1 GEOLOGICAL INVESTIGATIONS Aggregate Investigation Greenwood Aggregates Company Limited Part Lots 30 to 32, Concession 4, E.H.S. Town of Mono County of Dufferin Box #122, 38 Alpine Drive, Moonstone, Ontario, L0K 1N0 Bus/Fax (705)
2 GEOLOGICAL INVESTIGATIONS INTRODUCTION Geological Investigations was retained by Sam Greenwood (Greenwood Aggregates Company Limited) to evaluate the aggregate resource on the subject property (see Figure 1). The site is not licensed under the Aggregate Resources Act (ARA.). The intent is to complete the require studies to make an application for a pit license under the Aggregate Resources Act. Application under the Planning Act is also required to amend the Zoning Bylaw and the Official Plan to permit the operation of a pit. ASSUMPTIONS Geological Investigations has made the following assumptions during this investigation: 1/ Requirements of the Ontario Aggregate Resources Act (ARA), and Regulations will be met. 2/ Aggregate Resources Act extraction set back requirements will be used to determine the area available for future extraction of aggregate products 3 The following tonnage formula will be used when determining the volume of aggregate on site. Area (hectares) x depth of materials (metres) x 17,700 (tonnes per hectare per metre depth) = tonnage (tonnes). 4/ Complete extraction of materials contained with the site (127 hectares) to a depth 1.5 metres above the local water table. FIELD WORK Under the supervision of Geological Investigations 13 observation wells (see Appendix 1) were constructed on site, by drilling, to a maximum depth below ground surface of 100 feet (30metres). The intent of the drilling was to determine the types of materials at depth and install wells to permit the monitoring of the groundwater elevation. Samples were taken at various depths for grain size analysis, (see Appendix I &II). Box #122, 38 Alpine Drive, Moonstone, Ontario, L0K 1N0 Bus/Fax (705) geologicalinvestigations@sympatico.ca 2
3 FIGURE 1 SITE LOCATION
4 GEOLOGICAL INVESTIGATIONS In addition to the 13 observation wells Greenwood Aggregates Company Limited conducted a power equipment test pit survey, 52 test pits (see Appendix I & II) of the subject property. Samples were taken at various depths for grain size analysis, (see appendix II). Geological Investigations was not on site during the construction of these test pits. Geological Investigations is familiar with several aggregate operations in this area and is satisfied that information obtained during our field investigation is sufficient to determine the aggregate resource on site. METHODOLOGY The volume of aggregate was calculated by multiplying the area available for extraction (hectares) by the depth (metres) of resource 1.5 metres above the estimated water table. The tonnage of unconsolidated material was calculated by multiplying the volume by 17,700. Area (hectares) x (depth) metres x 17,700 = tonnes Excavation setbacks of 15 metres from property boundaries and 30 metres from road allowances or boundaries with residential use or zoning were considered as required by the Aggregate Resources Act. Box #122, 38 Alpine Drive, Moonstone, Ontario, L0K 1N0 Bus/Fax (705) geologicalinvestigations@sympatico.ca 3
5 GEOLOGICAL INVESTIGATIONS DISCUSSION The Subject property, see Figure 2, consists of approximately hectares. When required Aggregate Resources Act setbacks to extraction are applied approximately 127 hectares are available for potential aggregate extraction. Tonnage calculations have been completed on a individual property basis. Harrison Property ( Figure 3) Resource Calculation of aggregate reserves on Area A (30.23 ha), see Figure 2 Unconsolidated material hectares x metres x 17,700 = 9,946,969 tonnes Wake Property ( Figure 4 ) Resource Calculation of aggregate reserves on Area B (37.74 hectares), see Figure 2 Unconsolidated material East 2/3 of property: 23 hectares x 25 metres x 17,700 = 10,177,500 tonnes West 1/3 of property : hectares x 15 metres x 17,700 = 3,913,470 tonnes D'Orofino Property ( Figure 5 ) Resource Calculation of aggregate reserves on Area C (36.30 hectares), see Figure 2 Unconsolidated material hectares x metres x 17,700 = 11,385,277 tonnes Box #122, 38 Alpine Drive, Moonstone, Ontario, L0K 1N0 Bus/Fax (705) geologicalinvestigations@sympatico.ca 4
6 PENDLETON PROPERTY D OROFRIO PROPERTY WAKE PROPERTY HARRISON PROPERTY FIGURE 2 VIOLET HILL PROPERTIES SCALE 1 : 8,860 VIOLET HILL PROPERTY BOUNDARY
7 OW OW OW2 OW1& FIGURE 3 HARRISON PROPERTY SCALE 1 : 4,300 PROPERTY BOUNDARY OBSERVATION WELL (OW 5) TEST PIT (1)
8 OW OW FIGURE 4 WAKE PROPERTY SCALE 1 : 4,300 PROPERTY BOUNDARY OBSERVATION WELL (OW 5) TEST PIT (1)
9 OW OW6 FIGURE 5 D OROFINO PROPERTY SCALE 1 : 4,300 PROPERTY BOUNDARY OBSERVATION WELL (OW 5) TEST PIT (1)
10 MW 10 MW MW MW 7 FIGURE 6 PENDLETON PROPERTY SCALE 1 : 4,300 PROPERTY BOUNDARY OBSERVATION WELL (OW7) TEST PIT (1)
