Project: ACT Acorn Feasibility Study

Size: px
Start display at page:

Download "Project: ACT Acorn Feasibility Study"

Transcription

1 Project: ACT Acorn Feasibility Study Terms of Use The ACT Acorn Consortium partners reserve all rights in this material and retain full copyright. Any reference to this material or use of the material must include full acknowledgement of the source of the material, including the reports full title and its authors. The material contains third party IP, used in accordance with those third party s terms and credited as such where appropriate. Any subsequent reference to this third party material must also reference its original source. The material is made available in the interest of progressing CCS by sharing this ACT work done on the Acorn project. Pale Blue Dot Energy reserve all rights over the use of the material in connection with the development of the Acorn Project. In the event of any questions over the use of this material please contact info@pale-blu.com.

2 Acorn 10196ACTC-Rep January ACT Acorn, project , has received funding from BEIS (UK), RCN (NO) and RVO (NL), and is co-funded by the European Commission under the ERA-Net instrument of the Horizon 2020 programme. ACT Grant number

3 Contents Contents Document Summary Client Project Title Title: Distribution: Research Council of Norway & Department of Business, Energy & Industrial Strategy Accelerating CCS Technologies: Acorn Project Client & Public Domain Date of Issue: 8 th January 2018 Prepared by: Steve Murphy (Pale Blue Dot Energy) Approved by: Sam Gomersall, Commercial Director (Pale Blue Dot Energy) Amendment Record Rev Date Description Issued By Checked By Approved By V01 08/01/18 First Issue S Murphy T Dumenil S Gomersall Disclaimer: While the authors consider that the data and opinions contained in this report are sound, all parties must rely upon their own skill and judgement when using it. The authors do not make any representation or warranty, expressed or implied, as to the accuracy or completeness of the report. The authors assume no liability for any loss or damage arising from decisions made on the basis of this report. The views and judgements expressed here are the opinions of the authors and do not reflect those of the client or any of the stakeholders consulted during the course of this project. The ACT Acorn consortium is led by Pale Blue Dot Energy and includes Bellona Foundation, Heriot-Watt University, Radboud University, Scottish Carbon Capture and Storage (SCCS), University of Aberdeen, University of Edinburgh and University of Liverpool. ACT Acorn Consortium Page 3 of 36

4 Contents Table of Contents CONTENTS EXECUTIVE SUMMARY INTRODUCTION SCOPE PRE-FEED PROGRAMME FEED PROGRAMME ORGANISATION PROJECT SCHEDULE BUDGET EXECUTION STRATEGY CONCLUSIONS REFERENCES ANNEX 1: BUDGET ASSUMPTIONS ACT Acorn Consortium Page 4 of 36

5 Contents CONTENTS... 3 TABLE OF CONTENTS... 4 FIGURES... 8 TABLES EXECUTIVE SUMMARY INTRODUCTION ACT ACORN OVERVIEW ACORN DEVELOPMENT CONCEPT SCOPE PURPOSE SCOPE CAPITAL VALUE PROCESS PROJECT DEFINITION BASIS PRE-FEED PROGRAMME OBJECTIVES MAJOR DELIVERABLES WORK STRUCTURE WORK SCOPE Engineering Design Subsurface Development Permitting and Consenting Commercial Development Finance and Economics Strategy and Communications Project Management ACT Acorn Consortium Page 5 of 36

6 Contents 5.0 FEED PROGRAMME OBJECTIVES MAJOR DELIVERABLES WORK STRUCTURE WORK SCOPE Technical Definition Development Planning Health, Safety & Environment Commercial Development Finance and Economics Strategy and Communications Project Management ORGANISATION CONCEPT STAGE FEED STAGE PROJECT SCHEDULE SUMMARY SCHEDULE CONCEPT STAGE FEED STAGE BUDGET CONCEPT STAGE FEED STAGE ASSUMPTIONS EXECUTION STRATEGY CONCEPT STAGE ACT Acorn Consortium Page 6 of 36

7 Contents 9.2 FEED STAGE CONCLUSIONS REFERENCES ANNEX 1: BUDGET ASSUMPTIONS ACT Acorn Consortium Page 7 of 36

8 Contents Figures FIGURE 2-1: ACT ACORN CONSORTIUM PARTNERS FIGURE 2-2: KEY AREAS OF INNOVATION FIGURE 2-3: ACT ACORN WORK BREAKDOWN STRUCTURE FIGURE 2-4: ACORN OUTLINE MINIMUM VIABLE DEVELOPMENT PLAN FIGURE 2-5: ACORN BUILD OUT SCENARIO FROM THE 2017 PCI APPLICATION FIGURE 3-1: CAPITAL VALUE PROCESS FIGURE 3-2: UNCERTAINTY IN COST ESTIMATE CLASSES (AFTER AACE 18R-97) FIGURE 4-1: PRE-FEED WBS FIGURE 5-1: FEED WBS FIGURE 6-1: ILLUSTRATIVE FEED ORGANISATION FIGURE 7-1: SUMMARY SCHEDULE FIGURE 7-2: CONCEPT STAGE SCHEDULE FIGURE 7-3: FEED STAGE SCHEDULE FIGURE 9-1: ILLUSTRATIVE EXECUTION ARRANGEMENT FOR FEED Tables TABLE 2-1: ACT ACORN MILESTONES AND DELIVERABLES TABLE 3-1: COST ESTIMATE CLASS DEFINITIONS (AACE 18R-97) TABLE 4-1: PRE-FEED DELIVERABLES TABLE 5-1: FEED DELIVERABLES TABLE 8-1: CONCEPT STAGE BUDGET TABLE 8-2: FEED STAGE BUDGET TABLE 12-1: BUDGET ASSUMPTIONS ACT Acorn Consortium Page 8 of 36

