Appendix B - General Engineering
|
|
- Franklin Jacobs
- 5 years ago
- Views:
Transcription
1 ppendix - General Engineering
2 . GEERL ESIG OSIERTIOS The proposed project is composed of the design of an in-lake sediment retention basin that will capture silt and increase the amount of aquatic wetlands. Three sites named 1, 2, and 3 were proposed from the initial investigation of aerial imagery and were determine by topography to minimize the length of the structure. fourth site named 1 was recommended to the project team by the sponsor based on the concern of access and the need for a reduced amount of real estate acquisition. Figure 1: Site Locations -1
3 Figure 2: Site 1 ankline Figure 3: Site 1 ankline -2
4 2. OSTRUTILITY OSIERTIOS 2.1 onstruction ccess The shoreline of the upper portion of Lake Lou Yaeger remains undeveloped with the exception of various camp sites with docks that are most only accessible by boat. The area is densely vegetated and the terrain near the lake is uneven. One of the major goals of the project was to minimize the impact to the existing ecosystem and existing cleared areas were explored for site access Site 1 ccess The proposed access to site 1 uses an existing road, a pasture, and a clearing in the vegetation for an electric line. The existing road is named Privacy Lane which is a privately owned gravel road that connects 3 residences to ounty Road 650 East. It is assumed that Privacy Lane will require improvement to sustain the transport of construction equipment and improvement upon completion of construction to restore the road to existing conditions. The remaining segment of access road will require the construction of a temporary gravel road across a pasture and existing clearing for an electric line that is an overhead line and turns into a buried line approximately 700 feet east of the lake. The access road will require grading to meet the maximum slopes allowed for construction equipment in EM Section 4 and will also require a culvert to allow for drainage through a gulley during rain events. The width of the haul route is constrained by the terrain, vegetation and the powerline. The contractor will have room to construct turnouts or wider sections of haul route to allow for 2 way traffic passage but a full 2 way haul route would require the removal of long stretches of vegetation which will be avoided. The contractor will also need a method of communication between vehicles or a control plan to coordinate traffic through constrained areas. The access road will also require a temporary construction easement for approximately 1.3 acres of land -3
5 Figure 4: Site 1 ccess Route Sites 1 & 2 ccess The proposed access to sites 1 and 2 uses an existing road. The existing road is named emetery Lane which is a gravel road that connects 2 residences and a several of the lakes west bank camping sites to East 5 th Road. emetery Lane is partially located on private land and the sponsor s property. It is assumed that the entire length of emetery Lane will require improvement to sustain the transport of construction equipment and improvement upon completion of construction to restore the road to existing conditions. t some locations the access road would require to allow for the passage of large construction equipment. The access road will also require a permanent construction easement for approximately 1.4 acres of land. -4
6 Figure 5: Sites 1&2 ccess Route Site 3 ccess The proposed access to sites 3 uses an existing road and path to a boat ramp on the lake shoreline. The existing road is named orth 18 th venue which is a gravel road that connects several residences to ounty Road 650 East. orth 18 th venue is located on private land. It is assumed that the entire length of orth 18 th venue will require improvement to sustain the transport of construction equipment and improvement upon completion of construction to restore the road to existing conditions. The remaining segment of access road will require the construction of a temporary gravel road through an existing path through the wood line. site visit to determine the condition of the road and path was not conducted because site 3 was eliminated from consideration prior to a site visit being completed. 2.2 Rock erm esign onsiderations The results from the average flow velocity data calculated from steady-flow hydraulic modeling was used to determine the design average flow velocity. wide range of flow -5