11 GEOLOGICAL INVESTIGATIONS Pentleton Property ( Figure 6 ) Resource Calculation of aggregate reserves on Area C (23.26 hectares), see Figure 2 Unconsolidated material hectares x metres x 17,700 = 9,695,582 tonnes Total Extractable Resources The total extractable resources on site is the sum of the four properties = 45,118,798 tonnes Grain size analysis was conducted on samples taken from various levels of the drill holes and from the test pits. Comparison was made to the Provincial Standards for Granular "B" and Concrete sand. The samples, when plotted against the provincial standards were favourable. Production of quality Aggregate products requires blending and processing to obtain the correct gradation. Geological investigations is confident that aggregate products meeting the required provinical standards can be produced from the materials found at this property without difficulty. The type of products which can be produced from the materials encountered at this site include, but are not limited to, Granular "B", concrete sand, general most sand product, clear stone and Granular "A" with additional of stone to increase the stone content. Box #122, 38 Alpine Drive, Moonstone, Ontario, L0K 1N0 Bus/Fax (705) geologicalinvestigations@sympatico.ca 5
12 GEOLOGICAL INVESTIGATIONS CONCLUSIONS This investigation has determined that 45,118,798 tonnes of aggregate resource exists on this property. Processing and blending of materials found on this site will be required to product quality aggregate products. This is normal practise in aggregate operations. All requirements of the Aggregate Resources Act have been taken into consideration while making this determination. During development of an aggregate operation on this site physical and environmental factors will reduce the total available aggregate, i.e. greater setbacks from nearby residential uses to reduce the impact of noise, possible elimination of areas due to wildlife species. Geological Investigations does not expect any reduction in available tonnage of aggregate to be great and will not affect the economic viability of the proposal The results and conclusions of this investigation are based on the available information at the time. Should additional information become available, i.e. additional testing, the results and conclusions may change Box #122, 38 Alpine Drive, Moonstone, Ontario, L0K 1N0 Bus/Fax (705)
13 GEOLOGICAL INVESTIGATIONS Aggregate Investigation Greenwood Aggregates Company Limited Part Lots 30 to 32, Concession 4, E.H.S. Town of Mono County of Dufferin Geological Investigations Reference #GI William D. Fitzgerald MSc., P.Geo. September 30, 2015 Box #122, 38 Alpine Drive, Moonstone, Ontario, L0K 1N0 Bus/Fax (705)
14 GEOLOGICAL INVESTIGATIONS APPENDIX I Boreholes & Grain Size Analysis Box #122, 38 Alpine Drive, Moonstone, Ontario, L0K 1N0 Bus/Fax (705) geologicalinvestigations@sympatico.ca 8
15 GREENWOOD CONSTRUCTION (VIOLET HILL) PROJECT, MAY 12, 2014 BORE HOLE #1 0 TO 1 FOOT TOPSOIL 1 TO 5 FEET M-F SAND, FINE STONE, MAX 2 INCHES, DRY DIRTY 5 TO 10 FEET M-F SAND, TRACE FINE STONE, MAX 2 INCHES, DRY, DIRTY 10 TO 15 FEET M-F SAND, FINE STONE, MAX 3 INCHES, DRY 15 TO 20 FEET M-C SAND, FINE STONE, MAX 3 INCHES, DRY, CLEANER 20 TO 22 FEET M TO F SAND, TRACE STONE, MAX 2 INCHES, DRY 22 TO 25 FEET SILTY CLAY TO SILT, DAMP 25 TO 30 FEET SILT TO CLAYEY SILT, DAMP TO WET, NO STONE 30 TO 35 FEET SILT TO CLAYEY SILT, WET, NO STONE WELL CONSTRUCTION 0 TO 15 FEET HOLE PLUG 15 TO 20 FEET SAND 20 TO 30 FEET SCREEN AND SAND 30 TO 35 SAND STICK UP 0.61 METRES WATER MEASUREMENTS FROM TOP OF PIPE MAY 15, :25 AM MAY 16, :26 AM MAY 20, :45 AM MAY 21, :25 PM MAY 22, :38 AM MAY 23, :15 PM DRY DRY DRY DRY DRY DRY
16 GREENWOOD CONSTRUCTION (VIOLET HILL) PROJECT, MAY 12, 2014 BORE HOLE #2 0 TO 4 FOOT TOPSOIL AND FILL 4 TO 5 FEET M-F SAND, TRACE FINE STONE 5 TO 7.5 FEET M-F SAND, TRACE FINE STONE 7.5 TO 8.5 FEET SILTY CLAY TO SILT, STONEY, TILL? 8.5 TO 10 FEET M TO FINE SAND, TRACE FINE STONE, DAMP 10 TO 13 FEET M-F SAND, FINE STONE 13 TO 14 FEET M-C SAND, DIRTY 14 TO 15 FEET M TO F SAND, TRACE STONE, MAX 2 INCHES, DRY 15 TO 17 FEET M TO C SAND, TRACE OF STONE, MAX 3 INCHES, CLEAN 17 TO 20 FEET M TO F SAND, TRACE FINE STONE, CLEAN 20 TO 25 FEET M TO F SAND, TRACE FINE STONE, CLEAN 25 TO 30 FEET M TO F SAND, TRACE FINE STONE, CLEAN 30 TO 35 FEET F SAND, TRACE FINE STONE, COARSER NEAR 34 TO 35 FEET, CLEAN 35 TO 40 FEET M TO F SAND, 10% M TO F STONE, MAX 3 INCHES 40 TO 45 FEET M TO F SAND, TRACE FINE STONE, MAX 3 INCHES 45 TO 50 FEET M TO FINE SAND, 10% FINE STONE, MAX 3 INCHES 50 TO 55 FEET M TO F SAND, TRACE FINE STONE 55 TO 59 FEET M TO F SAND, TRACE FINE STONE 59 TO 60 FEET M TO F SAND, 10% FINE STONE, MAX 2 INCHES 60 TO 62 FEET M TO F SAND, 10% FINE STONE, MAX 2 INCHES 62 TO 65 FEET M TO F SAND, 10% FINE STONE, MAX 4 INCHES 65 TO 70 FEET M TO F SAND, 5% FINE STONE, MAX 3 INCHES 70 TO 75 FEET M TO F SAND, 5% FINE STONE, MAX 2 INCHES 75 TO 80 FEET M TO F SAND, SOME SILT, DIRTY, DAMP
17 80 TO 85 FEET M TO FINE SAND, SOME SILT & CLAY, DIRTY, DAMP 85 TO 90 FEET M TO FINE SAND, SILT AND CLAY, DIRTY, DAMP, TRACE OF FINE STONE 90 TO 95 FEET CLAYEY SILT TO FINE SAND, WET 95 TO 100 FEET CLAYEY SILT TO FINE SAND, TRACE FINE STONE, WET WELL CONSTRUCTION 0 TO 70 FEET HOLE PLUG 70 TO 75 FEET SAND 75 TO 95 FEET SCREEN AND SAND 95 TO 100 SAND STICK UP 0.58 METRES WATER MEASUREMENTS FROM TOP OF PIPE MAY 15, :20 AM MAY 16, :22 AM MAY 20, :40 AM MAY 21, :25 PM MAY 22, :28 AM MAY 23, :02 PM M M M M M M