9 Executive Summary 1.0 Executive Summary A plan and budget to progress Acorn beyond the definition resulting from completion of the ACT programme has been developed. Key additional pre-feed activities include additional definition of the capture facilities, commercial agreements and definition of the Storage complex This Concept stage work is estimated to require 12,300 man-hours and cost approximately 1.6million. The proposed FEED programme will progress the project to a maturity and level of definition that results in a recommendation for a final investment decision. The Front End Engineering and Design (FEED) programme outlined in this report is informed by previous FEED studies for the Scottish Power Longannet Demo1, Shell Peterhead and Capture Power Limited White Rose projects. The current ACT Acorn work programme is anticipated to progress the project definition to approximately 5%, (AACE International, 2016). Additional work requires completion before the project can commence FEED. In particular, the preferred options for CO2 capture and storage must be selected, several key commercial agreements must be put in place and a more comprehensive plan for FEED completed. This Concept Stage activity would increase the project definition to around 15 20%. It is estimated to require 12,300 man-hours of activity and cost 1.6million. The FEED programme will add considerable definition to the project and by the time the programme is completed the project definition deliverables should be at 80-90% maturity. The FEED programme is estimated to require 66,000 manhours of activity and cost approximately 15.3million. Illustrative examples of the project organisation required for FEED and an outline execution strategy are proposed. Key roles have been identified. A key element of the Concept stage work is to finalise the plan for FEED. It is likely that additional commercial and financial activity will be required before the actual Final Investment Decision (FID) milestone. ACT Acorn Consortium Page 9 of 36

10 Introduction 2.0 Introduction 2.1 ACT Acorn Overview ACT Acorn, project , has received funding from BEIS (UK), RCN (NO) and RVO (NL), and is co-funded by the European Commission under the ERA- Net instrument of the Horizon 2020 programme. ACT Grant number ACT Acorn is a collaborative project between seven organisations across Europe being led by Pale Blue Dot Energy in the UK, as shown in Figure 2-1. The research and innovation study addresses all thematic areas of the ACT Call including Chain Integration. The project includes a mix of both technical and non-technical innovation activities as well as leading edge scientific research. Together these will enable the development of the technical specification for an ultra-low cost, integrated CCS hub that can be scaled up at marginal cost. It will move the Acorn development opportunity from proof-of-concept (TRL3) to the pre-feed stage (TRL5/6) including iterative engagement with relevant investors in the private and public sectors. Specific objectives of the project are to: Produce a costed technical development plan for a full chain CCS hub that will capture CO2 emissions from the St Fergus Gas Terminal in north east Scotland and store the CO2 at an offshore storage site (to be selected) under the North Sea. Identify technical options to increase the storage efficiency of the selected storage site based on scientific evidence from geomechanical experiments and dynamic CO2 flow modelling and through this drive scientific advancement and innovation in these areas. Explore build-out options including interconnections to the nearby Peterhead Port, other large sources of CO2 emissions in the UK region and CO2 utilisation plants Identify other potential locations for CCS hubs around the North Sea regions and develop policy recommendations to protect relevant infrastructure from Figure 2-1: ACT Acorn consortium partners premature decommissioning and for the future ownership of potential CO2 stores. ACT Acorn Consortium Page 10 of 36

11 Introduction Engage with CCS and low carbon economy stakeholders in Europe and worldwide to disseminate the lessons from the project and encourage replication. CCS is a new and emerging industry. Maturity improvements are required in the application of technology, the commercial structure of projects, the scope of each development and the policy framework. The key areas of innovation in which the project will seek insights are summarised in Figure 2-2. The project will be delivered over a 19-month period, concluding on the 28 th February During that time, it will create and publish 21 items known as Deliverables. Collectively these will provide a platform for industry, local partnerships and government to move the project forward in subsequent phases. It will be driven by business case logic and inform the development of UK and European policy around infrastructure preservation. The deliverables are listed in Table 2-1. Figure 2-2: Key areas of innovation Figure 2-3: ACT Acorn work breakdown structure The project activity has been organised into 6 work packages as illustrated in Figure 2-3. Specific areas being addressed include; regional CO2 emissions; St Fergus capture plant concept; CO2 storage site assessments and development plans; reservoir CO2 flow modelling, geomechanics; CCS policy development; infrastructure re-use; lifecycle analysis; environmental impact; economic modelling; FEED and development plans; and build out growth assessment. ACT Acorn Consortium Page 11 of 36

12 Introduction Milestone Deliverable D01 Kick-off Meeting Report 1) St Fergus Hub Design D02 CO2 Supply Options D17 Feeder 10 Business Case D03 Basis of Design for St Fergus Facilities D04 Site Screening Methodology 2) Site Screening & Selection D05 Site Selection Report 3) Expansion Options D18 Expansion Options D10 Policy Options Report D11 Infrastructure Reuse Report 4) Full Chain Business Case D14 Outline Environmental Impact Assessment D15 Economic Model and Documentation D16 Full Chain Development Plan and Budget D06 Geomechanics Report 5) Geomechanics D07 Captain X Storage Development Plan and Budget D08 Site 2 Storage Development Plan and Budget 6) Storage Development Plans D09 Eclipse Model Files 7) Lifecycle Assessment D12 Carbon Lifecycle Analysis D21 Societal Acceptance Report 8) Project Completion D19 Material for Knowledge Dissemination Events D20 Publishable Final Summary Report Table 2-1: ACT Acorn Milestones and Deliverables ACT Acorn Consortium Page 12 of 36

