringing the industry forward. A little bit on our company-- I got to throw this in. Peck and I work for VDCO Tech. We do BIM services, but we also work directly with owners. We have Broward County right now. We have a contract with them as their BIM staffing. But go check us out if you're interested in seeing more about us. Good. PECK SUKPHISIT: So how to COBie-ize the Revit MEPF model for efficient data deliverable. So basically now this today we're going to walk you through the process. So what we're going to do here is to show you how to prepare the models, and then we're going to talk about how the-- the importance of the architectural-- this is where they're really the MVP in some levels on the data deliverable and they don't know it. We're going to talk about how to match. We're going to talk about validate, and then actually how to address when you don't have spaces for equipment. There's no rooms, there's no spaces. How am I supposed to deliver it? Where do I get the rooms from? COBie says I have to have a room and I don't have a room. And then, lastly, we're going to talk about where you can get the extension and some information on getting more. There's a lot out there that's really supportive that we're not going to get into, because it's enough. But the most important one we want to close with is how to append to a single file. A lot of times they don't want individual. They want an appended file. And I want to make sure everybody understands how that process works. And finally, you will see our tips, things that we're saying, hey, take note. Take note. Do this, but make sure you look at this, too. And that'll be where you'll see that.

3 So what we're going to do is we're going to show you-- these are the important steps. This is what we're going to go through and takeaways at the end. But in other words, during the-- when you link your models, what you need to make sure everything is done to make sure you get the right setup. Then we're going to talk about MEPF models. Again, that's going to be where you use certain steps, and we're going to show you how to use them to make sure you get some automation to make that quicker-- and then, finally, again where you can get it and a little bit on pending files. Go ahead. PECK SUKPHISIT: So first of all, first thing we need to do is verify architectural and structural link to MEPF. And you'll notice that on the MEPF we have a little slash. So it depends on your contract, because you can have a single MEPF model or individual models, so you have four, for example. Now, what do you need to do is look in your project browser. Look under Rivet Links. You must have the room bounding selected, because what it does is it's recognized the room bounding that's coming in from architectural model and structural model. Next, you need to follow by-- look at the model level. Make sure that they are aligned. So in this instance, there's a structural top of the slab level. And then you have architect also provide finished floor level. And this is very critical, because you want to make sure that the architect is using the level that they want, because that can be indicate the floor level. You want to be the same throughout the project. You don't want to be hour one and then you have hour two finish, which that incorrect. I'm the data side. So one of the things I don't think people realize is in your deliverable on these-- COBie spreadsheet-- is the facility tab. That information is actually captured in your project information tab. And what we see a lot of times is people do their export and next thing you know, they've used a template, so all this information is from another project. That happens a lot. So what ideally happens-- to be honest with you-- is what we want to do is-- oh, and by the way, there's no schedule. The COBie toolkit has all those pre-determined schedules. There's no schedule to show what the project data-- what that tab would look like. So that's why it's important to look at there first.

4 But what happens a lot of times is I'd really like to see the architect set it up, get this all setup so that when you link the models up, you can transfer that information. So you're not worrying about it. You just transfer what they put up. And so the setup for you for that part of the deliverable has already been established. And you can use transfer project standards, and there's a project info click, and you can bring it over. So if you talk to your-- like in your PXP plan-- talk about this a little bit. Because if you're doing COBie deliverable, you really need to have that setup once and reuse it, and not continue to everybody do a different kind of setup in here. PECK SUKPHISIT: So now we have start have to match the data from architectural room number through MEPF space number. So first, you need to go and look in the plan view and make sure that view display toolbar setup to visual style vectors hidden line. And you're going to select Interior and Referent under space, because that's going to make the space visible once we're adding them. Next, you're going to Ready to Create Space. Go to Analyze tab. Now, if you've already created your spaces, this is in case you haven't created spaces. You're doing your workflow as it goes. But if you've already created spaces, already done this, step two will show you where to go, but we're just trying to get the full workflow. PECK SUKPHISIT: Go to space then select on the contextual tab place spaces automatically. And, of course, once you automatically insert space, everything turns green because we insert your reference and interior selection. Then, of course, you're going to see how many space are automatically created. That will pop up so that let you know. And then rinse and repeat, basically, on all floors that apply. PECK SUKPHISIT: So spaces represent in green. And if it's not already on the space tag, go to annotate tab. Go to tag all. Make sure that come in, so through all the floors. And, of course, we can start to confirm and validate with the space schedule. I assume that everyone know how to create the space schedule. I have level number and name. Obviously, number is just random, space to say default to

5 main-- I mean to space. And now we are preparing to validate. So we could do it manually or we could do it automatically. But in order for us to do automatically, go to edit schedule. Make sure that you select include element links. This going to bring you-- allow you to bring in the architectural rooms. And switch to room, and then go to room number name. And don't forget area, because area could be basically a little check that you know that the space is valid or not. So this is the result. That's what you're going to see. On the left column is MEPF space information, which it's doing correct. Then the right is the architectural model room information. And, of course, you can see some that is blank, because the architect never assigned space to that-- never assigned the room to that space. Next, have you guys used space naming utilities before? Great tool-- Of course, you go to Autodesk app store for it, download, install. Once you select the space naming utility, name and numbers come up. Make sure that all level are selected. And once you're on, this is when you're going to see the-- you're going to see side by side the match. Now, let's go back to a step further. What happened for the invalid rooms? Those are nonexisting or no room assigned. So in this case, for example, that little space behind the water fountain is invalid. And, of course, when you look at the schedule, you see here is architect number assigned for it, and of course the space name and utility doesn't know where it's to match up to, so-- and also that 4 square foot standing out right there. That's anomaly. So that mean, of course, you're going to go manually delete that out, or you can use your filter or sorting and then just get rid a bunch of them. Yeah, and then sometimes what you'll have is there's some white area-- like you see all green but then there's certain places it's white. And when it's white often there's just no space or room there, and so it just has one blank across. So, anyway, we just want to make sure you understand, those are common so don't freak out. Those happen. And like Peck says, for your deliverable, you really need to delete those so that you don't pull them over. And really, you guys, we really shouldn't be editing the spreadsheet. It should come corrected and then come over. I know there's a tendency to do that. I understand, but it really needs to be something that is repeatable-- and so, just a little word of caution there. PECK SUKPHISIT: Yep.

6 So I'm going to talk-- Peck and I are going to talk about this a little bit. So we run into this a lot. Peck's half-time in a MEPF firm supporting them. And so, they're doing a lot of these deliverables, working on a lot of large projects. And we find that this is something that people don't understand how to solve sometimes. And so, we're just going to try and give you some options. We're going to go through about four options based on what it is. So, for instance, these are some situations where you have them on the roof. The roof doesn't usually have any space to find up there, or on the exterior of the building, so outside the building-- chillers, generators, stuff like that that kind of sit out there but don't have any really space assigned to them. Architects don't have any space-- I mean, there's just no rooms and stuff. The other situations are above ceiling in an interstitial area, in walls-- so when they're placed in the wall, they don't understand there's a room right there. So they're sitting back. The other one is when you have smoke dampers. Again, I'm working mostly on the assets that-- or equipment types that you will need for your deliverable for COBie. There's other stuff in here, but I'm not trying to address that. I'm trying to address the basic equipment that you're going to see on your deliverables. So in walls, you'll have panels. You also have fire dampers, which will be between two walls. And how do you get those assigned to a room? And then finally also below grade-- you'll have a sump pump down there. How do I able to get that space to cover that? So these are just four different ways we're going to go through to address some of these. Go ahead, Peck. So the first way-- PECK SUKPHISIT: The first one, we need to create a new space. So on the roof, they are pretty straightforward, create space-- in this case, for capturing the condensing unit or air conditioning. Make sure that the level of the unit-- make sure that the space is captured, because sometimes it's wall mount, a little bit higher, so you need to verify the space volume height a little bit. What architects also a lot of times overlook is the exterior space. Remember, it's beyond 5 feet away from the building, which is usually the generator sits or some electrical vault. So confirm with the architect, make sure that-- how do you want to assign this space name.

