The Process Protocol: Process and IT modelling for the UK Construction industry.

Size: px
Start display at page:

Download "The Process Protocol: Process and IT modelling for the UK Construction industry."

Transcription

1 The Process Protocol: Process and IT modelling for the UK Construction industry. Michail Kagioglou 1, Ghassan Aouad 2, Rachel Cooper 1 and John Hinks 3 1 Research Centre for Design, Manufacture & Marketing, University of Salford, UK 2 Research Centre for the Built and Human Environment, University of Salford, UK 3 Department of Building Engineering and Surveying, Heriot-Watt University, UK ABSTRACT: Sir Michael Latham (1994) published a report, which identified fragmentation and confrontational relationships as the greatest barriers to improving quality and productivity in the UK construction industry. The lead bodies for change in the UK Construction Industry e.g. the Construction Research and Innovation Strategy Panel (CRISP); the Construction Productivity Network (CPN) and Construct IT; the lead implementation body for the DETR (Department of the Environment, Transport and the Regions) on Construction Information Technology; and the construction task force, have been calling for roadmaps for the purposes of alignment and identifying the direction for change. Such roadmaps have been called for in terms of Process and Construction IT. It was recognised that manufacturing industry is not as plagued with such problems having introduced a number of improvement initiatives over the past twenty years. One such improvement that has been adopted is the stage gate approach to new product development (NPD). This approach enabled progressive management and monitoring of the whole project lifecycle for all activities involved in the product development. The applicability and adaptability of manufacturing principles and practises into a construction environment has been examined in the past form a production viewpoint (Koskela 1992). This approach could prove beneficial to the UK construction industry. However, the applicability of such principles from a whole project view, similar to manufacturing NPD has not been widely examined. This paper summarises the main findings of a funded project, which involved a number of industrial partners from the whole spectrum of the UK construction industry. The main aim of the project was to develop a construction process, which adopts and adapts the manufacturing NPD principles. The authors present maps for Construction IT and for a Generic Design and Construction Process Protocol (GDCPP), the latter of which has been adopted by CRISP and is currently under implementation as a complete process as well as providing a framework for benchmarking and procurement. 1 INTRODUCTION Sir Michael Latham published the Constructing the Team report (1994) in which he identified a number of significant issues that hindered the effective development of the UK construction industry in the past and he put forward suggestions for the future change of the industry. A number of those issues and suggestions relevant to the paper are presented in brief below (Latham 1994): 1. Implementation of change begins with clients and together with the government they have a leading role in promoting excellence in design 2. A productivity target of 30 per cent cost reduction by the year 2000 should be launched 3. Fragmentation and confrontational relationships are the greatest barriers for improving quality and productivity Furthermore, Sir John Egan s Rethinking Construction report (1998) identified and presented a number of significant issues related to the UK construction industry. A brief summary of those issues is presented below (Egan 1998): 1. Although the construction industry is likely to have an output equivalent to approximately 10 per cent of the GDP, the industry s in-house research and development capital has fallen by 80 per cent since There are five key drivers for change: committed leadership, customer focus, integrated

2 processes and teams, quality driven agenda and commitment to people. 3. In order to achieve 10 per cent annual reduction in construction costs and 20 per cent reduction of defects, radical changes are needed to the processes through which the project develops. These processes need to be explicit and transparent to the industry and its clients Both the Latham and Egan reports broadly suggest that improvements can be made in the construction industry. In order for such improvements to materialise there needs to be a consistent and hollistic approach to developing, managing and coordinating construction projects whilst at the same time the personnel within it i.e. clients, contractors, consultants, suppliers, etc. are operating within a consistent business and project framework. The manufacturing industry, although not without its problems, has examined and in most cases solved the current problems in construction. This however, was achieved by implementing consistent and small steps. The technology and knowledge transfer of manufacturing experiences and principles into a construction environment have been the subject of research in the UK for a number of years. Indeed this is further emphasised by the formation of the IMI (Innovative Manufacturing Initiative) and in particular the Construction as a Manufacturing Process sector, which funded the research project described in this paper. 2 MANUFACTURING VS. CONSTRUCTION There majority of manufacturing operations could prove to have a number of similarities with their construction counterparts. The manufacturing industry's continuous mission, towards effective and manageable production and materials handling techniques has been implemented form a customer perspective in its wider sense. These customers do not only include the person or body that provides the finances for undertaking the project but also the end user, internal customers to the organisation i.e. functions, departments, etc. as well as external stakeholders such as the environment, local communities, culture etc. This focus on internal and external stakeholders necessitated that any improvement made should firstly be beneficial to the customers and then as a result ensure the company s survival and continuous growth. This has necessitated the careful identification and consideration of all activities undertaken in a project either internally or externally. Those activities were then placed into a consistent framework, which not only presented these activities in a co-ordinated, logical order, but their management was explicitly presented in terms of personnel and resources utilisation. These frameworks resulted in consistent processes which are presented in two levels: strategic i.e. business case, overall company considerations, and operational i.e. operations management. New product development (NPD) processes have been developed in manufacturing so that the whole development of products from the first steps of identifying a need or capturing a clients' need to the final delivery and replacement of a product can be considered as parts of 'one' consistent process. A number of generation of such processes have been developed in the past. It is interesting to observe that the initial NPD processes developed were sequential i.e. the development of a project moves through different, almost mutually exclusive phases. This approach has been exemplified by the National Aeronautics and Space Administration s (NASA) phased program planning (PPP). Concept decisions, product design and testing are performed prior to manufacturing system design, process planning and production. The construction industry could relate with this approach in particular due to the fact that temporary organisations are formed on a project to project basis based on functional expertise areas which are not integrated. However, the days of sequential approaches to NPD have long gone for the majority of manufacturing companies. They have been replaced by processes which concentrate on front end participation of a wide spectrum of expertise which attempt to predict, inform and design out problems that might be encountered at the later stages of the process. The majority of manufacturing organisations are currently implementing stage/gate or phase review new product development methodologies, whereby early involvement of project participants is structured and the results of their activities are documented and they are used for decision making and communication purposes. NPD in its literal sense does not exist widely as a process undertaken by the construction industry but its principles could potentially be applied to the construction industry (Kagioglou et al. 1998). For the majority of projects undertaken by construction firms the NPD process is enacted once only, each time with a different combination of distribution, production and delivery techniques. That said, it could be argued that an element of commonality exists between each 'one-off' NPD process in construction. Koskela (1992) suggested that the neglect of process improvement in construction has