13 Introduction The Consortium includes a mix of industrial, scientific and CCS policy experts in keeping with the multidisciplinary nature of the project. The project is led by Pale Blue Dot Energy along with University of Aberdeen, University of Edinburgh, University of Liverpool, Heriot Watt University, Scottish Carbon Capture & Storage (SCCS), Radboud University and The Bellona Foundation. Pale Blue Dot Energy affiliate CO2DeepStore are providing certain input material. 2.2 Acorn Development Concept Many CCS projects have been burdened with achieving economies of scale immediately to be deemed cost effective. This inevitably increases the initial cost hurdle to achieve a lower lifecycle unit cost (be that /MWh or /T) which raises the bar from the perspectives of initial capital requirement and overall project risk. The Acorn development concept use a Minimum Viable Development (MVD) approach. This takes the view of designing a full chain CCS development of industrial scale (which minimises or eliminates the scale up risk) but at the lowest capital cost possible, accepting that the unit cost for the initial project may be high for the first small tranche of sequestered emissions. Acorn will use the unique combination of legacy circumstances in North East Scotland to engineer a minimum viable full chain carbon capture, transport and offshore storage project to initiate CCS in the UK. The project is illustrated in Figure 2-4 and seeks to re-purpose an existing gas sweetening plant (or build a new capture facility if required) with existing offshore pipeline infrastructure connected to a well understood offshore basin, rich in storage opportunities. All the components are in place to create an industrial CCS development in North East Scotland, leading to offshore CO2 storage by the early 2020s. Figure 2-4: Acorn Outline Minimum Viable Development Plan ACT Acorn Consortium Page 13 of 36

14 Introduction A successful project will provide the platform and improve confidence for further low-cost growth and incremental development. This will accelerate CCS deployment on a commercial basis and will provide a cost effective practical stepping stone from which to grow a regional cluster and an international CO2 hub. The seed infrastructure can be developed by adding additional CO2 capture points such as from hydrogen manufacture for transport and heat, future CO2 shipping through Peterhead Port to and from Europe and connection to UK national onshore transport infrastructure such as the Feeder 10 pipeline which can bring additional CO2 from emissions sites in the industrial central belt of Scotland including the proposed Caledonia Clean Energy Project, CCEP. A build out scenario for Acorn used in the 2017 Projects of Common Interest (PCI) application is included as Figure 2-5. Pale Blue Dot Energy is exploring various ways and partners to develop the Acorn project. Figure 2-5: Acorn build out scenario from the 2017 PCI application ACT Acorn Consortium Page 14 of 36

15 Scope 3.0 Scope 3.1 Purpose The purpose of this Deliverable (D13) is to outline the activities, resources and effort required in the next phase of the Acorn Development. A key assumption is that the next phase of major activity is FEED (Front End Engineering and Design). Before FEED can commence there are some feasibility-level activities outside the scope of the ACT work programme that must be completed, and these are also described in this report. 3.3 Capital Value Process The capital value process is a project management approach used widely by offshore industry, particularly in the North Sea. The process provides a logical framework within which to develop projects and has a good alignment with the main stages of engineering development, as illustrated in Figure Scope The scope of this deliverable includes; Description of key deliverables Outline of activities required to produce deliverables Estimate of resources required to complete activities Cost estimate Project schedule Potential organisation Key milestones This study has considered previous work on CCS FEED programmes, including the published material from the two UK CCS Demonstration Competitions (ScottishPower CCS Consortium, 2011), (Shell UK, 2016), (Capture Power Ltd, 2016) and preparatory FEED planning work from the Captain Clean Energy Project (CO2DeepStore, 2012). Figure 3-1: Capital Value Process 3.4 Project Definition Basis This work has adopted industry guidelines from The Association for the Advancement of Cost Estimators to assess the level of project definition and for the various classes of cost estimate. These are summarised in Table 3-1. Each class has a different uncertainty range as shown in Figure 3-2. ACT Acorn Consortium Page 15 of 36

16 Scope Class Project Definition (%) Purpose Concept Screening Feasibility Budget Control Check Basis Capacity factored, Judgement, parametric models Equipment factored, parametric models Semi-detailed unit costs Major equipment list Detailed unit cost and material take-off Detailed unit cost and material take-off Table 3-1: Cost Estimate Class Definitions (AACE 18R-97) Figure 3-2: Uncertainty in Cost Estimate Classes (after AACE 18R-97) ACT Acorn Consortium Page 16 of 36

17 Pre-FEED Programme 4.0 Pre-FEED Programme 4.1 Objectives Objective Deliverable There are three primary objectives for this short phase of the project. A. Demonstrate to the Decision Makers a compelling recommendation such that the project is ready to begin FEED on 1 st January At the time of writing, the decision-making body had still to be formed; B. Provide the Decision Makers with a very high degree of confidence that the organisation can deliver the project successfully; and C. Remain flexible & adapt to the possibility that the contract for the next phase is strongly linked to a future full-term Project Contract. 4.2 Major Deliverables The main deliverables that are required to achieve the objectives are outlined in Table 4-1. A B C 1. Contractual terms acceptable to all parties. 2. Evolve bid into a compelling proposition. 1. Fully developed project definition document for FEED which includes those items outside the scope of the current ACT work Programme. 2. Fully specified and costed FEED programme covering all costs recoverable under the FEED contract. 3. Fully specified and costed FEED programme covering all costs not recoverable under the FEED contract. 4. Support of key internal stakeholders and decision makers. 5. Detailed listing of FEED deliverables agreed with Project Developer and supply chain. 6. Have contracts in place with all the contractors for FEED. 1. Maintain clear communication with decision makers, supply chain and financiers. Table 4-1: Pre-FEED Deliverables ACT Acorn Consortium Page 17 of 36

