1 FLOOD ESTIMATE FROM POSSIBLE DAM BREAK SCENARIO OF SUN KOSI LAND SLIDE DAM, NEPAL by O. P. GUPTA Director Central Water Commission
2 Introduction Landslide dams are natural phenomenon that poses a major threat of flash flood in d/s area due breaching of such dams. In the past number of flash flood events (Parechu, Kurichhu etc occured. Information in respect of possible rise of WL, time of flood peak is required in shortest possible time for an effective disaster management. In majority of cases, it may not be possible to get requisite input data for simulation. Case study of Sun Kosi landslide, Nepal
3 Event Brief On the at 2:35 AM a major landslide took place in the upperreachesofsunkosiriverin Sindhupalchowk district in Nepal at a location having latitude: N, longitude: E LSD The landslide location is around 1.2 km u/s of existing Sun Kosi Hydro Power Dam and around 11.3 km u/s of confluence of Sun Kosi and Bhute Kosi As per the initial information the depth of water column was approximately 50 m to 60 m. The reservoir thus formed submerged the area upto around 4 to 5 km u/s of the landslide location.
4 Data constraints Data available Latitude and Longitude of land slide dam photograph of LSD (LSD)location and Approximate height of LSD and very rough estimate of reservoir volume Prevailing discharge at Kosi barrage located about 280 km downstream of land slide dam location, which was about 3540 cumec Data required Proper estimate of storage volume behind LSD Cross section of river from LSD location up to Kosi barrage Catchment area of the river at LSD and Kosi barrage
5 Major Challenge To estimate the possible rise in Kosi water level in the event of LSD breach To achieve the target better estimate of storage volume behind LSD, catchment details and river cross sections from LSD upto Kosi barrage were essential
6 How did we proceed Location of Land Slide dam marked on Google Earth ASTER DEM of 30m x 30 m resolution having grid size 1 degree x 1 degree has been downloaded and a mosaic has been prepared to get the coverage of entire catchment of Kosi river up to Kosi barrage Catchment area and hypsometry of the river catchment at LSD and Kosi barrage has been estimated by GIS processing of the DEM using HEC GeoHMS extention of HEC. The catchment area of major streams between LSD and Kosi barrage has also been estimated for distribution of prevailing initial condition flow in Kosi river
7 Drainage area of Kosi river at Kosi Barrage LSD Location
8 ASTER DEM of Kosi Cross section of river upstream of LSD has been extracted from ASTER DEM for estimating the storage volume behind LSD Cross section of river from LSD upto Kosi barrage has been extracted for hydrodynamic routing of dam break flood to get flood peak, its travel time and possible additional rise in river water level at different locations
9 Estimate of storage volume behind LSD 8.6 MCM for 49 m depth 31 MCM for 80 m depth
10 Estimated volume for 80 m depth of water Reach River Sta Profile Top Min Ch El W.S. Elev Flow Area Width Volume (m) (m) (m2) (m) (1000 m3) LSDUS 8000 PF LSDUS 7000 PF LSDUS 6000 PF LSDUS 5000 PF LSDUS 4000 PF LSDUS 3000 PF LSDUS 2000 PF Volume Plan: 840Plan Elevation (m) River LSDUS Main Channel Distance (m) Legend WS PF 1 Ground
11 Cross sections of Sun Kosi and Kosi rivers
12 MIKE11 model set up for dam break simulation
13 Bed profile of river from land slide dam up to kosi barrage [meter] :00: Lowest point in cross section (marker 2) KOSI [m]
14 Distribution of Initial condition flow Breach width 80 m Breach depth 40 m Breach development time 2 hours Initial condition flow 3540 cumec at Kosi barrage, distributed in catchment area proportion and impinged at confluence points of tributaries
15 Flood peak and its travel time [m^3/s] Time Series Discharge Discharge KOSI KOSI KOSI KOSI KOSI LAKE :00: :00:00 08:00:00 12:00:00 16:00:00 20:00:00 00:00: :00:00
16 Flood peak and additional rise in water level Locatiom (m) downstream of land slide dam Initial flood in river (cumec) Initial flood + land slide dam breach flood (cumec) Flood peak due to land slide dam (cumec) Possible additional rise in water level due to land slide dam breach (m) Flood peak occurrence time (date- hr:min Land slide dam /8/2014 2:15 KOSI /8/2014 2:19 KOSI /8/2014 2:30 KOSI /8/2014 2:34 KOSI /8/2014 2:55 KOSI /8/2014 3:19 KOSI /8/2014 7:24 KOSI /8/ :04 KOSI /8/ :34 KOSI (Near Kosi barrage) /8/ :20