3 become a barrier for progress and due to deficient conceptualisation, development efforts such as industrialisation and computer integrated construction have often be misdirected. This is true to the nature of the industry, which sees IT as a driver for achieving improvements in construction projects. Although this might be the case on the operational level there is a lack of co-ordination of IT within a process framework. For example, there is little point examining the assembly capability of a building at the production stage because this activity will identify what has been designed wrongly instead of identifying these non conformities during the design stage where mistakes can be rectified at a fraction of the cost which would have been incurred if the changed were made at the production stage. Furthermore, the consideration of IT in the project environment needs to be considered very carefully because potentially those temporary multi organisations (TMOs) could operate a number of IT systems, which often can result in systems that are not compatible. This paper describes a generic design and construction protocol and an IT process map. 3 THE PROJECT The Design and Construction Process Protocol project was funded by EPSRC under the IMI 'Construction as a Manufacturing Process' sector. It's two-year duration involved the participation of a number of companies from the whole spectrum of the UK construction industry e.g. clients, contractors, subcontractors, consultants, suppliers and IT specialists. The main aims of the project were to develop a design and construction process protocol based on Manufacturing NPD and to examine how IT can facilitate such a process. In order for any process to be implemented and have an impact in the construction industry it requires the strong drive of the client body. Therefore, the process protocol was developed from a client perspective and in particular the uneducated or one off clients because they require the most help when undertaking major construction projects. In addition the process had to be generic so that it could be applied in a variety of situations and by a variety of clients. As a result the process needs to be adapted and in some cases redesigned to suit company procedures and the nature of the project. The same applies for the IT modelling which needs to prescribe generic technologies so that the selection of a particular IT system becomes secondary with the primary being its applicability in the project environment and its functional properties. 3.1 Project Methodology The methodology employed to successfully achieve the project aims and objectives had to accommodate qualitative and quantitative data, the triangulation of which could produce valid results. For this reason a number of research techniques were applied as shown below: Extensive literature reviews of construction (design and construction) and manufacturing (NPD) sectors, as well as the IT support technologies available either established or emerging Investigation into the applicability of manufacturing principles into construction and how this technology and knowledge transfer could be achieved Investigation into modelling techniques and identification of their applicability for the needs of the project Interviews, questionnaire and workshops were undertaken so that general trends can be identified and analysed by the strong participation of the industrial partners to the project Retrospective and prospective case studies within the construction and manufacturing industries so that common attributes and practises can be identified, as well as identifying areas for improvement Process and IT modelling so that any lessons learnt can be communicated in a transparent manner whilst aiding wide dissemination 3.2 Project Results The two-year project resulted in the production of the following: A generic design and construction process protocol map A generic IT map based around the process framework An academic report illustrating the investigation methods and knowledge gained as well as describing the overall results of the project and future word areas Guidelines for the process protocol

4 This paper describes the Process Protocol and IT maps. 4 THE PROCESS PROTOCOL FRAMEWORK The production of the Process Protocol framework was influenced by a number of existing frameworks in the construction and manufacturing industry. The main aim was to produce a model, which could be understood and communicated very easily whilst illustrating the principles and philosophies behind its structure. For this purpose a number of modelling techniques were considered such flowcharts, activity based, IDEF0, data flow diagrams etc. The models produced based on the aforementioned methods were presented to the industrial partners to the project but it was found that although the models described the process they did not communicate its elements effectively. This is very true in particular for high level processes where strategic rather than operational processes are modelled. The decision was made early on in the project to adopt some of the basic attributes of any process and try to apply them so that a consistent and transparent process can be produced. Rosenau (1996) notes, that process models are an effective way to show how a process works and as a definition: A process map consists of an X and a Y axis, which show process sequence (or time) and process participants, respectively. The horizontal X axis illustrates time in process and the individual process activities (and) or gates. The Y axis shows the departments or functions participating in the process... Beyond this convention, there appears to be little formality in the method used to represent a process. The research team and industrial partners of the research project have agreed to employ such a method by representing the project/process phases on the X-axis, and the project participants on the Y- axis. Furthermore, it was important that the framework produced for the process would lent itself for modelling the IT. Indeed, IT should not stand outside the process as an off-the-shelve tool but it should be integrated to the process. The task therefore was to produce the necessary elements that need to be included in the X and Y-axis of the process framework whilst making sure that all the important elements of the process protocol philosophies and principles were communicated in an effective way. Figure 1 illustrates the process protocol map. 4.1 The Process Stages According to Hughes (1991): " every project goes through similar steps in its evolution in terms of stages of work. The stages vary in their intensity or importance depending upon the project." The identification of those steps is very important as they define the genericity of the model that is created. For example, taking the process from a contractor s point of view you will end up with a process, which does not refer to the front end business issues of the client. Furthermore, if a process is formed based on the architect s point of view then you end up with a different process the RIBA plan of works had this viewpoint. To identify the generic stages within the design and construction process the industrial partners to the project were asked to fill in a qualitative questionnaire whereby their beliefs and aspirations were communicated through the identification of the generic steps of the process. Due to the fact that the steps presented were from a particular, functional viewpoint (contractor s, architect s, client s etc.) the results were triangulated and debated through a number of workshops. The final result of these investigations were the formulation of four broad stages with respective phases within them as presented below: Pre - project stage: Demonstrating the need Conception of need Outline feasibility Substantive feasibility study and outline financial authority Pre - construction stage: Outline conceptual design Full conceptual design Coordinated design, procurement and full financial authority Construction stage: Production information Construction Post completion stage: Operation and maintenance As a result they have formed the top X-axis of the Process protocol. Since the aim of this exercise was to represent the whole life of a project with a particular focus at the front end, the construction phase, although time and resources consuming, is only a small part of it. Furthermore, the consideration of construction activities is focused on operational issues rather than strategic.

5 Fig. 1 The Generic Design and Construction Process Protocol

6 4.2 The Activity Zones Traditionally, a construction project s participants are referred to by their professional or expert status. Ball (1988) demonstrates how this may be attributed to the inherent class relations associated with each of the professions and expert groups. The participants in the Process Protocol are referred to in terms of their primary responsibilities, and are represented on the Y-axis of the Process Model (figure 1). It is recognised that traditionally, project to project, organisational roles and responsibilities change, resulting in ambiguity and confusion (Luck & Newcombe, 1996). The research team of the project and the industrial participants, have recognised early on that there is a need to depart from this traditional views. The Process Protocol groups the participants in any project into Activity Zones. These zones are not functional but rather they are multifunctional and they represent structured sets of tasks and processes which guide and support work towards a common objective (for example to create an appropriate design solution). A single person or firm can carry out an activity zone in smallprojects but in large and complex projects, an activity zone may consist of a complex network of people and between relevant functions and/or organisations. Membership of the zones is determined by the specific project task and/or process implemented. The activity zones for the Process Protocol are the following: Development management Project management Resources management Design management Production management Facilities management Health and safety, statutory and legal management Process management The majority of the activity zones are selfexplanatory but for the process management. These activity zones are essentially the interface between the Development Management (predominately the client body) and the other project participants. A distinction must be made between this conventional view of a project manager and the Process Management role. Process Management, as the title suggests, is concerned with the enactment of the process, rather than the project. Acting as the Development Management s agent, it will ensure the enactment of each process phase as planned. 4.3 Decision Making and Communications Communications between the project participants is a very important aspect. Poor, late or inaccurate exchange of information often results in mistakes which when rectified at the construction phase result in excessive costs. There is a clear need for a system, which informs all project participants of changes made as well as providing the backbone for communications. Such a system will need to store and maintain the relevant data in an efficient and structured manner. The Process Protocol aims to provide this by the creation, use and maintenance of a 'Legacy Archive' (bottom X- axis). Potentially such a system will not only hold information of a current project but from past project as well. Therefore the effective interrogation of any data in the Legacy Archive will facilitate learning from past projects whilst ensuring fast and accurate communications. The content and context of any data in the legacy archive will need to relate closely with the decision-making mechanisms of the process. The process protocol utilised the stage/gate or phase review approach to decision making which was first invented and utilised in the manufacturing industry. Such systems call for the installation of virtual gates between phases in the process. To gain access through a gate the project will need to satisfy a number of criteria and assessment factors relevant for a particular phase. These factors or assessment criteria are presented as deliverables and they are shown in the process protocol for every phase. Although there are potentially thousands of deliverables in a construction project they can be grouped to form the main deliverables. Those deliverables are assessed by Development Management at the gates and they decide for the continuation or otherwise of the project. Cooper (1994) identified that the introduction of gates throughout the process, which when seen as rigid (call for the temporary overhaul of a project) could potentially increase development cycles and result in poor utilisation of resources. He has called for fuzzy gates in the process, which are semi-transparent (activities are allowed to progress rather than overhauled) and therefore offer flexibility. These gates are referred to in the process protocol as soft gates and they exist at the end of each phase in the project. Hard