7 rates moving through the lake were modeled. The selected design velocity was 10 feet per second. This is an average flow velocity was used for initial riprap sizing. However, unsteady-flow hydraulic modeling of a flood event is recommended to better determine the flow velocities at the in-lake berm. It is recommended that unsteady-flow hydraulic modeling of a significant flood event entering the lake be developed for the case in which the lake elevation is at the level of the annual winter drawdown. This case may result in the highest likely flow velocity at the in-lake berm. The product delivery team referenced EM , Hydraulic esign of Flood ontrol hannels for designing the in-lake berm riprap. It was assumed that this scenario would also develop turbulent flows within the in-lake berm. The proposed riprap gradation selected by the product delivery team was a 1000 pound top size gradation. The riprap meets gradation requirements of LMV, Report on Standardization of Riprap Gradation, revised March Gradation of riprap material is as follows: 1000-Pound Top Size Riprap Percent Lighter by Weight Limits of Stone Weight, lb Given the assumption that the lake bottom is comprised of soft sediments, a bedding filter layer was not designed. The product delivery team expects that during placement of the required riprap quantities that a filter layer would be lost into the soft lake bottom. This would make the filter layer ineffective. Furthermore, it was assumed that 50% of the riprap volume placed for the in-lake berm would be lost or settle into the lake bottom during construction. The proposed design for the in-lake berm is to have a 10 foot wide crown and 1V:3H slopes. The 10 foot crown was selected to allow for the construction of the berm in wet conditions. It is assumed that the contractor will dump the required large stone with a smaller choke stone on top starting on one side of the lake and working across until the in-lake berm is complete. For quantity analysis it was assumed that up to 50% of the stone could settle into the lake bed during the construction of the berm. Therefore this additional material was factored into the quantities that were used to determine the cost estimate of the structure. -6
8 Figure 6: Typical Section The top elevation of the in-lake berm is designed to be elevation V 88 based on hydraulic consideration. The elevation 591 V 88 is 0.5 feet below the spillway elevation of the dam. The structure ties into the bank at elevation 596 V 88 with a 1V:10H slope to keep the structure from being flanked during a high water event as shown in the figure below. Figure 7: Site 1 Profile 2.3 ankline Revetment The bankline revetment was designed using SE Manuals and Reports on Engineering Practice o. 124: Inland avigation hannel Training Works. The rock berm tie-in was similar to a dike bankhead and the bank paving option was more favorable then a root tie-in examples shown in hapter 5. To determine the amount of downstream revetment the report suggests using the bank height multiplied by 3 for average conditions. The bank height of 8 feet was assumed to be the bottom of revetment key-in to the top of the structure tie-in. This -7
9 resulted in 24 feet which was rounded up to 25 feet of downstream paving. The report recommended the upstream paving not exceed the bank height therefore the 8 feet was rounded up to 10 feet. The revetment typical section is shown in the figure below. Figure 8: Revetment Typical Section -8
10 TE PPR. WETL RESTORTIO PROJET ITY OF LITHFIEL ESRIPTIO MOTGOMERY OUTY, ILLIIS ESIGE Y: SOLIITTIO.: W Y: K Y: OTRT.: SUMITTE Y: FILE UMER: PLOT SLE:PLOT SIZE: FILE ME: SI LLY_G-001OV.dgn QUTI EOSYSTEM RESTORTIO MOTGOMERY OUTY LITHFIEL, ILLIIS OVER SHEET XXXXX XX, PLTE G-001
11 FIVE MILE LKE FIVE MILE RH W EST FORK SHOL REEK IOW E S M O I E S R I V E R HIL MISSISSIPPI I L L I O I S ILLIIS RIVER HV PEORI SPRIGFIEL LKE SHELYVILLE TE PPR. S L T R. EW MRK TWI LO T L/ RIVER SHELYVILLE PROJET LOTIO MISSOURI JEFFERSO ITY LKE PROJET LOTIO LEGE UIVRE RIVER HERM O U R E U M I S S O U R I R. SE R. ISTRIT OURIES TROY UIO MER M E R. L/ T ST.HRLES I G R. HRI L/ STE.GEEVIEVE L K R. LTO T T L/ ST.LOUIS LKE EST ST.LOUIS WPPPELLO K S K S K I R. HESTER MISSISSIPPI VLI RLYLE IG M U Y R. RIVER RLYLE LKE MURPHYSORO IRO RE LKE OHIO PUH KY RIVER ESRIPTIO ITERSTTE 55 VIIITY MP SLE: TS ESIGE Y: SOLIITTIO.: W Y: K Y: OTRT.: SUMITTE Y: FILE UMER: PLOT SLE:PLOT SIZE: FILE ME: SI LLY_G-002-VI.dgn LITHFIEL, IL ILLIIS ROUTE 16 QUTI EOSYSTEM RESTORTIO MOTGOMERY OUTY LITHFIEL, ILLIIS PROJET LOTIO VIIITY MP PROJET LOTIO MP SLE 1" = 3000' PLTE G-002