7 So, in this case, they say, oh, you know what? Go ahead call the exterior north, so at least I know the general area where the equipment is located. And, of course, that's the whole generator, for example. Yeah, we had a couple of situations where the building that actually-- the renovation project was actually in a building adjacent to a parking garage. And they also had condensing units sitting outside into the parking garage structure. And so, it was outside of the scope of the job, but at the same time it was a piece of equipment we had to deliver on. So a couple of ways we do that-- we often we rather go and talk to the FM people, at least tell them what do you think. And they're usually like I don't know. We don't call that or will tell us what we want it to be called. Because really it's ultimately their data. So if you can get to them. If not, kind of what we're talking about is on the exterior-- at least if you say exterior north or something, just kind of generally they know it's outside on the north side of the building. So those are just little defaults that you can use if you don't have any access or you're trying to just get the deliverable done. So the other ones that we look at are above ceilings-- VAVs, our good friends, fans, things like that that are up in the interstitial or above a room that hasn't been captured, so like that. Inwall-- again, fire panels, electrical panels, smoke dampers, things like that, fire dampers, things that are actually built into the wall and don't really associate with a room when you run your first-- when you start looking at your schedules and stuff. Go ahead, Peck. PECK SUKPHISIT: So we can address the issue of above the ceiling equipment asset. So, as you can see, it's by default it's going to 9 feet. A lot of time, maybe you have already working with MEPF firm. They already have the space in place. However, those space normally using a mechanical to capture the CFM, but you need to modify that space to extend it up to underside of the structure, basically. And now you cannot do this manually. You cannot use the select instance in our instance. You have to do this manually. So I normally just do the window click. Go to Filter, select that. And go to the property palette and manually adjust the limit offset. Now, we use minus 3 inch, because we don't know how high that is, but as long as I can just slightly below the level above. So I want to make sure that it's captured correctly. It depends on the structure. In this case, it's like-- if you have double 20s or framing, you know at least you go into that.

8 Yeah? So when you've got a space that's being bound by architecture, when it hits that ceiling, it's going to stop. What are you guys doing about? PECK SUKPHISIT: Right, OK. Yeah, because if the ceiling is select on the room bounding but because-- remember, you make sure that the room bounding is off from the architecture or-- I know. It's for the deliverable. So, I mean, that's what we're-- I know. I know. And, again, this is the challenges we have with those. It does tweak things. PECK SUKPHISIT: Right. We can start to run into this a little bit of a situation how the architect does think about that. I want to make one comment on those deliverables. Don't make it the week before you're supposed to do your CDs. Come on, you guys-- I mean, excuse me, not you guys. I mean, really it should be a week after you do your CDs. I mean, really I've had more times where we went and delivered and the next thing you know, the CDs got changed and my delivery is off. So just what I'm saying is if we can get the CDs out and then you can go that's with the models a little bit. So it's just a work-around. I understand. PECK SUKPHISIT: Yes, sir. Is there a reason that you would use that as opposed to if you have a slab thickness that? Oh yeah. PECK SUKPHISIT: Yeah. Yeah. We just said negative because some are-- you don't want to sit there and goes at 3 inches-- I mean, excuse me. Is it 8 feet, 9 feet, 10 feet? It's just-- exactly. You look at your slab. Do minus 5, whatever is kind of-- but it gets it-- Below the actual.

9 Yeah. Yeah, yeah. That's just our first default. I've had pretty good success with the room tabulation point. Well, we're coming to that. Hold on. We're only at an option two. That's option four. So option one is create spaces. Option two is to extend. Now we just talked about extending up. Next thing we're going to talk about is-- oh, rinse and repeat if you have to do this on all your floors. PECK SUKPHISIT: Now, we're going to extend space. Of course, maybe now is the time to look down, especially elevator pit. Sometimes you look, you're always looking up. You don't see the-- what's below you. So in this case, usually I'd do for the elevator pit. You want to make sure you capture the sump pump and some equipment. And what I normally do is do a section cut-- simple. And you can do it via project instance property, or you can just manually drag it down, and easy as that. So this is one place where you do it by space. The other one we were talking about, you want to pretty much do more globally. All right, option three-- PECK SUKPHISIT: Option three. Option three will be-- well, we're going to give you an example, but essentially you have something in an unbounded space. In other words, it may be downstairs-- and we're going to show an example in an airport-- where you don't have a bounded room but you need to have that room bounded to make the space. So we'll give you an example real shortly, but that's where we start using the space separator. PECK SUKPHISIT: Yep. So a baggage sorting area is a good example that we ran into. It's open space, but on the ceiling they've got heater, fan equipment that we need to track. So in this case we just go in. We use a space separator running across and be able to capture. And don't forget that you make sure the volume of the space is captured your asset. All right, number four. PECK SUKPHISIT: Number four, OK-- so currently the airport project that I'm working on, you've got the passenger area. And the roof and the ceiling extend over the retail area. And this is the

10 limitation of space that it's basically a cube that going all the way up. How do we address that? And also same thing with similar to panel mounted in walls, because if the-- we're going to start looking to the room calculation point. Double click the asset, bring up the family, and of course, make sure you look into property palette. Look at the room calculation point, select it on. And once you have that, you're going to see a little node with a little X, Y, Z coordinate. Then use your mouse. You just drag it out across. One thing should be careful about is you want to be far enough but not too far. Because you're editing a family, so that's going to happen throughout your entire project, and so moderation, basically. Yeah, so one side I didn't put it in here. So then once you do this and you go back to your wall panel, you can see that little access thing. And then that's when you can go in and drag it out. What gets funky in this situation is you think your panel's in a certain direction and you pull this out, the little-- you drag it out there and then when you get it it's in another room. It's on the backside. And so, sometimes it's a little bit of tweaking. But the bottom line is, yes. This is option four. Before they had some of these other tools, this was your option. You had to take all your VAVs and drag them all up. But now with some of these other things, we've been able to avoid that. But these are, again, those unique situations where you can't get to the room and you have to find the room and attach it to it. And this is the quick and dirty way, by the way. If you have one or two, don't mess with the other options. Go to this. So does this one make sense? Do you guys play with this at all? Yeah. You need a panel for everything. Yeah, I know. I know.

11 Right, right. So yeah, anyway-- I mean, again, we're trying to just give you four options, ways to deal with situations. And that way you can pick which works best. PECK SUKPHISIT: Yes, sir. transparent clearance zone. calculation point within that clearance zone. It gets into your space without going too far away. Good point. Thank you. PECK SUKPHISIT: My rule of thumb is what is the easiest way to access that space that have the hierarchy over. So like fire dampers or what? But see, that's the thing. We're looking about if you had to go find it. I don't care what it's servicing. Do you see what I'm saying? So everyone gets that-- Yeah, so this is something everyone-- and that's a great point, because that's what happened originally with COBie and stuff. Everybody's like, well, which room it services? And I'd go, I don't care what it services. I'm looking to find it. So when you're looking at this concept, you're delivering information to someone who is trying to find it. Gotcha. And so, that's that. Now, when you look at systems-- that other tab they've got-- that's where those things would connect over there. No, good question. I agree. Those sometimes aren't always the intuitive in terms of why this is important. Our buddy-- enough said. I'm just going to give you two places to locate this. It used to be up in the app store, but apparently I couldn't find it up there either. So they have it at the Autodesk Knowledge Network. Have you guys found that? That's one place you can get it.

12 This is actually something the-- the second place here. This is something Autodesk actually put together. And this is actually probably a better location. It's got a couple other tools here that you might want to look at-- classification manager. Right now, in a lot of the Revit right now is-- I don't know. The omni class is like three years old or something. You know what I'm saying is it doesn't match up and then you've got to go play around with the text file and all of these things. We've all done that. Well, that's what this is intended to do. So look at the classification manager. They do have a model checker that's a little more expanded. And so, I think this is actually some really good opportunities. Go ahead. Your presentation up there is slightly different than the material from. Yeah, this is the website that I just copy and paste off this. Well, no, I mean your entire presentation, there were some slides in the options and stuff that are not in the material. It will all be available, you guys. And we tried to do it so that if you printed it, it wouldn't sit on top of each other and-- even though we do a lot of animations. So back to the interoperability. So this is something-- it's funny. They don't even put Autodesk up there. You know they're hiding. But it is all theirs, but it's great. It's great. It's good to have. So this, again, is where you can get the COBie extension. It goes back a few, maybe 15. But that guide, I could sit here and talk two hours on it, and that guide is better than whatever I would say. So I decided not to talk about it. So I really think this is really where you guys, if you really want to get more information, really, it's really a very good breakdown. And I think there's a forum on there, too, so I mean lot of opportunity to like-- I don't get. What do you do? So the COBie extension or the toolkit has all sorts of little fun things to do and get things going. And, again, if those of you who haven't seen it, this is the interface. But, again, look at the guide. I just want to bring this part up. I mean, this is something I just want to make sure everybody-- let's clear the air a little bit on COBie on what's required and what's not. And everybody's, oh my god, the spreadsheets. Who thought of this?