7 gates are introduced where the continuation of a project would require heavy investment and when the impact of decisions made at a phase could potentially have a great impact to the project. This mechanism should install some consistency through the phase review reports for each phase of the project development. These phase review reports and other relevant documentation can be stored either on a paper driven system or ideally based on IT where the data can be interrogated and presented in different views. Taking under consideration that construction projects will typically last a considerable time the availability and easy access of project information through the phase review reports and the legacy archive system could prove very important when making future decisions. 5 IT AND THE PROCESS PROTOCOL The legacy archive presented above is only one of the tools that can be created by utilising IT. The information requirements of the Process Protocol need to be modelled. Technology can then be used to enhance integration and sharing of information. Technologies such as object oriented databases, virtual reality, expert systems, case-based reasoning, neural networks and traditional commercial packages can be used and integrated in order to illustrate these principles and to ensure that information can be shared between the various processes. This is a long term objective. This will allow the industry to realise the benefits, which can be gained from coupling visualisation systems, knowledge based systems, and traditional commercial packages in support of the reengineered processes. There are a number of IT solutions that could be applied throughout the lifecycle of a project to undertake diverse activities from modelling of a projects solution to the production of manufacturing information and operation of the finished facility in a virtual world. The aim is to provide an integrated IT system where IT can be utilised. Attention is drawn in implementing IT from a process focus rather than was the case traditionally where IT solution were and in some cases still are, developed as stand alone tools without a clear place in the design and construction process. Figure 2 illustrates how IT could be integrated in the Process protocol and enable communications between project participants, as well as speeding up the development of a project solution. Aouad et al (1998) suggests that when IT usage is similar to that shown on the IT map (figure 2) it should be possible for the client to walk through and interrogate various aspects of the designed building, such as cost and specification using VR, and also the information stored in the integrated database. It could be possible for the QS to select the most appropriate procurement path using neural networks techniques. The designer could be able to select the most suitable design using case-based reasoning techniques from information stored within the legacy archive of the integrated intelligent database. With the use of the intelligent integrated database and improved communication applications information flow between applications and project participants would be transparent and the data would remain unduplicated and uncorrupted. The IT map (fig. 2) includes some of the technologies specified by industry and academia at the initial phase (pre-project phase), where simulation, what-if? and economic appraisal tools are most appropriate. Potential project scenarios could be re-generated from an archived library of previous projects. These could include VR, 3D and other mediums. AI techniques including case-based reasoning, neural networks, fuzzy logic, genetic algorithms and KBS may be appropriate at the initial phase of design where the creativity issue of design plays a major role. CAD, VR and other tools are not able to capture the information required for this phase. The latter of these tools may prove helpful at the detailed design and construction phases. It is clearly shown on the IT map that there are many tools which can be used to support the various phases of the design and construction process. These tools are generic and can be used by any industry. It is the maturity of using an IT tool within an application context which will help the overall process through a technology push (Hinks et al. 1997). The IT map will serve as a catalyst for the process and shouldn t be looked at as the main driver although it could prove to be the main focus for some of the activities within the process. The process is driven by needs and requirements, and the technology can help in meeting these by providing the right mechanism for visualising, managing, communicating and integrating information which will result in a more consistent and improved process.

8 Fig. 2 IT and the Process Protocol

9 6 DISCUSSION The process protocol and IT map presented in the paper illustrate a potentially improved design and construction process. However, there are a number of issues that need to be considered when implementing such a process. It was also clearly identified by the industrial participants in the projects that there is an important need for changes in contractual arrangements, possible to include retention-based approaches or consultative-fee-based arrangements for pre-project consultation from a variety of professionals. This could improve the requirements capture phase for the clients, and allow them to make their early stage decisions on construction or alternative project solutions from a base of informed knowledge rather than inexperienced ignorance. Inherently the process calls for culture changes within the design and construction process. There appears to be a desire for change towards a more co-operative, less confrontational culture within the construction industry, which the industry itself was working for. This was seen as being a major potential advantage for production of a unifying process protocol potentially capable of unifying the design and construction process. A product-oriented emphasis (rather than a process-oriented emphasis) focuses on the differences between products and processes operating in other sectors. One of a kind products do tend to limit the feedback potential (Koskela, 1992) and focus reviews on product feedback and not process feedback. By focusing on the uniqueness of the product, rather than the commonality of the process for the management of their production, the construction industry continues to put its efforts into solving and resolving individual product -focused problems without creating the managerial systems which could help avoid, overcome, and/or learn from product and process solutions. To promote such a process emphasis it is essential that the parties involved in project teams are operating to a consistent process, which requires broadly similar process capabilities of the various team members. This will mean that industry-wide process improvement is required for the design and construction process to achieve repeatability and hence manageability (Hinks et al. 1997). There is also a requirement for a range of support tools that are needed by the various organisations, which will be operating the process protocol. Training is needed in order to allow the industry to establish their process capability and prioritise changes in process capability, and to allow them to identify and integrate an existing IT support change in the process. Implementing the process protocol would be a matter of business reengineering as well as process re-engineering. It will require to be operated across the depth of the industry as well as its breadth, in co-ordination with clients and those parties involved in the use and management of buildings beyond their completion. 7 FUTURE WORK Although the process protocol might be a catalyst for change, it will require to change flexibly as the industry adopts it partially. It will be essential to benchmark the processes as a whole, across the industry as well as the individual organisational processes. This may be a national bench marking initiative which can prove to be a useful mechanism for promoting the process protocol and the changes in individual organisational processes required in order to move to something more harmonised than the existing fragmented system. The concept of genericity embodied within the process protocol extends little further than the management and process principles which would be applied by process management and the phase review board in defining the phases activities associated with the various stages of the process. It is foreseeable that in specific projects, the application of process protocol would involve a lot of customisation. In this context the model should be seen as being more prototypical than generic. The effective implementation of the Process Protocol will greatly depend on its ability to effectively translate the strategic to the operational level. To this end further work is needed (and is currently under way at the University of Salford) in examining the sub-processes (Activity Zones) and produce generic maps for those sub-processes. In such a way the underlying principles and philosophies of the Process Protocol will form the framework for company/project based wide adoption and effective implementation. This is confirmed by the adoption of the Process Protocol by the CRISP Process Group with the comment that sub-level process definition needs to be defined. Furthermore, the process protocol is currently under implementation either as a complete process or as providing a framework for benchmarking and procurement.