17 Limitations Flood peak due to LSD breach and its travel time obtained using the river cross sections from ASTER DEM, may differ in comparison to surveyed river cross sections. A very high rainfall in the drainage area of the rivers may influence the attenuation pattern of the flood peak, resulting some higher discharge in comparison to estimated one. It is not possible to exactly predict the dam breach parameters, hence a major variation in dam breach parameter may result in variation of estimated flood peak
18 Thank You
APPENDIX I FLOODPLAIN ANALYSIS
APPENDIX I FLOODPLAIN ANALYSIS TECHNICAL MEMORANDUM Date: June 11, 2014 To: Bibiana Alvarez and Ryan Lee Sawyer, Analytical Environmental Services From: Melanie Carr, MS, PE, Tarick Abu- Aly, MS, PE, Rafael
More informationTUMARIA RESERVOIR Report
1 TUMARIA RESERVOIR Report Uttarakhand State spreads over an area of about 5.566 Mha. It is bounded by Himalayan range in north. The population of state is over 8 million. It has hilly Bhavar and Tarai
More informationCE 365K Exercise 2: HEC-RAS Modeling Spring 2014 Hydraulic Engineering Design
CE 365K Exercise 2: HEC-RAS Modeling Spring 2014 Hydraulic Engineering Design This exercise was prepared by Fernando R. Salas and David R. Maidment Introduction In this exercise, we will learn how to setup
More informationHydraulics and Floodplain Modeling Managing HEC-RAS Cross Sections
v. 9.1 WMS 9.1 Tutorial Hydraulics and Floodplain Modeling Managing HEC-RAS Cross Sections Modify cross sections in an HEC-RAS model to use surveyed cross section data Objectives Build a basic HEC-RAS
More informationField Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah
Sediment Transport Workshop, Utah State University, 1 August 2017 Field Observations and One-Dimensional Flow Modeling of Summit Creek in Mack Park, Smithfield, Utah I. Goals for learning and discussion:
More informationHydraulics and Floodplain Modeling Managing HEC-RAS Cross Sections
WMS 10.1 Tutorial Hydraulics and Floodplain Modeling Managing HEC-RAS Cross Sections Modify cross sections in an HEC-RAS model to use surveyed cross section data v. 10.1 Objectives Build a basic HEC-RAS
More informationThe Basics. HECRAS Basis Input. Geometry Data - the basics. Geometry Data. Flow Data. Perform Hydraulic Computations. Viewing the Output
The Basics HECRAS Basis Input Geometry Data. Flow Data. Perform Hydraulic Computations by G. Parodi WRS ITC The Netherlands Viewing the Output ITC Faculty of Geo-Information Science and Earth Observation
More informationFAME Service Sustainability Assessment Report
FAME Service Sustainability Assessment Report SPATIAL APPLICATIONS DIVISION (SADL) K.U.LEUVEN RESEARCH & DEVELOPMENT Vital Decosterstraat 102, B-3000 LEUVEN TEL.: 32 16 32 97 32 FAX: 32 16 32 97 60 URL:
More informationExample Application C H A P T E R 4. Contents
C H A P T E R 4 Example Application This chapter provides an example application of how to perform steady flow water surface profile calculations with HEC-RAS. The user is taken through a step-by-step
More informationIntroduction of CSRSR Image product processing systems in CSRSR Disaster monitoring and data processing
3 rd Joint Project Team Meeting for Sentinel Asia STEP3 Data Analysis Node Report Li-Yu Chang Associate Research Engineer Center for Space and Remote Sensing Research National Central University, Taiwan
More informationLab #4 Topographic Maps and Aerial Photographs
Lab #4 Topographic Maps and Aerial Photographs Purpose To familiarize you with using topographic maps. Visualizing the shape of landforms from topographic maps is an essential skill in geology. Proficiency
More informationPART XIII: HYDRAULIC/ HYDROLOGY SURVEYS
PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS 13.1 Purpose and Scope Hydraulic surveys are required for flow analysis to determine bridge and culvert design characteristics. A hydraulic survey is usually but
More informationPRE-LAB for: Introduction to Aerial Photographs and Topographic maps (Ch. 3)
GEOLOGY 306 Laboratory Instructor: TERRY J. BOROUGHS NAME: PRE-LAB for: Introduction to Aerial Photographs and Topographic maps (Ch. 3) For this assignment you will require: a calculator and metric ruler.