18 GREENWOOD CONSTRUCTION (VIOLET HILL) PROJECT, MAY 13, 2014 BORE HOLE #3 0 TO 1 FOOT TOPSOIL 1 TO 2 FEET SANDY SILT FILL 2 TO 5 FEET M-F SAND, 10 TO 15% FINE STONE, MAX 3 INCHES, DIRTY 5 TO 10 FEET M TO FINE SAND, 5 % FINE STONE, CLEAN, MAX 3 INCHES 10 TO 15 FEET M TO F SAND, 15 % FINE STONE, MAX 4 INCHES, DRY 15 TO 19 FEET M TO C SAND, 15 % FINE STONE, MAX 3 INCHES 19 TO 20 FEET M TO C SAND, TRACE FINE STONE, CLEAN 20 TO 25 FEET M TO C SAND, TRACE FINE STONE, CLEAN 25 TO 30 FEET M TO F SAND, 10 % FINE STONE, CLEAN, SAMPLED 30 TO 35 FEET M TO F SAND, TRACE FINE STONE, CLEAN 35 TO 40 FEET M TO F SAND, TRACE FINE STONE, SAMPLED 40 TO 42 FEET M TO F SAND, TRACE FINE STONE, 42 TO 45 FEET M TO FINE SAND, 10% FINE STONE, MAX 2 INCHES 45 TO 47 FEET M TO F SAND, LAYERED MEDIUM STONE 47 TO 50 FEET M TO F SAND, TRACE FINE STONE, CLEAN, SAMPLED 50 TO 55 FEET M TO F SAND, 10 5 FINE STONE, CLEAN 55 TO 60 FEET F SAND, CLEAN 60 TO 65 FEET F SAND, CLEAN 65 TO 70 FEET F SAND, CLEAN 70 TO 75 FEET F SAND, CLEAN 75 TO 80 FEET F SAND, TRACE FINE STONE, CLEAN 80 TO 82 FEET F SAND, TRACE FINE STONE, CLEAN 82 TO 85 FEET F SAND, TRACE FINE STONE, MAX 4 INCHES, CLEAN 85 TO 90 FEET F SAND, TRACE FINE STONE, DIRTY
19 90 TO 95 FEET F SAND, TRACE FINE STONE, DIRTY 95 TO 100 FEET F SAND, TRACE FINE STONE, DIRTY WELL CONSTRUCTION 0 TO 80 FEET HOLE PLUG 80 TO 85 FEET SAND 85 TO 95 FEET SCREEN AND SAND 95 TO 100 SAND STICK UP 0.68 METRES WATER MEASUREMENTS FROM TOP OF PIPE MAY 14, :40 AM MAY 15, :15 AM MAY 16, :23 AM MAY 20, :30 AM MAY 21, :17 PM MAY 22, :22 AM MAY 23, :52 PM M M M M M M M
20 GREENWOOD CONSTRUCTION (VIOLET HILL) PROJECT, MAY 14, 2014 BORE HOLE #4 0 TO 2 FOOT TOPSOIL 2 TO 5 FEET SANDY SILT TO CLAYEY SILT,, STONES, DIRTY, OVERBURDEN 5 TO 10 FEET SANDY SILT TO SILT 10 TO 15 FEET SANDY SILT TO CLAYEY SILT, TRACE OF STONE, SOFT, WET 15 TO 20 FEET SILT TO CLAYEY SILT, SOFT, STONEY 20 TO 25 FEET SANDY SILT TO SILT, 20% FINE STONE, 25 TO 30 FEET M TO C SAND, 20 % FINE STONE. DIRTY 30 TO 35 FEET M TO F SAND, 20 % FINE STONE, DIRTY, SAMPLED 35 TO 38 FEET M TO F SAND, 20 % FINE STONE, MAX 3 INCHES 38 TO 40 FEET SANDY SILT, NO STONE, SOFT, WET 40 TO 45 FEET SANDY SILT,TRACE FINE STONE, WET 45 TO 50 FEET SANDY SILT TO FINE SAND, 5 % FINE STONE, WET 50 TO 55 FEET SANDY SILT TO FINE SAND, 5 % FINE STONE, WET 55 TO 60 FEET SANDY SILT TO FINE SAND, 5 % FINE STONE, WET WELL CONSTRUCTION 0 TO 40FEET HOLE PLUG 40 TO 45 FEET SAND 45 TO 55 FEET SCREEN AND SAND 55 TO 60 SAND STICK UP 0.59 METRES
21 WATER MEASUREMENTS FROM TOP OF PIPE MAY 15, :30 AM MAY 16, :40 AM MAY 20, :50 AM MAY 21, :31PM MAY 22, :34 AM MAY 23, :43 PM M M M M M M
22 GREENWOOD CONSTRUCTION (VIOLET HILL) PROJECT, MAY 14, 2014 BORE HOLE #5 0 TO 2 FOOT TOPSOIL 2 TO 5 FEET SANDY SILT TO CLAYEY SILT,, STONES, DIRTY, OVERBURDEN 5 TO 10 FEET CLAYEY SILT TO SANDY SILT, FILL 10 TO 15 FEET SILTY FINE SAND, FINE STONE, DIRTY 15 TO 20 FEET FINE SAND TO SILT,10% FINE STONE, QUEENSTONE SHALE, MAX 3 INCHES 20 TO 22 FEET MTO F SAND, 10% FINE STONE, MAX 3 INCHES, DIRTY 22 TO 25 FEET FINE SAND, TRACE FINE STONE, MAX 2 INCHES, CLEAN 25 TO 30 FEET F SAND, TRACE FINE STONE. CLEAN 30 TO 35 FEET F SAND, TRACE FINE STONE, CLEAN, SAMPLED 35 TO 40 FEET M TO F SAND, TRACE FINE STONE, CLEAN 40 TO 45 FEET M TO F SAND, TRACE FINE STONE, CLEAN 45 TO 50 FEET M TO FINE SAND, 5 % FINE STONE, CLEAN 50 TO 55 FEET FINE SAND, TRACE FINE STONE, CLEAN 55 TO 60 FEET FINE SAND, TRACE FINE STONE, CLEAN 60 TO 65 FEET F SAND, TRACE FINE STONE, CLEAN, SAMPLED 65 TO 70 FEET F SAND, TRACE FINE STONE, CLEAN 70 TO 75 FEET F SAND, TRACE FINE STONE, CLEAN 75 TO 80 FEET F SAND, TRACE FINE STONE, CLEAN, DAMP 80 TO 85 FEET F SAND, TRACE FINE STONE, CLEAN, DAMP 85 TO 90 FEET F SAND, TRACE FINE STONE, CLEAN, WET
23 WELL CONSTRUCTION 0 TO 70FEET HOLE PLUG 70 TO 75 FEET SAND 75 TO 85 FEET SCREEN AND SAND 85 TO 90 SAND STICK UP 0.59 METRES WATER MEASUREMENTS FROM TOP OF PIPE MAY 15, :20 PM MAY 16, :45 AM MAY 20, :55 AM MAY 21, :12PM MAY 22, :17 AM MAY 23, :12 PM M M M M M M
24 GREENWOOD CONSTRUCTION (VIOLET HILL) PROJECT, MAY 15, 2014 BORE HOLE #6 0 TO 2 FOOT TOPSOIL 2 TO 5 FEET SILTY SAND, STONES, DIRTY, FILL 5 TO 7 FEET SANDY SILT, STONES 7 TO 10 FEET MEDIUM TO FINE SAND, 10% FINE STONE, MAX 4 INCHES, QUEENSTON SHALE STONES 10 TO 12 FEET MEDIUM TO FINE SAND, 30% FINE STONE, DIRTY 12 TO 15 FEET MEDIUM TO FINE SAND, 10% FINE STONE, DIRTY, WATER 15 TO 20 FEET MEDIUM TO FINE SAND, 30% FINE STONE, 3 INCHES, WATER 20 TO 22 FEET MEDIUM TO FINE SAND, 30% FINE STONE, DIRTY 22 TO 25 FEET MEDIUM TO FINE SAND, 30% FINE STONE, MAX 5 INCHES 25 TO 27 FEET MEDIUM TO FINE SAND, 30% FINE STONE, MAX 5 INCHES 27TO 30 FEET CLAYEY SILT TO SILT, WET 30 TO 35 FEET CLAYEY SILT TO SILT, WET 35 TO 36 FEET SPLIT SPOON, HARD SILT 36 T0 40 FEET FINE SAND TO SILT, SOUPY RECOVERY 40 TO 45 FEET FINE SAND TO SILT, SOUPY RECOVERY 45 TO 50 FEET FINE SAND TO SILT, SOUPY RECOVERY WELL CONSTRUCTION 0 TO 38 FEET HOLE PLUG 38 TO 43 FEET SAND 43 TO 48 FEET SCREEN AND SAND 48 TO 50 SAND STICK UP 0.67 METRES
25 WATER MEASUREMENTS FROM TOP OF PIPE MAY 15, :00 PM M MAY 16, :56 AM M DRY MAY 20, :00 AM M DRY MAY 21, :07PM M DRY MAY 22, :12 AM M DRY MAY 23, :20 PM M DRY