10 8 CONCLUSIONS The principles of the process protocol can therefore be summarised as a model which is capable of representing the diverse interests of all the parties involved in the design and construction process, which is sufficiently repeatable and definable to allow the modelling of IT to support its management and information management. The process protocol is divided into a series of sub-stages defined as pre-project, preconstruction, construction and post-completion, and within each of those major stages there are sub-phases which can be operated concurrently or concatenate to make the process more efficient in smaller scale projects. It provides a mechanism by which the systematic and consistent interfacing of the existing practices, professional practice and IT practice support tools can be facilitated. The terms used within the process should be clear in terms of what is required from whom, when and with whose co-operation, for whom the requirements are to be delivered for what purposes and how they will be evaluated (during phase reviews). The consideration in detail of the activity zones in the process should eliminate any ambiguity and it should offer a consistent framework at the operational level whilst maintaining strategic focus. The wider application of the process protocol will require the consistent consideration of the overall construction culture based around current practises and procedures. Partnership and framework arrangements will play an important role in the wider application of any contemporary process. Finally, the modelling of any process (including the modelling of IT) will have to achieve its primary objective, which is to communicate principles, philosophies, procedures and organisational structures in a non-ambiguous way. ACKNOWLEDGEMENT The research team wishes to thank IMI for providing the resources for the research project and the participating companies for their contributions to the project. REFERENCES Aouad, G., Cooper, R., Kagioglou, M., Hinks, J. and Sexton, M A synchronised process/it model to support the co-maturation of processes and IT in the construction sector. Proceedings of CIB Working Commission W78 - Information Technology in Construction Conference, Sweden, 3-5 June, Royal Institute of Technology-Stockholm: Ball, M Rebuilding Construction. Routledge, London, UK. Cooper, R.G Third-Generation New Product Processes. Journal of Product Innovation Management, (11): Egan, J Rethinking Construction, D.E.T.R. Hinks, J., Aouad, G., Cooper, R., Sheath, D., Kagioglou, M. and Sexton, M IT and The Design and Construction Process: A Conceptual Model of Co-Maturation. International Journal of Construction Information Technology, 5(1): Hughes, W Modelling the construction process using plans of work. Proceedings of an International Conference - Construction Project Modelling and Productivity, CIB W65, Dubrovnik Kagioglou, M., Cooper, R., Aouad, G., Sexton, M., Hinks, J. and Sheath, D Cross-industry learning: the development of a generic design and construction process based on stage/gate new product development processes found in the manufacturing industry. Proceedings of the Engineering Design Conference 98 - Design Reuse, UK, June, Brunel University- Uxbridge: Koskela, L Application of the New Production Philosophy to Construction. Technical Report 72. Technical Research Centre of Finland, Finland. Latham, M Constructing the Team. H.M.S.O. Luck, R. and Newcombe, R The case for the integration of the project participants activities within a construction project environment. The Organization and Management of Construction: Shaping theory and practice (Volume Two), Langford, D A and Retik, A (eds.), E. & F. N. Spon. Rosenau, M The PDMA handbook of new product development. John Wiley & Sons, Inc., U.S.A.

SPICE: IS A CAPABILITY MATURITY MODEL APPLICABLE IN THE CONSTRUCTION INDUSTRY? Spice: A mature model

SPICE: IS A CAPABILITY MATURITY MODEL APPLICABLE IN THE CONSTRUCTION INDUSTRY? Spice: A mature model SPICE: IS A CAPABILITY MATURITY MODEL APPLICABLE IN THE CONSTRUCTION INDUSTRY? Spice: A mature model M. SARSHAR, M. FINNEMORE, R.HAIGH, J.GOULDING Department of Surveying, University of Salford, Salford,

More information

EXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1

EXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1 EXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1 Medina Jordan & Howard Jeffrey Skanska ABSTRACT The benefits of BIM (Building Information Modeling) in design, construction and facilities

More information

Application Of Artificial Intelligence Techniques According To The Process And IT Protocols Applied In Construction Project Process

Application Of Artificial Intelligence Techniques According To The Process And IT Protocols Applied In Construction Project Process Second LACCEI International Latin American and Caribbean Conference for Engineering and Technology (LACCEI 2004) Challenges and Opportunities for Engineering Education, Research and Development 2-4 June

More information

CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES:

CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES: CO-ORDINATION MECHANISMS FOR DIGITISATION POLICIES AND PROGRAMMES: NATIONAL REPRESENTATIVES GROUP (NRG) SUMMARY REPORT AND CONCLUSIONS OF THE MEETING OF 10 DECEMBER 2002 The third meeting of the NRG was

More information

LINKING PROCESS MAPPING AND TECHNOLOGY: A CASE STUDY OF TEAMWORK 2001

LINKING PROCESS MAPPING AND TECHNOLOGY: A CASE STUDY OF TEAMWORK 2001 LINKING PROCESS MAPPING AND TECHNOLOGY: A CASE STUDY OF TEAMWORK 2001 Isao T Matsumoto 1, Antony Thorpe 1, Andrew Baldwin 1 and Richard McWilliams 2 1 CICE, Department Civil and Building Engineering, Loughborough

More information

An Exploratory Study of Design Processes

An Exploratory Study of Design Processes International Journal of Arts and Commerce Vol. 3 No. 1 January, 2014 An Exploratory Study of Design Processes Lin, Chung-Hung Department of Creative Product Design I-Shou University No.1, Sec. 1, Syuecheng

More information

THE CONSTRUCTION- AND FACILITIES MANAGEMENT PROCESS FROM AN END USERS PERSPECTIVE - ProFacil

THE CONSTRUCTION- AND FACILITIES MANAGEMENT PROCESS FROM AN END USERS PERSPECTIVE - ProFacil CEC 99 Björk, Bo-Christer, Nilsson, Anders, Lundgren, Berndt Page of 9 THE CONSTRUCTION- AND FACILITIES MANAGEMENT PROCESS FROM AN END USERS PERSPECTIVE - ProFacil Björk, Bo-Christer, Nilsson, Anders,

More information

SPC Spring Meeting March 21, 2013

SPC Spring Meeting March 21, 2013 SPC Spring Meeting March 21, 2013 A partnership to deliver the most current design guidance for packaging sustainability Adam Gendell, SPC Marina Pietrosel, ÉEQ Agenda Background of our collaborative project

More information

The Policy Content and Process in an SDG Context: Objectives, Instruments, Capabilities and Stages

The Policy Content and Process in an SDG Context: Objectives, Instruments, Capabilities and Stages The Policy Content and Process in an SDG Context: Objectives, Instruments, Capabilities and Stages Ludovico Alcorta UNU-MERIT alcorta@merit.unu.edu www.merit.unu.edu Agenda Formulating STI policy STI policy/instrument

More information

SUCCESSFULLY IMPLEMENTING SYSTEM INNOVATIONS WITHIN THE CONSTRUCTION PROJECT ENVIRONMENT

SUCCESSFULLY IMPLEMENTING SYSTEM INNOVATIONS WITHIN THE CONSTRUCTION PROJECT ENVIRONMENT SUCCESSFULLY IMPLEMENTING SYSTEM INNOVATIONS WITHIN THE CONSTRUCTION PROJECT ENVIRONMENT Craig S. Thomson 1 and Andrew K. Munns 1Construction Management Research Unit, Division of Civil Engineering, University

More information

Creative Informatics Research Fellow - Job Description Edinburgh Napier University

Creative Informatics Research Fellow - Job Description Edinburgh Napier University Creative Informatics Research Fellow - Job Description Edinburgh Napier University Edinburgh Napier University is appointing a full-time Post Doctoral Research Fellow to contribute to the delivery and

More information

Getting the evidence: Using research in policy making

Getting the evidence: Using research in policy making Getting the evidence: Using research in policy making REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 586-I Session 2002-2003: 16 April 2003 LONDON: The Stationery Office 14.00 Two volumes not to be sold

More information

Constructing our future. Product Improvement and Innovation Strategy

Constructing our future. Product Improvement and Innovation Strategy Constructing our future Product Improvement and Innovation Strategy 2018-2020 Context Construction is historically inefficient. We rarely build the same thing twice, instead reinventing the wheel time

More information

A SYSTEMIC APPROACH TO KNOWLEDGE SOCIETY FORESIGHT. THE ROMANIAN CASE

A SYSTEMIC APPROACH TO KNOWLEDGE SOCIETY FORESIGHT. THE ROMANIAN CASE A SYSTEMIC APPROACH TO KNOWLEDGE SOCIETY FORESIGHT. THE ROMANIAN CASE Expert 1A Dan GROSU Executive Agency for Higher Education and Research Funding Abstract The paper presents issues related to a systemic

More information

DIGITAL TRANSFORMATION LESSONS LEARNED FROM EARLY INITIATIVES

DIGITAL TRANSFORMATION LESSONS LEARNED FROM EARLY INITIATIVES DIGITAL TRANSFORMATION LESSONS LEARNED FROM EARLY INITIATIVES Produced by Sponsored by JUNE 2016 Contents Introduction.... 3 Key findings.... 4 1 Broad diversity of current projects and maturity levels

More information

THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 INNOVATION

THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 INNOVATION 73 INNOVATION 74 VISION A dynamic industry that innovates to evolve, grow and attract the best entrepreneurial talent OBJECTIVES Innovation makes a significant and continuing contribution to rail business

More information

Technology Transfer: An Integrated Culture-Friendly Approach

Technology Transfer: An Integrated Culture-Friendly Approach Technology Transfer: An Integrated Culture-Friendly Approach I.J. Bate, A. Burns, T.O. Jackson, T.P. Kelly, W. Lam, P. Tongue, J.A. McDermid, A.L. Powell, J.E. Smith, A.J. Vickers, A.J. Wellings, B.R.