More informationRadio Mobile. Software for Wireless Systems Planning
Latin American Networking School (EsLaRed) Universidad de Los Andes Merida Venezuela Javier Triviño and E.Pietrosemoli Radio Mobile Software for Wireless Systems Planning About Radio Mobile It is a tool
More informationURBAN DRAINAGE AND FLOOD CONTROL DISTRICT
URBAN DRAINAGE AND FLOOD CONTROL DISTRICT Digital Flood Hazard Area Delineation (DFHAD) Guidelines July 2009 Prepared by 720 South Colorado Boulevard Suite 410 S Denver, Colorado 80246 phone (303) 757-3655
More informationLab#2: Five Dimensions of GIS Data
NRM338 Fall 2018 Lab#1 Page#1 of 13 Lab#2: Five Dimensions of GIS Data In this lab, we will explore five basic dimensions of GIS data Location or position Length and Area Measures (M-dimension) Elevation
More informationWood Stork Aerial Survey Trip Report. Lake Murray and Saluda River August 27, Aircraft: Fixed-Wing Cessna 210 Survey Duration: hrs
Survey Attendees Shane Boring Tom Murphy Bucky Harris Kleinschmidt SCDNR Endangered Species Biologist SCDNR Pilot Aircraft: Fixed-Wing Cessna 210 Survey Duration: 1300 1415 hrs Survey Observations The
More informationIntroduction to Aerial Photographs and Topographic maps (Chapter 3)
GEOLOGY 306 Laboratory Instructor: TERRY J. BOROUGHS NAME: Introduction to Aerial Photographs and Topographic maps (Chapter 3) For this assignment you will require: a calculator and metric ruler. Objectives:
More informationSWAN LAKE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT 1
SWAN LAKE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT 1 1. General Description Figure 1 provides a map of the Swan Lake Watershed. The watershed is characterized by two major parallel
More informationSources of Geographic Information
Sources of Geographic Information Data properties: Spatial data, i.e. data that are associated with geographic locations Data format: digital (analog data for traditional paper maps) Data Inputs: sampled
More informationRECOMMENDATION ITU-R P Guide to the application of the propagation methods of Radiocommunication Study Group 3
Rec. ITU-R P.1144-2 1 RECOMMENDATION ITU-R P.1144-2 Guide to the application of the propagation methods of Radiocommunication Study Group 3 (1995-1999-2001) The ITU Radiocommunication Assembly, considering
More informationIGFA BELMONT FORUM (BF)
IGFA BELMONT FORUM (BF) National Centre for Sustainable Coastal Management (NCSCM), under a Memorandum of Understanding (MoU) with the IGFA BELMONT FORUM (BF) has undertaken research study focusing on
More informationPropagation Modelling White Paper
Propagation Modelling White Paper Propagation Modelling White Paper Abstract: One of the key determinants of a radio link s received signal strength, whether wanted or interfering, is how the radio waves
More informationIowa Bridge Sensor Demonstration Project Phase I and Phase II Executive Summary Report. Floodplain Management Services Silver Jackets Pilot Study
Iowa Bridge Sensor Demonstration Project Phase I and Phase II Executive Summary Report Floodplain Management Services Silver Jackets Pilot Study Final Report AUGUST 2016 Iowa Bridge Sensor Demonstration
More informationSlope analysis & Grading. Earth shape and earthwork Topographic map Slope form Slope analysis Grading
6 Slope analysis & Grading Earth shape and earthwork Topographic map Slope form Slope analysis Grading 81 Topographic Map Topographic Contour map Topographic contour map are composed of a series of line
More informationGovt. Engineering College Jhalawar Model Question Paper Subject- Remote Sensing & GIS
Govt. Engineering College Jhalawar Model Question Paper Subject- Remote Sensing & GIS Time: Max. Marks: Q1. What is remote Sensing? Explain the basic components of a Remote Sensing system. Q2. What is
More informationYamamoto, Yuta, Jeong, Jong-Hyeok Author(s) aka.