26 GREENWOOD CONSTRUCTION (VIOLET HILL) PROJECT, MAY 16, 2014 BORE HOLE #7 0 TO 1 FOOT TOPSOIL 1 TO 5 FEET SILTY FINE SAND 5 TO 10 FEET SILTY FINE SAND, DAMP TO WET 10 TO 15 FEET SILTY FINE SAND, WET, SOFT 15 TO 20 FEET SILTY FINE SAND, WET, SOFT 20 TO 25 FEET SILTY FINE SAND, WET, SOFT 25 TO 27 FEET SILTY FINE SAND, DAMP TO WET 27TO 30 FEET SILTY FINE SAND, DAMP TO WET, TRACE OF FINE STONE 30 TO 35 FEET SILTY FINE SAND, DAMP TO WET, TRACE OF FINE STONE, SAMPLE AT 30 FEET 35 T0 40 FEET FINE SAND, TRACE FINE STONE, DAMP TO WET 40 TO 45 FEET FINE SAND, TRACE FINE STONE, DAMP TO WET 45 TO 50 FEET FINE SAND, TRACE FINE STONE, DAMP TO WET 50 TO 55 FEET MEDIUM FINE SAND, TRACE FINE STONE, DAMP TO WET, SPLIT SPOON AT 55 TO 56 FEET, MEDIUM TO COARSE SAND, 10% FINE STONE 55 TO 60 FEET MEDIUM TO FINE SAND, TRACE FINE STONE, DAMP TO WET, SAMPLE AT 60 FEET 65 TO 70 FEET FINE SAND, TRACE FINE STONE, WET, SPLI SPOON AT 70 TO 71.5 FEET, FINE SAND, DRY WELL CONSTRUCTION 0 TO 55 FEET HOLE PLUG 55 TO 60 FEET SAND 60 TO 70 FEET SCREEN AND SAND 70 TO 72 SAND STICK UP 0.62 METRES
27 WATER MEASUREMENTS FROM TOP OF PIPE MAY 20, :05 PM M DRY MAY 21, :40 AM M DRY MAY 21, :01 PM M DRY MAY 22, :05 AM M DRY MAY 23, :25 PM M DRY
28 GREENWOOD CONSTRUCTION (VIOLET HILL) PROJECT, MAY 20, 2014 BORE HOLE #8 0 TO 3 FOOT TOPSOIL 3 TO 5 FEET SANDY SILT TO CLAYEY SILT, WET TO DAMP. ALLUVIUM 5 TO 7 FEET SANDY SILT TO CLAYEY SILT, WET TO DAMP. ALLUVIUM 7 TO 10 FEET SILTY TO CLAYEY FINE SAND, WET 10 TO 15 FEET SILTY TO CLAYEY FINE SAND, WET 15 TO 20 FEET MEDIUN TO FINE SAND, TRACE MEDIUM TO FINE STONE, HIGH CALY CONTENT, DAMP 20 TO 25 FEET MEDIUN TO FINE SAND, TRACE FINE STONE, DAMP, CLEANER WITH DEPTH 25 TO 30 FEET FINE SAND, TRACE FINE STONE, CLEANER 30 TO 35 FEET MEDIUM TO FINE SAND, 5% FINE STONE, DIRTY, SAMPLE TAKEN 35 T0 40 FEET FINE SAND, 10% FINE STONE, MAX 5 INCHES 40 TO 45 FEET MEDIUM TO FINE SAND, 20% FINE STONE, DIRTY CLAYEY AT 42 FEET, MAX 4 INCHES 45 TO 50 FEET MEDIUM TO FINE SAND, 20% FINE STONE, MAX 4 INCHES,DIRTY 50 TO 55 FEET MEDIUM TO FINE SAND, 20% FINE STONE, MAX 5 INCHES,DIRTY 55 TO 60 FEET COARSE TO MEDIUM SAND, TRACE FINE STONE, DIRTY 60 TO 65 FEET COARSE TO MEDIUM SAND, TRACE FINE STONE, SATURATED, SOUPY 65 TO 70 FEET COARSE TO MEDIUM SAND, TRACE FINE STONE, SATURATED WELL CONSTRUCTION 0 TO 53 FEET HOLE PLUG 53 TO 58 FEET SAND 58 TO 68 FEET SCREEN AND SAND 68 TO 70 SAND STICK UP 0.75 METRES
29 WATER MEASUREMENTS FROM TOP OF PIPE MAY 20, :30 PM MAY 21, :45 AM MAY 21, :56 PM MAY 22, :00 AM MAY 23, :30 PM M M M M M
30 GREENWOOD CONSTRUCTION (VIOLET HILL) PROJECT, MAY 20, 2014 BORE HOLE #9 0 TO 2 FOOT TOPSOIL 2 TO 5 FEET FINE SAND, TRACE FINE STONE, OXIDIZED 5 TO 7 FEET FINE SAND, TRACE FINE STONE, OXIDIZED 7 TO 10 FEET FINE SAND, TRACE FINE STONE, MAX 4 INCHES, DIRTY 10 TO 15 FEET FINE SAND, 10% FINE STONE, DIRTY, CLEANER WITH DEPTH 15 TO 17 FEET FINE SAND, 10% FINE STONE, DIRTY, CLEANER WITH DEPTH 17 TO 20 FEET "RED" MEDIUN TO COARSE SAND, TRACE FINE STONE, MAX 2 INCHES 20 TO 25 FEET "RED" MEDIUN TO COARSE SAND, TRACE FINE STONE, MAX 2 INCHES 25 TO 27 FEET "RED" MEDIUN TO FINE SAND, TRACE FINE STONE, MAX 2 INCHES 27 TO 30 FEET SILT TO SILTY FINE SAND, DAMP 30 TO 32 FEET SILT TO SILTY FINE SAND, TRACE OF STONE, WET, SAMPLE 32 TO 35 FEET FINE TO SILTY FINE SAND, TRACE FINE STONE, HARD 35 TO 36 FEET MEDIUM TO COARSE SAND, TRACE FINE STONE, SPLIT SPOON 36 T0 40 FEET FINE SAND TO SILTY FINE SAND, TRACE FINE STONE, WET 40 TO 45 FEET FINE SAND, TRACE FINE STONE, WET, SAND COARSER WITH DEPTH 45 TO 50 FEET MEDIUM TO FINE SAND, 5% FINE STONE, MAX 2 INCHES,DAMP 50 TO 55 FEET MEDIUM TO FINE SAND, 5% FINE STONE, MAX 1 INCHES,DAMP 55 TO 60 FEET MEDIUM TO FINE SAND, 5% FINE STONE, MAX 1 INCHES,DAMP 60 TO 65 FEET FINE SAND, TRACE FINE STONE, DAMP 65 TO 70 FEET FINE SAND 70 TO 75 FEET FINE SAND 75 TO 80 FEET FINE SAND, TRACE FINE STONE 80 TO 85 FEET FINE SAND, TRACE FINE STONE 85 TO 90 FEET FINE SAND, TRACE FINE STONE
31 WELL CONSTRUCTION 0 TO 73 FEET HOLE PLUG 73 TO 78 FEET SAND 78 TO 88 FEET SCREEN AND SAND 88 TO 90 SAND STICK UP 0.64 METRES WATER MEASUREMENTS FROM TOP OF PIPE MAY 22, :35 AM MAY 22, :40 PM MAY 23, AM MAY 23, PM M M M M
32 GREENWOOD CONSTRUCTION (VIOLET HILL) PROJECT, MAY 20, 2014 BORE HOLE #10 0 TO 1 FOOT TOPSOIL 1 TO 5 FEET SILTY, CLAYEY SAND, TRACE FINE STONE, DIRTY 5 TO 10 FEET FINE TO MEDIUM, 10% FINE STONE, SAND BECOMING CLEANER WITH DEPTH, 10 TO 10 FEET REFUSAL, LARGE ROCK, MOVED OVER AND STATED AGAIN 0 TO 1 FOOT TOPSOIL 1 TO 5 FEET FINE SAND TRACE FINE STONE, DIRTY BECOMING CLEANER WITH DEPTH 5 TO 10 FEET CLAYEY FINE SAND, TRACE FINE STONE 10 TO 15 FEET FINE SAND, 10% FINE STONE, MAX 5 INCHES, DIRTY 15 TO 20 FEET CLAYEY, SILTY SAND, TRACE FINE STONE 20 TO 25 FEET SILTY FINE SAND, CLEAN 25 TO 30 FEET FINE SAND, CLEAN 30 TO 35 FEET MEDIUM TO FINE SAND, 10% FINE STONE, SAMPLE 35 T0 40 FEET MEDIUM TO FINE SAND, 10% FINE STONE 40 TO 45 FEET MEDIUM TO FINE SAND, 10% FINE STONE 45 TO 50 FEET FINE SAND, TRACE FINE STONE 50 TO 55 FEET FINE SAND, TRACE FINE STONE 55 TO 60 FEET FINE SAND, TRACE FINE STONE 60 TO 65 FEET MEDIUM TO FINE SAND, TRACE FINE STONE, DAMP 65 TO 70 FEET MEDIUM TO FINE SAND, TRACE FINE STONE 70 TO 75 FEET MEDIUM TO FINE SAND, 10% FINE STONE, MAX 3 INCHES, CLEAN 75 TO 80 FEET MEDIUM TO FINE SAND, 10% FINE STONE, MAX 3 INCHES, CLEAN 80 TO 85 FEET MEDIUM TO FINE SAND, 20% FINE STONE, MAX 3 INCHES, CLEAN 85 TO 90 FEET MEDIUM TO FINE SAND, 10% FINE STONE, MAX 3 INCHES, CLEAN
33 90 TO 95 FEET MEDIUM TO FINE SAND, 10% FINE STONE, MAX 3 INCHES, CLEAN 95 TO 100 FEET MEDIUM TO FINE SAND, 10% FINE STONE, MAX 3 INCHES, CLEAN WELL CONSTRUCTION 0 TO 83 FEET HOLE PLUG 83 TO 98 FEET SAND 88 TO 98 FEET SCREEN AND SAND 98 TO 100 SAND STICK UP 0.75 METRES WATER MEASUREMENTS FROM TOP OF PIPE MAY 22, :35 PM M DRY MAY 23, AM M PROBE WAS WET BUT DID NOT BEEP MAY 23, PM M PROBE WAS WET BUT DID NOT BEEP MAY 23, :20 PM M PUT SOME BOTTLED WATER DOWN HOLE AND PROBE BEEPED
