Improving the Transmission/ Distribution interface Statement of Works process. March 2018 progress report

Size: px
Start display at page:

Download "Improving the Transmission/ Distribution interface Statement of Works process. March 2018 progress report"

Transcription

1 Improving the Transmission/ Distribution interface Statement of Works process March 2018 progress report

2 Introduction The Statement of Works process has been under review nationally for the past three years. This report outlines what a Statement of Works is, the reasons for the review and the progress made by the end of March 2018, both nationally and within Northern Powergrid. It also gives an outline of the continuing work that will take place throughout the remainder of 2018 and in to What is a Statement of Works and why might I need one? The connection of generation to our network may have an impact on the GB transmission network, which is operated by National Grid. Embedding generation in our network cause changes in the overall flow of electricity in the network, though the impact is normally greatest near to the generator. As more generation connects to our network the impact on the transmission network becomes more significant and may result in parts of the transmission network needing to be reinforced. Our network connects to the transmission network through Grid Supply Point (GSP) substations. When the cumulative capacity of contracted generation within the network connected to a GSP reaches an agreed threshold then we will check with National Grid to see if there is any material impact on the transmission network. We request a Statement of Works from National Grid. The statement identifies whether the contracted generation has a material impact. If there is no impact then the generator can connect. However, if there is an impact then we must ask the generator if they still want to progress with their scheme. If the generator does want to progress then we will issue a confirmation of progression to National Grid. They will then develop a solution to reinforce the transmission network and present us with a formal modification offer laying out the works required and the costs / liabilities. These costs and liabilities are passed on to the generator by us. If they agree to the works then we will accept National Grid s offer and the work can commence. The generator may not be permitted to connect to the network until the works are complete. However, in some cases the generator can connect in advance of completion with or without constraints. How will I know if I need a Statement of Works? Sites with an overall generation capacity of less than 1MW are exempt from requiring a Statement of Works. If your site has an overall generation capacity of less than 50MW then we will let you know whether your offer is subject to a Statement of Works when we offer you a connection. Sites with a generation capacity of 50MW or greater will always need a Statement of Works. Why do we need to change the process? The existing process is effective in situations where the volume of generation wanting to connect to the network is small. Historically, we used to process two or three Statement of Works requests per year and we never received more than one generation request on a particular network at a time. The existing Statement of Works process typically takes six to nine months from beginning to end for a site where transmission works are required. It only deals with one customer on a

3 particular network at a time and can therefore cause long delays to project development while the generator is waiting to find out what additional liabilities they will be subject to. The combination of delay and uncertainty is not satisfactory for customers, especially in areas with high volumes of connection applications, where the sequential processing of Statement of Works requests introduces unacceptable delays. What are we doing about it? NPg are part of a national working group that is looking to reform the Statement of Works process. Over the past 18 months trials have been taking place at different places across the country to develop an improved process. The objective of the trial is to give the customer greater certainty of the transmission costs / liabilities as early as possible. Wherever possible we would like to be able to provide this information with the connection quotation, which takes up to three months to prepare. This will not always be possible, but the trials have already shown that many customers can receive this information with their connection offer. Although none of the main trials have been in our licence area, we have been able to learn from them and are now adopting the successful elements. The following processes are being developed within the different trials. They are listed here in order of complexity. Bulk Statement of Works requests - Rather than submitting a single request for each generator we can now collate a number of recently contracted generators together and issue a bulk request to National Grid. In areas with multiple generators contracting for a connection, this speeds up the time taken to identify whether any works are required. When works are required we are able to identify which generators are affected and whether any generators are able to connect without delay. Materiality limits where there is still spare capacity available on the transmission network, or the conditions for connection are already known, it may be possible to agree a materiality limit with National Grid. This allows us to self-manage generators up to an agreed capacity and to make offers to customers with a pre-agreed set of transmission conditions. If the cumulative contracted capacity exceeds the agreed materiality limit then we have to submit a new Statement of Works request to National Grid to agree a new limit, possibly with additional conditions. Typically the materiality limit is set at 50MW. This process requires us to share the current position with National Grid on a monthly basis but as long as we stay within the agreed limits we do not have to wait for National Grid s confirmation before customer s can connect. Planning limits in some cases it is possible to identify the specific amount of generation that would trigger additional works on the transmission network. Depending on what the limiting factor is, this might allow us to connect more than 50MW of generation into a network, but it will still be necessary for us to check with National Grid on a monthly basis in case the capacity is utilised by a generator connecting directly to the transmission network. There are potential interactivity issues between transmission and distribution customers and although this hasn t occurred yet, the working group is considering how it would be managed if it did happen.