Kochi University of Technology Aca Establishing Spatial Database for Title with GPS Digital Camera Yamamoto, Yuta, Jeong, Jong-Hyeok Author(s) aka Society for Social Management Sys Citation ournal, 3(1)
More informationNovember 24, 2010xx. Introduction
Path Analysis XXXXXXXXX Ref Number: XXXXXXX Introduction This report is an analysis of the proposed XXXXXXXXX network between XXXXXXX and XXXXXXX. The primary aim was to investigate the frequencies and
More informationPeace Project Water Use Plan. Williston Air Photos and DEM. Reference: GMSWORKS #14. Williston Air Photos and DEM 2011
Peace Project Water Use Plan Williston Air Photos and DEM Reference: GMSWORKS #14 Williston Air Photos and DEM 2011 Study Period: May 2011 to December 2011 Les Giles Transmission Engineering, Photogrammetry
More informationGuide to Developing a Stream Photograph Documentation Program
Guide to Developing a Stream Photograph Documentation Program William Robertson: MSUEWQ & BSWC Introduction Landscape photographs can offer a qualitative and, in some situations, quantitative evaluation
More informationTechnical Memorandum ECO-7
To: Woody Frossard, TRWD From: Bob Brashear, CDM This document is released for the purpose of interim review under the authority of Robert Brashear, P.E., TX license 80771 on 21-Mar-2005. It is not to
More informationIntroduction to Aerial Photographs and Topographic maps (Chapter 7, 9 th edition) or (chapter 3, 8 th edition)
GEOLOGY 306 Laboratory Instructor: TERRY J. BOROUGHS NAME: Introduction to Aerial Photographs and Topographic maps (Chapter 7, 9 th edition) or (chapter 3, 8 th edition) For this assignment you will require:
More informationLand Navigation / Map Reading
Land Navigation / Map Reading What is the Field Manual for map reading and land navigation? FM 3-25.26 What are the basic colors of a map, and what does each color represent? Black - Indicates cultural
More informationNSF Project: Cataclysms And Catastrophes LEARNING EXPERIENCE 2: STUDENT HANDOUT HURRICANES
LEARNING EXPERIENCE 2: STUDENT HANDOUT HURRICANES Developed by Rebecca C. Smyth 1 and Matt Morris 2,3 1. Research Scientist Associate, Bureau of Economic Geology, Jackson School of Geosciences, The University
More informationRECOMMENDATION ITU-R P Characteristics of precipitation for propagation modelling
Rec. ITU-R P.837-4 1 RECOMMENDATION ITU-R P.837-4 Characteristics of precipitation for propagation modelling (Question ITU-R 21/3) (1992-1994-1999-21-23) The ITU Radiocommunication Assembly, considering
More informationDigital Letter of Map Change (DLOMC) Guidelines May 2010
Digital Letter of Map Change (DLOMC) Guidelines May 2010 Prepared for: Urban Drainage and Flood Control District 2450 West 26th Avenue, Suite 156B Denver, CO 80211 Prepared by: 8100 South Akron Street,
More informationFlood Hazard Area Delineation Guidelines MOSER & ASSOCIATES ENGINEERING ICON ENGINEERING URBAN DRAINAGE AND FLOOD CONTROL DISTRICT
Flood Hazard Area Delineation Guidelines MOSER & ASSOCIATES ENGINEERING ICON ENGINEERING URBAN DRAINAGE AND FLOOD CONTROL DISTRICT Flood Hazard Area Delineation (FHAD) Guidelines Contents Section Page
More informationImportant Questions. Surveying Unit-II. Surveying & Leveling. Syllabus
Surveying Unit-II Important Questions Define Surveying and Leveling Differentiate between Surveying and Leveling. Explain fundamental Principles of Surveying. Explain Plain and Diagonal Scale. What is
More informationSupporting Guidance Note
Supporting Guidance Note Supporting Guidance Note: SGN 2 Geomorphology photosurveys for hydropower developments We require a geomorphology photosurvey to be submitted with applications for abstraction
More informationJournal of Environmental Research And Development Vol. 5 No. 1, July-September 2010
COMPARATIVE STUDY OF HYDRO-MORPHOLOG- ICAL PARAMETERS EXTRACTED FROM DIGITAL ELEVATION MODEL (DEM) GENERATED FROM STEREO PAIR OF CARTOSAT- I SATELLITE DATA, SHUTTLE RADAR TOPOGRAPHIC MISSION (SRTM) AND
More informationChapter 3 Solution to Problems
Chapter 3 Solution to Problems 1. The telemetry system of a geostationary communications satellite samples 100 sensors on the spacecraft in sequence. Each sample is transmitted to earth as an eight-bit
More informationAutoCAD 2016 for Civil Engineering Applications
Introduction to AutoCAD 2016 for Civil Engineering Applications Learning to use AutoCAD for Civil Engineering Projects Nighat Yasmin Ph.D. SDC P U B L I C AT I O N S Better Textbooks. Lower Prices. www.sdcpublications.com
More informationTechTime New Mapping Tools for Transportation Engineering
GeoEye-1 Stereo Satellite Imagery Presented by Karl Kliparchuk, M.Sc., GISP kkliparchuk@mcelhanney.com 604-683-8521 All satellite imagery are copyright GeoEye Corp GeoEye-1 About GeoEye Corp Headquarters:
More informationStream Design: From GEOPAK to HEC-Ras
10 Stream Design: From GEOPAK to HEC-Ras OBJECTIVES Provide you with a general understanding of GEOPAK Cross Section Reports and their capability to generate geometric information for the HecRas program.