34 GREENWOOD CONSTRUCTION (VIOLET HILL) PROJECT, MAY 20, 2014 BORE HOLE #11 0 TO 1 FOOT TOPSOIL 1 TO 5 FEET MEDIUM TO FINE SAND, 20% FINE STONE, MAX 4 INCHES, DIRTY 5 TO 10 FEET MEDIUM TO FINE SAND, 20% FINE STONE, MAX 4 INCHES, DIRTY 10 TO 15 FEET MEDIUM TO COARSE SAND, 30% FINE STONE, MAX 6 INCHES, DIRTY 15 TO 20 FEET MEDIUM TO COARSE SAND, 30% FINE STONE, MAX 6 INCHES, DIRTY 20 TO 23 FEET MEDIUM TO COARSE SAND, 30% FINE STONE, MAX 6 INCHES, DIRTY 23 TO 25 FEET CLAYEY SILT TO MEDIUM SAND, 10% FINE STONE, DIRTY 25 TO 30 FEET SILTY FINE SAND, TRACE FINE STONE, CLEAN 30 TO 35 FEET SILTY FINE SAND, TRACE FINE STONE, CLEAN, SAMPLE 35 T0 40 FEET SILT TO SILTY FINE SAND 40 TO 45 FEET SILT TO SILTY FINE SAND 45 TO 50 FEET SILT TO SILTY FINE SAND 50 T0 53 FEET SILT TO SILTY FINE SAND 53 TO 55 FEET SILT TO SILTY FINE SAND, WET 55 TO 60 FEET SILT TO SILTY CLAY, VERY SOFT, PLASTIC, WET 60 TO 65 FEET SILT TO SILTY CLAY, VERY SOFT, PLASTIC, WET 65 TO 70 FEET SILT TO SILTY CLAY, VERY SOFT, PLASTIC, WET, TRACE FINE STONE 70 TO 75 FEET SILT TO SILTY CLAY, VERY SOFT, PLASTIC, WET TRACE FINE STONE 75 TO 80 FEET SILT TO SILTY CLAY, VERY SOFT, PLASTIC, VERY WET
35 WELL CONSTRUCTION 0 TO 33 FEET HOLE PLUG 63 TO 68 FEET SAND 68 TO 78 FEET SCREEN AND SAND 78 TO 80 SAND STICK UP? METRES WATER MEASUREMENTS FROM TOP OF PIPE MAY 23, :20 PM M
36 GREENWOOD CONSTRUCTION (VIOLET HILL) PROJECT, OCTOBER 23, 2014 BORE HOLE #12 0 TO 1 FOOT TOPSOIL 1 TO 5 FEET MEDIUM TO FINE SAND, 25% FINE STONE, MAX 2 INCHES 5 TO 10 FEET MEDIUM TO FINE SAND, 25% FINE STONE, MAX2 INCHES 10 TO 15 FEET MEDIUM TO FINE SAND, TRACE FINE STONE 15 TO 20 FEET MEDIUM TO FINE SAND, TRACE FINE STONE, SAMPLE TAKEN BETWEEN 15 TO 20 FEET 20 TO 25 FEET MEDIUM TO FINE SAND, 5% FINE STONE, MAX 2 INCHES 25 TO 30 FEET MEDIUM TO FINE SAND, 2% FINE STONE 30 TO 35 FEET MEDIUM TO FINE SAND, 5% FINE STONE, MAX 2 INCHES, SAMPLE TAKEN BETWEEN 30 TO 35 FEET 35 T0 40 FEET MEDIUM TO FINE SAND, 2% FINE STONE 40 TO 45 FEET MEDIUM TO FINE SAND, 2% FINE STONE 45 TO 50 FEET MEDIUM TO FINE SAND, TRACE FINE STONE, SHARP SAND 50 T0 55 FEET FINE SAND, TRACE FINE STONE 55 TO 60 FEET FINE TO MEDIUM SAND, LAYERED 5% FINE STONE, MAX 2 INCHES 60 TO 65 FEET FINE SAND TO SILT, SAMPLE TAKEN BETWEEN 60 TO 65 FEET 65 TO 70 FEET FINE SAND TO SILT, DAMP 70 TO 75 FEET FINE SAND TO SILT, DAMP 75 TO 80 FEET FINE SAND TO SILT, DRY 80 TO 85 FEET FINE SAND TO SILT, DRY 85 TO 90 FEET FINE SAND TO SILT, DRY 90 TO 95 FEET FINE SAND TO SILT, DRY
37 WELL CONSTRUCTION 0 TO 84 FEET HOLE PLUG 80 TO 84 FEET SAND 84 TO 94 FEET SCREEN AND SAND 94 TO 95 SAND STICK UP 0.67 METRES WATER MEASUREMENTS FROM TOP OF PIPE OCTOBER 24, :00 PM M
38 GREENWOOD CONSTRUCTION (VIOLET HILL) PROJECT, OCTOBER 23 & 24, 2014 BORE HOLE #13 0 TO 1 FOOT TOPSOIL 1 TO 5 FEET MEDIUM TO FINE SAND, 20% FINE STONE, DIRTY 5 TO 8 FEET MEDIUM TO FINE SAND, 30% FINE STONE, MAX3 INCHES 8 TO 10 FEET MEDIUM TO FINE SAND, 10% FINE STONE, MAX2 INCHES 10 TO 15 FEET MEDIUM TO FINE SAND, 10% FINE STONE, MAX 2 INCHES 15 TO 20 FEET MEDIUM TO COARSE SAND, 30% FINE STONE, MAX 3 INCHES 20 TO 25 FEET MEDIUM TO FINE SAND, 30% FINE STONE, MAX 3 INCHES, SAMPLE TAKEN BETWEEN 20 TO 25 FEET 25 TO 28 FEET MEDIUM TO FINE SAND, 30% FINE STONE, MAX 3 INCHES, SAMPLE TAKEN BETWEEN 25 TO 28 FEET 28 TO 30 FEET MEDIUM TO FINE SAND, 10% FINE STONE, MAX 1 INCH 30 TO 35 FEET MEDIUM TO FINE SAND, 5% FINE STONE, MAX 2 INCHES 35 T0 40 FEET MEDIUM TO FINE SAND, 5% FINE STONE, MAX 2 INCHES 40 TO 45 FEET FINE SAND 45 TO 50 FEET MEDIUM TO FINE SAND, 10% FINE STONE, MAX 1 INCH 50 T0 55 FEET FINE SAND 55 TO 60 FEET FINE SAND 60 TO 65 FEET FINE SAND, SAMPLE TAKEN BETWEEN 60 TO 65 FEET 65 TO 70 FEET FINE SAND 70 TO 75 FEET FINE SAND TO SILT 75 TO 80 FEET FINE SAND TO SILT 80 TO 85 FEET FINE SAND TO SILT 85 TO 90 FEET FINE SAND TO SILT 90 TO 95 FEET FINE SAND TO SILT
39 WELL CONSTRUCTION 0 TO 84 FEET HOLE PLUG 80 TO 84 FEET SAND 84 TO 94 FEET SCREEN AND SAND 94 TO 95 SAND STICK UP 0.55 METRES WATER MEASUREMENTS FROM TOP OF PIPE OCTOBER 24, :20 PM M
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75 GEOLOGICAL INVESTIGATIONS APPENDIX II Test Pits & Grain Size Analysis Box #122, 38 Alpine Drive, Moonstone, Ontario, L0K 1N0 Bus/Fax (705)
76 GEOLOGICAL INVESTIGATIONS Harrison Property Box #122, 38 Alpine Drive, Moonstone, Ontario, L0K 1N0 Bus/Fax (705)
77
78
79
80
81
82
83
84
85
86
87
88
89 GEOLOGICAL INVESTIGATIONS Wake Property Box #122, 38 Alpine Drive, Moonstone, Ontario, L0K 1N0 Bus/Fax (705)
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108 GEOLOGICAL INVESTIGATIONS D'Orofino Property Box #122, 38 Alpine Drive, Moonstone, Ontario, L0K 1N0 Bus/Fax (705)
109
110
111
112
113
114
115
116
117 GEOLOGICAL INVESTIGATIONS Pendleton Property Box #122, 38 Alpine Drive, Moonstone, Ontario, L0K 1N0 Bus/Fax (705)
118
119
120
121
122
GEOTECHNICAL SUBSURFACE EXPLORATION DATA REPORT
GEOTECHNICAL SUBSURFACE EXPLORATION DATA REPORT Traffic Signal Pole Foundations River Road at Huguenot Road City of Richmond and Henrico County, Virginia Schnabel Reference No. 15613005 January 30, 2015
More informationA B C D E F G H SEE NOTE 1 EL (MIN.) 2 NEW UNCOMPACTED EL. VARIES EARTH EMBANKMENT 3 (MIN.) TYPICAL SECTION EMBANKMENT AND BORROW 6 (MIN.