13 What I'm trying to articulate here real quickly is what is really required and what's really optional. So when you get these requirements, you're like, oh my god. They want COBie and they're not telling me anything. First of all, COBie will only-- one of the things, if they don't tell you what assets they want it on, you should ask. They don't want it on light-- well, they do on light fixtures. I don't know why. But the point is is that's one thing you need to make sure. You need to understand what they want the information on. And as a default, if you guys were not told, look at your mechanical schedules. What has scheduled maintenance? Best guess-- I mean, it's better than nothing. So keep that list as tight as possible. You don't have to give everything. So if they don't tell you, I'd go to the mechanical schedules, look at your pumps, your air handlers, your chillers-- best guess, but don't go beyond that. Don't push it too far, because they don't even know what to do with all that. So if you really want to do some diligence and really show value back to them and that you know what you're doing, go to your mechanical schedules, maybe VFDs. But I'm just saying keep it high level and just give them a small section cut of it and let them come back and say, oh, I want something else. But don't go whole hog. I swear that you'll drive yourself crazy, especially on light fixtures. So what I'm trying to get here is everything in the yellow is what you'll be entering-- previously fields that are carried forward from the other tabs. Green is optional, you guys. If they don't tell you, it's really not required. So that's the basics. So basically everything to the left of the purple field's required. Names have to be unique, you guys. And what we mean by that is you can't have-- they can't have the same-- you can't say transformer and transformer. It has to be a transformer-- some voltage, some voltage. So make sure they're independently-- don't duplicate names. That's all I'm trying to say. And the other piece is if you are a design firm and you have VTCO tech air handler, that ain't going to cut it, either. They are trying to put this into a system that they're going to be searching. They just want to know it's an air handler. By putting your name or having a manufacturer name under type doesn't help them. That actually makes them look like I can't

14 use this information. So those are just little tips over there. The required tabs are in yellow, seriously. And those are client-specified over there. If they don't specify them, you seriously don't really have to deliver them. Again, clients have to tell you whether they want zones. Some of these are not mandatory. And I'm just trying to tell you. If they ask for them, then that's what's deliverable. But if they don't really give you any guidance, you can go by this kind of approach. Those purple fields-- everybody is like what do you do with the purple fields? They don't do anything with the purple fields. They're intended to be able to be pulled into another system so they know where it came from. And then they actually if you want to go bi-directional, they actually have the GUIDs to go back and forth. That's the intent. Not much is going on at this moment totally with some of the CMMS systems, and that's what COBie's for. So the purple fields are really-- you can also see where it actually came from and what software. I mean, that's really the best thing. But really those as a deliverable commonly is not as viewed as some. So bottom line-- left of purple field, yellow tabs are required-- right of purple fields are client-specified or optional, as is these ones down here. Does that all make sense? I just wanted to-- PECK SUKPHISIT: You had a question? Yeah. The software fields-- is there any kind of standardization of how you would write that in there? I mean, everybody here in this room-- You don't have to write it in. --would understand. So it is-- It's only if you're pulling it in and out of software. That's the only way you can do that, because of the GUIDs and everything. If you want to be helpful, you can go ahead and put what software. It came out of Revit 2006 or something-- drag and drop it down just to give them a reference. But if you're not going in and out of software, that purple fields right now are not necessarily required.

15 As far as the spreadsheet up here,. But that is information from the model. Yeah, it will populate it and stuff. And so, I'm saying if it populates, you can give it to them. But if not all of it populates and they didn't ask for it, don't feel like you have to go spend time trying to populate it. So that's a good point. I just wanted to be clear that some of the people that hear that-- Yeah. Yeah so, well, I mean even if you're manually filling it out, these rules still apply. But I think his point is if you take it out of the model and you get some of that information back there, just leave it there. But the point is is if they're not asking for it, don't feel like you you have to go through the extra effort and complete it. I think that's all I'm trying to say. Personally, my opinion is if they didn't ask for it and it came out, I hide it. Because the next thing they know, why are these other ones not there and you spend all this time arguing over why it's there and why it's not. But exactly true-- it's already comes out, give it to them. It's not valid, data though, if it's default information. Yeah, I mean, and so there's-- either way, you can give it to them if you feel comfortable, but the quality of the data-- or you can actually just delete it or hide it. Because, again, in some cases it's either bad data. COBie is not a panacea for delivering bad data. It delivers bad data just quicker. And there's BIM here that will help you fix whatever data that might need to be fixed. How are we getting here on time? We're doing good. Because we want question and answers, too, so give you a little bit of time on that. Append files-- often they don't want separate files. They don't want just one architecture from-- they like to just get one file. And if you give them everything in your model, that's not a good way to do it. So we're just going to talk about this real quick. Typically, what you architectural

16 model in your-- get you all setup there, then you can go ahead and start with-- we start with a mechanical model, right? PECK SUKPHISIT: Yep. We start off with mechanical model, because that is the most populated. That's the way I see it. So you run the export for mechanical model. You will make sure that you have contact, facility, floor-- let's see. I got on the next slide. So we're good. We're good. But we just wanted to show you the steps. It's repeat, repeat as needed. Again, if it's all in one model, this may all happen at once, but it's just depending on what you do. And the reason you're wanting to do that-- rinse and repeat, OK. So what we're trying to do is this first one you use create new. And you just go through-- let's just say at this point as required. As applicable, you go down and do any of these checks. So I'm not trying to say don't check them. I'm just saying as an easy one. So what you want to do is the first file that you export out-- whether it's any of the-- sorry, plumbing or anything. But again with the mechanical because it has most of it first, you get all of that. You want to get the contact, as you were saying. And so, that will actually populate all those. So that's the beginning of the file as a new created one. PECK SUKPHISIT: And now, since we already export the mechanical, now we're ready to do the rest. So he's going to select type, component, system. And you don't want to select those top rows anymore of contact, facility, floor space, and so on, because we already exported that once already. So it's going to keep compiling if you do that. And make sure that you select it on the. And it's going to have a menu that say you want to append? Make sure you go there. Yeah, because if you click them all, then you get facility, facility, facility. PECK SUKPHISIT: floor. So, again, all it's doing is taking any of the new information and tagging it below. That's all this pending does. So, essentially, your first export will look like that. Then you do your plumbing.

17 In comes the next set. Then you do your electoral-- in comes that, and then finally if you've got fire protection. So it just cascades down, but it puts it all in one file and you're not redoing the first couple of sets. So it's just a quick way to do a-- use the toolkit in a way to do a deliverable that maybe you want to combine of the sheets. Maybe you're doing the plumbing and mechanical and you just want to get that deliverable out without two different deliverables. So in wrapping up, told you what we said we're going to say now. Hopefully, you can tell me if I said this. So go ahead, Peck. Tell them about workflow. PECK SUKPHISIT: So we cover room bounding. Make sure that you select next is a level. As you can see on the last slide with the export, if the floor you've done correctly, you only have the floor that you want to export. But if you make a mistake and you have a deviation, you can start to see that the randomness of the floor level that it get export. And, of course, facility type data, that's coming in from architects, and using the project standard. And we use the space schedule to verify space and room. Make sure that match. And any time an architect modified their room information-- because the client always come back and say, hey, can you change the room number-- you've got to run the space naming utility again. So you just have to be aware of that. And analyze tabs, space naming-- and, of course, you look at the full option. How do you address the issue of ceiling heights, the depth, the area that is not being defined? And, of course, COBie export-- we've got two site for downloading COBie extension, appending export for a single COBie file deliverable. So hopefully we've touched on all of those. If we didn't, get your money back. Good luck. So, again, hopefully at the end you learned how to prepare the models for more efficient workflow. There's always variations. It's not always perfect. People don't hand off models. I understand all that, but if we can look at what we're trying to get to and you can work around that one. This is really important. I've presented recently on this. I really think the architecture model, it really is the most valuable player in the state of deliverable. If you look at the data that needs to be delivered, yeah-- I mean, the mechanical stuff, yeah, it looks like you've got a lot of information delivered and stuff like that. But if you don't have the space in the room right, it doesn't matter. You can give them all sorts of information. They're no better than they got

18 before. They just have it on a spreadsheet now with the wrong rooms. So my point is is really being able to do the setup properly when you link those models. And use these steps so that you do carry forward the most current that you have-- rooms-- into the spaces is huge, and creating those spaces where there aren't any, because then they can find it. But if you can deliver it with no spaces-- and it doesn't help them, to be honest with you. So that's why I think making sure that the architect understands that their role-- matter of fact, a lot of times on the design side, that's who delivers this. They're responsible for this, so they should understand how important they are. So I wanted to say that again. Anyway, so then we decided to make sure we understand how to match them, how to validate it. And then if you don't have them when you validate, where are those spaces supposed to go and how to do that-- and then finally where you can get the extension and then a little bit on the appending, because I think that's not always very clear to people on how and why you would do that-- friendly tips. So when you guys get there, if you could help us out on that one. And then lastly, this is Peck and I have our addresses here. We're both on LinkedIn, so find us there, if you want to read more about us, whatever, or want some help. We're willing to help, so if you guys send us some s with some questions, seriously, we're here to give you some advice. So with that, we'd like to say thank you. PECK SUKPHISIT: Thank you. [APPLAUSE] I just wanted to throw out there Thank you. PECK SUKPHISIT: Thank you. I have a question directly related to that. I know there's some good Dynamo scripts out there that are readily available to create the spaces and name them the same as the room. That