More informationGEO-SLOPE International Ltd, Calgary, Alberta, Canada Relief Well Spacing
1 Introduction Relief Well Spacing Relief wells are commonly installed on the downstream side of an earth dam to control the seepage and pore-pressures (e.g. levee; Figure 1). A key design requirement
More informationPeace Project Water Use Plan. Physical Works Terms of Reference. GMSWORKS-26 Communications and Safety Improvements Williston, Dinosaur and Peace
Peace Project Water Use Plan Physical Works Terms of Reference GMSWORKS-26 Communications and Safety Improvements Williston, Dinosaur and Peace April 21, 2008 Peace Water Use Plan Physical Works Terms
More informationNatural Disaster Hotspots Data
Natural Disaster Hotspots Data Source: Dilley, M., R.S. Chen, U. Deichmann, A.L. Lerner-Lam, M. Arnold, J. Agwe, P. Buys, O. Kjekstad, B. Lyon, and G. Yetman. 2005. Natural Disaster Hotspots: A Global
More informationENVI.2030L Topographic Maps and Profiles
Name ENVI.2030L Topographic Maps and Profiles I. Introduction A map is a miniature representation of a portion of the earth's surface as it appears from above. The environmental scientist uses maps as
More informationTiered Species Habitats (Terrestrial and Aquatic)
Tiered Species Habitats (Terrestrial and Aquatic) Dataset Description Free-Bridge Area Map The Department of Game and Inland Fisheries (DGIF s) Tiered Species Habitat data shows the number of Tier 1, 2
More informationAVISTA CORPORATION ' FEDERAL STORAGE CLAIM A-1
AVISTA CORPORATION 2126.5' FEDERAL STORAGE CLAIM A-1 AVISTA CORPORATION 2126.5' FEDERAL STORAGE CLAIM EXHIBIT A-2 AVISTA CORPORATON 2126.5' FEDERAL STORAGE CLAIM EXHIBIT A-3 AVISTA CORPORATION 2126.5'
More informationAssessment of White-bellied Heron (Ardea insignis) population and its distribution in Kurichhu and Drangmachhu basins, Eastern Bhutan
Assessment of White-bellied Heron (Ardea insignis) population and its distribution in Kurichhu and Drangmachhu basins, Eastern Bhutan Jigme Dorji June 2018 Introduction White-bellied heron is the most
More informationDigital Flood Hazard Area Delineation (DFHAD) Guidelines
Digital Flood Hazard Area Delineation (DFHAD) Guidelines Contents Section Page Acronyms and Abbreviations Abbreviations and Acronyms... iii Revise Descriptions... iv 1.0 Introduction and Purpose... 1 1.1
More informationAppendix A Lower Columbia River Chart Datum Modeling
Appendix A Lower Columbia River Chart Datum Modeling David Evans and Associates, Inc. David Evans and Associates, Inc. 2801 SE Columbia Way, Ste. 130 Vancouver, WA 98661 (360) 314-3200 1.0 Vertical Datum
More informationProduced by Mr B Ward (Head of Geography PGHS)
Getting to Know Google Earth The following diagram describes some of the features available in the main window of Google Earth. 9. Sun - Click this to display sunlight across the landscape. 1. Search panel
More informationComparative Study of Cartosat-DEM and SRTM-DEM on Elevation Data and Terrain Elements
Cloud Publications International Journal of Advanced Remote Sensing and GIS 2015, Volume 4, Issue 1, pp. 1361-1366, Article ID Tech-480 ISSN 2320-0243 Research Article Open Access Comparative Study of
More informationCHAPTER 3 MARGINAL INFORMATION AND SYMBOLS
CHAPTER 3 MARGINAL INFORMATION AND SYMBOLS A map could be compared to any piece of equipment, in that before it is placed into operation the user must read the instructions. It is important that you, as
More informationCombining low-cost sonar and high-precision GNSS for river and estuarine bathymetry