4 Regional Development Programmes Some parts of the transmission network are so congested that adding generation on one part of our distribution network will reduce how much generation can be added to a different part of our network. In such circumstances a regional solution is required that groups the distribution networks together so that the same capacity is not accidentally used twice. Rollout within Northern Powergrid In 2017 we started submitting bulk Statement of Works requests to National Grid. All of our Statement of Works requests are now submitted on a bulk basis unless there is only one contracted customer in the GSP network. This is already reducing the timescales for obtaining details of the required transmission works. In addition, where we already know that some transmission-related works will be required, we now move straight to the Confirmation of Progression stage, also referred to as a Modification Application. This typically saves two months in the overall process by avoiding going through the initial Statement of Works request process. The bulk Statement of Works approach will suffice for areas where there are low levels of customer interest in installing generation. However, if the volume of applications is higher then the use of Materiality limits or Planning limits may be more appropriate. In February 2018 we received our first offer from National Grid with Materiality limits for Saltend North GSP. This arrangement will allow us to make further offers to other customers as well as allow the contracted customers that triggered the request to get connected. We are currently putting the necessary processes in place to allow us to share our contracted position with National Grid on a monthly basis so that any new customers can connect quicker. When we reach the agreed Materiality limit we will need to submit a new request to National Grid to identify if further headroom can be released. National Grid will be making a second offer to us in quarter two of 2018 using Materiality limits for West Melton GSP. We expect that going forward, our GSPs will transition to Materiality limits as and when we need to submit a Statement of Works request. Our aspiration is to eventually use Planning limits rather than Materiality limits, as they give greater visibility of the available capacity on the transmission network. However, it is more resource intensive for National Grid, as the limits may change on a regular basis due to interactivity across the transmission network. It is more likely that Planning limits will only be used where the volume of generation trying to connect makes it cost-effective for all parties. Regional Development Programmes (RDP) are only expected to be used in areas where there are significant constraints on the transmission network. We have not identified any parts of the transmission network within our area that would currently require this approach. However, we are continuing to monitor levels of activity in case an RDP is required. In December 2017 all of the network operators published their current plans for the rollout the different processes across their networks, on GPS by GSP basis. The publication can be found here. This is likely to be updated later in the year, as plans become more certain for each GSP.

5 Further work within the national working group in 2018 The national trials will continue to take place and our learning from Saltend North GSP, and from other sites where we are moving to Materiality limits, will be fed in to the overall trials. The development of the process for managing a GSP using Materiality limits is nearing completion and the working group is looking to submit the necessary code changes to formalise the trial arrangements on an enduring basis. This will not stop the detailed processes from continuing to be developed throughout 2018 to improve them. The process for using Planning limits is less well developed, though there has been more success in the trials in Scotland, as the works required when the Planning limit is exceeded had already been quantified for the networks being trialled. The trial model used in Scotland is being considered for use in England and Wales and may result in more Planning limits being established further south, but the work required to produce Planning limits remains significant. The trial use of RDPs will continue in the southeast and the working group will look to develop a standardised approach where an RDP is required. A customer feedback workshop was run in March 2018, which, as well as other things, identified that customers were not necessarily aware that they were in a trial area. The working group will be using the feedback received at the workshop to look for further improvements that can be made to the process and the way that information is shared with customers.

Orkney Electricity Network Reinforcement Stakeholder Consultation Response. August 2014

Orkney Electricity Network Reinforcement Stakeholder Consultation Response. August 2014 Orkney Electricity Network Reinforcement August 2014 Introduction In February 2014 Scottish and Southern Energy Power Distribution 1 (SSEPD) undertook a stakeholder consultation Connecting Orkney: Electricity

More information

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES Issue 11: February 2018 National Grid Registered Office National Grid Electricity Transmission plc Registered Office: 1-3 Strand London WC2N

More information

CMP298. Updating the Statement of Works process to facilitate aggregated assessment of relevant and collectively relevant embedded generation.

CMP298. Updating the Statement of Works process to facilitate aggregated assessment of relevant and collectively relevant embedded generation. CUSC Modification Proposal Form CMP298 Updating the Statement of Works process to facilitate aggregated assessment of relevant and collectively relevant embedded generation. At what stage is this document

More information

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES Issue 9: May 2013 National Grid National Grid Registered Office National Grid Electricity Transmission plc Registered Office: 1-3 Strand London

More information

Geoff Brown & Associates Ltd

Geoff Brown & Associates Ltd Geoff Brown & Associates Ltd REVIEW OF WESTERN POWER S APPLICATION FOR A TECHNICAL RULES EXEMPTION FOR NEWMONT MINING SERVICES Prepared for ECONOMIC REGULATION AUTHORITY Final 20 August 2015 Report prepared

More information

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy National Grid s commitments when undertaking works in the UK Our stakeholder, community and amenity policy Introduction This document describes the ten commitments we have made to the way we carry out

More information

NHS Vale of York CCG TURNAROUND ACTION PLAN

NHS Vale of York CCG TURNAROUND ACTION PLAN NHS Vale of York CCG TURNAROUND ACTION PLAN Ref. Area Action Priority By When Progress Responsible Status 01. Underlying Financial TP Position The material underlying deficit position highlights the unsustainable

More information

Guidance Notes for Power Park Developers

Guidance Notes for Power Park Developers Guidance Notes for Power Park Developers September 2008 Issue 2 Foreword These Guidance Notes have been prepared by National Grid plc to indicate to Generators the manner in which they should: (i) Record

More information

Low Frequency Demand Disconnection Summary

Low Frequency Demand Disconnection Summary Low Frequency Demand Disconnection Summary This article assesses the suitability of current low frequency protection on the network as more distributed generation is connected to WPD s network. DSOF June

More information

Business radio light licence application form OfW432

Business radio light licence application form OfW432 Business radio light licence application form OfW432 For a quicker service you can make changes directly online at https://ofcom.force.com/licensingcomlogin. Registering is easy and we have published guidance

More information

East Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection

East Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection East Anglia TWO and East Anglia ONE North Summary and Approach to Site Selection 1 Introduction ScottishPower Renewables (SPR) has recently concluded work in order to inform our onshore site selection