18 Pre-FEED Programme 4.3 Work Structure The 7-part work breakdown structure is illustrated in Figure 4-1, details are provided in Section 4.4. Figure 4-1: Pre-FEED WBS ACT Acorn Consortium Page 18 of 36

19 4.4 Work Scope This section outlines the work that is required to be completed before FEED can commence and is in addition to that covered in the ACT Acorn work programme Engineering Design The ACT Acorn programme contains some Engineering Design work primarily aimed at identifying and describing conceptual designs. For instance, outline design for new build capture and compression facilities at St Fergus. The ACT programme is estimated to be approximately 5% of the final project definition, as illustrated in Figure 3-2. The next phase of engineering activity is to add more definition to the design in each of the following key areas: CO2 capture and conditioning Subsea infrastructure Pipeline Interface with terminal operations Operations requirements This next phase of design work will include the following deliverables. Final Design Basis Selection of best location for CO2 capture Process flow diagram for the CO2 Heat and mass balance Process description Process control philosophy Equipment list Pre-FEED Programme Preliminary piping and instrumentation diagram (P&ID) Effluent summary Preliminary equipment layout Fluid classification Piping classification summary Preliminary instrumentation list Utilities summary Main equipment process data sheets Electrical load list Waste disposal procedure Solvent handling procedures Subsurface Development The ACT Acorn programme contains some Subsurface Development work primarily aimed at identifying two potential storage sites and creating an initial development plan for each of those sites. The next phase of subsurface activity is to add more definition to the design in each of the following key areas: Selection of preferred CO2 storage site CO2 injection strategy Well design Definition of the Storage Complex boundaries At the current time, it is anticipated that the preferred storage site will be at the Captain X site. This area has already been subject to a significant amount of subsurface analysis and there is no current intention to repeat this work. ACT Acorn Consortium Page 19 of 36

20 Pre-FEED Programme Consequently, the next phase of subsurface design work will be limited to the following deliverables. Final Design Basis Seismic interpretation Structural architecture Refinement of reservoir simulation Coordinates of the proposed Storage Complex boundaries Permitting and Consenting The ACT Acorn work programme includes preparation of an initial consents register and an early statement to address the requirements of using the best available technology (BAT). This element of the future scope will progress the major permits and consents such as obtaining an Agreement for Lease from the Crown Estate and a CO2 storage License from the Oil and Gas Authority Commercial Development The ACT Acorn work programme does not contain any commercial development activities. This element of the future scope will progress the initial forms of the following major commercial agreements. Commercial Agreements Register Heads of Terms for the Atlantic pipeline Heads of Terms for procuring flue gas Heads of Terms for provision of services by Terminal Operators Outline Joint Venture company structure Terminal Plant Outline Agreement Finance and Economics The ACT Acorn work programme includes a limited amount of economic analysis on the full chain development plan but does not include an activity related to financing the development. This element of the future scope will include the development of a budget for FEED and a more refined estimate for the project itself. Additionally, a comprehensive risk analysis will be necessary to inform the economic analysis. An initial view of risk allocation between the parties will also be completed Strategy and Communications The ACT Acorn work programme does not contain any strategy of communication development work. The programme does however include a substantial dissemination component, and this is largely focussed on identifying issues related to a just transition to a low carbon economy. This element of the future scope will progress engagement with stakeholders who have a more tangible link to the physical project as well as statutory consultees Project Management In addition to the normal project management activities of coordination and direction, progress reporting, delivery assurance and stakeholder engagement that will be associated with the scope items discussed above the key output from this element of the work will be a recommendation for FEED. The recommendation will detail the scope, budget, resource requirements and schedule of FEED activities as well as the decision support package to justify the recommendation. ACT Acorn Consortium Page 20 of 36

21 FEED Programme 5.0 FEED Programme 5.1 Objectives There are three primary objectives for this phase of the project. A. Demonstrate to the Decision Makers a compelling recommendation such that the project is ready to begin Detailed Engineering and Design; B. Provide the owners and BEIS with a very high degree of confidence that the organisation can deliver the project successfully; and C. Remain flexible and adapt to the possibility that the contract for the next phase is strongly linked to the full-term Project Contract. 5.2 Major Deliverables The main deliverables that are required to achieve the objectives are outlined in Table 5-1. Objective A B C Deliverable 1. Contractual terms acceptable to all parties. 2. Evolve design into a compelling investment proposition. 1. Fully developed project definition document for detailed engineering. 2. Fully specified and costed development programme covering all costs recoverable under the project contract. 3. Fully specified and costed development programme covering all costs not recoverable under the project contract. 4. Support of key internal stakeholders and decision makers. 5. Detailed listing of deliverables agreed with Project Developer and supply chain. 6. Have contracts in place with all the contractors for detailed engineering. 1. Maintain clear communication with decision makers, supply chain and financiers. Table 5-1: FEED Deliverables ACT Acorn Consortium Page 21 of 36

22 FEED Programme 5.3 Work Structure The 7-part work breakdown structure is illustrated in Figure 5-1, details are provided in Section 5.4. Figure 5-1: FEED WBS ACT Acorn Consortium Page 22 of 36