Combining low-cost sonar and high-precision GNSS for river and estuarine bathymetry J.A. Gonçalves, J. Pinheiro, L. Bastos, A. Bio Background Bathymetry surveys are essential to provide data to keep navigation
More informationRebman Creek Evaluation of In-Stream Rehabilitation Structures
Rebman Creek Evaluation of In-Stream Rehabilitation Structures Draft Report Prepared for: Weldwood of Canada Ltd. Quesnel, BC by: G3 Consulting Ltd. 4508 Beedie Street Burnaby, BC V5J 5L2 December 2000
More informationRe: Survey of constructed cross section per Restoration Framework on Wind River, Fremont County, WY
1-11-17 LeClair Irrigation District 1418 Cowboy Lane Riverton, WY 82501 (307) 856-4018 Re: Survey of constructed cross section per Restoration Framework on Wind River, Fremont County, WY Dear Mr. Hoelzen,
More informationCONCEPT REVIEW GUIDELINES
Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES
More informationFloods On The Minnesota River Planning For St. Peter
Floods On The Minnesota River Planning For St. Peter Group Members Section: A B C D E In this lab, we will make a flood hazard map for the city of St. Peter. We will use the 100-year flood as the design
More informationNR402 GIS Applications in Natural Resources
NR402 GIS Applications in Natural Resources Lesson 5 GPS/GIS integration Global Positioning System (GPS)..a global navigation system that everyone can use What is GPS? How does it work? How accurate is
More informationMAPPING YOUR STREAM. TIME REQUIRED 50 minutes in Field 50 minutes in Classroom 50 minutes Homework
OUR MAPPING YOUR STREAM STREAM ACTIVITY SUMMARY Students will draft a cross-sectional profile of the stream and measure the velocity of the current. They will use both of these to calculate the discharge
More informationLine and polygon features can be created via on-screen digitizing.
This module explains how GPS works, sources of error, and error correction using real time or post processing differential correction. Cost and accuracy of different grades of GPS units are also part of
More informationWhat are the causes of water-related disasters? Does water governance play a role? SANDRA SOARES-FRAZÃO UCL-IMMC
What are the causes of water-related disasters? Does water governance play a role? SANDRA SOARES-FRAZÃO UCL-IMMC Natural disasters 1961-2015 1000 900 800 700 600 500 400 300 200 100 Number of events Floods
More informationASTER GDEM Version 2 Validation Report
ASTER GDEM Version 2 Validation Report Japan s Validation Report August 12th, 2011 Tetsushi Tachikawa (ERSDAC) Manabu Kaku (Mitsubishi Material Techno Corp.) Akira Iwasaki (University of Tokyo) ---------------------------------------------------------------------------------------
More informationHartwell Lake Application for Dry Dredging
Hartwell Lake Application for Dry Dredging Applicant: Mailing Address: E-Mail Address: Day Time Phone Number/s: Dredging Site Address: Subdivision: Lot #: Shoreline Use Permit #: Next Upstream Permit #,
More informationDESIGN OF SATELLITE LINKS FOR Ka-BAND NETWORK IN NEPAL. Presented By Amrita Khakurel Nepal
DESIGN OF SATELLITE LINKS FOR Ka-BAND NETWORK IN NEPAL Presented By Amrita Khakurel Nepal 1 To design Ka-band network links by logically selecting technologies and optimizing scarce resources. To depict
More informationLoy Gulch, Paint Pony, East Fork Paint Pony LOMR
Loy Gulch, Paint Pony, East Fork Paint Pony LOMR Woodland Park, CO Prepared by: Michael Baker International 165 S. Union Blvd, Suite 200 Lakewood, CO 80226 TABLE OF CONTENTS I. INTRODUCTION... 2 1.1 Purpose...