12 SHEET. TITLE GEERL G-001 OVER SHEET G-002 PROJET LOTIO VIIITY MPS G-003 IEX OF RWIGS IVIL TE PPR SITE 1 PL PROFILE -102 SITE 1 ESS PL SHEET 1 OF 3 FIVE MILE RH SITE 2 SITE 3-107/110 W EST FORK SHOL REEK -112 SITE 3 ESS ROUTE SITE 1 ESS PL SHEET 2 OF 3 SITE 1 ESS PL SHEET 3 OF 3 SITE 1 PL PROFILE SITE 1 ESS PL SHEET 1 OF 2 SITE 1 ESS PL SHEET 2 OF 2 SITE 2 ESS PL SHEET 1 OF 2 SITE 2 ESS PL SHEET 2 OF 2 SITE 3 ESS PL SHEET 1 OF 3 SITE 3 ESS PL SHEET 2 OF 3 SITE 3 ESS PL SHEET 3 OF 3 TYPIL SETIOS ESRIPTIO SITE 1 / 2 ESS ROUTE -106/ SITE ESIGE Y: SOLIITTIO.: W Y: K Y: OTRT.: SUMITTE Y: FILE UMER: PLOT SLE:PLOT SIZE: FILE ME: SI LLY_G-003-I.dgn SITE 1 SITE 1 ESS ROUTE QUTI EOSYSTEM RESTORTIO MOTGOMERY OUTY LITHFIEL, ILLIIS SHEET IEX SLE 1" = 500' SHEET IEX MP PLTE G-003
13 GEERL SHEET TES 1. ELEVTIOS RE I RTH MERI VERTIL TUM (..V.. 88) FLOW TE PPR LIER FEET OF RIPRP REVETMET UPSTREM OF STRUTURE SEE PLTE -301 FOR TYPIL SETIO 10' (TYP) LIER FEET OF RIPRP REVETMET OWSTREM OF STRUTURE SEE PLTE -301 FOR TYPIL SETIO ROK ERM PL 1V:3H TYP. 1V:3H TYP LIER FEET OF RIPRP REVETMET UPSTREM OF STRUTURE SEE PLTE -301 FOR TYPIL SETIO 25 LIER FEET OF RIPRP REVETMET OWSTREM OF STRUTURE SEE PLTE -301 FOR TYPIL SETIO SOLIITTIO.: ESRIPTIO SLE 1" = 50' 0 50' 100' OTRT.: FILE UMER: ESIGE Y: W Y: K Y: SUMITTE Y: PLOT SLE:PLOT SIZE: FILE ME: SI LLY_-101.dgn V:10H TIE-I EL. 596 TIE-I EL. 596 RML POOL EL 591 TOP OF ERM EL V:10H LKE E QUTI EOSYSTEM RESTORTIO MOTGOMERY OUTY LITHFIEL, ILLIIS SITE 1 PL PROFILE ROK ERM PROFILE 0 50' 100' HORIZ. SLE 1" = 50' VERT. SLE 1" = 10' ' 20' PLTE -101
14 GEERL SHEET TES 1. RIGHT OF WY FOR SITE 1 TEMPORRY ESS RO OUTSIE LKE PROPERTY LIMITS PPROXIMTELY 1.3 RES 2. UTILITY LOTIOS RE PPROXIMTE TE PPR. OSTRUTIO LIMITS LOTE WITHI LKE PROPERTY URIE ELETRI JUTIO OX (LOTIOS RE PPROXIMTE) 20' RIGHT OF WY FOR TEMPORRY ESS RO WITHI LKE PROPERTY LIMITS MIIML RUSH LERIG LOG SOUTH EGE OF RIGHT OF WY OVERHE ELETRI UTILITIES POLES (LOTIOS RE PPROXIMTE) 12' GRVEL RO MTH LIE SEE SHEET -103 SOLIITTIO.: OTRT.: FILE UMER: ESRIPTIO 0.1 RES OF TREE LERIG REQUIRE FOR ROK ERM REVETMET OSTRUTIO MIIML TREE LERIG FOR ROK ERM REVETMET OSTRUTIO OTRTOR STGIG RE ESIGE Y: W Y: K Y: SUMITTE Y: PLOT SLE:PLOT SIZE: FILE ME: SI LLY_-102.dgn QUTI EOSYSTEM RESTORTIO MOTGOMERY OUTY LITHFIEL, ILLIIS SITE 1 ESS PL SHEET 1 OF 3 ESS PL SLE 1" = 50' 0 50' 100' -13 PLTE -102
15 GEERL SHEET TES 1. RIGHT OF WY FOR SITE 1 TEMPORRY ESS RO OUTSIE LKE PROPERTY LIMITS PPROXIMTELY 1.3 RES 2. UTILITY LOTIOS RE PPROXIMTE TE PPR. MTH LIE SEE SHEET -102 PPROXIMTE LKE PROPERTY LIE 20' RIGHT OF WY FOR TEMPORRY ESS RO WITHI LKE PROPERTY LIMITS EXPE RIGHT OF WY FOR ULVERT SLOPES OF FILL (PPROXIMTE LOTIO) OVERHE ELETRI UTILITIES POLES (LOTIOS RE PPROXIMTE) MTH LIE SEE SHEET -104 ESIGE Y: W Y: K Y: SOLIITTIO.: SUMITTE Y: OTRT.: FILE UMER: PLOT SLE:PLOT SIZE: FILE ME: SI LLY_-103.dgn ESRIPTIO ULVERT TO E PLE I EXISTIG ITH FOR OSTRUTIO ESS RO SEE TYPIL SETIO O SHEET ' RIGHT OF WY FOR TEMPORRY ESS RO 12' GRVEL RO QUTI EOSYSTEM RESTORTIO MOTGOMERY OUTY LITHFIEL, ILLIIS SITE 1 ESS PL SHEET 2 OF 3 ESS PL SLE 1" = 50' 0 50' 100' -14 PLTE -103
16 GEERL SHEET TES 1. RIGHT OF WY FOR SITE 1 TEMPORRY ESS RO OUTSIE LKE PROPERTY LIMITS PPROXIMTELY 1.3 RES TE PPR. MTH LIE SEE SHEET -103 RIGHT OF WY TO FOLLOW EGE OF PRIVY LE PRIVY LE PPROXIMTE OUTY PROPERTY LIE OUTY RO 650 EST SOLIITTIO.: OTRT.: FILE UMER: ESRIPTIO ESIGE Y: W Y: K Y: SUMITTE Y: PLOT SLE:PLOT SIZE: FILE ME: SI LLY_-104.dgn 12' GRVEL RO QUTI EOSYSTEM RESTORTIO MOTGOMERY OUTY LITHFIEL, ILLIIS SITE 1 ESS PL SHEET 3 OF 3 20' RIGHT OF WY FOR TEMPORRY ESS RO ESS PL SLE 1" = 50' 0 50' 100' -15 PLTE -104