19 utility, same thing. No, I mean if you want to go run the right scripts-- I mean, or pull an app down. I mean, it depends. I mean Dynamo is getting more and more powerful in that regard. Those of us in the room, a third of us will be programmers in another month. It's coming. So embrace that, by the way. I swear. Once Rivet went with their open API, they went from having a handful of developers to-- I don't know-- 2 million developers out there, because all the Rivet users could be developers. So if you don't have a developer-- a programmer on your team right now, you'll go find them, because they're being scooped up-- or become one yourself. Is this PowerPoint slide available on? I have no idea. But I'm just saying if the others are, this is no different than any of your other presentations. So if someone can help me out on that, I don't know. But this is going to be with Autodesk's, wherever they store all their presentations, and if it's in PDF. And if you don't have it, contact us and I'll send to you, seriously-- so plan B. construction firms. What's the best way to pre-load along this into our Rivet? Pre-load? Yeah. I mean, are you using the design models or anything like that? I mean, a lot of the space information is where that would come from. Otherwise, if you're doing your own models, you-- Yeah, so you bring in your product object. That will pull that information in. And then you have to COBie-ize it to get the data fields into there. Now, one thing that I think the COBie toolkit does now that it didn't before was if you had manufacturer down here, it knew where to go to go get it, so you don't have to redo it. But there is some of that balancing that you're going to have to do. So there is some additional work. I mean, the contractor deliverable-- if it isn't reused from the design side-- can be a little bit more work, I mean, to be honest with you.

20 And what do they do with it? PECK SUKPHISIT: So the question is the contractor get the spreadsheet, what do they do with the spreadsheet? Well,. What does the owner do with it? Yeah, what does the owner do with it? A lot of times they don't know what to do with it, because they asked for it but it's like they ask for BIM, and they get these models and where do they put them? But the point is the intent of that whole deliverable is for them to-- a lot of their CMM-- their maintenance management systems have adopted COBie as a import standard. So if you give that to them, they can actually import it in. And so, it automates that versus typing it in. That's the whole big picture view-- not always happening, but that's the intent is for them. Some of them don't actually have all that information in one place. They like it in the spreadsheet. And others just mostly say they want it, don't check it. You guys don't deliver all the information. I mean, it's just like the BIMs, sorry- - at this point. But still respect the data. Yeah? Yeah, and so they-- Yeah, but if they have one, typically they've adopted the standard, in the sense that it recognizes if you bring that import in, it knows where to go. That's the whole goal is that it automates that part of it. So thank you.

21 We have a client that requires multiple COBie deliverables and design milestones. Do you recommend you do it through new COBie files each time if you're managing? No, no, no. You update. Just send them a new one, because things change. Yeah, once you send in one, just give them another. PECK SUKPHISIT: Yeah, the asset comes and go all the time. So, I mean, those-- I mean, let's say you were changing unit, it's the size changed and capacity has changed already. You've got to re-run it. A lot of people in the models, people do stuff. They really do. They're not supposed to. So I would go ahead and do another export out. On that note, one of the best things, again, you can do for an owner-- if you want to help them-- is give some interim ones. Because that way they can prepare, especially from a contractor's perspective-- not so much on the design side. But on the contractor's perspective, I always try and say, look, you have your deliverable as you're going through submittals. Because this is supposed to help the LNM people prepare for the equipment coming in. They may know there's pumps, but they don't know what manufacturer. And they may know there's five or some, and they may know nothing. But any information they can get ahead of time-- even in a spreadsheet-- allows them to start getting prepared. They're like, oh my god. We have all this new stuff. I need to go get trained, or I need to get new people, or I need to look at my schedule because these guys are going to come online, and-- instead of just and here's the building, and then they have to figure out things. So I encourage interim deliverables at times, too. Do you guys think the designers? Do you see designers doing that as they're laying out the pictures or do you see that as another task where somebody comes in behind them after the design is slowed by it? PECK SUKPHISIT: Well, light fixture-- that's iffy item, isn't it? The question is do you want to number-- Yeah, I would go with what they have. A lot of times when we're talking about equipment, their

22 equipment schedule already says air handler one and air handler two. Now, the lighting I just-- I try to stay away from, because it's really not something they import in. So you've got to realize this whole deliverable is intended to be imported into a maintenance management system. They're not maintenance managing lights. But if they are doing it, just go with the numbering, the-- Right. Right. They should do that. That's the answer. Yes, they should hold on to that. We had a client that says I want a campus, building-- what-- floor, room, and then the-- yeah. That's a lot of data for every single. Well, I think in the new toolkit-- especially on the either design or construction can use. It actually, I think, has some ability to do some catenation of some of that information. And then you can always use BIM Assure, because that's what we're doing-- to actually look at that and then fix it, and then send it back. So there's some other interim things you can do if they're not following, because they won't always follow what they're-- they don't even follow-- you give them all these room numbers and they use their own. We know all these things happen. But I think what you're saying is is if they have a certain naming convention, if it could be started in the design phase, yes, as long as they have that information and that's what they're supposed to do. And if anything, ask them to do it at least on this list of assets, please, because I don't care about the rest. See if there's some-- but yeah, getting that is-- Yeah. I think we're seeing more and more folks have realized when they need some numbers. Yeah, well, they do. They have this rule-- well, and that's because of the systems they have. It has nothing to do with-- the reason they do that, by the way, is because what happens is is that asset-- with all the floor and blah, blah, blah information-- gets put on another exported report, which doesn't include all the information. So all they know, it's an air handler in this

23 building. They don't know where it is. So we'll fix that. We're going to take the ID and tell you where it is. So that's where that came from. But that's not what you would traditionally identify as on your book? No. No, what I would do is take that naming convention, and then whatever you have on your equipment schedule, tag that on at the end. And I've had to go in to those schedules in the-- yeah, we've all tried copied and paste, right? Yeah. So yeah, and I've had to-- Yeah, well, I mean that's really what you should do. Two or three years ago, I was doing the other one, which is really a pain. So, yes, I would export it out into one of those Excel formats. Do all of your catenation over there and pull it back in. Done, yeah. You mentioned export to a CMMS system. Does the maintenance ever get put into COBie or is that done? So when you mean maintenance, you mean like the schedules and-- Yeah,. You guys, they already know what their schedule is on pumps. I swear, just putting it all in here. Anything that goes beyond over there is really beyond what we can do today very efficiently, and I don't recommend it. So the answer question is is if you tell them make and model number, they'll go to the internet and figure out what they need. And so, they're just trying to figure out where it is, what it is, what the model number is so that they can go. And if you've got serial number-- again, serial number, that's another big thing. I don't like to get serial number on everything. I don't need it on a friggin' BAV. What I need it on is engineered equipment like your chiller or your air handlers, things that you go out and actually procure that are engineered, because they need that serial number to go get information. Anything that's bulk manufactured like VAVs, and doors, and all that stuff, the standards that we write, we very much take that down a notch and say, look, I only need serial numbers on these things.

24 So when a serial number comes in-- and you notice it's actually an optional field, by the way. It's not a required field. And so, serial number is one of my-- I don't know. Personally, I like either the commissioning agent or the owner just go get them, because people who don't really need the information don't care about the information. Bless their hearts, they'll go out and write it down, but is it five and S? I don't know. Just get it over there. So serial numbers is a little pet peeve of mine, anyways. Oh, installation date, that's another one. When is the installation date? Right, that's pretty much-- you know what they think the installation date is when they put it into their system, the day the building was turned over. It's one date. Because what they're trying to do is look at when that thing hits. And in a year, if something happened to it, I need to go find the contractor. If it's over a year, it's my problem. That's all they need it for. Now, warranty, by the way-- and I'm a mechanical, and I've done construction, and I've bought equipment and I've had to get extended warranties because by the time it turned over, it was a year and half. So I had to get an extra so it would at least cover to the end of the project. So they're not looking specifically that-- they're looking for a warranty to go after. They're trying to figure out who they need to talk to about the warranty. And most of the equipment that they have that they're asking for is out of warranty by the time you guys-- the building is handed over. So these are things that when you talked again to an owner, they may say they want it at commissioning. OK, fine. You figure that out. But if they don't tell you is it when the pump is set, when it turns on, when it's been running for a day, that's a vague area. And so, anyway, these again are things I like to define in our standards so everyone understands what that dates are in for. Anything else? I could go on forever. Well, thank you very much. I appreciate your time. PECK SUKPHISIT: Thank you.

Autodesk University Automating Plumbing Design in Revit

Autodesk University Automating Plumbing Design in Revit Autodesk University Automating Plumbing Design in Revit All right. Welcome. A couple of things before we get started. If you do have any questions, please hang onto them 'till after. And I did also update

More information

Autodesk University See What You Want to See in Revit 2016

Autodesk University See What You Want to See in Revit 2016 Autodesk University See What You Want to See in Revit 2016 Let's get going. A little bit about me. I do have a degree in architecture from Texas A&M University. I practiced 25 years in the AEC industry.