More information

Added Value of Networking Case Study INOV: encouraging innovation in rural Portugal. Portugal

Added Value of Networking Case Study INOV: encouraging innovation in rural Portugal. Portugal Added Value of Networking Case Study RUR@L INOV: encouraging innovation in rural Portugal Portugal March 2014 AVN Case Study: RUR@L INOV encouraging innovation in rural Portugal Executive Summary It was

More information

RFP No. 794/18/10/2017. Research Design and Implementation Requirements: Centres of Competence Research Project

RFP No. 794/18/10/2017. Research Design and Implementation Requirements: Centres of Competence Research Project RFP No. 794/18/10/2017 Research Design and Implementation Requirements: Centres of Competence Research Project 1 Table of Contents 1. BACKGROUND AND CONTEXT... 4 2. BACKGROUND TO THE DST CoC CONCEPT...

More information

Engaging UK Climate Service Providers a series of workshops in November 2014

Engaging UK Climate Service Providers a series of workshops in November 2014 Engaging UK Climate Service Providers a series of workshops in November 2014 Belfast, London, Edinburgh and Cardiff Four workshops were held during November 2014 to engage organisations (providers, purveyors

More information

Committee on Development and Intellectual Property (CDIP)

Committee on Development and Intellectual Property (CDIP) E CDIP/10/13 ORIGINAL: ENGLISH DATE: OCTOBER 5, 2012 Committee on Development and Intellectual Property (CDIP) Tenth Session Geneva, November 12 to 16, 2012 DEVELOPING TOOLS FOR ACCESS TO PATENT INFORMATION

More information

November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS

November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS Note: At the joint meeting of the CTF and SCF Trust Fund Committees held on November 3, 2011, the meeting reviewed the

More information

RESEARCH AND INNOVATION STRATEGY. ANZPAA National Institute of Forensic Science

RESEARCH AND INNOVATION STRATEGY. ANZPAA National Institute of Forensic Science RESEARCH AND INNOVATION STRATEGY ANZPAA National Institute of Forensic Science 2017-2020 0 CONTENTS INTRODUCTION... 3 PURPOSE... 4 STRATEGY FOUNDATION... 5 NEW METHODS AND TECHNOLOGY... 5 ESTABLISHED METHODS

More information

Capturing the impacts of Liverpool 08 Evaluating European Capital of Culture

Capturing the impacts of Liverpool 08 Evaluating European Capital of Culture UK Evaluation Society Conference 2009 24 th -25 th Nov 2009, Holiday Inn, Bloomsbury Capturing the impacts of Liverpool 08 Evaluating European Capital of Culture Ruth Melville, Programme Manager Impacts

More information

UN GA TECHNOLOGY DIALOGUES, APRIL JUNE

UN GA TECHNOLOGY DIALOGUES, APRIL JUNE UN GA TECHNOLOGY DIALOGUES, APRIL JUNE 2014 Suggestions made by participants regarding the functions of a possible technology facilitation mechanism Background document by the Secretariat for the fourth

More information

Foresight Impact on Policy making and Lessons for New Member States and Candidate Countries Insights from the FORLEARN mutual learning process

Foresight Impact on Policy making and Lessons for New Member States and Candidate Countries Insights from the FORLEARN mutual learning process Foresight Impact on Policy making and Lessons for New Member States and Candidate Countries Insights from the FORLEARN mutual learning process Cristiano CAGNIN, Philine WARNKE Fabiana SCAPOLO, Olivier

More information

Publishable summary. 1 P a g e

Publishable summary. 1 P a g e Publishable summary Project context and objectives Many studies and projects have highlighted the problems faced by innovative, growing SMEs in developing or acquiring new technologies and exploiting them

More information

Component Based Mechatronics Modelling Methodology

Component Based Mechatronics Modelling Methodology Component Based Mechatronics Modelling Methodology R.Sell, M.Tamre Department of Mechatronics, Tallinn Technical University, Tallinn, Estonia ABSTRACT There is long history of developing modelling systems

More information

Designing a New Communication System to Support a Research Community

Designing a New Communication System to Support a Research Community Designing a New Communication System to Support a Research Community Trish Brimblecombe Whitireia Community Polytechnic Porirua City, New Zealand t.brimblecombe@whitireia.ac.nz ABSTRACT Over the past six

More information

Satellite Environmental Information and Development Aid: An Analysis of Longer- Term Prospects

Satellite Environmental Information and Development Aid: An Analysis of Longer- Term Prospects Satellite Environmental Information and Development Aid: An Analysis of Longer- Term Prospects Executive Summary Commissioned by the European Space Agency Caribou Space AUTHORS The following authors wrote

More information

Belgian Position Paper

Belgian Position Paper The "INTERNATIONAL CO-OPERATION" COMMISSION and the "FEDERAL CO-OPERATION" COMMISSION of the Interministerial Conference of Science Policy of Belgium Belgian Position Paper Belgian position and recommendations

More information

Meetings and Proceedings; Book Chapter. Dawood, N. N. (Nashwan); Iqbal, N. (Nahim)

Meetings and Proceedings; Book Chapter. Dawood, N. N. (Nashwan); Iqbal, N. (Nahim) TeesRep - Teesside's Research Repository Building information modelling (BIM): A visual & whole life cycle approach Item type Authors Citation Publisher Additional Link Rights Meetings and Proceedings;

More information

INFORMATION TECHNOLOGY FOR CONSTRUCTION: RECENT WORK AND FUTURE DIRECTIONS

INFORMATION TECHNOLOGY FOR CONSTRUCTION: RECENT WORK AND FUTURE DIRECTIONS CIB World Building Congress, April 2001, Wellington, New Zealand Page 1 of 10 INFORMATION TECHNOLOGY FOR CONSTRUCTION: RECENT WORK AND FUTURE DIRECTIONS ROBERT AMOR 1 AND MARTIN BETTS 2 1 Department of

More information

Innovation Management & Technology Transfer Innovation Management & Technology Transfer

Innovation Management & Technology Transfer Innovation Management & Technology Transfer Innovation Management & Technology Transfer Nuno Gonçalves Minsk, April 15th 2014 nunogoncalves@spi.pt 1 Introduction to SPI Opening of SPI USA office in Irvine, California Beginning of activities in Porto

More information

MedTech Europe position on future EU cooperation on Health Technology Assessment (21 March 2017)

MedTech Europe position on future EU cooperation on Health Technology Assessment (21 March 2017) MedTech Europe position on future EU cooperation on Health Technology Assessment (21 March 2017) Table of Contents Executive Summary...3 The need for healthcare reform...4 The medical technology industry