More information

Safety related product corrective action

Safety related product corrective action Safety related product corrective action Brian Such Standards Solutions Project Manager British Standards Institution Copyright 2017 BSI. All rights reserved 1 03/07/2017 Safety related product corrective

More information

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution Herts Valleys Clinical Commissioning Group Review of NHS Herts Valleys CCG s constitution Agenda Item: 14 REPORT TO: HVCCG Board DATE of MEETING: 30 January 2014 SUBJECT: Review of NHS Herts Valleys CCG

More information

EDS FAULT LEVELS

EDS FAULT LEVELS Document Number: EDS 08-1110 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 08-1110 FAULT LEVELS This standard provides guidance on the calculation, application and availability of

More information

USE OF HVDC MULTI TERMINAL OPTIONS FOR FUTURE UPGRADE OF THE NATIONAL GRID

USE OF HVDC MULTI TERMINAL OPTIONS FOR FUTURE UPGRADE OF THE NATIONAL GRID USE OF HVDC MULTI TERMINAL OPTIONS FOR FUTURE UPGRADE OF THE NATIONAL GRID JOS ARRILLAGA Emeritus Professor, FIEE, FIEEE, MNZM 2/77 HINAU STREET, RICCARTON CHRISTCHURCH ARRILLJ@ELEC.CANTERBURY.AC.NZ TELEPHONE

More information

Licence Application Submission Procedure for Planned Radio Stations Below 960 MHz

Licence Application Submission Procedure for Planned Radio Stations Below 960 MHz Issue 5 October 2008 Spectrum Management and Telecommunications Radio Standards Procedure Licence Application Submission Procedure for Planned Radio Stations Below 960 MHz Aussi disponible en français

More information

Reactive power roadmap. Patrick Cassels, Senior Strategy Analyst Commercial (Electricity), National Grid ESO

Reactive power roadmap. Patrick Cassels, Senior Strategy Analyst Commercial (Electricity), National Grid ESO Reactive power roadmap Patrick Cassels, Senior Strategy Analyst Commercial (Electricity), National Grid ESO Agenda Principles of reform What is reactive power? How is it managed today? Why is change needed?

More information

Prepared by the Working Group on the Use of Nuclear Power Sources in Outer Space

Prepared by the Working Group on the Use of Nuclear Power Sources in Outer Space United Nations General Assembly Distr.: General 1 March 2017 Original: English Committee on the Peaceful Uses of Outer Space Scientific and Technical Subcommittee Report on the status of implementation

More information

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS (This contents page does not form part of the Grid Code) Paragraph No/Title Page No ECP.1 INTRODUCTION... 2 ECP.2 OBJECTIVE... 3 ECP.3 SCOPE...

More information

Oil & Gas Activity in the Canadian Arctic and Eastern Canada Activity

Oil & Gas Activity in the Canadian Arctic and Eastern Canada Activity Oil & Gas Activity in the Canadian Arctic and Eastern Canada Activity Keith Landra - Chief Safety Officer with contributions by: Paul Alexander, Chief Safety Officer, Robert Normore, Chief Safety Officer,

More information

Science and mathematics

Science and mathematics Accreditation of HE Programmes (AHEP): Collated learning outcomes for six areas of learning Programmes accredited for IEng Engineering is underpinned by science and mathematics, and other associated disciplines,

More information

Founding Manifesto Friends of Floating Offshore Wind 18 May 2016

Founding Manifesto Friends of Floating Offshore Wind 18 May 2016 Founding Manifesto Friends of Floating Offshore Wind 18 May 2016 Members: Pilot Offshore Renewables Hexicon RES Offshore IDEOL Floating Power Plant Glosten PelaStar Principle Power Inc. Atkins ACS Cobra

More information

RQIA Board Meeting. Min/Nov17/public. To share with Board members a record of the previous meeting of the RQIA Board.

RQIA Board Meeting. Min/Nov17/public. To share with Board members a record of the previous meeting of the RQIA Board. RQIA Board Meeting Date of Meeting 11 January 2018 Title of Paper Public Session Minutes Agenda Item 1 Reference Author Presented by Purpose Executive Summary FOI Exemptions Applied Equality Impact Assessment

More information

TESTING GUIDANCE FOR PROVIDERS OF FIRM FREQUENCY RESPONSE BALANCING SERVICE

TESTING GUIDANCE FOR PROVIDERS OF FIRM FREQUENCY RESPONSE BALANCING SERVICE TESTING GUIDANCE FOR PROVIDERS OF FIRM FREQUENCY RESPONSE BALANCING SERVICE Authors Published Version Update Summary Kevin Smethurst Vicci Walsh May 2017 D1 Kevin Smethurst Vicci Walsh Draft 2/6/17 D6

More information

Smart Meter Attitudes

Smart Meter Attitudes Smart Meter Attitudes A report by: In conjunction with: Survey powered by: HARRIS 24 April 2017 INTRODUCTION By the end of 2020, around 53 million Smart meters are expected to be fitted by energy suppliers

More information

Application Form for a GNSS Repeater Licence

Application Form for a GNSS Repeater Licence Ofcom application form OfW523 Application Form for a GNSS Repeater Licence Page 1 of 8 www.ofcom.org.uk 1. Before filling out this form, please read these notes. If you are unsure how to complete any part

More information

Requirements for Generators European Network Code High Level Implementation Issues