23 5.4 Work Scope This section outlines the work that is required to be completed before a final investment decision (FID) can be made. The WBS is slightly different to that planned for the Concept stage to better reflect the increasing emphasis on Health, Safety and Environment (HSE) and development planning activities as the project matures towards FID Technical Definition The key deliverables currently identified for the CO2 capture and conditioning plant (including flue gas gathering), transport, injection and storage are listed below. Prepare and issue the Basis of Design Calculate the heat and material balances Prepare the general and specific arrangement drawings Prepare piping layouts Prepare process flow diagrams Prepare piping and instrumentation diagrams including material selections and process data sheets Calculate equipment sizes for all major components Prepare equipment lists and system descriptions Prepare single line diagrams for all major electrical equipment Calculate and confirm utility consumption of power, water, and other utilities for all major equipment. Prepare plant water balance Prepare control specifications, control architecture, instrument list and control room layout FEED Programme Calculate the foundation loading for all major power plant equipment, prepare buildings plan Obtain vendor quotations for all major plant equipment Calculate material take-offs for concrete, earth work, structural steel, piping, cable, cable tray, conduit, valving and instruments Prepare installation plan and overall project schedule Technical interface documents Design & coordination registers Specification for the offshore pipeline surveys Offshore pipeline survey report Geotechnical survey specification Pipeline condition report Subsea field layout drawings Subsea manifold cluster layout Control system configuration report Control system schematic drawings Subsea structures definition report Tie-in spool and jumper preliminary design Umbilical routing report Subsurface data collection and maintenance Learning from other projects Core analysis review Sedimentological review Core testing Seismic interpretation Seismic inversion Log interpretation ACT Acorn Consortium Page 23 of 36

24 FEED Programme Pore pressure prediction Static model (field) Static model (Captain Aquifer "fairway") Static model (overburden and underburden) Geological model uncertainty evaluation Definition of injection well data acquisition to fill existing data gaps Dynamic model construction Dynamic reservoir simulations Impact on other subsurface users Wellbore injectivity & near wellbore issues Geochemical modelling Geomechanical modelling Safe operating envelopes Storage complex definition Geological containment Well containment Wellbore stability for new injector wells Specify initial well design criteria Design of new injector wells Impact assessment of environment / health & safety / social issues Subsurface technical risk assessment Monitoring technology feasibility assessment Monitoring plan Refine injection development plan Operational planning - technology maturation plan Operational planning - key operational processes Detailed start-up/shutdown operational processes Prepare +/-10% accurate cost estimate Development Planning The key deliverables currently identified for this element of work are listed below. Full chain development plan and budget Project execution plan Procurement strategy and plan Capital requirement budget Operating cost estimate Health, Safety & Environment The key deliverables currently identified for this element of work are listed below. Environmental impact assessment (EIA) EIA Scoping Report Environmental Statement Obtain consent for pollution prevention and control Obtain consent for Marine License Obtain consents for St Fergus operations Definition of BAT (best available technology) requirements Revised Consents register Scoping document Surveys, investigations & data gathering Consultations Land referencing Mapping & drawing Pipeline routeing Compliance statements ACT Acorn Consortium Page 24 of 36

25 FEED Programme Hazard and operational study (HAZOP) report Hazard identification (HAZID) report Control of major accident hazards (COMAH) report Commercial Development The key deliverables currently identified for this element of work are listed below. Risk allocation model development Develop business model Negotiate revenue model Energy and CO2 supply contracts Negotiate owner s engineering contract Negotiate power purchase contract Negotiate engineering, procurement & construction (EPC) contracts Negotiate operations and maintenance (O&M) contract Negotiate pipeline purchase contracts Negotiate storage joint operating agreement Negotiate 3 rd party access conditions Negotiate contracts for terminal services Negotiate contracts for flue gas supply Negotiate storage lease Negotiate storage licence / permit Negotiate project contracts Interface with technical team Negotiate to establish special purpose vehicle to deliver project Finance and Economics The key deliverables currently identified for this element of work are listed below. Insurance strategy Financial and Economic Model Development Develop Cost Model Funding plan debt, equity & other Develop list of potential investors Decision support package Strategy and Communications The key deliverables currently identified for this element of work are listed below. Stakeholder Management Plan Communications Plan Stakeholder profiling and validation Project Management The key deliverables currently identified for this element of work are listed below. Project management activities of coordination and direction, progress reporting, delivery assurance and stakeholder engagement Recommendation for FID. The recommendation will detail the scope, budget, resource requirements and schedule of detailed engineering and construction activities as well as the decision support package to justify the recommendation Establish project management office (PMO) PMO cost control activities PMO reporting activities PMO control activities Develop and maintain risk register ACT Acorn Consortium Page 25 of 36

26 Organisation 6.0 Organisation 6.1 Concept Stage The organisation for the Concept Stage will be similar to that used in the ACT Acorn programme. Pale Blue Dot Energy will lead the activity and sub-contract certain specialist activities. ACT Acorn Consortium Page 26 of 36

27 Organisation 6.2 FEED Stage To complete the FEED programme a larger and more sophisticated project organisation will be required, as illustrated in Figure 6-1. Figure 6-1: Illustrative FEED Organisation ACT Acorn Consortium Page 27 of 36

28 Project Schedule 7.0 Project Schedule 7.1 Summary Schedule Figure 7-1: Summary Schedule ACT Acorn Consortium Page 28 of 36

29 Project Schedule 7.2 Concept Stage Figure 7-2: Concept Stage Schedule ACT Acorn Consortium Page 29 of 36

30 Project Schedule 7.3 FEED Stage ACT Acorn Consortium Page 30 of 36

31 Project Schedule Figure 7-3: FEED Stage Schedule ACT Acorn Consortium Page 31 of 36

32 Budget 8.0 Budget Budgetary estimates have been prepared for the next two stages of the project development. These estimates are based on the activities identified in Section 7.0, the resources (people, software, fees etc) required to complete them and assumptions about the cost of these resources. 8.1 Concept Stage Work Area Effort (Man-hours) Cost (,000) Subsurface Definition Engineering Definition 2, Commercial Arrangements 1, Permitting & Consenting Finance & Economics Strategy & Communications 4, Project Management 1, Total 12,268 1, FEED Stage Work Area Effort (Man-hours) Cost (,000) Technical Definition 23,050 5,533 Commercial Arrangements 9,340 2,042 Finance & Economics 2, Health Safety & Environment 3, Development Planning 7, Strategy & Communications 8,900 4,042 Project Management 10,960 1,429 Total 65,730 15,276 Table 8-2: FEED Stage Budget 8.3 Assumptions A table of assumptions is provided in Annex 1. Table 8-1: Concept Stage Budget ACT Acorn Consortium Page 32 of 36