BORROW AS NECESSARY TO CONSTRUCT RIVERWARD SEE NOTE EL.. (MIN.) (MIN.) NEW UNCOMPACTED EL. EARTH C L C C C TYPICAL SECTION AND BORROW NO SCALE. CDF FLAT POOL EL.. JULJRP/REH AS CONSTRUCTED Approved Description
More informationOEEP lesl l~ell I GREENWOOD, DELAWARE
Public Access Copy DO NOT REMOVE from room 208. UNIVERSITY OF D~lAWA~E DtlAWARE GEOlO,G leat SURVEY REPORT OF INVESTJGATlONS No, 23 CRETACEOUS AND TERTIARV SECr[ON~ OEEP lesl l~ell I GREENWOOD, DELAWARE
More information580 - NOISE BARRIERS OPSS 580 INDEX
580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS
More informationRecording Guide. Please use black ink and write nice and clearly: the information gets photocopied and needs to be clear
Recording Guide Accurate and thorough recording is crucial in archaeology because the process of excavation is destructive. We cannot recover missed information once a test pit has been finished. Archaeologists
More informationComparing Guided Auger Boring Techniques under Challenging Conditions
North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 TM1-T4-02 Comparing Guided Auger Boring Techniques under Challenging Conditions Matthew
More informationModule 6 : Design of Retaining Structures. Lecture 30 : Dewatering [ Section 30.1 : Introduction ]
Lecture 30 : Dewatering [ Section 30.1 : Introduction ] Objectives In this section you will learn the following Introduction Lecture 30 : Dewatering [ Section 30.1 : Introduction ] Introduction Dewatering
More informationB CIVILTECH SOFTWARE LOG OF BORING. RIVERFROT COMDOM Project No. EVERETT, WASHINGTON. Plate
B-1-1999 Type Remark here Remarks Moisture (%) Dry Density 2 3 Blow Counts Sample Type Water Table Surface Elevation: 4 Boring Date: 11/2/99 Boring Location: West Side of Building Drilling Method: Auger
More informationQUANTITY SURVEYS. Introduction
QUANTITY SURVEYS Introduction In engineering surveying, we often consider a route (road, sewer pipeline, channel, etc.) from three distinct perspectives. The plan view of route location is the same as
More informationDewatering. Deep Wells Vacuum Wellpoints Eductor Wells Artesian Conditions System Design Water Treatment.
Dewatering Deep Wells Vacuum Wellpoints Eductor Wells Artesian Conditions System Design Water Treatment www.malcolmdrilling.com Deep Wells Vacuum Wellpoints Eductor Wells Artesian Conditions System Design
More informationIGLOO MODIFICATIONS CHARLIE AREA BELLEMONT FLAGSTAFF ROADWAY/ RAILROAD NEAR BUILDING 350 CHARLIE AREA IGLOOS N Not to Scale IGLOO MODIFICATIONS CHARLI
ILOO MODIFICATIOS CHALIE AEA BELLEMOT FLASTAFF OADWAY/ AILOAD EA BUILDI 30 CHALIE AEA ILOOS ot to Scale ILOO MODIFICATIOS CHALIE AEA Vicinity Map Western Technologies Inc. Job o. 224JK132 Plate 1 ILOO
More informationThe Basics of Screening
The Basics of Screening Joe Schlabach, VP of Marketing & Sales WHAT IS A VIBRATING SCREEN? 1 WHAT IS A VIBRATING SCREEN? A machine tool to separate aggregates by particle size by means of an exciting force
More informationSemi-permanent sediment pore water sampling systems.
Semi-permanent sediment pore water sampling systems. These are based on the simple and extremely effective MHEproducts TubeWells which are constructed of ¼ polyethylene tubing and fitted with a 10 cm polypropylene
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.
More informationTest Pitting Guide. Contents: What is a test pit? Why do we use test pitting in archaeology? How do we do it? Big Heritage
Test Pitting Guide Contents: What is a test pit? Why do we use test pitting in archaeology? How do we do it? 1 What is a test pit? A test-pit is a small trench, usually 1x1m, excavated to the natural geology.
More informationHelical Pier Frequently Asked Questions
Helical Pier Basics Q: What is a Helical Pier? A: A helical pier or pile is an extendable deep foundation system with helical bearing plates welded to a central steel shaft. Load is transferred from the
More informationB422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422
B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced
More informationSITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS
INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with
More information.CCOM. Preliminary Hydrogeological Investigation. February 7, 2013
.CCOM AECOM 300-300 Town Centre Boulevard 905 477 8400 tel Markham, ON, Canada L3R 5Z6 905 477 1456 fax www.aecom.com February 7, 2013 Ms. lsa James Planner Town of W hitchurch-stouffville 111 Sandiford
More informationAquaflex Universal Soil Moisture Sensor (Model SI.162-Pulse) -User Manual- Pulse Version -
Aquaflex Universal Soil Moisture Sensor (Model SI.162-Pulse) -User Manual- Pulse Version - The AQUAFLEX Universal Sensor (part # SI.162) uses the unique AQUAFLEX measurement technique using a 3m (10 )
More informationSTEPS and Stages of the Clay
STEPS and Stages of the Clay Slip - Clay that is watered down - smooth and runny. It attaches handles and decorations.. Wedging Used for eliminating lumps and air bubbles, drying the clay. Wedging makes
More informationNWP of 10 Enclosure
#6301 4/16/2018 Pacific Habitat Services, Inc. 9450 SW Commerce Circle, Suite 180 Wilsonville, OR 97070 Project Site General Location and Topography Reed Pit Expansion - Marion County, Oregon United States
More informationAquaflex Universal Soil Moisture Sensor (Model SI.162-mA) -User Manual- ma Version -
Aquaflex Universal Soil Moisture Sensor (Model SI.162-mA) -User Manual- ma Version - The AQUAFLEX Universal Sensor (part # SI.162) uses the unique AQUAFLEX measurement technique using a 3m (10 ) long flexible
More informationSECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.
SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section
More informationAppendix B Drilling Methods
Appendix B Drilling Methods B-1. Introduction A brief discussion of available drilling methods is included below. It is not the intent of this manual to include a detailed description of these methods.
More informationSELF-ALIGNING PLASTIC INCLINOMETER CASING IN BOREHOLES. Model GEO-LOK. Roctest Limited, All rights reserved.
INSTRUCTION MANUAL SELF-ALIGNING PLASTIC INCLINOMETER CASING IN BOREHOLES Model Roctest Limited, 2013. All rights reserved. This product should be installed and operated only by qualified personnel. Its
More informationSPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections
SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS Section 1 Definitions 2 Scope of Work 3 Extent of Work 4 Inspection and Performance of Work 5 Trenching 6 Duct Installation
More informationWith time, the evolution of anchors have led to different designs More than one anchor type may be suitable for a particular purpose Thus there are
Supreme range of Soil & rock anchors Introduction Used to anchor into concrete, masonry, stone With time, the evolution of anchors have led to different designs More than one anchor type may be suitable
More informationDiagnosis of Operating Mine Dewatering Wells Efficiency through Groundwater Modelling
Diagnosis of Operating Mine Dewatering Wells Efficiency through Groundwater Modelling Houcyne El Idrysy1, Lenar Sultanov2 SRK Consulting (UK) Ltd, Cardiff, United Kingdom, hidrysy@srk.co.uk SRK Consulting
More informationSurvey Requirements. Design Guidelines and Standards. June Office of the University Architect
Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements
More informationBy SveMin, FinnMin and Norsk Bergindustri
Recommended Rules for Public Reporting of Exploration Results, Surveys, Feasibility Studies and Estimates of Mineral Resources and Mineral Reserves in Sweden, Finland and Norway By SveMin, FinnMin and
More informationSECTION MANHOLES
SECTION 02601 MANHOLES PART 1 GENERAL 1.01 SCOPE OF WORK A. WORK required under this section consists of all materials, accessories, equipment, tools, and labor required to install precast concrete standard
More informationStratigraphy Modeling Boreholes and Cross. Become familiar with boreholes and borehole cross sections in GMS
v. 10.3 GMS 10.3 Tutorial Stratigraphy Modeling Boreholes and Cross Sections Become familiar with boreholes and borehole cross sections in GMS Objectives Learn how to import borehole data, construct a
More informationCrow Wing County Mound Design
Property Owner: Date: Mailing Address: City: State: Zip: Home Phone Number: - - Cell: - - Site Address: City: State: Zip: Driving directions if no address issued: Legal Description: Sec: Twp: Range: Township
More informationOn-Site Sewage Disposal Application Packet
On-Site Sewage Disposal Application Packet This packet of materials should include all you need to begin your residential or commercial application for on-site sewage disposal: Site feasibility Installation
More informationI N S TA L L AT I O N & M A I N T E N A N C E G U I D E