17 GEERL SHEET TES 1. LL ELEVTIOS RE I RTH MERI VERTIL TUM (..V.. 88) FLOW TE PPR. 10 LIER FEET OF RIPRP REVETMET UPSTREM OF STRUTURE SEE PLTE -301 FOR TYPIL SETIO ' (TYP) 25 LIER FEET OF RIPRP REVETMET OWSTREM OF STRUTURE SEE PLTE -301 FOR TYPIL SETIO V:3H TYP. ROK ERM PL 1V:3H TYP LIER FEET OF RIPRP REVETMET UPSTREM OF STRUTURE SEE PLTE -301 FOR TYPIL SETIO 25 LIER FEET OF RIPRP REVETMET OWSTREM OF STRUTURE SEE PLTE -301 FOR TYPIL SETIO SOLIITTIO.: ESRIPTIO SLE 1" = 50' 0 50' 100' OTRT.: FILE UMER: ESIGE Y: W Y: K Y: SUMITTE Y: PLOT SLE:PLOT SIZE: FILE ME: SI LLY_-105.dgn 600 1V:10H TIE-I EL. 596 TIE-I EL. 596 RML POOL EL 591 TOP OF ERM EL V:10H LKE E QUTI EOSYSTEM RESTORTIO MOTGOMERY OUTY LITHFIEL, ILLIIS SITE 1 PL PROFILE ROK ERM PROFILE 0 50' 100' HORIZ. SLE 1" = 50' VERT. SLE 1" = 10' ' 20' PLTE -105
18 GEERL SHEET TES 1. RIGHT OF WY FOR SITE 1 TEMPORRY ESS RO OUTSIE LKE PROPERTY LIMITS PPROXIMTELY 1.5 RES TE PPR. MTH LIE SEE SHEET -107 ESRIPTIO RIGHT OF WY TO FOLLOW EGE OF EMETRY LE SOLIITTIO.: OTRT.: FILE UMER: ESIGE Y: W Y: K Y: SUMITTE Y: PLOT SLE:PLOT SIZE: FILE ME: SI LLY_-106.dgn PPROXIMTE OUTY PROPERTY LIE E 5TH R EMETRY LE QUTI EOSYSTEM RESTORTIO MOTGOMERY OUTY LITHFIEL, ILLIIS SITE 1 ESS PL SHEET 1 OF 2 ESS PL SLE 1" = 100' 0 100' 200' -17 PLTE -106
19 GEERL SHEET TES 1. RIGHT OF WY FOR SITE 1 TEMPORRY ESS RO OUTSIE LKE PROPERTY LIMITS PPROXIMTELY 1.5 RES 2. UTILITY LOTIOS RE PPROXIMTE TE PPR. ESRIPTIO MTH LIE SEE SHEET -106 RIGHT OF WY TO FOLLOW EGE OF EMETRY LE EMETRY LE PPROXIMTE LKE PROPERTY LIE RIGHT OF WY FOR TEMPORRY ESS WITHI LKE PROPERTY LIMITS OVERHE ELETRI (LOTIO PPROXIMTE) STGIG RE LOG EXISTIG PTH, LERIG T LLOWE MIIML TREE LERIG REQUIRE FOR ROK ERM REVETMET OSTRUTIO UERGROU ELETRI (LOTIO PPROXIMTE) 0.1 RES OF TREE LERIG REQUIRE FOR ROK ERM REVETMET OSTRUTIO ESIGE Y: QUTI EOSYSTEM RESTORTIO W Y: K Y: SOLIITTIO.: MOTGOMERY OUTY LITHFIEL, ILLIIS SUMITTE Y: OTRT.: FILE UMER: PLOT SLE:PLOT SITE 1 ESS PL SIZE: FILE ME: SHEET 2 OF 2 SI LLY_-107.dgn ESS PL SLE 1" = 100' 0 100' 200' -18 PLTE -107
20 GEERL SHEET TES 1. RIGHT OF WY FOR SITE 2 TEMPORRY ESS RO OUTSIE LKE PROPERTY LIMITS PPROXIMTELY 1.5 RES TE PPR. MTH LIE SEE SHEET -110 ESRIPTIO RIGHT OF WY TO FOLLOW EGE OF EMETRY LE SOLIITTIO.: OTRT.: FILE UMER: ESIGE Y: W Y: K Y: SUMITTE Y: PLOT SLE:PLOT SIZE: FILE ME: SI LLY_-109.dgn PPROXIMTE OUTY PROPERTY LIE E 5TH R EMETRY LE QUTI EOSYSTEM RESTORTIO MOTGOMERY OUTY LITHFIEL, ILLIIS SITE 2 ESS PL SHEET 1 OF 2 ESS PL SLE 1" = 100' 0 100' 200' -19 PLTE -109
21 GEERL SHEET TES 1. RIGHT OF WY FOR SITE 2 TEMPORRY ESS RO OUTSIE LKE PROPERTY LIMITS PPROXIMTELY 1.5 RES 2. UTILITY LOTIOS RE PPROXIMTE TE PPR. 0.1 RES OF TREE LERIG REQUIRE FOR ROK ERM REVETMET OSTRUTIO ESRIPTIO MTH LIE SEE SHEET -109 RIGHT OF WY TO FOLLOW EGE OF EMETRY LE EMETRY LE PPROXIMTE LKE PROPERTY LIE RIGHT OF WY FOR TEMPORRY ESS WITHI LKE PROPERTY LIMITS MIIML TREE LERIG REQUIRE FOR ROK ERM REVETMET OSTRUTIO STGIG RE LOG EXISTIG PTH, LERIG T LLOWE OVERHE ELETRI (LOTIO PPROXIMTE) UERGROU ELETRI (LOTIO PPROXIMTE) ESIGE Y: QUTI EOSYSTEM RESTORTIO W Y: K Y: SOLIITTIO.: MOTGOMERY OUTY LITHFIEL, ILLIIS SUMITTE Y: OTRT.: FILE UMER: PLOT SLE:PLOT SITE 2 ESS PL SIZE: FILE ME: SHEET 2 OF 2 SI LLY_-110.dgn ESS PL SLE 1" = 100' 0 100' 200' -20 PLTE -110
22 GEERL SHEET TES 1. RIGHT OF WY FOR SITE 3 TEMPORRY ESS RO OUTSIE LKE PROPERTY LIMITS PPROXIMTELY 1.4 RES TE PPR. EXISTIG VEHILE PTH TO E IMPROVE FOR OSTRUTIO ESS RIGHT OF WY FOR TEMPORRY ESS WITHI LKE PROPERTY LIMITS MTH LIE SEE SHEET -113 SOLIITTIO.: ESRIPTIO OTRT.: FILE UMER: 0.1 RES OF TREE LERIG REQUIRE FOR ROK ERM REVETMET OSTRUTIO ESIGE Y: W Y: K Y: SUMITTE Y: PLOT SLE:PLOT SIZE: FILE ME: SI LLY_-112.dgn MIIML TREE LERIG FOR OTRTOR STGIG ROK ERM REVETMET OSTRUTIO PPROXIMTE LKE PROPERTY LIE QUTI EOSYSTEM RESTORTIO MOTGOMERY OUTY LITHFIEL, ILLIIS SITE 3 ESS PL SHEET 1 OF 3 ESS PL SLE 1" = 50' 0 50' 100' -21 PLTE -112
23 GEERL SHEET TES 1 1. RIGHT OF WY FOR SITE 3 TEMPORRY ESS RO OUTSIE LKE PROPERTY LIMITS PPROXIMTELY 1.4 RES 18TH VE TE PPR. RIGHT OF WY TO FOLLOW EGE OF 18TH VE MTH LIE SEE SHEET -114 SOLIITTIO.: ESRIPTIO OTRT.: FILE UMER: ESIGE Y: W Y: K Y: SUMITTE Y: PLOT SLE:PLOT SIZE: FILE ME: SI LLY_-113.dgn MTH LIE SEE SHEET -112 RIGHT OF WY TO FOLLOW EGE OF EXISTIG PTH EXISTIG VEHILE PTH TO E IMPROVE FOR OSTRUTIO ESS QUTI EOSYSTEM RESTORTIO MOTGOMERY OUTY LITHFIEL, ILLIIS SITE 3 ESS PL SHEET 2 OF 3-22 SLE 1" = 50' ESS PL 0 50' 100' PLTE -113