Requirements for Generators European Network Code High Level Implementation Issues Requirements for Generators European Network Code High Level Implementation Issues Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be

More information

LIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK

LIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK LIMITS FOR TEMPORARY OEROLTAGES IN ENGLAND AND WALES NETWORK This document is for internal and contract specific use only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept

More information

Representation - Draft Modification Report UNC A 0636B 0636C 0636D Updating the parameters for the NTS Optional Commodity Charge

Representation - Draft Modification Report UNC A 0636B 0636C 0636D Updating the parameters for the NTS Optional Commodity Charge Representation - Draft Modification Report UNC 0636 0636A 0636B 0636C 0636D Updating the parameters for the NTS Optional Commodity Charge Responses invited by: 5pm on 14 June 2018 To: enquiries@gasgovernance.co.uk

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

EUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS. (This contents page does not form part of the Grid Code)

EUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS. (This contents page does not form part of the Grid Code) GC0102 EXTRACT OF EUROPEAN CONNECTION CONDITIONS LEGAL TEXT DATED 08/01/2018 Paragraph No/Title EUROPEAN CONNECTION CONDITIONS (ECC) CONTENTS (This contents page does not form part of the Grid Code) Page

More information

European Workgroup. 7th May 2015

European Workgroup. 7th May 2015 European Workgroup Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 7th May 2015 Code Status

More information

Air Monitoring Directive Chapter 9: Reporting

Air Monitoring Directive Chapter 9: Reporting Air Monitoring Directive Chapter 9: Reporting Version Dec 16, 2016 Amends the original Air Monitoring Directive published June, 1989 Title: Air Monitoring Directive Chapter 9: Reporting Number: Program

More information

Personal Medical Services (PMS) Contract Review Update

Personal Medical Services (PMS) Contract Review Update Personal Medical Services (PMS) Contract Review Update 1. Introduction NHS England commenced the Personal Medical Services (PMS) Review process across the North West London (NWL) Collaboration of CCGs

More information

ESB National Grid Transmission Planning Criteria

ESB National Grid Transmission Planning Criteria ESB National Grid Transmission Planning Criteria 1 General Principles 1.1 Objective The specific function of transmission planning is to ensure the co-ordinated development of a reliable, efficient, and

More information

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance

Click to edit Master title style. Click to edit Master title style. Northern Powergrid Asset Recording Guidance Click to edit Master title style Click to edit Master title style Northern Powergrid Asset Recording Guidance Rules for ICP & IDNO Version 1.0 April 2017 Introduction Accurate records for all assets are

More information

Load-Frequency Control and Reserves Network Code. David Bunney JESG 19 March 2013

Load-Frequency Control and Reserves Network Code. David Bunney JESG 19 March 2013 Load-Frequency Control and Reserves Network Code David Bunney JESG 19 March 2013 Agenda Overview and Timescales Stakeholder Engagement Overview of the Code More detailed discussion on Frequency Quality

More information

6 th December South West Scotland Forum

6 th December South West Scotland Forum 6 th December 2017 South West Scotland Forum SWS Developers Forum 6 www.spenergynetworks.co.uk th Dec 2017 1 Agenda Introduction Pearse Murray System Design Diyar Kadar Programme Update Bob McGuire, Colin

More information

NETS SQSS Modification Proposal

NETS SQSS Modification Proposal NETS SQSS Modification Proposal Operational and Planning Criteria for 220kV Transmission Assets Panel Paper by Bless Kuri, SHE Transmission For presentation to the SQSS Panel Meeting on 1 st April 2015

More information

Spectrum Policy Task Force

Spectrum Policy Task Force Spectrum Policy Task Force Findings and Recommendations February 2003 mmarcus@fcc.gov www.fcc.gov/sptf 1 Outline Introduction Spectrum Policy Reform: The Time is Now Major Findings and Recommendations

More information

SYNCHRONISING AND VOLTAGE SELECTION

SYNCHRONISING AND VOLTAGE SELECTION SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any

More information

SSE Offices, Glasgow and Teleconference

SSE Offices, Glasgow and Teleconference DRAFT Minutes Name NETS SQSS Sub-Synchronous Oscillations (SSO) Workgroup Number 3 Date of 28 November 2014 Time 10:00 14:00 Location SSE Offices, Glasgow and Teleconference Attendees Name Role Initials

More information

CRIRSCO and evolving international accounting standards: IFRSs

CRIRSCO and evolving international accounting standards: IFRSs 8 November, 2011 International Financial Reporting Standards CRIRSCO and evolving international accounting standards: IFRSs Glenn Brady Senior Technical Manager, IASB The views expressed in this presentation

More information

Digital Universal Credit

Digital Universal Credit Digital Universal Credit Get the facts What s happening? 1 When will I need to claim? 3 Can I claim now? 5 How do I make a claim? 7 Completing the claim process 9 When will I get paid? 11 Advance Payments

More information

AAPFA- Australian Au Pair Families Association

AAPFA- Australian Au Pair Families Association AAPFA- Australian Au Pair Families Association Code of Conduct The AAPFA is an independent advocate to represent the Au Pair industry in Australia. Our service is free to all Au Pairs staying with Host

More information

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title

EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) CONTENTS. (This contents page does not form part of the Grid Code) Paragraph No/Title EUROPEAN COMPLIANCE PROCESSES (post RfG Implementation) Style Definition: TOC 1: Right: -0.59 cm CONTENTS (This contents page does not form part of the Grid Code) Paragraph No/Title Page No ECP.1 INTRODUCTION...