I N S TA L L AT I O N & M A I N T E N A N C E G U I D E E N V I R O B U I L D. C O M + 4 4 ( 0 ) 2 0 8 0 8 8 4 8 8 8 Version 3.2 EnviroBuild 2018 C O N T E N T S Storage & Handling 03 Tools 04 Calculating
More informationCase Studies and Innovative Uses of GPR for Pavement Engineering Applications
Case Studies and Innovative Uses of GPR for Pavement Engineering Applications Richard Korczak, MASc., P.Eng., Stantec Consulting Ltd. Amir Abd El Halim, PhD., P.Eng., Stantec Consulting Ltd. Paper prepared
More informationDATA FOR FOUR GEOLOGIC TEST HOLES IN THE SACRAMENTO VALLEY, CALIFORNIA. By C. F. Berkstresser, Jr., J. J. French, and M. E. Schaal
DATA FOR FOUR GEOLOGIC TEST HOLES IN THE SACRAMENTO VALLEY, CALIFORNIA By C. F. Berkstresser, Jr., J. J. French, and M. E. Schaal U.S. GEOLOGICAL SURVEY Open-File Report 85-488 Regional Aquifer-System
More informationHDD Training. HDD Construction Process. Mark Miller, PE Jon Robison, PE
HDD Training HDD Construction Process Mark Miller, PE Jon Robison, PE What is HDD Horizontal Directional Drilling (HDD) is meant to be a convenient method of installing utilities beneath sensitive areas
More informationThis Land Surveying course has been developed by. Failure & Damage Analysis, Inc. Earthwork
This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Earthwork CHAPTER 4 EARTHWORK Section I. PLANNING OF EARTHWORK OPERATIONS IMPORTANCE In
More informationSite Plan/Building Permit Review
Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required
More informationGOOD GROUNDING PRACTICES. A Brief Introduction to the Basics of Electrical Grounding for Power Systems
GOOD GROUNDING PRACTICES A Brief Introduction to the Basics of Electrical Grounding for Power Systems Introduction to Grounding TABLE OF CONTENTS 1.0 Introduction to Grounding 2.0 Standard Industrial Grounding
More informationPractices and Challenges. For Open Pit Geotechnical Characterization, Design and Execution
Practices and Challenges For Open Pit Geotechnical Characterization, Geomechanics Risk Management Perspective - Mining Context Sizing up geomechanics risk in mining: Mining is considered to be a high risk
More informationPort of Pasco: Old Grain Terminal Pier Inspection May 8-9, 2013
Port of Pasco: Old Grain Terminal Pier Inspection May 8-9, 2013 Submitted by: 3901 E. Ferry Avenue Spokane, WA 99202 (509) 533-6500 INTRODUCTION: The Port of Pasco Old Grain Terminal Pier is located on
More information2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town.
Subject: Antenna Systems Policy Number: Date Developed: 2008/09 Date Approved: April 8, 2009 Lead Department: Planning and Development Date Modified: (if applicable) November 26, 2014 A. PROTOCOL STATEMENT:
More informationB.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST
B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary
More informationAppendix F: Archaeology VEIRS MILL CORRIDOR MASTER PLAN PUBLIC HEARING DRAFT
Appendix F: Archaeology VEIRS MILL CORRIDOR MASTER PLAN PUBLIC HEARING DRAFT Appendix - Archaeology Summary In 1838, Samuel Clark Veirs constructed a mill on Rock Creek along the south side of the one-lane
More informationsouthpaw enterprises, inc.
southpaw enterprises, inc. Store these instructions along with the enclosed maintenance checklist in a safe place. You may also access them on our website. Instruction Sheet: Fiber Optic Activity Panel
More information1.1 GENERAL RECORD DRAWING REQUIREMENTS
Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has
More informationCurriculum Vitae: Academic and Practical Experience. Married and have four children
Curriculum Vitae: Academic and Practical Experience 1- Personality data: Name Abdel-Aziz Ahmed Ali Hassan Date of Birth 28/7/1964 Position Status Address Tel. Associate professor Married and have four
More informationSedPoint2 Temporary or Semi-permanent sediment pore water sampling systems.
SedPoint2 Temporary or Semi-permanent sediment pore water sampling systems. These are based on the simple and extremely effective MHEproducts TubeWells which are constructed of ¼ polyethylene tubing, perforated
More informationIn response to a request from Water Rights Branch, a short. In general, the sequence of post glacial events in the immediate. D. M.
. TO Dr. J. C. Foweraker......!...... C&* Groundwater Div i s ion... GOVERNMENT OF BRITISH COLUMBIA M EM0 RAN DU M D. M. Callan Groundwater Division... July 6th... 19... 71... SUBJECT GROUNDWATER INVESTIGATION
More informationScienceDirect. Stabilization of Clay with Waste Soda Lime Glass Powder
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 161 (2016 ) 600 605 World Multidisciplinary Civil Engineering-Architecture-Urban Planning Symposium 2016, WMCAUS 2016 Stabilization
More informationAsset Protection Cathodic Protection Soil Resistivity Measurement. Work Instruction No.:
Asset Protection Cathodic Protection Soil Resistivity Measurement Approved by: Manager Pipeline Standards 1 PURPOSE This work instruction describes the processes to be followed when measuring soil resistivity.
More informationGround Investigation 6 New Mill Court, Enterprise Park, Swansea. SA7 9FG. Land adjacent to Village Green, Templeton Trial Pit Photographs
Ground Investigation 6 New Mill Court, Enterprise Park, Swansea. SA7 9FG TEL 01792 411013 FAX 01792 411014 EMAIL wales@ground-investigation.com Land adjacent to Village Green, Templeton Trial Pit Photographs
More informationSECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationPREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS
PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS High Strength Fast Setting Pourable Helpful Items: TCC Materials February 09 Version 2.0 Tools Required: Concrete mixer or ½ drill (600 RPM or
More information) Forensic Footwear and Tire Impression Evidence. t the form of a three-dimensional shoe impression
101 An Introduction to Forensic Science j3 surfaces, 3uch as sand, soil, or snow, iney may cause a permanent deformation of that surface an object that made them An examiner will examine these characteristics
More informationSec Radio, television, satellite dish and communications antennas and towers.
Se 2106. - Radio, television, satellite dish and communications antennas and towers. (a) (b) (c) (d) No guy wires or other accessories associated with any antenna or tower shall cross, encroach, or otherwise
More informationVerona Bookcase. Assembly Instructions - Please keep for future reference 609/ /6472
Verona Bookcase Assembly Instructions - Please keep for future reference 609/5095 60/67 Dimensions Width - 60cm Depth - 0cm Height - cm Important - Please read these instructions fully before starting
More information*** All chrome surfaces should be cleaned using a clean damp cloth. *** No abrasive cleaning agents or materials should be used.
Cleaning *** All chrome surfaces should be cleaned using a clean damp cloth. *** No abrasive cleaning agents or materials should be used. *** No chemical cleaners can be used on the glass use only mild
More informationAppendix C7. Geotechnical Assessment Report
Appendix C7 Geotechnical Assessment Report a Old Main Road, Judges Walk, Kloof, Kwazulu-Natal, South Africa, 6 PO Box 89, Gillitts, 6, South Africa Tel: +7 () 76 7 Fax: +7 () 76 7 Web: www.gcs-sa.biz Geotechnical
More informationA GUIDE TO APPLYING FOR A BUILDING PERMIT FOR A DETACHED GARAGE OR ACCESSORY BUILDING
January, 2013 BUILDING DIVISION A GUIDE TO APPLYING FOR A BUILDING PERMIT FOR A DETACHED GARAGE OR ACCESSORY BUILDING This bulletin is for general guidance only. It does not replace by-laws or other legal
More informationMERRY GO ROUND ITEM NO: 8030
MERRY GO ROUND ITEM NO: 8030 OWNER S MANUAL CAUTION: This unit is designed to be used safely by up to 4 children between the ages of 3 years to 8 years old with a maximum weight of 00 pounds (45.4 kgs)
More informationSectional HDD Reamer Package
Sectional HDD Reamer Package Recommended for Sand, Soft Soil, Sand Stone, Coral Mix and Gravel Carbides Internally welded leaving an external groove. Using a thin grinder blade, worn out carbides can be
More informationTOWN OF DOUGLAS EARTH REMOVAL SPECIAL PERMIT APPLICATION FORM Pursuant to Section 6.1 of the Douglas Zoning Bylaw
I. Owner Information II. Applicant Information III. Representative Information IV. Operator Information er.doc Page 1 of 5 Douglas Planning Board V. Site Information Assessors Map Assessors Parcel Deed
More informationMULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST
MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST This application lists the content and format of the submittal requirements to initiate the Design Review process. An incomplete application will not be
More informationA. Dewatering observation wells are part of dewatering allowance.