24 GEERL SHEET TES 1. RIGHT OF WY FOR SITE 3 TEMPORRY ESS RO OUTSIE LKE PROPERTY LIMITS PPROXIMTELY 1.4 RES TE PPR. 18TH VE RIGHT OF WY TO FOLLOW EGE OF 18TH VE PPROXIMTE OUTY PROPERTY LIE SOLIITTIO.: ESRIPTIO OTRT.: FILE UMER: MTH LIE SEE SHEET -113 ESIGE Y: W Y: K Y: SUMITTE Y: PLOT SLE:PLOT SIZE: FILE ME: SI LLY_-114.dgn QUTI EOSYSTEM RESTORTIO MOTGOMERY OUTY LITHFIEL, ILLIIS SITE 3 ESS PL SHEET 3 OF 3 ESS PL SLE 1" = 50' 0 50' 100' -23 PLTE -114
25 GEERL SHEET TES 1V:1.5H 2% 9" RUSHE STOE 2% 1. ELEVTIOS RE I RTH MERI VERTIL TUM (..V.. 88) TE PPR ' MI PIPE OVER -WOVE GEOTEXTILE ESS RO TYPIL SETIO 3 SLE TS RML POOL EL 591 1V:3H 10' EL V:3H FLOW ESRIPTIO 48" ULVERT SSUME EXISTIG GRE LKE E SOLIITTIO.: OTRT.: FILE UMER: ESS RO ITH ROSSIG 3 SLE TS HORIZ. SLE 1" = 10' ROK ERM SETIO VERT. SLE 1" = 5' 0 5' 10' 10' 20' 0 ESIGE Y: W Y: K Y: SUMITTE Y: PLOT SLE:PLOT SIZE: FILE ME: SI LLY_-301.dgn EXISTIG GRE EL 596 1V:3H 30" RIPRP 5' 1V:2H EXISTIG GRE 1V:2H 5' 30" RIPRP 1V:3H EL " EIG MTERIL EXVTIO LIE WEST K REVETMET EL 588 SLE 1" = 10' 0 10' 20' EL EST K REVETMET SLE 1" = 10' 0 10' 20' EXVTIO LIE 6" EIG MTERIL QUTI EOSYSTEM RESTORTIO MOTGOMERY OUTY LITHFIEL, ILLIIS TYPIL SETIOS PLTE
A B C D E F G H EXCAVATE AS NEEDED TO CONSTRUCT NEW EMBANKMENT POTENTIAL BORROW PRISM, NOT MEASURED FOR PAYMENT FLAT POOL EL. 183.
8 7 EMNKMENT PLE 0. M EING N 0. M KG RIPRP EL. 8. -7 MIN. SEE 7-0 EXVTE S NEEE TO ONSTRUT NEW EMNKMENT NEW UNOMPTE ERTH EMNKMENT - 0 MIN POTENTIL ORROW PRISM, NOT MESURE FOR PYMENT EMNKMENT FLT POOL EL.
More informationRe: Survey of constructed cross section per Restoration Framework on Wind River, Fremont County, WY
1-11-17 LeClair Irrigation District 1418 Cowboy Lane Riverton, WY 82501 (307) 856-4018 Re: Survey of constructed cross section per Restoration Framework on Wind River, Fremont County, WY Dear Mr. Hoelzen,
More informationInformation for File # RMM
Information for File # 3-4-RMM Applicant:, L.P. Corps Contact: Ryan Malterud Address: 8 Fifth Street East, St. Paul, Minnesota 56 E-Mail: Ryan.M.Malterud@usace.army.mil Phone: (65) 9-586 Primary County:
More informationA B C D E F G H SEE NOTE 1 EL (MIN.) 2 NEW UNCOMPACTED EL. VARIES EARTH EMBANKMENT 3 (MIN.) TYPICAL SECTION EMBANKMENT AND BORROW 6 (MIN.
BORROW AS NECESSARY TO CONSTRUCT RIVERWARD SEE NOTE EL.. (MIN.) (MIN.) NEW UNCOMPACTED EL. EARTH C L C C C TYPICAL SECTION AND BORROW NO SCALE. CDF FLAT POOL EL.. JULJRP/REH AS CONSTRUCTED Approved Description
More information50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges
50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:
More informationDRAWING LIST Sheet Sheet Title Number Cover Sheet & Key Plan L0.0
onstruction rawings for orth ear reek, Muskoseepi Park LIET RWIG LIST Sheet Sheet Title umber over Sheet & Key Plan L00 L Trailhead at entre 000 emolition & Preservation Plan ridge Underpass rea, Trails
More informationCity of Massillon Site Plan Checklist
City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete
More informationSite Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)
1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone
More informationCHAPTER 11. Plan Standards
CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.
More informationE WHITE HEAD V-102 V-103 HAMPTON HILL PLANTERS HILL GENERAL NOTES:
2 3 4 6 7 8 9 824 826 WIR RIVR, MSSHUSTTS 2-OOT RL HL 83 M STT PL OORITS # STI ORTHI MI OR US rmy orps of ngineers 2924 SUST POIT V- W IR R IV R 24 WHIT H V-2 82276 29249 2 8228 29247 3 8266 2924244 4
More informationRE: Engineered Riffle Concepts for Sodom Dam Removal Grade Control Elements
November 19, 2009 Ms. Melissa Jundt NOAA Fisheries Hydropower Division 1201 NE Lloyd Boulevard, Suite 1100 Portland, Oregon 97232 RE: Engineered Riffle Concepts for Sodom Dam Removal Grade Control Elements
More informationCITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)
CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION
More informationAuthorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:
CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT
More informationPlan Preparation Checklist
Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC
More informationAPPENDIX E CIVIL DESIGN (QUANTITY CALCULATION)
APPENDIX E CIVIL DESIGN (QUANTITY CALCULATION) LOWER CACHE RIVER 1135 CIVIL DESIGN CALCULATIONS R2200, R90, & FILTER MATERIAL VOLUME CALCULATIONS FOR WEIR STRUCTURES EMBEDDED RIPRAP THICKNESS 4' 6'
More informationCITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:
CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?