More information

Autodesk University Laser-Scanning Workflow Process for Chemical Plant Using ReCap and AutoCAD Plant 3D

Autodesk University Laser-Scanning Workflow Process for Chemical Plant Using ReCap and AutoCAD Plant 3D Autodesk University Laser-Scanning Workflow Process for Chemical Plant Using ReCap and AutoCAD Plant 3D LENNY LOUQUE: My name is Lenny Louque. I'm a senior piping and structural designer for H&K Engineering.

More information

QUICKSTART COURSE - MODULE 7 PART 3

QUICKSTART COURSE - MODULE 7 PART 3 QUICKSTART COURSE - MODULE 7 PART 3 copyright 2011 by Eric Bobrow, all rights reserved For more information about the QuickStart Course, visit http://www.acbestpractices.com/quickstart Hello, this is Eric

More information

Autodesk University Advanced Topics Using the Sheet Set Manager in AutoCAD

Autodesk University Advanced Topics Using the Sheet Set Manager in AutoCAD Autodesk University Advanced Topics Using the Sheet Set Manager in AutoCAD You guys, some of you I already know, and some of you have seen me before, and you've seen my giant head on the banner out there.

More information

Autodesk University Project Navigator to the Rescue in AutoCAD Architecture: Fix Standard Mismatches in a Project

Autodesk University Project Navigator to the Rescue in AutoCAD Architecture: Fix Standard Mismatches in a Project Autodesk University Project Navigator to the Rescue in AutoCAD Architecture: Fix Standard Mismatches in a Project Good afternoon. Thank you for choosing the class Project Navigator to the Rescue in AutoCAD

More information

Autodesk University More Practical Dynamo; Practical Uses for Dynamo Within Revit

Autodesk University More Practical Dynamo; Practical Uses for Dynamo Within Revit Autodesk University More Practical Dynamo; Practical Uses for Dynamo Within Revit Hello, everyone. How's everyone doing? All right! Everyone excited to learn about Dynamo? Yeah! Welcome, everyone, to the

More information

Buying and Holding Houses: Creating Long Term Wealth

Buying and Holding Houses: Creating Long Term Wealth Buying and Holding Houses: Creating Long Term Wealth The topic: buying and holding a house for monthly rental income and how to structure the deal. Here's how you buy a house and you rent it out and you

More information

MITOCW R3. Document Distance, Insertion and Merge Sort

MITOCW R3. Document Distance, Insertion and Merge Sort MITOCW R3. Document Distance, Insertion and Merge Sort The following content is provided under a Creative Commons license. Your support will help MIT OpenCourseWare continue to offer high-quality educational

More information

MITOCW R22. Dynamic Programming: Dance Dance Revolution

MITOCW R22. Dynamic Programming: Dance Dance Revolution MITOCW R22. Dynamic Programming: Dance Dance Revolution The following content is provided under a Creative Commons license. Your support will help MIT OpenCourseWare continue to offer high quality educational

More information

Autodesk University Texting Gone Wild; Advanced Annotation Tips and Tricks for Fabrication CADmep

Autodesk University Texting Gone Wild; Advanced Annotation Tips and Tricks for Fabrication CADmep Autodesk University Texting Gone Wild; Advanced Annotation Tips and Tricks for Fabrication CADmep I want to start out with just a little introduction, obviously. Because see a lot of familiar faces in

More information

PARTICIPATORY ACCUSATION

PARTICIPATORY ACCUSATION PARTICIPATORY ACCUSATION A. Introduction B. Ask Subject to Describe in Detail How He/She Handles Transactions, i.e., Check, Cash, Credit Card, or Other Incident to Lock in Details OR Slide into Continue

More information

BEST PRACTICES COURSE WEEK 21 Creating and Customizing Library Parts PART 7 - Custom Doors and Windows

BEST PRACTICES COURSE WEEK 21 Creating and Customizing Library Parts PART 7 - Custom Doors and Windows BEST PRACTICES COURSE WEEK 21 Creating and Customizing Library Parts PART 7 - Custom Doors and Windows Hello, this is Eric Bobrow. In this lesson, we'll take a look at how you can create your own custom

More information

MITOCW MITCMS_608S14_ses03_2

MITOCW MITCMS_608S14_ses03_2 MITOCW MITCMS_608S14_ses03_2 The following content is provided under a Creative Commons license. Your support will help MIT OpenCourseWare continue to offer high quality educational resources for free.

More information

Using Google Analytics to Make Better Decisions

Using Google Analytics to Make Better Decisions Using Google Analytics to Make Better Decisions This transcript was lightly edited for clarity. Hello everybody, I'm back at ACPLS 20 17, and now I'm talking with Jon Meck from LunaMetrics. Jon, welcome

More information

Autodesk University I Feel the Need, the Need for Speed AutoCAD Electrical Automation

Autodesk University I Feel the Need, the Need for Speed AutoCAD Electrical Automation Autodesk University I Feel the Need, the Need for Speed AutoCAD Electrical Automation Good afternoon, everyone. Welcome to I Feel the Need, the Need for Speed, AutoCAD Electrical Automation. Let me go

More information

Autodesk University CSI: CAD Standards Implementation

Autodesk University CSI: CAD Standards Implementation Autodesk University CSI: CAD Standards Implementation All right, everybody. Welcome to CSI CAD standards implementation, and my name is Sam Lucido. Many of you have seen me, and first we're going to get

More information

BEST PRACTICES COURSE WEEK 14 PART 2 Advanced Mouse Constraints and the Control Box

BEST PRACTICES COURSE WEEK 14 PART 2 Advanced Mouse Constraints and the Control Box BEST PRACTICES COURSE WEEK 14 PART 2 Advanced Mouse Constraints and the Control Box Copyright 2012 by Eric Bobrow, all rights reserved For more information about the Best Practices Course, visit http://www.acbestpractices.com

More information

The Open University SHL Open Day Online Rooms The online OU tutorial

The Open University SHL Open Day Online Rooms The online OU tutorial The Open University SHL Open Day Online Rooms The online OU tutorial [MUSIC PLAYING] Hello, and welcome back to the Student Hub Live open day, here at the Open University. Sorry for that short break. We

More information

Environmental Stochasticity: Roc Flu Macro

Environmental Stochasticity: Roc Flu Macro POPULATION MODELS Environmental Stochasticity: Roc Flu Macro Terri Donovan recorded: January, 2010 All right - let's take a look at how you would use a spreadsheet to go ahead and do many, many, many simulations

More information

ArchiCAD Tutorial: How to Trace 2D Drawings to Quickly Create a 3D Model

ArchiCAD Tutorial: How to Trace 2D Drawings to Quickly Create a 3D Model ArchiCAD Tutorial: How to Trace 2D Drawings to Quickly Create a 3D Model Hello, this is Eric Bobrow of Bobrow Consulting Group, creator of the ArchiCAD MasterTemplate with another ArchiCAD video tip. In

More information

The Slide Master and Sections for Organization: Inserting, Deleting, and Moving Around Slides and Sections

The Slide Master and Sections for Organization: Inserting, Deleting, and Moving Around Slides and Sections The Slide Master and Sections for Organization: Inserting, Deleting, and Moving Around Slides and Sections Welcome to the next lesson in the third module of this PowerPoint course. This time around, we

More information

MITOCW watch?v=fp7usgx_cvm

MITOCW watch?v=fp7usgx_cvm MITOCW watch?v=fp7usgx_cvm Let's get started. So today, we're going to look at one of my favorite puzzles. I'll say right at the beginning, that the coding associated with the puzzle is fairly straightforward.

More information

2015 Mark Whitten DEJ Enterprises, LLC 1

2015 Mark Whitten DEJ Enterprises, LLC   1 All right, I'm going to move on real quick. Now, you're at the house, you get it under contract for 10,000 dollars. Let's say the next day you put up some signs, and I'm going to tell you how to find a

More information

1 of 14. Lesson 2 MORE TOOLS, POLYGONS, ROOF. Updated Sept. 15, By Jytte Christrup.

1 of 14. Lesson 2 MORE TOOLS, POLYGONS, ROOF. Updated Sept. 15, By Jytte Christrup. 1 of 14 TUTORIAL - Gmax (version 1.2) Lesson 2 Updated Sept. 15, 2008. By Jytte Christrup. MORE TOOLS, POLYGONS, ROOF. We need to talk a bit about polygons and polycount. In Trainz, a model is seen as

More information

Transcript of the podcasted interview: How to negotiate with your boss by W.P. Carey School of Business

Transcript of the podcasted interview: How to negotiate with your boss by W.P. Carey School of Business Transcript of the podcasted interview: How to negotiate with your boss by W.P. Carey School of Business Knowledge: One of the most difficult tasks for a worker is negotiating with a boss. Whether it's

More information

MITOCW R9. Rolling Hashes, Amortized Analysis

MITOCW R9. Rolling Hashes, Amortized Analysis MITOCW R9. Rolling Hashes, Amortized Analysis The following content is provided under a Creative Commons license. Your support will help MIT OpenCourseWare continue to offer high quality educational resources

More information

Autodesk University Automated Programming with FeatureCAM

Autodesk University Automated Programming with FeatureCAM Autodesk University Automated Programming with FeatureCAM JEREMY MALAN: All right. I'm going to go out and begin. Hopefully, we have everyone in here that was planning to attend. My name is Jeremy Malan.