More information[EN-107] Impact of the low latitude ionosphere disturbances on GNSS studied with a three-dimensional ionosphere model
ENRI Int. Workshop on ATM/CNS. Tokyo, Japan (EIWAC21) [EN-17] Impact of the low latitude ionosphere disturbances on GNSS studied with a three-dimensional ionosphere model + S. Saito N. FUjii Communication
More informationPresented By: Todd Ward Project Manager
Presented By: Todd Ward Project Manager Mailing Address All submittals for LOMRs and CLOMRs Harris County should be directed to Harris County Flood Control District. Submittals can be mailed or hand-delivered
More informationRemote Sensing. Measuring an object from a distance. For GIS, that means using photographic or satellite images to gather spatial data
Remote Sensing Measuring an object from a distance For GIS, that means using photographic or satellite images to gather spatial data Remote Sensing measures electromagnetic energy reflected or emitted
More informationAral Sea profile Selection of area 24 February April May 1998
250 km Aral Sea profile 1960 1960 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 2010? Selection of area Area of interest Kzyl-Orda Dried seabed 185 km Syrdarya river Aral Sea Salt
More informationAircraft Scatter on 10 and 24 GHz using JT65c and ISCAT-A
Aircraft Scatter on 10 and 24 GHz using JT65c and ISCAT-A By VK7MO and David Smith VK3HZ The authors have been using the digital modes JT65C and ISCAT-A to work aircraft scatter at distances of up to 842
More informationAPPENDIX E - FLOODPLAIN INFORMATION
CITY OF WOODLAND PARK STORMWATER MASTER PLAN - Floodplain Information APPENDIX E - FLOODPLAIN INFORMATION E1 - Floodplain Information TABLE OF CONTENTS I. INTRODUCTION... 2 Loy Gulch, Paint Pony, East
More informationPULSE-DOPPLER RADAR-SYSTEM FOR ALPINE MASS MOVEMENT MONITORING
PULSE-DOPPLER RADAR-SYSTEM FOR ALPINE MASS MOVEMENT MONITORING KOSCHUCH R. IBTP Koschuch e.u., Langegg 31, 8463 Leutschach, Austria, office@ibtp-koschuch.com Monitoring of alpine mass movement is a major
More informationDevelopment of the Technology of Utilization of Airborne Synthetic Aperture Radar (SAR)
Development of the Technology of Utilization of Airborne Synthetic Aperture Radar (SAR) Mamoru Koarai, Kouichi Moteki, Nobuyuki Watanabe, Takaki Okatani,Youko Yamada and Kaoru Matsuo Geographical Survey
More informationPhotogrammetry. Lecture 4 September 7, 2005
Photogrammetry Lecture 4 September 7, 2005 What is Photogrammetry Photogrammetry is the art and science of making accurate measurements by means of aerial photography: Analog photogrammetry (using films:
More informationFlood risk assessment in the Nemunas River delta area of Lithuania: a case study
Flood risk assessment in the Nemunas River delta area of Lithuania: a case study By Vytautas Dubra, Petras Grecevičius Institute of Maritime and Cultural Landscapes, Klaipeda University, Lithuania Abstract
More informationTerrain Modeling with ArcView GIS
What You Will Need: A Pentium class PC with 32 MB of RAM (minimum) and 100 MB of free hard drive space, ArcView GIS 3.1 or higher and WinZip or an equivalent program, and an Internet connection. Data and/or
More informationComparison of Flow Characteristics at Rectangular and Trapezoidal Channel Junctions
Journal of Physics: Conference Series Comparison of Flow Characteristics at Rectangular and Channel Junctions To cite this article: Ajay Kumar Pandey and Rakesh Mishra 202 J. Phys.: Conf. Ser. 364 024
More informationGROUNDWATER-SURFACE WATER INTERACTIONS ALONG THE BLANCO RIVER
Fall 2017 GROUNDWATER-SURFACE WATER INTERACTIONS ALONG THE BLANCO RIVER GEO 327G FINAL PROJECT YATES, KENDALL A OVERVIEW The Blanco River and surrounding aquifers have become an area of interest for ground
More informationMap and Drawing Standards for the South Pacific Division Regulatory Program
Map and Drawing Standards for the South Pacific Division Regulatory Program Hollis Jencks Project Manager, Nevada/Utah Section Sacramento District Regulatory Program Workshop 31 May 2018 US Army Corps
More informationRE: Engineered Riffle Concepts for Sodom Dam Removal Grade Control Elements
November 19, 2009 Ms. Melissa Jundt NOAA Fisheries Hydropower Division 1201 NE Lloyd Boulevard, Suite 1100 Portland, Oregon 97232 RE: Engineered Riffle Concepts for Sodom Dam Removal Grade Control Elements
More informationCompensatory Mitigation Monitoring Report Aquatic Habitat Improvement City of Montrose Whitewater Park, Montrose County, Colorado March 6, 2014
Compensatory Mitigation Monitoring Report Aquatic Habitat Improvement City of Montrose Whitewater Park, Montrose County, Colorado March 6, 2014 i. Project Overview 1. USACE # # SPK 2013 00851 2. Permittee:
More informationHYDRAULIC MODELING - MAPPING OF RIVER BED
THEME D: Experiences from Models and Prototypes 449 HYDRAULIC MODELING - MAPPING OF RIVER BED Geisler T., Breitenstein S., Hammer A., Mayr D. and Klasinc R. Graz University of Technology, Hermann-Grengg
More informationRemote Sensing in Daily Life. What Is Remote Sensing?