More informationThe Basics. HECRAS Basis Input. Geometry Data - the basics. Geometry Data. Flow Data. Perform Hydraulic Computations. Viewing the Output
The Basics HECRAS Basis Input Geometry Data. Flow Data. Perform Hydraulic Computations by G. Parodi WRS ITC The Netherlands Viewing the Output ITC Faculty of Geo-Information Science and Earth Observation
More informationCITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS
CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment
More informationAnne Arundel County Dept. of Inspections and Permits Storm Drain Checklist
Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated
More informationQUANTITY SURVEYS. Introduction
QUANTITY SURVEYS Introduction In engineering surveying, we often consider a route (road, sewer pipeline, channel, etc.) from three distinct perspectives. The plan view of route location is the same as
More informationTown of Westlake Construction Plans Review Checklist
CONSTRUCTION PLANS CONTENTS All Drawings 24 x 36 Cover Sheet Final Plat Site Plan Demolition Plan Utility Plan Drainage Area Map and Calculations Paving Plan & Profile Sheets Storm Drain Plan & Profile
More informationUPPER MISSISSIPPI RIVER RESTORATION LAKE ODESSA HABITAT REHABILITATION AND ENHANCEMENT PROJECT OPERATION AND MAINTENANCE MANUAL APPENDIX F
UPPER MISSISSIPPI RIVER RESTORATION LAKE ODESSA HABITAT REHABILITATION AND ENHANCEMENT PROJECT OPERATION AND MAINTENANCE MANUAL APPENDIX F PROJECT PHOTOGRAPHS Table of Photographs Photograph 1: Lake Odessa
More informationGrading, Erosion and Sediment Control (GESC) Checklist
Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Planner of the Day 303-660-1393 Grading, Erosion and Sediment Control (GESC) Checklist A complete Grading, Erosion and Sediment
More informationLIBERTY CENTER B1 A1 A1 B2 B1 MAINT. CLUBHOUSE RETAIL UNDERGROUND PARKING LEVEL MECHANICAL PLAN DRAWN BY: LEVEL 1 MECHANICAL FLOOR PLAN
5 6 7 8 9 0 6 7 8 UP D. D. UP LUHOUSE RETIL RMP UP UP MIT. MEHIL KEYED OTES: GEERL MEHIL OTES: MEHIL PERFORME OTES: o. REVISIOS/SUMISSIOS DTE ITY OETS 6// PERMIT OETS, IITIL VE REQUESTS // SI-0, OORDITIO
More informationList of Figures. List of Forms
City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan
More informationREQUEST FOR PROPOSAL AERIAL PHOTOGRAPHY & DIGITAL MAPPING ROADS DEPARTMENT
REQUEST FOR PROPOSAL AERIAL PHOTOGRAPHY & DIGITAL MAPPING ROADS DEPARTMENT The Cherokee Nation is requesting proposals from qualified professionals to provide aerial photography and digital mapping of
More informationField Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah
Sediment Transport Workshop, Utah State University, 1 August 2017 Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah I. Goals for learning and discussion:
More informationCE 365K Exercise 2: HEC-RAS Modeling Spring 2014 Hydraulic Engineering Design
CE 365K Exercise 2: HEC-RAS Modeling Spring 2014 Hydraulic Engineering Design This exercise was prepared by Fernando R. Salas and David R. Maidment Introduction In this exercise, we will learn how to setup
More informationLOCATION MAP NOT TO SCALE DRAINAGE AREA MAP DRAWING INDEX APPROVED: OCDWEP ACTING COMMISSIONER : MICHAEL LANNON, P.E. DATE: COUNTY BID REFERENCE #
2 3 4 5 6 RWIG IEX OOG OUTY GREE IFRSTRUTURE PROGRM I REF #33, PL SET VOLUME II OF II SUYREST PRK LOWER PRKIG LOT FOR OUTY OF OOG, EW YORK EPRTMET OF WTER EVIROMET PROTETIO (OWEP) OWEP TIG OMMISSIOER:
More informationPorter County Plan Commission
Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer
More informationApplication Submittal Checklist for a BASIC USE PERMIT (BUP) Planning & Development Department Planning Division
Application Submittal Checklist for a BASIC USE PERMIT (BUP) APPLICABILITY. This checklist should be used when submitting an application for a Basic Use Permit. When is a Basic Use Permit required? Section
More informationSECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS
SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of
More informationExisting and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.
PLAN REQUIREMENTS The plans for street design shall conform to the requirements of Sections 3 and 4. The following requirements shall also be shown on the plans where applicable. Road and Storm Plans:
More informationPerformance Monitoring
Performance Monitoring Rock Island District Kara N. Mitvalsky, P.E. CEMVR-EC-DN Traditional Reports Analysis of existing data Comparison of data points to objectives identified in the feasibility reports
More informationDate Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project
Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must
More informationNWP of 10 Enclosure
#6301 4/16/2018 Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070 Project Site General Location and Topography Reed Pit Expansion - Marion County, Oregon United States
More informationFor crossing under a railroad, contact the specific railroad company's engineering department.