33 Execution Strategy 9.0 Execution Strategy 9.1 Concept Stage The execution of the next stage of activity will be similar to the current arrangement. Pale Blue Dot Energy will continue to lead the project development and subcontract certain activities that require specialist expertise. Examples of work that is likely to be supplemented by specialist subcontractors are listed below. The strategy illustrated in Figure 9-1 assumes that BEIS are significantly involved in funding (or otherwise underwriting the cost of) the FEED programme. Other arrangements are possible. Subsea infrastructure design; Capture facility design; and Legal aspects of commercial arrangements. 9.2 FEED Stage The execution of the FEED stage of activity will differ from the current arrangement due to the scale, spectrum of activities, number of parties involved and general complexity. Pale Blue Dot Energy will continue to lead the project development and subcontract certain activities that require specialist expertise. Examples of work that is likely to be supplemented by specialist subcontractors are listed below. Project Management Office Facility and infrastructure design Subsurface analysis Well design Legal, finance and insurance Operations planning Figure 9-1: Illustrative execution arrangement for FEED ACT Acorn Consortium Page 33 of 36

34 Conclusions 10.0 Conclusions 1. Plans and budgets for the Concept and FEED stages of the Acorn project development have been developed. 2. The Concept stage is estimated to require 12,268 man-hours of effort to produce the required deliverables and cost approximately 1.6M. 3. The FEED stage is estimated to require 65,730 man-hours of effort to produce the required deliverables and cost approximately 15.3M. 4. The project organisation for the Concept stage is likely to be broadly similar to the current arrangement where Pale Blue Dot Energy is supported by a few specialist engineering, legal and technical organisations. 5. The project organisation for the FEED stage is likely to be substantially larger than the current arrangement. In particular, a number of specialist companies will be required to provide the detailed technical, commercial and HSE development work. In addition, a more comprehensive project management office function will be needed to properly manage the more complex range of activities and ensure appropriate cost control. ACT Acorn Consortium Page 34 of 36

35 References 11.0 References AACE International. (2016). 18R-97 Recommended Practice Cost Estimation in Process Industires. Association for Advancement of Cost Engineering International. Capture Power Ltd. (2016). K01 Full Chain FEED Summary Report. Capture Power Ltd. CO2DeepStore. (2012). Proposal for the DECC 2012 CCS Commercialisation Programme. ScottishPower CCS Consortium. (2011). Demo 1 KT: SP-SP RT015 Feed Close Out Report. Shell UK. (2016). FEED Summary Report for Full CCS Chain. Shell. ACT Acorn Consortium Page 35 of 36

36 12.0 Annex 1: Budget Assumptions Annex 1: Budget Assumptions Resource Name Type Work Std. Rate Cost/Use Accrue At Cost Advisor Work 40 hrs 150/hr 0 Prorated 6,000 Business Analyst Work 2,160 hrs 120/hr 0 Prorated 259,200 Capture Work 5,510 hrs 100/hr 0 Prorated 551,000 Chief Technologist Work 4,058 hrs 180/hr 0 Prorated 730,440 Commercial Advisor Work 5,190 hrs 180/hr 0 Prorated 934,200 Commercial Director Work 7,097 hrs 180/hr 0 Prorated 1,277,460 Communications Work 500 hrs 60/hr 0 Prorated 30,000 Compression Work 1,920 hrs 100/hr 0 Prorated 192,000 Construction Specialist Work 1,580 hrs 150/hr 0 Prorated 237,000 Environmental Advisor Work 1,400 hrs 130/hr 0 Prorated 182,000 Environmental Engineer Work 790 hrs 100/hr 0 Prorated 79,000 Feeder 10 - Technical Material ,000 Prorated 100,000 Feeder 10 Commercial Material ,000 Prorated 750,000 Feeder 10 Studies Material ,000 Prorated 0 Finance Director Work 400 hrs 160/hr 0 Prorated 64,000 Financial Advisor Work 1,510 hrs 400/hr 0 Prorated 604,000 Geologist Work 1,000 hrs 120/hr 0 Prorated 120,000 Geophysicist Work 1,000 hrs 120/hr 0 Prorated 120,000 Hydrogen - Commercial Material ,000 Prorated 800,000 Hydrogen - Technical Material ,000 Prorated 150,000 Hydrogen Studies Material ,000 Prorated 0 Intelligent Pig Inspection Material 1 0 3,000,000 End 3,000,000 Lease Fees Material ,000 Prorated 100,000 Legal Advisor Work 2,235 hrs 400/hr 0 Prorated 894,000 Marketing Work 600 hrs 60/hr 0 Prorated 36,000 Mechanical Engineer Work 2,350 hrs 75/hr 0 Prorated 176,250 Option Fee Material ,000 End 30,000 Pipeline Work 5,240 hrs 100/hr 0 Prorated 524,000 Pipeline Acquisition Material ,000 End 0 Planning Specialist Work 980 hrs 80/hr 0 Prorated 78,400 Pro Eng Software Work 80 hrs 50/hr 0 Prorated 4,000 Project Accountant Work 1,775 hrs 50/hr 0 Prorated 88,750 Project Economist Work 300 hrs 120/hr 0 Prorated 36,000 Project Engineer Work 6,840 hrs 75/hr 0 Prorated 513,000 Project Manager Work 6,113 hrs 180/hr 0 Prorated 1,100,340 Res Eng Software Work 560 hrs 50/hr 0 Prorated 28,000 Reservoir Eng Work 1,400 hrs 150/hr 0 Prorated 210,000 Shipping Specialist Work 1,100 hrs 75/hr 0 Prorated 82,500 Shipping Studies Material ,000 Prorated 400,000 Shipping Studies - Commercial Material ,000 End 600,000 Snr Process Eng Work 7,540 hrs 120/hr 0 Prorated 904,800 Storage Engineer Work 1,720 hrs 150/hr 0 Prorated 258,000 Subsea Engineer Work 2,740 hrs 120/hr 0 Prorated 328,800 Subsurface Team Leader Work 150 hrs 160/hr 0 Prorated 24,000 Team Travel Concept Phase Material 0 0 5,000 Prorated 0 Team Travel FEED Phase Material ,000 Prorated 20,000 Wells Work 2,120 hrs 120/hr 0 Prorated 254,400 Table 12-1: Budget Assumptions ACT Acorn Consortium Page 36 of 36