More information

ElectraLink s response to the ENA Open Networks Project Consultation on Phase 2 Work Programme.

ElectraLink s response to the ENA Open Networks Project Consultation on Phase 2 Work Programme. . 3rd Floor Northumberland House 303-306 High Holborn London WC1V 7JZ Tel: 0207 432 3000 www.electralink.co.uk ElectraLink s response to the ENA Open Networks Project Consultation on Phase 2 Work Programme.

More information

Moyle Interconnector between Northern Ireland and Scotland. Methodology Statement for Determination of System-to-System Flow

Moyle Interconnector between Northern Ireland and Scotland. Methodology Statement for Determination of System-to-System Flow Moyle Interconnector between Northern Ireland and Scotland Methodology Statement for Determination of System-to-System Flow 1. Requirement for Methodology Statement 1.1 This Methodology Statement is produced

More information

Ruapehu Alpine Lifts. Whakapapa Electrical Network Strategy. Summary Consultation Document. 15 December 2016

Ruapehu Alpine Lifts. Whakapapa Electrical Network Strategy. Summary Consultation Document. 15 December 2016 Ruapehu Alpine Lifts Whakapapa Electrical Network Strategy Summary Consultation Document 15 December 2016 1. Introduction Local Networks are electricity distribution networks connected to Transpower s

More information

Sunday Working for Shop and Betting Workers

Sunday Working for Shop and Betting Workers Sunday Working for Shop and Betting Workers A guide to your rights Introduction The laws in relation to Sunday working for shop and betting workers in England and Wales are now consolidated into the Employment

More information

UK Broadband Ltd - Spectrum Access 28 GHz Licence Company Registration no: First Issued 22 July Licence Number: /01/18

UK Broadband Ltd - Spectrum Access 28 GHz Licence Company Registration no: First Issued 22 July Licence Number: /01/18 Office of Communications (Ofcom) Wireless Telegraphy Act 2006 SPECTRUM ACCESS LICENCE 28 GHz This Licence replaces the version of the licence issued by Ofcom on 18 February 2016 to UK Broadband Limited.

More information

Energy Energy Networks. Networks Association. Association. Insert presentation. The Voice of the Networks

Energy Energy Networks. Networks Association. Association. Insert presentation. The Voice of the Networks The Voice of the Networks Energy Energy Networks Networks Association Association Active Network Management: Good Practice Guide Insert presentation 15 title th July 2015 here Name Position Date Agenda

More information

Spectrum Efficiency in Scotland. Study Proposal. National Grid Wireless. Prepared for: Ofcom Prepared by: National Grid Wireless.

Spectrum Efficiency in Scotland. Study Proposal. National Grid Wireless. Prepared for: Ofcom Prepared by: National Grid Wireless. Spectrum Efficiency in Scotland Study Proposal National Grid Wireless Prepared for: Ofcom Prepared by: National Grid Wireless 1 EXECUTIVE SUMMARY... 3 2 INTRODUCTION... 4 3 METHODOLOGY... 4 4 CHANGES TO

More information

Demand Side Response Methodology (DSR) for Use after a Gas Deficit Warning (GDW) Background. Draft Business Rules

Demand Side Response Methodology (DSR) for Use after a Gas Deficit Warning (GDW) Background. Draft Business Rules Demand Side Response Methodology (DSR) for Use after a Gas Deficit Warning (GDW) Draft Business Rules Version 0.1 Following the broad consensus of Workgroup 0504 meeting 3 (WG3), held on the 10 September

More information

Smart Grid Panel Presentation

Smart Grid Panel Presentation Smart Grid Panel Presentation Robert J. Thomas Cornell University PSerc Summer Workshop Lake Tahoe, CA August 4, 2008 Smart Grid Values (Why are we doing this?) Some reasons A more reliable grid - power

More information

Item Topic Lead Action Documents

Item Topic Lead Action Documents Agenda Meeting name CUSC Modifications Panel Meeting number 225 Date of meeting 31 August 2018 Time 10:00 15:00 Location National Grid House, Warwick Item Topic Lead Action Documents 1 Introductions/Apologies

More information

Network Monitoring and Visibility Summary

Network Monitoring and Visibility Summary Network Monitoring and Visibility Summary This article reviews the shortfalls in legacy monitoring and what will be needed to manage the changing nature of the distribution network. This includes a particular

More information

GOVERNING BODY MEETING in Public 25 April 2018 Agenda Item 3.2

GOVERNING BODY MEETING in Public 25 April 2018 Agenda Item 3.2 GOVERNING BODY MEETING in Public 25 April 2018 Paper Title Paper Author(s) Jerry Hawker Accountable Officer NHS Eastern Cheshire CCG The Future of CCG Commissioning in Cheshire Alison Lee Accountable Officer

More information

PROJECT BRIEF PROJECT NEXUS. Development of Requirements FINAL DRAFT V1.0. Project Nexus Development of Requirements Project Brief.