More information

Keynote Speech. at the. Trilateral User Conference "CHALLENGES FACING THE GLOBAL PATENT SYSTEM"

Keynote Speech. at the. Trilateral User Conference CHALLENGES FACING THE GLOBAL PATENT SYSTEM Keynote Speech at the Trilateral User Conference "CHALLENGES FACING THE GLOBAL PATENT SYSTEM" 16 November 2006 Tokyo Professor ALAIN POMPIDOU President of the EPO Trilateral Offices and Users' Conference

More information

GENEVA COMMITTEE ON DEVELOPMENT AND INTELLECTUAL PROPERTY (CDIP) Fifth Session Geneva, April 26 to 30, 2010

GENEVA COMMITTEE ON DEVELOPMENT AND INTELLECTUAL PROPERTY (CDIP) Fifth Session Geneva, April 26 to 30, 2010 WIPO CDIP/5/7 ORIGINAL: English DATE: February 22, 2010 WORLD INTELLECTUAL PROPERT Y O RGANI ZATION GENEVA E COMMITTEE ON DEVELOPMENT AND INTELLECTUAL PROPERTY (CDIP) Fifth Session Geneva, April 26 to

More information

Clients and Users in Construction. Research Roadmap Summary

Clients and Users in Construction. Research Roadmap Summary P a ic bl u on ti 8 0 4 Clients and Users in Construction Research Roadmap Summary CIB Roadmap.indd 1 26-05-2016 11:18:57 2 CIB Roadmap.indd 2 Title Subtitle Serial title Year Authors Language Pages Keywords

More information

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO Brief to the Senate Standing Committee on Social Affairs, Science and Technology Dr. Eliot A. Phillipson President and CEO June 14, 2010 Table of Contents Role of the Canada Foundation for Innovation (CFI)...1

More information

Information & Communication Technology Strategy

Information & Communication Technology Strategy Information & Communication Technology Strategy 2012-18 Information & Communication Technology (ICT) 2 Our Vision To provide a contemporary and integrated technological environment, which sustains and

More information

Fostering Innovative Ideas and Accelerating them into the Market

Fostering Innovative Ideas and Accelerating them into the Market Fostering Innovative Ideas and Accelerating them into the Market Dr. Mikel SORLI 1, Dr. Dragan STOKIC 2, Ana CAMPOS 2, Antonio SANZ 3 and Miguel A. LAGOS 1 1 Labein, Cta. de Olabeaga, 16; 48030 Bilbao;

More information

ANU COLLEGE OF MEDICINE, BIOLOGY & ENVIRONMENT

ANU COLLEGE OF MEDICINE, BIOLOGY & ENVIRONMENT AUSTRALIAN PRIMARY HEALTH CARE RESEARCH INSTITUTE KNOWLEDGE EXCHANGE REPORT ANU COLLEGE OF MEDICINE, BIOLOGY & ENVIRONMENT Printed 2011 Published by Australian Primary Health Care Research Institute (APHCRI)

More information

Score grid for SBO projects with a societal finality version January 2018

Score grid for SBO projects with a societal finality version January 2018 Score grid for SBO projects with a societal finality version January 2018 Scientific dimension (S) Scientific dimension S S1.1 Scientific added value relative to the international state of the art and

More information

Programme Specification

Programme Specification Programme Specification Title: Bachelor of Final Award: Bachelor of (BArch Hons) With Exit Awards at: Certificate of Higher Education (CertHE) Diploma of Higher Education (DipHE) To be delivered from:

More information

Robotics: from FP7 to Horizon Libor Král, Head of Unit Unit A2 - Robotics DG Communication Networks, Content and Technology European Commission

Robotics: from FP7 to Horizon Libor Král, Head of Unit Unit A2 - Robotics DG Communication Networks, Content and Technology European Commission Robotics: from FP7 to Horizon 2020 Libor Král, Head of Unit Unit A2 - Robotics DG Communication Networks, Content and Technology European Commission Robotics in Regions 30 October 2013 Key issues research

More information

Building Collaborative Networks for Innovation

Building Collaborative Networks for Innovation Building Collaborative Networks for Innovation Patricia McHugh Centre for Innovation and Structural Change National University of Ireland, Galway Systematic Reviews: Their Emerging Role in Co- Creating

More information

April 2015 newsletter. Efficient Energy Planning #3

April 2015 newsletter. Efficient Energy Planning #3 STEEP (Systems Thinking for Efficient Energy Planning) is an innovative European project delivered in a partnership between the three cities of San Sebastian (Spain), Bristol (UK) and Florence (Italy).

More information

Score grid for SBO projects with an economic finality version January 2019

Score grid for SBO projects with an economic finality version January 2019 Score grid for SBO projects with an economic finality version January 2019 Scientific dimension (S) Scientific dimension S S1.1 Scientific added value relative to the international state of the art and

More information

LINKING CONSTRUCTION INFORMATION THROUGH VR USING AN OBJECT ORIENTED ENVIRONMENT

LINKING CONSTRUCTION INFORMATION THROUGH VR USING AN OBJECT ORIENTED ENVIRONMENT LINKING CONSTRUCTION INFORMATION THROUGH VR USING AN OBJECT ORIENTED ENVIRONMENT G. Aouad 1, T. Child, P. Brandon, and M. Sarshar Research Centre for the Built and Human Environment, University of Salford,

More information

The 45 Adopted Recommendations under the WIPO Development Agenda

The 45 Adopted Recommendations under the WIPO Development Agenda The 45 Adopted Recommendations under the WIPO Development Agenda * Recommendations with an asterisk were identified by the 2007 General Assembly for immediate implementation Cluster A: Technical Assistance

More information

INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN ICED 03 STOCKHOLM, AUGUST 19-21, 2003

INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN ICED 03 STOCKHOLM, AUGUST 19-21, 2003 INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN ICED 03 STOCKHOLM, AUGUST 19-21, 2003 A KNOWLEDGE MANAGEMENT SYSTEM FOR INDUSTRIAL DESIGN RESEARCH PROCESSES Christian FRANK, Mickaël GARDONI Abstract Knowledge

More information

Strategic Plan Public engagement with research

Strategic Plan Public engagement with research Strategic Plan 2017 2020 Public engagement with research Introduction Public engagement with research (PER) is more important than ever, as the value of these activities to research and the public is being

More information

Construction value management revisited: the designer's role

Construction value management revisited: the designer's role Loughborough University Institutional Repository Construction value management revisited: the designer's role This item was submitted to Loughborough University's Institutional Repository by the/an author.