Remote Sensing in Daily Life What Is Remote Sensing? First time term Remote Sensing was used by Ms Evelyn L Pruitt, a geographer of US in mid 1950s. Minimal definition (not very useful): remote sensing
More informationVICINITY MAP LOCATION MAP GRAPHIC SCALES
VICINITY MAP LOCATION MAP GI-01 LEGEND TABLE OF CONTENTS CONSTRUCTION SEQUENCE NOTES GENERAL NOTES SEDIMENTATION & EROSION CONTROL ABBREVIATIONS GI-02 M P P P P M EXISTING HYDRAULIC PROFILE AND DEMOLITION
More informationNorth Carolina No-Rise Guidance Document
North Carolina No-Rise Guidance Document June 4, 2015 Atlanta, GA Dan Brubaker, PE, CFM NFIP Engineer (919) 825-2300 Dan.Brubaker@ncdps.gov Purpose Provide guidance for No-Rise preparation Engineers Provide
More informationContents. Radar and Flood Forecast System. Study Area and Biseulsan Radar. Hydrologic Analysis of Radar Rainfall. Conclusions
Contents 1 Motivations and Objective 2 3 4 5 Radar and Flood Forecast System Study Area and Biseulsan Radar Hydrologic Analysis of Radar Rainfall Conclusions Motivations and Objective In order to prevent
More informationA GIS-Based Data Model and Tools for Analysis and Visualization of Levee Breaching Using the GSSHA Model
Brigham Young University BYU ScholarsArchive All Theses and Dissertations 2011-03-17 A GIS-Based Data Model and Tools for Analysis and Visualization of Levee Breaching Using the GSSHA Model Hoang Luu Tran
More informationWhakapapa River: 2014 Drift Dive Survey. Author: Adam Daniel Publication date: June 6, 2014 Auckland/Waikato Fish and Game Hamilton New Zealand
Whakapapa River: 2014 Drift Dive Survey Author: Adam Daniel Publication date: June 6, 2014 Auckland/Waikato Fish and Game Hamilton New Zealand 1 SUMMARY Two drift dive surveys were carried out in the headwaters
More informationIntroduction General Quick references Adding Extract Module to MapEarth2D Excel formats for Transform mode...
CONTENTS Introduction... 2 General... 2 Quick references... 2 Adding Extract Module to MapEarth2D... 2 Excel formats for Transform mode... 3 Excel formats for Tweak mode... 5 Creating dxf file using AutoCAD...
More informationB422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422
B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced
More informationKWT Group an introduction
KWT Group an introduction Ron den Hertog MSc Director KWT Group Nov 2015 About KWT Group Member of family owned company, 5th generation > 1989 water management Products: Comportas (sluice gates, penstocks)
More informationA B C D E F G H SEE NOTE 1 EL (MIN.) 2 NEW UNCOMPACTED EL. VARIES EARTH EMBANKMENT 3 (MIN.) TYPICAL SECTION EMBANKMENT AND BORROW 6 (MIN.
BORROW AS NECESSARY TO CONSTRUCT RIVERWARD SEE NOTE EL.. (MIN.) (MIN.) NEW UNCOMPACTED EL. EARTH C L C C C TYPICAL SECTION AND BORROW NO SCALE. CDF FLAT POOL EL.. JULJRP/REH AS CONSTRUCTED Approved Description
More informationMOBILE AUGMENTED REALITY FOR FLOOD EVENTS MANAGEMENT
D. Mirauda, et al., Int. J. Sus. Dev. Plann. Vol. 13, No. 3 (2018) 418 424 MOBILE AUGMENTED REALITY FOR FLOOD EVENTS MANAGEMENT DOMENICA MIRAUDA 1, UGO ERRA 2, ROBERTO AGATIELLO 2 & MARCO CERVERIZZO 3
More informationMODULE 7 LECTURE NOTES 3 SHUTTLE RADAR TOPOGRAPHIC MISSION DATA
MODULE 7 LECTURE NOTES 3 SHUTTLE RADAR TOPOGRAPHIC MISSION DATA 1. Introduction Availability of a reasonably accurate elevation information for many parts of the world was once very much limited. Dense
More informationCivil Engineering Hydraulics. Backwater Profile
Civil Engineering Hydraulics God put me on this earth to accomplish a certain number of things. Right now I am so far behind that I will never die. Last class, we derived an expression for the change in
More information2. CHARTS. 2.1 Chart projections Mercator projections. Maps which are used for marine or aeronautical navigation are called charts.
Maps which are used for marine or aeronautical navigation are called charts. In Canadian waters, mariners are required to carry the latest editions of the paper charts, at the largest scale available (see
More information