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationHartwell Lake Application for Dry Dredging
Hartwell Lake Application for Dry Dredging Applicant: Mailing Address: E-Mail Address: Day Time Phone Number/s: Dredging Site Address: Subdivision: Lot #: Shoreline Use Permit #: Next Upstream Permit #,
More informationBISHOPGARTH, WESTFIELD ROAD, WAKEFIELD GROUND GAS RISK ASSESSMENT
21 November 2014 Our reference: 301469/L01/la For the attention of: Ian Stuart Property Asset Coordinator Estates Department West Yorkshire Police The Potteries Pottery Street Castleford WF10 1NJ UK Telephone:
More informationINDEX PAGE RELEASE SECTION NUMBER DATE
INSTALLATION INSTRUCTIONS For Wind Zone 1 (other Wind Zones available on request) Version 11/20/2002 INDEX PAGE RELEASE SECTION NUMBER DATE Approval INTRODUCTION 2 2/26/2001 GENERAL INSTALLATION 3 2/26/2001
More informationZoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801
2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax
More informationCHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS
CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05
More information1-1/4" Microstar Gerbs
Volume 6, Issue 2 Beginner Project... Page 1 1-1/4" Microstar Gerbs Figure 1: 10-20m titanium turnings and micro stars. Figure 2: Rolling the casing from poster board. Materials: (1) 44" long x 7" wide
More informationThe ROMFA Archaeological Recording Manual
The ROMFA Archaeological Recording Manual The ROMFA Archaeology Recording System is comprised of a series of modules each covering an aspect of fieldwork. The primary function of the manual is to act as
More informationSECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 312319 - DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationP Forsmark site investigation. RAMAC and BIPS logging in borehole HFM11 and HFM12
P-04-39 Forsmark site investigation RAMAC and BIPS logging in borehole HFM11 and HFM12 Jaana Gustafsson, Christer Gustafsson Malå Geoscience AB/RAYCON March 2004 Svensk Kärnbränslehantering AB Swedish
More informationWILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305
WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal
More informationFailure Mode of Mud Anchors or Gumbo, It s Not Just For Food Anymore
Failure Mode of Mud Anchors or Gumbo, It s Not Just For Food Anymore Presented by: Scott Blackburn Failure Mode of Mud Anchors or Gumbo, It s Not Just For Food Anymore Developed by Michael Dunn Presented
More informationFigure 1: Excavation of Test-Pit 6. Looking west.
Test-Pit 6: The Parish Field, Park Street (SK 40787 03101) Test-Pit 6 was excavated in the north-west corner of the Parish Field on the south side of Park Street at SK 40787 03101 (Figure 1). Over two
More informationWhere Did That Come From? Finding the Pieces and Part for Your Contest Mat Ocean Rescue Senior Robotics Challenge
Boomer Dispersal Station 4 8 feet tall, electrical tape Where Did That Come From? Finding the Pieces and Part for Your Contest Mat Ocean Rescue Senior Robotics Challenge Coastal Recover Center 8 Oil Rig*
More informationVillage of Princeville Minutes of the Regular Board Meeting February 19, :00 p.m.
The Princeville Village Board met on the above date and time at the Village Hall, 206 N. Walnut Street, Princeville, Illinois 61559. President Pro Tem Sutherland called the meeting to order at 7:02 p.m.
More informationStratigraphy Modeling Boreholes and Cross Sections
GMS TUTORIALS Stratigraphy Modeling Boreholes and Cross Sections The Borehole module of GMS can be used to visualize boreholes created from drilling logs. Also three-dimensional cross sections between
More informationChecklist for Tentative Subdivision Map
Checklist for Tentative Subdivision Map All submittal information shall be provided to the Community Development Department. All submittal information shall be presented along with the Uniform Application,
More informationTechnologies, Inc. Installation Instructions for Anchors & Components. Rev PAGE 1 / 11
Installation Instructions for Anchors & Components PAGE 1 / 11 GROUND ANCHOR INSTALLATION INSTRUCTIONS NOTE: 1) The tensioning bolt can be inserted in the head from either side. 2) In areas of severe cold
More informationappendix f: slope density
CONTENTS: F-2 Statement of Purpose F-3 Discussion of Slope F-4 Description of Slope Density The Foothill Modified Slope Density The Foothill Modified 1/2 Acre slope density The 5 20 slope density F-7 How
More informationInstructions For Building A Three-Pump Shared Aquifer Model
Instructions For Building A Three-Pump Shared Aquifer Model Overview The following groundwater model and simulator can be constructed for less than $5.00 with a little planning. The most difficult parts
More informationResults of GPR survey of AGH University of Science and Technology test site (Cracow neighborhood).
Results of GPR survey of AGH University of Science and Technology test site (Cracow neighborhood). October 02, 2017 Two GPR sets were used for the survey. First GPR set: low-frequency GPR Loza-N [1]. Technical
More informationBi-partite gouge auger model P
Bi-partite gouge auger model P Manual Meet the difference Eijkelkamp Soil & Water Nijverheidsstraat 30, 6987 EM Giesbeek, the Netherlands T +31 313 880 200 E info@eijkelkamp.com I www.eijkelkamp.com 2018-07
More informationPlan Submittal and Review Checklist
Improving quality of life today creating a better tomorrow Plan Submittal and Review Checklist Version 1.2 September 4, 2017 Contents Overview... 2 Plan Submittal Checklist... 2 Plan Review Checklist -
More informationWIRELESS TELECOMMUNICATION FACILITIES. Chapter 15
Title 9 Land Management Code WIRELESS TELECOMMUNICATION FACILITIES Chapter 15 9-15-1: PURPOSE: 9-15-2: DEFINITIONS: 9-15-3: APPLICABILITY: 9-15-4: MASTER PLAN REQUIRED: 9-15-5: ALLOWABLE USES: 9-15-6:
More informationAPPENDIX M NOISE ANALYSIS
APPENDIX M NOISE ANALYSIS McCORMICK RANKIN CORPORATION 2655 North Sheridan Way, Suite 300 Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO
More informationBy Jamie Bright All Rights Reserved
By Jamie Bright All Rights Reserved Concrete Garden Ornaments let s be honest, we all love them! From a typical garden gnome to a graceful Roman statue, there is a huge range of different garden ornaments
More informationTown of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014
Town of Mount Pleasant PRELIMINARY Design Review Submittal Check List June 1, 2014 This form is to be completed by either applicant or their representative and submitted with Preliminary Review plans.
More informationEstimated Cost of Project Contractor License No. Contractor Qualifier No.
Building, Safety and Zoning Department COMMERCIAL Application for Building Permit Owners and/or Contractors: Please fill out all the information listed below and submit those documents needed for your
More informationSECTION 3. Housing. FAppendix F SLOPE DENSITY
SECTION 3 Housing FAppendix F SLOPE DENSITY C-2 Housing Commission Attachment B Appendix F Slope Density STATEMENT OF PURPOSE This appendix has been prepared with the intent of acquainting the general
More informationGROUND INVESTIGATON INTERPRETATIVE REPORT
GROUND INVESTIGATON INTERPRETATIVE REPORT for the site at COPLEY VALLEY REDEVELOPMENT, COPLEY, HALIFAX for Calderdale Metropolitan Borough Council thinking beyond construction GROUND INVESTIGATON INTERPRETATIVE
More informationGeoprobe Macro-Core MC inch Light-Weight Center Rod Soil Sampling System
Geoprobe Macro-Core MC5 1.25-inch Light-Weight Center Rod Soil Sampling System Standard Operating Procedure Technical Bulletin No. MK3139 PREPARED: January, 2011 A. B. C. D. E. A. Assembled MC5 Sampler
More informationExperiment on Artificial Frozen Soil Boundary GPR Detection During Cross-passage Construction in Tunnels
354 Progress In Electromagnetics Research Symposium 2005, Hangzhou, China, August 22-26 Experiment on Artificial Frozen Soil Boundary GPR Detection During Cross-passage Construction in Tunnels Yong-Hui
More information