More information

Smart Management for Smart Cities. How to induce strategy building and implementation

Smart Management for Smart Cities. How to induce strategy building and implementation Smart Management for Smart Cities How to induce strategy building and implementation Why a smart city strategy? Today cities evolve faster than ever before and allthough each city has a unique setting,

More information

Technology Needs Assessments under GEF Enabling Activities Top Ups

Technology Needs Assessments under GEF Enabling Activities Top Ups National Communications Support Programme United Nations Development Programme Global Environment Facility Technology Needs Assessments under GEF Enabling Activities Top Ups UNFCCC/UNDP Expert Meeting

More information

Our digital future. SEPA online. Facilitating effective engagement. Enabling business excellence. Sharing environmental information

Our digital future. SEPA online. Facilitating effective engagement. Enabling business excellence. Sharing environmental information Our digital future SEPA online Facilitating effective engagement Sharing environmental information Enabling business excellence Foreword Dr David Pirie Executive Director Digital technologies are changing

More information

GROUP OF SENIOR OFFICIALS ON GLOBAL RESEARCH INFRASTRUCTURES

GROUP OF SENIOR OFFICIALS ON GLOBAL RESEARCH INFRASTRUCTURES GROUP OF SENIOR OFFICIALS ON GLOBAL RESEARCH INFRASTRUCTURES GSO Framework Presented to the G7 Science Ministers Meeting Turin, 27-28 September 2017 22 ACTIVITIES - GSO FRAMEWORK GSO FRAMEWORK T he GSO

More information

Engaging Stakeholders

Engaging Stakeholders Engaging Stakeholders Users, providers and the climate science community JPI Climate WG2 Workshop: National Dialogues in Europe Thursday, 08 th May 2014 Roger B Street Module 2 Lessons Learned Users Needs

More information

DEPUIS project: Design of Environmentallyfriendly Products Using Information Standards

DEPUIS project: Design of Environmentallyfriendly Products Using Information Standards DEPUIS project: Design of Environmentallyfriendly Products Using Information Standards Anna Amato 1, Anna Moreno 2 and Norman Swindells 3 1 ENEA, Italy, anna.amato@casaccia.enea.it 2 ENEA, Italy, anna.moreno@casaccia.enea.it

More information

Evaluation of the Three-Year Grant Programme: Cross-Border European Market Surveillance Actions ( )

Evaluation of the Three-Year Grant Programme: Cross-Border European Market Surveillance Actions ( ) Evaluation of the Three-Year Grant Programme: Cross-Border European Market Surveillance Actions (2000-2002) final report 22 Febuary 2005 ETU/FIF.20040404 Executive Summary Market Surveillance of industrial

More information

December Eucomed HTA Position Paper UK support from ABHI

December Eucomed HTA Position Paper UK support from ABHI December 2008 Eucomed HTA Position Paper UK support from ABHI The Eucomed position paper on Health Technology Assessment presents the views of the Medical Devices Industry of the challenges of performing

More information

European Circular Economy Stakeholder Conference Brussels, February 2018 Civil Society Perspectives

European Circular Economy Stakeholder Conference Brussels, February 2018 Civil Society Perspectives European Circular Economy Stakeholder Conference Brussels, 20-21 February 2018 Civil Society Perspectives On the 20 th and 21 st February 2018, the European Commission and the European Economic and Social

More information

The Components of Networking for Business to Business Marketing: Empirical Evidence from the Financial Services Sector

The Components of Networking for Business to Business Marketing: Empirical Evidence from the Financial Services Sector The Components of Networking for Business to Business Marketing: Empirical Evidence from the Financial Services Sector Alexis McLean, Department of Marketing, University of Strathclyde, Stenhouse Building,

More information

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN W.A.T. Alder and J. Perkins Binnie Black and Veatch, Redhill, UK In many of the high hazard industries the safety case and safety

More information

TERMS OF REFERENCE FOR CONSULTANTS

TERMS OF REFERENCE FOR CONSULTANTS Strengthening Systems for Promoting Science, Technology, and Innovation (KSTA MON 51123) TERMS OF REFERENCE FOR CONSULTANTS 1. The Asian Development Bank (ADB) will engage 77 person-months of consulting

More information

A Harmonised Regulatory Framework for Supporting Single European Electronic Market: Achievements and Perspectives

A Harmonised Regulatory Framework for Supporting Single European Electronic Market: Achievements and Perspectives A Harmonised Regulatory Framework for Supporting Single European Electronic Market: Achievements and Perspectives Irina NEAGA, Tarek HASSAN, Chris CARTER Loughborough University, Loughborough, Leicestershire,

More information

WIPO Development Agenda

WIPO Development Agenda WIPO Development Agenda 2 The WIPO Development Agenda aims to ensure that development considerations form an integral part of WIPO s work. As such, it is a cross-cutting issue which touches upon all sectors

More information

Media Literacy Policy

Media Literacy Policy Media Literacy Policy ACCESS DEMOCRATIC PARTICIPATE www.bai.ie Media literacy is the key to empowering people with the skills and knowledge to understand how media works in this changing environment PUBLIC

More information

Standardization and Innovation Management

Standardization and Innovation Management HANDLE: http://hdl.handle.net/10216/105431 Standardization and Innovation Management Isabel 1 1 President of the Portuguese Technical Committee for Research & Development and Innovation Activities, Portugal

More information

Digitisation Plan

Digitisation Plan Digitisation Plan 2016-2020 University of Sydney Library University of Sydney Library Digitisation Plan 2016-2020 Mission The University of Sydney Library Digitisation Plan 2016-20 sets out the aim and

More information

PROJECT FINAL REPORT Publishable Summary

PROJECT FINAL REPORT Publishable Summary PROJECT FINAL REPORT Publishable Summary Grant Agreement number: 205768 Project acronym: AGAPE Project title: ACARE Goals Progress Evaluation Funding Scheme: Support Action Period covered: from 1/07/2008

More information

COMMISSION STAFF WORKING PAPER EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the

COMMISSION STAFF WORKING PAPER EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the EUROPEAN COMMISSION Brussels, 30.11.2011 SEC(2011) 1428 final Volume 1 COMMISSION STAFF WORKING PAPER EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT Accompanying the Communication from the Commission 'Horizon

More information

PROGRAMME SYLLABUS Sustainable Building Information Management (master),

PROGRAMME SYLLABUS Sustainable Building Information Management (master), PROGRAMME SYLLABUS Sustainable Building Information Management (master), 120 Programmestart: Autumn 2017 School of Engineering, Box 1026, SE-551 11 Jönköping VISIT Gjuterigatan 5, Campus PHONE +46 (0)36-10

More information

Evaluation report. Evaluated point Grade Comments

Evaluation report. Evaluated point Grade Comments Evaluation report Scientific impact of research Very good Most of the R&D outcomes are of a high international standard and generate considerable international interest in the field. Research outputs have

More information

CIVIC EPISTEMOLOGIES Civic Epistemologies: Development of a Roadmap for Citizen Researchers in the age of Digital Culture Workshop on the Roadmap

CIVIC EPISTEMOLOGIES Civic Epistemologies: Development of a Roadmap for Citizen Researchers in the age of Digital Culture Workshop on the Roadmap This project has received funding from the European Union s Seventh Framework Programme for research, technological development and demonstration under grant agreement no 632694 CIVIC EPISTEMOLOGIES Civic

More information

DRAFT TEXT on. Version 2 of 9 September 13:00 hrs

DRAFT TEXT on. Version 2 of 9 September 13:00 hrs DRAFT TEXT on SBSTA 48.2 agenda item 5 Development and transfer of technologies: Technology framework under Article 10, paragraph 4, of the Paris Agreement Version 2 of 9 September 13:00 hrs Elements of

More information

in the New Zealand Curriculum

in the New Zealand Curriculum Technology in the New Zealand Curriculum We ve revised the Technology learning area to strengthen the positioning of digital technologies in the New Zealand Curriculum. The goal of this change is to ensure

More information

UNIT-III LIFE-CYCLE PHASES

UNIT-III LIFE-CYCLE PHASES INTRODUCTION: UNIT-III LIFE-CYCLE PHASES - If there is a well defined separation between research and development activities and production activities then the software is said to be in successful development

More information

OSRA Overarching Strategic Research Agenda and CapTech SRAs Harmonisation. Connecting R&T and Capability Development

OSRA Overarching Strategic Research Agenda and CapTech SRAs Harmonisation. Connecting R&T and Capability Development O Overarching Strategic Research Agenda and s Harmonisation Connecting R&T and Capability Development The European Defence Agency (EDA) works to foster European defence cooperation to become more cost