Tidal Energy. Transmission & Distribution Network. Wind Energy. Offshore Substation. Onshore Substation. Tidal Stream Energy.

Tidal Energy. Transmission & Distribution Network. Wind Energy. Offshore Substation. Onshore Substation. Tidal Stream Energy. Offshore Renewables Tidal Energy Transmission & Distribution Network Offshore Substation Wind Energy Onshore Substation Tidal Stream Energy Consumer Atkins in Offshore Renewables The offshore wind journey

More information

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN W.A.T. Alder and J. Perkins Binnie Black and Veatch, Redhill, UK In many of the high hazard industries the safety case and safety

More information

Brae Area Pre Decommissioning MARATHON BRAE. Brae Area Decommissioning Programme. June Revision 1.0

Brae Area Pre Decommissioning MARATHON BRAE. Brae Area Decommissioning Programme. June Revision 1.0 Brae Area Pre Decommissioning MARATHON BRAE Brae Area Decommissioning Programme June 2017 Revision 1.0 Why is Marathon Oil decommissioning? Decommissioning is a natural step in the life cycle of an oil

More information

Offshore wind. A new journey, a proven track record

Offshore wind. A new journey, a proven track record Offshore wind A new journey, a proven track record Petrofac is a leading provider of services to the international energy industry. We support our customers to unlock the potential of their assets; on

More information

Maasvlakte CCS Project - ROAD

Maasvlakte CCS Project - ROAD Maasvlakte CCS Project - ROAD European CCS Demonstration Project Network Meeting Rotterdam, May 10, 2011 Hans Schoenmakers Project Director ROAD Permits for a CCS project Power Plant Capture Plant Transport

More information

87R14 PETROLEUMEXPLORATI

87R14 PETROLEUMEXPLORATI E 87R14 SA M PL COSTESTI MATECLASSI FI CATI ON SYSTEM-ASAPPLI EDFORTHE PETROLEUMEXPLORATI ONAND PRODUCTI ONI NDUSTRY AACE International Recommended Practice No. 87R-14 COST ESTIMATE CLASSIFICATION SYSTEM

More information

How it works and Stakeholder Benefits

How it works and Stakeholder Benefits UNFC 2009 - Applications in Uranium and Thorium Resources: Focus on Comprehensive Extraction How it works and Stakeholder Benefits David MacDonald Santiago 9-12 July 2013 Stakeholders of our reported resources

More information

Onshore & Offshore Engineering and Management of Subsea Cables and Pipelines

Onshore & Offshore Engineering and Management of Subsea Cables and Pipelines Established in 1997, Primo Marine is an independent specialist with a wealth of experience in subsea cable engineering, from landfalls to subsea marine infrastructures. With an extensive track record,

More information

Emerging Subsea Networks

Emerging Subsea Networks FIBRE-TO-PLATFORM CONNECTIVITY, WORKING IN THE 500m ZONE Andrew Lloyd (Global Marine Systems Limited) Email: andrew.lloyd@globalmarinesystems.com Global Marine Systems Ltd, New Saxon House, 1 Winsford

More information

Click to edit Master title style

Click to edit Master title style Lessons Learnt: UKCS Oil and Gas Click to edit Master title style Projects 2011-2016 Jan Manoharan Asset Stewardship Lead, NNS/WoS May 2018 Click to edit Master subtitle style OGA 2018 This presentation

More information

DNB s oil and offshore conference. Idar Eikrem, CFO

DNB s oil and offshore conference. Idar Eikrem, CFO DNB s oil and offshore conference Idar Eikrem, CFO Well positioned for future market opportunities 1) Leading contractor within proven track record 2) Competitive position strengthened a) Delivering projects

More information

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia

ASX Release. 20 April Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia ASX Release 20 April 2018 Dear Shareholder, ADX Dougga Presentation to ETAP and Ministry in Tunisia ADX Energy Ltd (ASX: ADX) are pleased to advise that the Tunisian national oil company ETAP has requested

More information

We ll Get You There. Petroxin Petroleum Solutions 2016

We ll Get You There.   Petroxin Petroleum Solutions 2016 We ll Get You There. www.petroxin.org Petroxin Petroleum Solutions 2016 Unlocking the previously thought unreachable resources is Petroxin s priority. We focus on creative exploration and production techniques

More information

ENGINEERING SERVICES CONSULTANCY

ENGINEERING SERVICES CONSULTANCY ENGINEERING SERVICES CONSULTANCY Managing complexity, unlocking value Petrofac Engineering & Production Services 02 03 Discover the difference Consultancy services Petrofac is an international service

More information

marine, construction, drilling, floating production, decommissioning and renewables industries.