More information

even describe how I feel about it.

even describe how I feel about it. This is episode two of the Better Than Success Podcast, where I'm going to teach you how to teach yourself the art of success, and I'm your host, Nikki Purvy. This is episode two, indeed, of the Better

More information

QUICKSTART COURSE - MODULE 1 PART 2

QUICKSTART COURSE - MODULE 1 PART 2 QUICKSTART COURSE - MODULE 1 PART 2 copyright 2011 by Eric Bobrow, all rights reserved For more information about the QuickStart Course, visit http://www.acbestpractices.com/quickstart Hello, this is Eric

More information

CLICK HERE TO SUBSCRIBE

CLICK HERE TO SUBSCRIBE Mike: Hey, what's happening? Mike here from The Membership Guys. Welcome to Episode 144 of The Membership Guys podcast. This is the show that helps you grow a successful membership website. Thanks so much

More information

Proven Performance Inventory

Proven Performance Inventory Proven Performance Inventory Module 4: How to Create a Listing from Scratch 00:00 Speaker 1: Alright guys. Welcome to the next module. How to create your first listing from scratch. Really important thing

More information

Common Phrases (2) Generic Responses Phrases

Common Phrases (2) Generic Responses Phrases Common Phrases (2) Generic Requests Phrases Accept my decision Are you coming? Are you excited? As careful as you can Be very very careful Can I do this? Can I get a new one Can I try one? Can I use it?

More information

Autodesk University Linking RISA Software with Revit 2017: Beyond the Basics

Autodesk University Linking RISA Software with Revit 2017: Beyond the Basics Autodesk University Linking RISA Software with Revit 2017: Beyond the Basics All right, well it looks like it's 1 o'clock. So I can get things started here now. Thanks, everybody, for coming out. Good

More information

Copyright MMXVII Debbie De Grote. All rights reserved

Copyright MMXVII Debbie De Grote. All rights reserved Gus: So Stacy, for your benefit I'm going to do it one more time. Stacy: Yeah, you're going to have to do it again. Gus: When you call people, when you engage them always have something to give them, whether

More information

Hello and welcome to the CPA Australia podcast. Your weekly source of business, leadership, and public practice accounting information.

Hello and welcome to the CPA Australia podcast. Your weekly source of business, leadership, and public practice accounting information. Intro: Hello and welcome to the CPA Australia podcast. Your weekly source of business, leadership, and public practice accounting information. In this podcast I wanted to focus on Excel s functions. Now

More information

The Emperor's New Repository

The Emperor's New Repository The Emperor's New Repository I don't know the first thing about building digital repositories. Maybe that's a strange thing to say, given that I work in a repository development group now, and worked on

More information

Life Science Marketing Agencies: The RFP is Dead

Life Science Marketing Agencies: The RFP is Dead Life Science Marketing Agencies: The RFP is Dead This transcript was lightly edited for clarity. My guest on this episode is Laura Brown. Laura is the CEO of Covalent Bonds. Covalent Bonds works with scientific

More information

Celebration Bar Review, LLC All Rights Reserved

Celebration Bar Review, LLC All Rights Reserved Announcer: Jackson Mumey: Welcome to the Extra Mile Podcast for Bar Exam Takers. There are no traffic jams along the Extra Mile when you're studying for your bar exam. Now your host Jackson Mumey, owner

More information

7-1-The_Best_Practices_Course--Week_7--Part_1--Interactive_Legends_Part_1

7-1-The_Best_Practices_Course--Week_7--Part_1--Interactive_Legends_Part_1 Hello, this is Eric Bobrow. And in this lesson, we're going to take a look at a variation of the favorites that I call Interactive Legends of Visual Favorites. Here I have a set of favorites that's going

More information

1 Best Practices Course Week 12 Part 2 copyright 2012 by Eric Bobrow. BEST PRACTICES COURSE WEEK 12 PART 2 Program Planning Areas and Lists of Spaces

1 Best Practices Course Week 12 Part 2 copyright 2012 by Eric Bobrow. BEST PRACTICES COURSE WEEK 12 PART 2 Program Planning Areas and Lists of Spaces BEST PRACTICES COURSE WEEK 12 PART 2 Program Planning Areas and Lists of Spaces Hello, this is Eric Bobrow. And in this lesson, we'll take a look at how you can create a site survey drawing in ArchiCAD

More information

The Open University xto5w_59duu

The Open University xto5w_59duu The Open University xto5w_59duu [MUSIC PLAYING] Hello, and welcome back. OK. In this session we're talking about student consultation. You're all students, and we want to hear what you think. So we have

More information

3 SPEAKER: Maybe just your thoughts on finally. 5 TOMMY ARMOUR III: It's both, you look forward. 6 to it and don't look forward to it.

3 SPEAKER: Maybe just your thoughts on finally. 5 TOMMY ARMOUR III: It's both, you look forward. 6 to it and don't look forward to it. 1 1 FEBRUARY 10, 2010 2 INTERVIEW WITH TOMMY ARMOUR, III. 3 SPEAKER: Maybe just your thoughts on finally 4 playing on the Champions Tour. 5 TOMMY ARMOUR III: It's both, you look forward 6 to it and don't

More information

MITOCW ocw lec11

MITOCW ocw lec11 MITOCW ocw-6.046-lec11 Here 2. Good morning. Today we're going to talk about augmenting data structures. That one is 23 and that is 23. And I look here. For this one, And this is a -- Normally, rather

More information

Autodesk University Tips and Tricks to Enhance Productivity in Revit

Autodesk University Tips and Tricks to Enhance Productivity in Revit Autodesk University Tips and Tricks to Enhance Productivity in Revit All right. Last class, right? Exciting. So I realized in all my classes this week, I've forgotten to introduce myself. So I'm going

More information

Autodesk University Using Hydraulic Calculations in Revit to Do Comparative Modeling of Sprinkler Designs

Autodesk University Using Hydraulic Calculations in Revit to Do Comparative Modeling of Sprinkler Designs Autodesk University Using Hydraulic Calculations in Revit to Do Comparative Modeling of Sprinkler Designs I'm Alan Johnston. I'm from Hydratec, Incorporated. We've been in the sprinkler business for over

More information

Commencement Address by Steve Wozniak May 4, 2013

Commencement Address by Steve Wozniak May 4, 2013 Thank you so much, Dr. Qubein, Trustees, everyone so important, especially professors. I admire teaching so much. Nowadays it seems like we have a computer in our life in almost everything we do, almost

More information

MITOCW mit_jpal_ses06_en_300k_512kb-mp4

MITOCW mit_jpal_ses06_en_300k_512kb-mp4 MITOCW mit_jpal_ses06_en_300k_512kb-mp4 FEMALE SPEAKER: The following content is provided under a Creative Commons license. Your support will help MIT OpenCourseWare continue to offer high-quality educational

More information

Listening Comprehension Questions These questions will help you to stay focused and to test your listening skills.

Listening Comprehension Questions These questions will help you to stay focused and to test your listening skills. RealEnglishConversations.com Conversations Topic: Job Interviews Listening Comprehension Questions These questions will help you to stay focused and to test your listening skills. How to do this: Listen

More information

NFL Strength Coach of the Year talks Combine, Training, Advice for Young Strength Coaches

NFL Strength Coach of the Year talks Combine, Training, Advice for Young Strength Coaches NFL Strength Coach of the Year talks Combine, Training, Advice for Young Strength Coaches Darren Krein joins Lee Burton to discuss his recent accolades, changes in the NFL Combine, his training philosophies

More information

BEST PRACTICES COURSE WEEK 20 Managing Attributes, Project Preferences, Work Environment Part 1-F Element Attributes: Pen Colors and Pen Sets

BEST PRACTICES COURSE WEEK 20 Managing Attributes, Project Preferences, Work Environment Part 1-F Element Attributes: Pen Colors and Pen Sets BEST PRACTICES COURSE WEEK 20 Managing Attributes, Project Preferences, Work Environment Part 1-F Element Attributes: Pen Colors and Pen Sets Welcome everyone to the ArchiCAD Best Practices Course lesson.