PAGE 330524-1 SECTION 330524 SPECIFIER: This section is for the underground installation of piping by directional drilling. When specifying this method of piping installation, care must be taken to ensure
More informationB422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422
B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced
More informationSewer Line Extension Permit Design Checklist
CHECKLIST C1 Revised 4/7/2017 Sewer Line Extension Permit Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling sewer line
More informationMemorandum 1.0 Highway Traffic Noise
Memorandum Date: September 18, 2009 To: Chris Hiniker, SEH From: Stephen B. Platisha, P.E. Re: Updated CSAH 14 Noise Analysis The purpose of this memorandum is to provide the results of the revised traffic
More informationSTANDARD BID ITEM NUMBERS
10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation
More informationAPPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST
VI-K -1 of 8 APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST Final Submittal Major Subdivision Project Name Subdivision Number Location (Street
More informationKing And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA (804) (804) (fax)
King And Queen County, VA P.O. Box 177 King and Queen Courthouse, VA 23085 (804) 785-5975 (804) 785-5999 (fax) Shoreline Erosion Project Water Quality Impact Assessment (WQIA) & Wetland Board Permit Submittal
More informationCompensatory Mitigation Monitoring Report Aquatic Habitat Improvement City of Montrose Whitewater Park, Montrose County, Colorado March 6, 2014
Compensatory Mitigation Monitoring Report Aquatic Habitat Improvement City of Montrose Whitewater Park, Montrose County, Colorado March 6, 2014 i. Project Overview 1. USACE # # SPK 2013 00851 2. Permittee:
More informationVARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)
VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION) 190-66. General procedure for completeness review. A. In order to be determined complete for review by the Board, all of the required information must
More informationTYPE 4-C TYPE 6 TYPE 7 TYPE 8
````` Face of ase rad. 42 TYPE rad. " T T T 22.5 2'- unless otherwise shown on plans 5" 5" 5" Slope 2: TYPE 2 rad. Concrete TYPE 2-A rad. Wearing Course Concrete ase Course TYPE 2-0" rad. TYPE 3 As Shown
More informationOAK RUN BUILDING PERMIT
OAK RUN BUILDING PERMIT (DOCK APPLICATION) ALL PERMIT APPLICATIONS MUST BE SUBMITTED AT THE POA OFFICE A MINIMUM OF 48 HOURS BEFORE THE SCHEDULED MEETING. ALL INFORMATION MUST BE SUPPLIED AND HAVE PROPER
More informationAMENDMENT TO ADVERTISED CONTRACT
November 16, 2016 AMENDMENT TO ADVERTISED ONTRAT ONTRAT I.D. NUMBER: GEORGIA PROJET NUMBER: B1BA1601612-0 BRSLB-2015-00(003) PN: - OUNTY: TROUP AMENDMENT NUMBER: 2 LETTING NOVEMBER 18, 2016 LETTING NUMBER:
More informationPLANNING AND DEVELOPMENT
OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing
More informationSection E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02
Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing
More informationPART XIII: HYDRAULIC/ HYDROLOGY SURVEYS
PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS 13.1 Purpose and Scope Hydraulic surveys are required for flow analysis to determine bridge and culvert design characteristics. A hydraulic survey is usually but
More informationTOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw
I. Owner Information II. Applicant Information III. Representative Information IV. Operator Information er.doc Page 1 of 5 Douglas Planning Board V. Site Information Assessors Map Assessors Parcel Deed
More informationMAJOR GRADING PLAN CHECKLIST
MAJOR GRADING PLAN CHECKLIST PUBLIC WORKS DEPARTMENT / ENGINEERING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: (619) 667-1166 Fax: (619) 667-1380 Grading plans shall address both rough grading
More informationIntroduction to Aerial Photographs and Topographic maps (Chapter 7, 9 th edition) or (chapter 3, 8 th edition)
GEOLOGY 306 Laboratory Instructor: TERRY J. BOROUGHS NAME: Introduction to Aerial Photographs and Topographic maps (Chapter 7, 9 th edition) or (chapter 3, 8 th edition) For this assignment you will require:
More informationB.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST
B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary
More informationCCAC SOUTH CAMPUS. COMPANY Engineering FILM/VIDEO ELECTRICAL UPGRADE
SOUTH MPUS FLM/VEO ELETRL UPRE OMPY 407 Sclp venue Johnstown, P 5904 Phone: 4-69-9300 onsultnts: FX: 4-69-930 750 LRTO RO (ROUTE 5) WEST MFFL, P 5-309 PROJET UMER: -S-003 Sel: Sel: Project dentifiction:
More information5.7 Plan Documentation and Supporting Information.
5.7 and Supporting Information. In any case where the and Supporting Information for a Development Plan requires the submission of a Site Plan, Overall Plan, Landscape Plan, Building Elevations, Sign Plan
More informationZoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801
2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax
More informationCITY OF MUSKEGO DRAFTING STANDARDS
CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under
More informationSUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT
Case #: SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT 171 North Ross Street, Suite 200 Auburn, AL 36830 (334) 501-3000 ~ Fax: (334) 501-7294 Applicant Name: Mailing Address: Email Address:
More informationWashington County Road Engineering Plan Submittal/Review Checklist
Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation
More informationCHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d
Development Name: Submitted by: Highlands County Engineering Department Improvement Plan Checklist Date Received: Due Date: Y N E N / S O A Permits/Approvals 1. Copy of water management district permit
More informationARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS
SITE PLAN CONTROL ARMOUR TOWNSHIP SITE PLAN APPLICATION REQUIREMENTS Site Plan Control is a process involving municipal approval of the lay-out, design and appearance of certain new developments, as authorized
More informationMINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.
MINOR SUBDIVISION 190-69. Minor subdivisions. In addition to the requirements indicated in 190-67 (SEE BELOW), the information below shall be shown on the plans for all minor subdivision applications.
More informationCHAPTER 11 SURVEY CADD
CHAPTER 11 SURVEY CADD Chapter Contents Sec. 11.01 Sec. 11.02 Sec. 11.03 Sec. 11.04 Sec. 11.05 Sec. 11.06 Sec. 11.07 Sec. 11.08 Sec. 11.09 Sec. 11.10 General Description of Survey File Contents of Survey
More informationCabaniss Engineering Inc.
280 North River Church 4215 Rice Mine Road NE -1529 North River Church Subdivision Plat Book 2010, Page 131 Deed Book 550 Page 761 4 18,427 sf 67.7' 5 14,367 sf 60.2' 65.0' 3 13,546 sf 35.2' 6 35' X 277.99
More informationMICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER
1.01 DEVELOPMENT METHODS 1.01.01 References 1.01.02 General 1.01.03 Survey and Mapping Methods 1.02 PLAN SHEETS MICHIGAN DESIGN MANUAL 1.02.01 Title Sheet A. Project Location B. Traffic Data C. Project
More informationADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)
ADDENDUM No. 1 ITB No. 4521 Northside Interceptor Condition Assessment Due: February 1, 2018 at 10:00 A.M. (Local Time) The following changes, additions, and/or deletions shall be made to the Invitation
More informationThis Land Surveying course has been developed by. Failure & Damage Analysis, Inc.