More information

VIRTUAL REALITY APPLICATIONS IN THE UK's CONSTRUCTION INDUSTRY

VIRTUAL REALITY APPLICATIONS IN THE UK's CONSTRUCTION INDUSTRY Construction Informatics Digital Library http://itc.scix.net/ paper w78-1996-89.content VIRTUAL REALITY APPLICATIONS IN THE UK's CONSTRUCTION INDUSTRY Bouchlaghem N., Thorpe A. and Liyanage, I. G. ABSTRACT:

More information

Work package 4: Towards a virtual foundry

Work package 4: Towards a virtual foundry D4.5 WP4 September 2014 COLAE: Commercialization Clusters of OLAE Work package 4: Towards a virtual foundry Public Final Report COLAE 2013 Project name: Commercialization Clusters of OLAE Acronym: COLAE

More information

Standard of Knowledge, Skill and Competence for Practice as an Architectural Technologist

Standard of Knowledge, Skill and Competence for Practice as an Architectural Technologist Standard of Knowledge, Skill and Competence for Practice as an Architectural Technologist RIAI 2010 Contents Foreword 2 Background 3 Development of the Standard.4 Use of the Standard..5 Reading and interpreting

More information

Competency Standard for Registration as a Professional Engineer

Competency Standard for Registration as a Professional Engineer ENGINEERING COUNCIL OF SOUTH AFRICA Standards and Procedures System Competency Standard for Registration as a Professional Engineer Status: Approved by Council Document : R-02-PE Rev-1.3 24 November 2012

More information

Knowledge Exchange Strategy ( )

Knowledge Exchange Strategy ( ) UNIVERSITY OF ST ANDREWS Knowledge Exchange Strategy (2012-2017) This document lays out our strategy for Knowledge Exchange founded on the University s Academic Strategy and in support of the University

More information

IMPLEMENTATION ISSUES FOR BUILDING PRODUCT MODELS (BPM) IN AUSTRALIA: A FRAMEWORK FOR INVESTIGATION

IMPLEMENTATION ISSUES FOR BUILDING PRODUCT MODELS (BPM) IN AUSTRALIA: A FRAMEWORK FOR INVESTIGATION VISUALISATION AND INFORMATIONS Case Study IMPLEMENTATION ISSUES FOR BUILDING PRODUCT MODELS (BPM) IN AUSTRALIA: A FRAMEWORK FOR INVESTIGATION University of Newcastle, Australia cameron.beard@studentmail.newcastle.edu.au

More information

2018 ASSESS Update. Analysis, Simulation and Systems Engineering Software Strategies

2018 ASSESS Update. Analysis, Simulation and Systems Engineering Software Strategies 2018 ASSESS Update Analysis, Simulation and Systems Engineering Software Strategies The ASSESS Initiative The ASSESS Initiative was formed to bring together key players to guide and influence strategies

More information

Reputation enhanced by innovation - Call for proposals in module 3

Reputation enhanced by innovation - Call for proposals in module 3 Reputation enhanced by innovation - Call for proposals in module 3 The Nordic Innovation Centre on behalf of the Nordic partners of the programme Innovation in the Nordic marine sector invites to submit

More information

Making It Your Own A PUBLIC ART POLICY AND PLANNING TEMPLATE. Arts North West Creative Opportunities 2012

Making It Your Own A PUBLIC ART POLICY AND PLANNING TEMPLATE. Arts North West Creative Opportunities 2012 2012 Making It Your Own A PUBLIC ART POLICY AND PLANNING TEMPLATE This Public Art Policy and Planning Template has been produced by Arts North West to assist LGAs and associated arts organisations in the

More information

UNFPA/WCARO Census: 2010 to 2020

UNFPA/WCARO Census: 2010 to 2020 United Nations Regional Workshop on the 2020 World Programme on Population and Housing Censuses: International Standards and Contemporary Technologies UNFPA/WCARO Census: 2010 to 2020 Lagos, Nigeria, 8-11

More information

A Science & Innovation Audit for the West Midlands

A Science & Innovation Audit for the West Midlands A Science & Innovation Audit for the West Midlands June 2017 Summary Report Key Findings and Moving Forward 1. Key findings and moving forward 1.1 As the single largest functional economic area in England

More information

BIM-MEP AUS ROAD MAP Parliamentary Launch

BIM-MEP AUS ROAD MAP Parliamentary Launch BIM-MEP AUS ROAD MAP 2012 Parliamentary Launch CONTENTS 1 DRIVING PRODUCTIVITY IMPROVEMENTS IN THE BUILDING AND CONSTRUCTION INDUSTRY 2 DRIVING INDUSTRY CHANGE 3 PROACTIVE INDUSTRY LEADERSHIP AND ACTION

More information

Initial draft of the technology framework. Contents. Informal document by the Chair

Initial draft of the technology framework. Contents. Informal document by the Chair Subsidiary Body for Scientific and Technological Advice Forty-eighth session Bonn, 30 April to 10 May 2018 15 March 2018 Initial draft of the technology framework Informal document by the Chair Contents

More information

Consultancy on Technological Foresight

Consultancy on Technological Foresight Consultancy on Technological Foresight A Product of the Technical Cooperation Agreement Strategic Roadmap for Productive Development in Trinidad and Tobago Policy Links, IfM Education and Consultancy Services

More information

Please send your responses by to: This consultation closes on Friday, 8 April 2016.

Please send your responses by  to: This consultation closes on Friday, 8 April 2016. CONSULTATION OF STAKEHOLDERS ON POTENTIAL PRIORITIES FOR RESEARCH AND INNOVATION IN THE 2018-2020 WORK PROGRAMME OF HORIZON 2020 SOCIETAL CHALLENGE 5 'CLIMATE ACTION, ENVIRONMENT, RESOURCE EFFICIENCY AND

More information

10246/10 EV/ek 1 DG C II

10246/10 EV/ek 1 DG C II COUNCIL OF THE EUROPEAN UNION Brussels, 28 May 2010 10246/10 RECH 203 COMPET 177 OUTCOME OF PROCEEDINGS from: General Secretariat of the Council to: Delegations No. prev. doc.: 9451/10 RECH 173 COMPET

More information

Social Innovation and new pathways to social changefirst insights from the global mapping

Social Innovation and new pathways to social changefirst insights from the global mapping Social Innovation and new pathways to social changefirst insights from the global mapping Social Innovation2015: Pathways to Social change Vienna, November 18-19, 2015 Prof. Dr. Jürgen Howaldt/Antonius

More information

A Research and Innovation Agenda for a global Europe: Priorities and Opportunities for the 9 th Framework Programme

A Research and Innovation Agenda for a global Europe: Priorities and Opportunities for the 9 th Framework Programme A Research and Innovation Agenda for a global Europe: Priorities and Opportunities for the 9 th Framework Programme A Position Paper by the Young European Research Universities Network About YERUN The

More information

Methodology for Agent-Oriented Software

Methodology for Agent-Oriented Software ب.ظ 03:55 1 of 7 2006/10/27 Next: About this document... Methodology for Agent-Oriented Software Design Principal Investigator dr. Frank S. de Boer (frankb@cs.uu.nl) Summary The main research goal of this

More information

Co-funded by the I Erasmus+ Programme of the European Union

Co-funded by the I Erasmus+ Programme of the European Union ENEX Innovation Management Lesson plans ver. 1 February, 2016, Faculty of Management Co-funded by the I Erasmus+ Programme of the European Union 1 Table of contents Introduction...3 Course modules...4

More information

Eective ecodesign: nding a way forward for industry

Eective ecodesign: nding a way forward for industry Loughborough University Institutional Repository Eective ecodesign: nding a way forward for industry This item was submitted to Loughborough University's Institutional Repository by the/an author. Citation:

More information