More information

MITOCW R7. Comparison Sort, Counting and Radix Sort

MITOCW R7. Comparison Sort, Counting and Radix Sort MITOCW R7. Comparison Sort, Counting and Radix Sort The following content is provided under a Creative Commons license. B support will help MIT OpenCourseWare continue to offer high quality educational

More information

Autodesk University Free Your Design Data

Autodesk University Free Your Design Data Autodesk University Free Your Design Data ADAM NAGY: Good morning, everyone. I'm glad to see that so many of you survived the party yesterday. Did you enjoy it? Yes, so my name is Adam Nagy. I'm working

More information

Episode 14: How to Get Cheap Facebook Likes and Awesome Engagement Subscribe to the podcast here.

Episode 14: How to Get Cheap Facebook Likes and Awesome Engagement Subscribe to the podcast here. Episode 14: How to Get Cheap Facebook Likes and Awesome Engagement Subscribe to the podcast here. Hi everybody welcome to episode number 14 of my podcast where I'm going to be talking about how to use

More information

COLD CALLING SCRIPTS

COLD CALLING SCRIPTS COLD CALLING SCRIPTS Portlandrocks Hello and welcome to this portion of the WSO where we look at a few cold calling scripts to use. If you want to learn more about the entire process of cold calling then

More information

2015 Mark Whitten DEJ Enterprises, LLC 1

2015 Mark Whitten DEJ Enterprises, LLC  1 Mark: All right guys. First of all I just wanted to thank everybody for getting on this webinar. Usually I go around the country, I do my seminars, my bus tours, or things like that and it is good. I just

More information

The ENGINEERING CAREER COACH PODCAST SESSION #1 Building Relationships in Your Engineering Career

The ENGINEERING CAREER COACH PODCAST SESSION #1 Building Relationships in Your Engineering Career The ENGINEERING CAREER COACH PODCAST SESSION #1 Building Relationships in Your Engineering Career Show notes at: engineeringcareercoach.com/session1 Anthony s Upfront Intro: This is The Engineering Career

More information

2015 Mark Whitten DEJ Enterprises, LLC 1

2015 Mark Whitten DEJ Enterprises, LLC  1 Now what we going to do is we going to talk about setting up a business, all right? As you see on the screen, it's says, "Setting Up Your LLCs". What's an LLC? An LLC is a limited liability company. Why

More information

The ENGINEERING CAREER COACH PODCAST SESSION #13 How to Improve the Quality of Your Engineering Design Work and Boost Your Confidence

The ENGINEERING CAREER COACH PODCAST SESSION #13 How to Improve the Quality of Your Engineering Design Work and Boost Your Confidence The ENGINEERING CAREER COACH PODCAST SESSION #13 How to Improve the Quality of Your Engineering Design Work and Boost Your Confidence Show notes at: engineeringcareercoach.com/quality Anthony s Upfront

More information

SOAR Study Skills Lauri Oliver Interview - Full Page 1 of 8

SOAR Study Skills Lauri Oliver Interview - Full Page 1 of 8 Page 1 of 8 Lauri Oliver Full Interview This is Lauri Oliver with Wynonna Senior High School or Wynonna area public schools I guess. And how long have you actually been teaching? This is my 16th year.

More information

Getting Affiliates to Sell Your Stuff: What You Need To Know

Getting Affiliates to Sell Your Stuff: What You Need To Know Getting Affiliates to Sell Your Stuff: What You Need To Know 1 Getting affiliates to promote your products can be easier money than you could make on your own because... They attract buyers you otherwise

More information

MITOCW watch?v=1qwm-vl90j0

MITOCW watch?v=1qwm-vl90j0 MITOCW watch?v=1qwm-vl90j0 The following content is provided under a Creative Commons license. Your support will help MIT OpenCourseWare continue to offer high quality educational resources for free. To

More information

IB Interview Guide: How to Walk Through Your Resume or CV as an Undergrad or Recent Grad

IB Interview Guide: How to Walk Through Your Resume or CV as an Undergrad or Recent Grad IB Interview Guide: How to Walk Through Your Resume or CV as an Undergrad or Recent Grad Hello, and welcome to this next lesson in this module on how to tell your story, in other words how to walk through

More information

CLICK HERE TO SUBSCRIBE

CLICK HERE TO SUBSCRIBE Mike Morrison: Welcome to episode 68 of the Membership Guys podcast with me, your host, Mike Morrison, one half of the Membership Guys. If you are planning on running a membership web site, this is the

More information

I'm going to set the timer just so Teacher doesn't lose track.

I'm going to set the timer just so Teacher doesn't lose track. 11: 4th_Math_Triangles_Main Okay, see what we're going to talk about today. Let's look over at out math target. It says, I'm able to classify triangles by sides or angles and determine whether they are

More information

MITOCW watch?v=-qcpo_dwjk4

MITOCW watch?v=-qcpo_dwjk4 MITOCW watch?v=-qcpo_dwjk4 The following content is provided under a Creative Commons license. Your support will help MIT OpenCourseWare continue to offer high quality educational resources for free. To

More information

Phase 2: Testing & Validation: Forever Affiliate Content Strategy - Minisite & Authority Site

Phase 2: Testing & Validation: Forever Affiliate Content Strategy - Minisite & Authority Site Phase 2: Testing & Validation: Forever Affiliate Content Strategy - Minisite & Authority Site Okay. Welcome to Phase 2: Testing and Validation: Forever Affiliate Content Strategy for Minisites and Authority

More information

BEST PRACTICES COURSE WEEK 20 Managing Attributes, Project Preferences, Work Environment Part 4 Model View Options

BEST PRACTICES COURSE WEEK 20 Managing Attributes, Project Preferences, Work Environment Part 4 Model View Options BEST PRACTICES COURSE WEEK 20 Managing Attributes, Project Preferences, Work Environment Part 4 Model View Options Welcome everyone to the ArchiCAD Best Practices training lesson. Today we'll be focusing

More information

MITOCW R11. Principles of Algorithm Design

MITOCW R11. Principles of Algorithm Design MITOCW R11. Principles of Algorithm Design The following content is provided under a Creative Commons license. Your support will help MIT OpenCourseWare continue to offer high quality educational resources

More information

Instructor (Mehran Sahami):

Instructor (Mehran Sahami): Programming Methodology-Lecture21 Instructor (Mehran Sahami): So welcome back to the beginning of week eight. We're getting down to the end. Well, we've got a few more weeks to go. It feels like we're

More information

BEST PRACTICES COURSE WEEK 16 Roof Modeling & Documentation PART 8-B - Barrel-Vault Roofs in ArchiCAD 15 and Later

BEST PRACTICES COURSE WEEK 16 Roof Modeling & Documentation PART 8-B - Barrel-Vault Roofs in ArchiCAD 15 and Later BEST PRACTICES COURSE WEEK 16 Roof Modeling & Documentation PART 8-B - Barrel-Vault Roofs in ArchiCAD 15 and Later Hello, this is Eric Bobrow. In this lesson, we'll take a look at how you can create barrel-vaulted

More information

Autodesk University Design Strategies with FormIt 360

Autodesk University Design Strategies with FormIt 360 Autodesk University Design Strategies with FormIt 360 JAROD SCHULTZ: Well, thank you ladies, gentlemen for showing up for my class. You've got hundrds to choose from, right? But you chose mine, which is

More information

How to Help People with Different Personality Types Get Along

How to Help People with Different Personality Types Get Along Podcast Episode 275 Unedited Transcript Listen here How to Help People with Different Personality Types Get Along Hi and welcome to In the Loop with Andy Andrews. I'm your host, as always, David Loy. With

More information

Autodesk University Revit and Dynamo for Landscape Architects

Autodesk University Revit and Dynamo for Landscape Architects Autodesk University Revit and Dynamo for Landscape Architects So we're getting pretty close to 8:30. And I will start then. But I guess before we do that, I'm just kind of curious what kind of crowd we

More information

Real Estate Investing Podcast Brilliant at the Basics Part 15: Direct Mail Is Alive and Very Well

Real Estate Investing Podcast Brilliant at the Basics Part 15: Direct Mail Is Alive and Very Well Real Estate Investing Podcast Brilliant at the Basics Part 15: Direct Mail Is Alive and Very Well Hosted by: Joe McCall Featuring Special Guest: Peter Vekselman Hey guys. Joe McCall back here with Peter

More information

CLICK HERE TO SUBSCRIBE

CLICK HERE TO SUBSCRIBE Mike Morrison: What's up, everybody? Welcome to Episode 120 of The Membership Guys Podcast. I'm your host Mike Morrison, one half of the Membership Guys, and on today's show we're talking about five things

More information

Autodesk University Precast Building Design Using Revit, Robot Structural Analysis, and Dynamo

Autodesk University Precast Building Design Using Revit, Robot Structural Analysis, and Dynamo Autodesk University Precast Building Design Using Revit, Robot Structural Analysis, and Dynamo ALI SHRIH: Good afternoon, everyone. My name is Ali Shrih. I work for a small company in Wisconsin, J3 Engineering.