PROJECT BRIEF PROJECT NEXUS. Development of Requirements FINAL DRAFT V1.0. Project Nexus Development of Requirements Project Brief. PROJECT NEXUS Development of Requirements PROJECT BRIEF FINAL DRAFT V1.0 22nd October 2009 Copyright xoserve Limited 2009 1 Final Draft V1.0 About this document xoserve is planning a major systems investment

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS NETWORK CODE FOR REQUIREMENTS FOR GRID CONNECTION APPLICABLE TO ALL GENERATORS FREQUENTLY ASKED QUESTIONS 24 JANUARY 2012 Disclaimer: This document is not legally binding. It only aims at clarifying the

More information

NAB WRITTEN SUBMISSION TO ICASA ON DIGITAL SOUND BROADCASTING DISCUSSION DOCUMENT 6 JUNE 2018

NAB WRITTEN SUBMISSION TO ICASA ON DIGITAL SOUND BROADCASTING DISCUSSION DOCUMENT 6 JUNE 2018 NAB WRITTEN SUBMISSION TO ICASA ON DIGITAL SOUND BROADCASTING DISCUSSION DOCUMENT 6 JUNE 2018 Postal Address: P.O.Box 412363, Craighall, 2024, South Africa Tel: +27(11) 326 2444 Fax: +27(11) 326 3086 info@nabsa.co.za

More information

Excerpts from PG&E s SmartMeter Reports to the California Public Utilities Commission. PG&E s SmartMeter Program is a Massive Technology Rollout

Excerpts from PG&E s SmartMeter Reports to the California Public Utilities Commission. PG&E s SmartMeter Program is a Massive Technology Rollout May 10, 2010 Excerpts from PG&E s SmartMeter Reports to the California Public Utilities Commission PG&E s SmartMeter Program is a Massive Technology Rollout A note about this document: Some terms used

More information

Mr B s complaint is about a payment protection insurance (PPI) policy sold to him in February 2000 by MBNA Limited.

Mr B s complaint is about a payment protection insurance (PPI) policy sold to him in February 2000 by MBNA Limited. complaint Mr B s complaint is about a payment protection insurance (PPI) policy sold to him in February 2000 by MBNA Limited. MBNA has agreed it mis-sold the policy to Mr B. Mr B says MBNA hasn t fully

More information

EC O4 403 DIGITAL ELECTRONICS

EC O4 403 DIGITAL ELECTRONICS EC O4 403 DIGITAL ELECTRONICS Asynchronous Sequential Circuits - II 6/3/2010 P. Suresh Nair AMIE, ME(AE), (PhD) AP & Head, ECE Department DEPT. OF ELECTONICS AND COMMUNICATION MEA ENGINEERING COLLEGE Page2

More information

North York Moors National Park Authority

North York Moors National Park Authority Item 13 North York Moors National Park Authority 1 October 2018 Government Consultations on: i) Permitted Development rights for Shale Gas Exploration; ii) Inclusion of Shale Gas Production Projects in

More information

RELEVANT ELECTRICAL STANDARDS

RELEVANT ELECTRICAL STANDARDS RELEVANT ELECTRICAL STANDARDS Issue 2 February 2014 National Grid 2014 No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means electronic,

More information

Arqiva Limited - Spectrum Access 28GHz Licence Company Registration no: First Issued 30 January Licence Number: /01/17

Arqiva Limited - Spectrum Access 28GHz Licence Company Registration no: First Issued 30 January Licence Number: /01/17 Office of Communications (Ofcom) Wireless Telegraphy Act 2006 SPECTRUM ACCESS LICENCE 28GHz The spectrum authorised under this Licence was formerly authorised under licences issued by Ofcom on 05 July

More information

Enhancing Our Users' Experience Update Appendix B Customer Service Action Plan January Update 2016

Enhancing Our Users' Experience Update Appendix B Customer Service Action Plan January Update 2016 1. Purpose The purpose of this document is to provide visibility of the actions Kier are undertaking to improve the experience. This activities support the LCC Highways Customer Experience Plan. 2. Kier

More information

POWER POTENTIAL: DISTRIBUTED ENERGY RESOURCES (DER) TECHNICAL SPECIFICATIONS GUIDANCE FOR PROVISION OF REACTIVE AND ACTIVE POWER SERVICES

POWER POTENTIAL: DISTRIBUTED ENERGY RESOURCES (DER) TECHNICAL SPECIFICATIONS GUIDANCE FOR PROVISION OF REACTIVE AND ACTIVE POWER SERVICES POWER POTENTIAL: DISTRIBUTED ENERGY RESOURCES (DER) TECHNICAL SPECIFICATIONS GUIDANCE FOR PROVISION OF REACTIVE AND ACTIVE POWER SERVICES For use with the Power Potential DER Technical Characteristics

More information

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007.

Revision 24 of Issue 3 of the Grid Code has been approved by the Authority for implementation on 19 th November 2007. Our Ref: Your Ref: Date: November 2007 To: All Recipients of the Serviced Grid Code Regulatory Frameworks Electricity Codes National Grid Electricity Transmission plc National Grid House Warwick Technology

More information

CORE TEAM MEMBER - JOB DESCRIPTION & PERSON SPECIFICATION

CORE TEAM MEMBER - JOB DESCRIPTION & PERSON SPECIFICATION CORE TEAM MEMBER - JOB DESCRIPTION & PERSON SPECIFICATION POSITION: REPORTS TO: FEE: Core Team Writer Writing Squad Director 5,000 for 35 days over a 12-month period CONTEXT The Writing Squad exists to

More information

OPERATING CODE NO. 5 (OC5)

OPERATING CODE NO. 5 (OC5) Paragraph No/Title OPERATING CODE NO. 5 (OC5) TESTING AND MONITORING CONTENTS (This contents page does not form part of the Grid Code) Page Number OC5.1 INTRODUCTION... 2 OC5.2 OBJECTIVE... 3 OC5.3 SCOPE...