This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Bridge Surveying SURVEYS Bridge surveying is necessary to locate a site, obtain information
More information1.1 GENERAL RECORD DRAWING REQUIREMENTS
Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has
More informationGEO-SLOPE International Ltd, Calgary, Alberta, Canada Relief Well Spacing
1 Introduction Relief Well Spacing Relief wells are commonly installed on the downstream side of an earth dam to control the seepage and pore-pressures (e.g. levee; Figure 1). A key design requirement
More informationNEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST
NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be
More informationCONSTRUCTION CERTIFICATION PACKAGE
Purpose: The intent of this Construction Certification Package is to ensure that acceptable documentation is maintained during the construction of stormwater management practices (SMPs). For general information
More information10010 RECORD DRAWING INFORMATION
SECTION 10000 RECORD DRAWING CHECK LIST All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes, shall submit to the Town of Cary Engineering
More informationA. Dewatering observation wells are part of dewatering allowance.
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationMAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX
407-1 - MAINTENANCE HOLES, CATCH BASINS AND DITCH INLETS - MTC FORM 407 INDEX 407-1.1 GENERAL Tender Items Specifications Standard Drawings 407-1.1.1 Frame and Grate Selection 407-1.1.2 Selection of Structure
More informationSubdivision Application Checklist
City of Portsmouth, New Hampshire Subdivision Application Checklist This subdivision application checklist is a tool designed to assist the applicant in the planning process and for preparing the application
More informationLOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)
MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW
More informationClarifications in italics added July 2018
SECTION 10000 RECORD DRAWING CHECKLIST Clarifications in italics added July 2018 All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes,
More informationCHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS
CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS Section Title Page 3.1 General... 3-1 3.1.1 Plan Set...3-1 A. Loveland (City Limits Only)...3-1 3.1.2 Final Mylars...3-1
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationDECK PERMIT APPLICATION PACKET
Building Division 865 SE Barrington Dr Oak Harbor, WA 98277 Ph 360.279.4510 Fax 360.279.4519 DECK PERMIT APPLICATION PACKET SUBMITTAL FORMS INDEX Basic Deck Submittal Checklist Residential Deck Submittal
More information11/06/2014 Pay Items - 1
Pay Item Description Pay Unit 90701 Mobilization.... LS 91101 Excavation.... L.F. 91102 Excavation.... mi 91103 Excavation.... LS 91104 Borrow..... C.Y. 91105 Borrow..... LS 91106 Existing Trail Restoration...
More informationPeace Project Water Use Plan. Williston Air Photos and DEM. Reference: GMSWORKS #14. Williston Air Photos and DEM 2011
Peace Project Water Use Plan Williston Air Photos and DEM Reference: GMSWORKS #14 Williston Air Photos and DEM 2011 Study Period: May 2011 to December 2011 Les Giles Transmission Engineering, Photogrammetry
More informationAPPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN
209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) DEVELOPMENT PLAN *** IMPORTANT INFORMATION ~ Please
More informationBRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006
Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.
More informationB-PERMIT PLAN CHECK MANUAL
B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases
More informationSECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.
More informationSlope analysis & Grading. Earth shape and earthwork Topographic map Slope form Slope analysis Grading
6 Slope analysis & Grading Earth shape and earthwork Topographic map Slope form Slope analysis Grading 81 Topographic Map Topographic Contour map Topographic contour map are composed of a series of line
More informationMinor Site Plan Application and Checklist Land Disturbing Activities
Minor Site Plan Application and Checklist Land Disturbing Activities INSTRUCTIONS: Please provide the requested information below. The Development Services Department reviews each site plan submittal based
More informationRESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST
RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST The purpose of this form is to inform applicants of: 1) the requirements for building permits and stormwater permits for residential demolition projects;
More informationCHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN
N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional
More informationEssential Skills: Reading and Interpreting Maps and Plans
Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /
More informationTUSCAN VILLAGE - MASTERPLAN Salem, New Hampshire PRELLWITZ CHILINSKI ASSOCIATES 221 Hampshire Street Cambridge MA 02139
TUSCAN VILLAGE - 03-11- 2016 MASTERPLAN Salem, New Hampshire PRELLWITZ CHILINSKI ASSOCIATES 221 Hampshire Street Cambridge MA 02139 t: 617-547-8120 f: 617-661-4986 www.prellwitzchilinski.com PROGRAM 50
More informationTO: FROM SUBJECT: SRBA Jon Albright Technical Memorandum on Hydrologic Yields PROJECT: Sulphur River Basin Feasibility Study DATE: 08/26/2014 CC:
593 Summerhill Rd Texarkana, Texas 7553 93-838-8533 fax 93-832-47 TO: FROM SUBJECT: PROJECT: SRBA Jon Albright Technical Memorandum on Hydrologic Yields Sulphur River Basin Feasibility Study DATE: 8/26/214
More informationOhio Department of Transportation, VBA Documentation
Contents 1.1 Current Versions... 2 1.2 Overview... 3 1.3 Supporting Files and Standards... 4 1.3.1 ODOT_Drainage.cel... 4 1.3.2 ODOT2013.ddb... 5 1.4 ODOT_StormSewerPlan2013.mvba... 6 1.4.1 Mode: Place
More informationTechnical Memorandum ECO-7
To: Woody Frossard, TRWD From: Bob Brashear, CDM This document is released for the purpose of interim review under the authority of Robert Brashear, P.E., TX license 80771 on 21-Mar-2005. It is not to
More informationSITE PLAN APPLICATION
SITE PLAN APPLICATION SECTION 1. APPLICANT/OWNER INFORMATION Please Print or Type Applicant/Developer: City: State: Zip: Telephone: Fax: E-mail: Applicant s Status: (Check One) Owner Tenant Prospective
More information