More information

Using HUD's CNA e-tool for Project Rental Assistance Contracts,

Using HUD's CNA e-tool for Project Rental Assistance Contracts, Using HUD's CNA e-tool for Project Rental Assistance Contracts, 2-8-18 Jennifer Larson: So welcome, everyone. I'm so glad that you've joined us today to learn about HUD's new CAN e-tool and how it will

More information

Flip Book Role Play. Presenter: Vicky Methven

Flip Book Role Play. Presenter: Vicky Methven Flip Book Role Play Presenter: Vicky Methven Vicky: Hey, Matt, thanks for having me. Matt: Hey, Vicky, thanks. Vicky: I want to be really kind of compact. I want to respect your time. I know you booked

More information

Episode Dealing with Summer Associate Offers with Ex-BigLaw Recruiter

Episode Dealing with Summer Associate Offers with Ex-BigLaw Recruiter Episode 108 - Dealing with Summer Associate Offers with Ex-BigLaw Recruiter Welcome to the Law School Toolbox podcast. Today, we're talking with ex BigLaw recruiter, Sadie Jones, about the processing of

More information

26 AdWords Mistakes: How They Are Killing Your Profits (And How To Fix Them) Contents

26 AdWords Mistakes: How They Are Killing Your Profits (And How To Fix Them) Contents Contents Mistake #1: Not Separating Search Network & Display Network Campaigns... 4 Mistake #2: Not Adding Negative Keywords... 5 Mistake #3: Adding Too Many Keywords Per Ad Group... 6 Mistake #4: Not

More information

BEST PRACTICES COURSE WEEK 21 Creating and Customizing Library Parts PART 5 - Importing 3D IFC and DWG Files to Create Library Parts

BEST PRACTICES COURSE WEEK 21 Creating and Customizing Library Parts PART 5 - Importing 3D IFC and DWG Files to Create Library Parts BEST PRACTICES COURSE WEEK 21 Creating and Customizing Library Parts PART 5 - Importing 3D IFC and DWG Files to Create Library Parts Hello, this is Eric Bobrow. In this ArchiCAD video tutorial, I will

More information

Glenn Livingston, Ph.D. and Lisa Woodrum Demo

Glenn Livingston, Ph.D. and Lisa Woodrum Demo Glenn Livingston, Ph.D. and Lisa Woodrum Demo For more information on how to fix your food problem fast please visit www.fixyourfoodproblem.com Hey, this is the very good Dr. Glenn Livingston with Never

More information

Module 1: From Chaos to Clarity: Traders Let s Get Ready for 2015!

Module 1: From Chaos to Clarity: Traders Let s Get Ready for 2015! Module 1: From Chaos to Clarity: Traders Let s Get Ready for 2015! Hi, this is Kim Krompass and this is Module 1: From Chaos to Clarity: Trader's Let's Get Ready for 2015! In this module, I want to do

More information

Before we start, I want to share with you how this challenge came to be.

Before we start, I want to share with you how this challenge came to be. Hey! Thank you for signing up for my Next Level Instagram Challenge! This 7 day challenge will grow your account but not without some work. What kind of work? In this challenge, you will be engaging (following,

More information

SHA532 Transcripts. Transcript: Forecasting Accuracy. Transcript: Meet The Booking Curve

SHA532 Transcripts. Transcript: Forecasting Accuracy. Transcript: Meet The Booking Curve SHA532 Transcripts Transcript: Forecasting Accuracy Forecasting is probably the most important thing that goes into a revenue management system in particular, an accurate forecast. Just think what happens

More information

Graphs and Charts: Creating the Football Field Valuation Graph

Graphs and Charts: Creating the Football Field Valuation Graph Graphs and Charts: Creating the Football Field Valuation Graph Hello and welcome to our next lesson in this module on graphs and charts in Excel. This time around, we're going to being going through a

More information

Autodesk University Show Me the Money Real-Time Design Cost-Analysis System for AutoCAD Civil 3D 2017

Autodesk University Show Me the Money Real-Time Design Cost-Analysis System for AutoCAD Civil 3D 2017 Autodesk University Show Me the Money Real-Time Design Cost-Analysis System for AutoCAD Civil 3D 2017 JEFFREY LYONS: OK I guess we'll get started. My name is Jeff Lyons I'm from AEC Solutions and my presentation

More information

MARKETING CONVERSION BOOSTING TACTICS

MARKETING CONVERSION BOOSTING TACTICS EMAIL MARKETING CONVERSION BOOSTING TACTICS Stephen, it's so great to have you here on the show. Thank you for being here. Hey, thanks for having me. I appreciate it. For the people who are listening here

More information

HUD CNA etool CNA e-tool Naming & Grouping of Components

HUD CNA etool CNA e-tool Naming & Grouping of Components HUD CNA etool CNA e-tool Naming & Grouping of Components Janine Cuneo: Great. We're now recording. I'm going to start -- officially start the CNA Virtual Classroom for the Naming/Grouping of components.

More information

U.S. DEPARTMENT OF TREASURY BUREAU OF ALCOHOL, TOBACCO & FIREARMS

U.S. DEPARTMENT OF TREASURY BUREAU OF ALCOHOL, TOBACCO & FIREARMS U.S. DEPARTMENT OF TREASURY BUREAU OF ALCOHOL, TOBACCO & FIREARMS 0 TAPE # March, 0 0 0 (Margarita holding the phone, not speaking into the receiver) MARGARITA: (indiscernible) Just a minute David. (indiscernible)

More information

just going to flop as soon as the doors open because it's like that old saying, if a tree falls in the wood and no one's around to hear it.

just going to flop as soon as the doors open because it's like that old saying, if a tree falls in the wood and no one's around to hear it. Mike Morrison: What's up, everyone? Welcome to episode 141 of The Membership Guys podcast. I'm your host, Mike Morrison, and this is the show for anybody serious about building and growing a successful

More information

HVAC in AutoCAD MEP: New and Improved. David Butts Gannett Fleming MP3724-L. Learning Objectives. At the end of this class, you will be able to:

HVAC in AutoCAD MEP: New and Improved. David Butts Gannett Fleming MP3724-L. Learning Objectives. At the end of this class, you will be able to: David Butts Gannett Fleming MP3724-L In the Building Information Modeling (BIM) world, there are still many users who have AutoCAD MEP but aren't ready to make the move to Autodesk Revit for a variety

More information

Power of Podcasting #30 - Stand Out From The Crowd Day 3 of the Get Started Podcasting Challenge

Power of Podcasting #30 - Stand Out From The Crowd Day 3 of the Get Started Podcasting Challenge Power of Podcasting #30 - Stand Out From The Crowd Day 3 of the Get Started Podcasting Challenge Hello and welcome to the Power of Podcasting, and today we have a very special episode. Recently, I just

More information

Elizabeth Jachens: So, sort of like a, from a projection, from here on out even though it does say this course ends at 8:30 I'm shooting for around

Elizabeth Jachens: So, sort of like a, from a projection, from here on out even though it does say this course ends at 8:30 I'm shooting for around Student Learning Center GRE Math Prep Workshop Part 2 Elizabeth Jachens: So, sort of like a, from a projection, from here on out even though it does say this course ends at 8:30 I'm shooting for around

More information

MITOCW watch?v=6fyk-3vt4fe

MITOCW watch?v=6fyk-3vt4fe MITOCW watch?v=6fyk-3vt4fe Good morning, everyone. So we come to the end-- one last lecture and puzzle. Today, we're going to look at a little coin row game and talk about, obviously, an algorithm to solve

More information

Ep #181: Proactivation

Ep #181: Proactivation Full Episode Transcript With Your Host Brooke Castillo Welcome to The Life Coach School Podcast, where it s all about real clients, real problems, and real coaching. And now your host, Master Coach Instructor,

More information

BEST PRACTICES COURSE WEEK 26 In-Office Project Management - Part 2 - Spell Checking and Text Submission

BEST PRACTICES COURSE WEEK 26 In-Office Project Management - Part 2 - Spell Checking and Text Submission BEST PRACTICES COURSE WEEK 26 In-Office Project Management - Part 2 - Spell Checking and Text Submission Welcome everyone to the Best Practices Course ArchiCAD training lesson. We are continuing in week

More information

So, again, that was addressing that main problem of how to attract new members. Even though people in that stage, you know, it's not just about

So, again, that was addressing that main problem of how to attract new members. Even though people in that stage, you know, it's not just about Mike Morrison: Hey there. Welcome to episode 142 of The Membership Guys Podcast. I'm your host Mike Morrison and, if you are looking for tips and advice on growing a successful membership, then good news,

More information

Today what I'm going to demo is your wire project, and it's called wired. You will find more details on this project on your written handout.

Today what I'm going to demo is your wire project, and it's called wired. You will find more details on this project on your written handout. Fine Arts 103: Demo LOLANDA PALMER: Hi, everyone. Welcome to Visual Concepts 103 online class. Today what I'm going to demo is your wire project, and it's called wired. You will find more details on this

More information