More information

National Grid Gas Transmission (NGGT) Gas Quality Consultation Questions - Draft

National Grid Gas Transmission (NGGT) Gas Quality Consultation Questions - Draft National Grid Gas Transmission (NGGT) Gas Quality Consultation Questions - Draft Existing NTS Entry Connections 1. Do you expect the number of requests by existing NTS entry parties to amend gas quality

More information

European Update. 5 th May 2016

European Update. 5 th May 2016 European Update Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 5 th May 2016 1. General Update

More information

Emerging Talent Shorts Application Guidelines

Emerging Talent Shorts Application Guidelines Emerging Talent Shorts Application Guidelines Introduction Supported by National Lottery funding from Creative Scotland and BFI NETWORK, Scottish Film Talent Network connects with new and emerging Scottish

More information

1. ICCF Guidelines POST Individual and Team tournament games

1. ICCF Guidelines POST Individual and Team tournament games International Correspondence Chess Federation ICCF PLAYING RULES GUIDELINES: Individual & Team Tournament Games Valid from 01/01/2017 Contents 1. ICCF Guidelines POST Individual and Team tournament games...

More information

Lexis PSL Competition Practice Note

Lexis PSL Competition Practice Note Lexis PSL Competition Practice Note Research and development Produced in partnership with K&L Gates LLP Research and Development (R&D ) are under which two or more parties agree to jointly execute research

More information

The Scout Association Census 2018 Guidance for Completion

The Scout Association Census 2018 Guidance for Completion The Scout Association Census 2018 Guidance for Completion Why do we have a census? The Scout Association has an annual census to create a detailed picture of the young people and adults that make-up the

More information

All submissions are read anonymously and every writer gets a submission feedback report.

All submissions are read anonymously and every writer gets a submission feedback report. All submissions are read anonymously and every writer gets a submission feedback report. Please Note: We now only accept entries submitted electronically through our Application Form. 1. DATES AND DEADLINES

More information

Improving consumer access to mobile services at 3.6GHz to 3.8GHz

Improving consumer access to mobile services at 3.6GHz to 3.8GHz Improving consumer access to mobile services at 3.6GHz to 3.8GHz Update on timing of spectrum availability Redacted [ ] for publication UPDATE: Publication Date: 2 February 2018 About this document In

More information

Incentive Guidelines. Aid for Research and Development Projects (Tax Credit)

Incentive Guidelines. Aid for Research and Development Projects (Tax Credit) Incentive Guidelines Aid for Research and Development Projects (Tax Credit) Issue Date: 8 th June 2017 Version: 1 http://support.maltaenterprise.com 2 Contents 1. Introduction 2 Definitions 3. Incentive

More information

TESTING GUIDANCE FOR PROVIDERS OF ENHANCED FREQUENCY RESPONSE BALANCING SERVICE

TESTING GUIDANCE FOR PROVIDERS OF ENHANCED FREQUENCY RESPONSE BALANCING SERVICE TESTING GUIDANCE FOR PROVIDERS OF ENHANCED FREQUENCY RESPONSE BALANCING SERVICE Authors Published Version Kevin Smethurst D3 - Sean Williams 29 March 2017 Final Vicci Walsh 1 Table of Contents 1 Introduction...

More information

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design June 2013 Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design Executive Summary A vendor pre-project design review of a new nuclear power plant provides an

More information

Seagreen Wind Energy Limited C/o SSE Renewables 1 Waterloo Street Glasgow G2 6AY

Seagreen Wind Energy Limited C/o SSE Renewables 1 Waterloo Street Glasgow G2 6AY Date: 30 th March 2018 Ref: A4MR-SEAG-Z-LGL810-SLE-548 Dr. Nicola Bain Marine Renewables Section Leader Licensing Operations Team Marine Scotland Marine Laboratory 375 Victoria Road Aberdeen AB11 9DB Seagreen

More information

Proposals for Liberalisation and Simplification for Business Radio Licensing and pricing

Proposals for Liberalisation and Simplification for Business Radio Licensing and pricing Ofcom Business Radio Spectrum Reform 2007 Proposals for Liberalisation and Simplification for Business Radio Licensing and pricing Ofcom 1 Contents Section 1 Purpose of the presentation Section 2 - Background

More information

Power Quality Summary

Power Quality Summary Power Quality Summary This article provides an overview of how voltage harmonic distortion is managed on the distribution network and focuses on the current at future issues surround the connection of

More information

Minutes from the Health and Well-Being Board Financial Planning Group Tuesday 15 December North London Business Park, F13 1pm 3pm

Minutes from the Health and Well-Being Board Financial Planning Group Tuesday 15 December North London Business Park, F13 1pm 3pm Minutes from the Health and Well-Being Board Financial Planning Group Tuesday 15 December North London Business Park, F13 1pm 3pm Present: (AC) Andrew Charlwood, Head of Governance, LBB (AD) Anisa Darr,

More information

Developing the MAREMAP Toolbox to allow the Marine Renewable Energy sector to access NERC data. September 2013

Developing the MAREMAP Toolbox to allow the Marine Renewable Energy sector to access NERC data. September 2013 Developing the MAREMAP Toolbox to allow the Marine Renewable Energy sector to access NERC data September 2013 Executive Summary The Marine Environmental Mapping Programme (MAREMAP) is a collaboration between

More information

156. MINUTES OF LAST MEETING The minutes of the last meeting were reviewed and agreed as an accurate account of the meeting.

156. MINUTES OF LAST MEETING The minutes of the last meeting were reviewed and agreed as an accurate account of the meeting. MINUTES OF THE MEETING OF THE ESCHOOLS PROJECT BOARD HELD ON WEDNESDAY 3 RD MARCH, 2010 10.00AM AT BOARDROOM, C2K HEADQUARTERS, ASHFIELD BOYS HIGH SCHOOL, HOLYWOOD ROAD, BELFAST PRESENT: Barry Mulholland

More information

SUBJECT HEADING: Switching Programmes ISSUE: 18

SUBJECT HEADING: Switching Programmes ISSUE: 18 SUBJECT: Switchgear/Switching PROCEDURE: S04 SUBJECT HEADING: Switching Programmes ISSUE: 18 DATE: Apr 2017 1. INTRODUCTION 1.1 A written programme of switching operations shall be prepared. This programme

More information

PROPOSALS FOR AQUIND INTERCONNECTOR

PROPOSALS FOR AQUIND INTERCONNECTOR PROPOSALS FOR AQUIND INTERCONNECTOR Introduction AQUIND Limited is the developer of AQUIND Interconnector, a new underground and subsea electric power transmission link that will connect the UK and French

More information

Revision of the Public Law Outline

Revision of the Public Law Outline Revision of the Public Law Outline Issue The President of the Family Division and the Ministry of Justice have been working together (and in conjunction with other family justice agencies) to revise the

More information

Operating instructions. RFID UHF antennas Low range / ultra-low range Mid range / short mid range Wide range

Operating instructions. RFID UHF antennas Low range / ultra-low range Mid range / short mid range Wide range Operating instructions RFID UHF antennas Low range / ultra-low range Mid range / short mid range Wide range ANT805 ANT810 ANT815 ANT820 ANT830 ANT910 ANT920 ANT930 706385 / 00 11 / 2014 Content 1 Preliminary

More information

Our approach to. Innovation. Strategy and delivery. March ukpowernetworks.co.uk

Our approach to. Innovation. Strategy and delivery. March ukpowernetworks.co.uk Our approach to Innovation Strategy and delivery March 2014 ukpowernetworks.co.uk Customer value and efficiency drive our innovation Welcome to UK Power Networks Innovation Strategy document. We have established

More information

LLOYDS BANKING GROUP MATTERS RESERVED TO THE BOARDS (LLOYDS BANKING GROUP PLC, LLOYDS BANK PLC, BANK OF SCOTLAND PLC & HBOS PLC)

LLOYDS BANKING GROUP MATTERS RESERVED TO THE BOARDS (LLOYDS BANKING GROUP PLC, LLOYDS BANK PLC, BANK OF SCOTLAND PLC & HBOS PLC) LLOYDS BANKING GROUP MATTERS RESERVED TO THE BOARDS (LLOYDS BANKING GROUP PLC, LLOYDS BANK PLC, BANK OF SCOTLAND PLC & HBOS PLC) LLOYDS BANKING GROUP PLC, LLOYDS BANK PLC, BANK OF SCOTLAND PLC & HBOS PLC

More information

The Kendoon to Tongland 132kV Reinforcement Project. Underground Cable Study: Our Approach

The Kendoon to Tongland 132kV Reinforcement Project. Underground Cable Study: Our Approach The Kendoon to Tongland 132kV Reinforcement Project Underground Cable Study: Our Approach November 2018 Kendoon to Tongland Reinforcement (KTR) Project SP Energy Networks November 2018 This note provides

More information

Recently, the SS38 Working Group on Inter-Area Dynamic Analysis completed two study reports on behalf of the UFLS Regional Standard Drafting Team.

Recently, the SS38 Working Group on Inter-Area Dynamic Analysis completed two study reports on behalf of the UFLS Regional Standard Drafting Team. December 7 th, 2010 NPCC Full Member Committee; Please find attached a draft revised NPCC Regional Reliability Directory #12 Underfrequency Load Shedding Program Requirements and a draft revised NPCC UFLS

More information

Mobile Technology in Policing. Home Office and National Policing Improvement Agency REPORT BY THE COMPTROLLER AND AUDITOR GENERAL

Mobile Technology in Policing. Home Office and National Policing Improvement Agency REPORT BY THE COMPTROLLER AND AUDITOR GENERAL REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1765 SESSION 2010 2012 27 JANUARY 2012 Home Office and National Policing Improvement Agency Mobile Technology in Policing Our vision is to help the nation

More information

INVESTIGATING THE BENEFITS OF MESHING REAL UK LV NETWORKS

INVESTIGATING THE BENEFITS OF MESHING REAL UK LV NETWORKS INVESTIGATING THE BENEFITS OF MESHING REAL UK LV NETWORKS Muhammed S. AYDIN Alejandro NAVARRO Espinosa Luis F. OCHOA The University of Manchester UK The University of Manchester UK The University of Manchester

More information

TS RES - OUTSTANDING ISSUES

TS RES - OUTSTANDING ISSUES TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next

More information