marine, construction, drilling, floating production, decommissioning and renewables industries. Maritime Assurance & Consulting Ltd (MAC), a Bureau Veritas Group Company, is a UK-based company with a global reach, offering a comprehensive range of support services to the Dynamic Positioning Assurance

More information

Analyst Day Real change starts here. Doug Pferdehirt, Chief Executive Officer

Analyst Day Real change starts here. Doug Pferdehirt, Chief Executive Officer 2017 Real change starts here Doug Pferdehirt, Chief Executive Officer Disclaimer Forward-looking statements We would like to caution you with respect to any forward-looking statements made in this commentary

More information

Offshore Construction Management Services. Capability & Experience

Offshore Construction Management Services. Capability & Experience Offshore Construction Management Services Capability & Experience Capability Overview INTECSEA has a proven track record for providing solutions to problems faced when implementing frontier projects, by

More information

Driving Cost Reductions in Offshore Wind THE LEANWIND PROJECT FINAL PUBLICATION

Driving Cost Reductions in Offshore Wind THE LEANWIND PROJECT FINAL PUBLICATION Driving Cost Reductions in Offshore Wind THE LEANWIND PROJECT FINAL PUBLICATION This project has received funding from the European Union s Co-funded by the Intelligent Energy Europe Seventh Programme

More information

Model project plan for Borssele (Innovation) Wind Farm Site V

Model project plan for Borssele (Innovation) Wind Farm Site V Model project plan for Borssele (Innovation) Wind Farm Site V Tips on how to draft your application: This project plan should be used to give a description of the project for which you are applying for

More information

Founding Manifesto Friends of Floating Offshore Wind 18 May 2016

Founding Manifesto Friends of Floating Offshore Wind 18 May 2016 Founding Manifesto Friends of Floating Offshore Wind 18 May 2016 Members: Pilot Offshore Renewables Hexicon RES Offshore IDEOL Floating Power Plant Glosten PelaStar Principle Power Inc. Atkins ACS Cobra

More information

Re-use & Decommissioning in The Netherlands: A Joint Effort

Re-use & Decommissioning in The Netherlands: A Joint Effort EUOAG Meeting Re-use & Decommissioning in The Netherlands: A Joint Effort 20 September 2017 Content Introduction EBN & NOGEPA Netherlands re-use & decommissioning landscape Netherlands Masterplan for Decommissioning

More information

Wood Group Investor Briefing Q1 2016

Wood Group Investor Briefing Q1 2016 Wood Group Investor Briefing Q1 2016 Our business Wood Group is an international projects, production and specialist technical solutions provider with around $6bn sales and 36,000 employees. We are focused

More information

COMPREHENSIVE SOLUTIONS

COMPREHENSIVE SOLUTIONS COMPREHENSIVE SOLUTIONS MCDERMOTT IS A PREMIER, FULLY INTEGRATED PROVIDER OF ENGINEERING, CONSTRUCTION AND TECHNOLOGY SOLUTIONS TO THE ENERGY INDUSTRY PROBLEM SOLVERS For more than a century, customers

More information

Subsea Engineering: Our Action Plan

Subsea Engineering: Our Action Plan Subsea Engineering: Our Action Plan Subsea Engineering Action Plan 3 FOREWORD Subsea technology and engineering know-how, honed in the North Sea, in the early eighties are now used around the world in

More information

Turning the wheels of your success

Turning the wheels of your success INDUSTRIAL SERVICES Turning the wheels of your success A comprehensive package of integrated services combining traditional certification and inspection with innovative business solutions based on the

More information

Reservoir Management

Reservoir Management Reservoir Management Field Development Studies TRACS Evaluations Exploration Production Engineering Unconventional Resources History 02 S. America N. America Europe Africa Asia Australia/Oceania AGR s

More information

Husky Energy - Development Plan Amendment Application. White Rose Extension Project. Public Review. Noia s Submission

Husky Energy - Development Plan Amendment Application. White Rose Extension Project. Public Review. Noia s Submission Husky Energy - Development Plan Amendment Application White Rose Extension Project Public Review Noia s Submission September 10, 2014 Table of Contents FOREWORD WREP PUBLIC REVIEW... 1. Background... 1.1

More information

Technology qualification management and verification

Technology qualification management and verification SERVICE SPECIFICATION DNVGL-SE-0160 Edition December 2015 Technology qualification management and verification The electronic pdf version of this document found through http://www.dnvgl.com is the officially

More information

European funding opportunities for Ocean Energy

European funding opportunities for Ocean Energy www.oceanenergy-europe.eu European funding opportunities for Ocean Energy Rémi Gruet Policy & Operations Director Ocean Energy Europe www.oceanenergy-europe.eu The European Ocean Energy Association Representing

More information

TECHNOLOGY QUALIFICATION MANAGEMENT

TECHNOLOGY QUALIFICATION MANAGEMENT OFFSHORE SERVICE SPECIFICATION DNV-OSS-401 TECHNOLOGY QUALIFICATION MANAGEMENT OCTOBER 2010 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property

More information

Buffalo field moving closer to production 3 May 2018

Buffalo field moving closer to production 3 May 2018 Buffalo field moving closer to production 3 May 2018 Highlights Preparations underway to drill the Buffalo-10 production well Buffalo-10 will be positioned to confirm attic oil and will be completed as

More information

-PILOT & Industry development -Decommissioning. Audrey Banner Head of Offshore Decommissioning Unit, DECC

-PILOT & Industry development -Decommissioning. Audrey Banner Head of Offshore Decommissioning Unit, DECC -PILOT & Industry development -Decommissioning Audrey Banner Head of Offshore Decommissioning Unit, DECC PILOT Joint Industry/Government Strategic Forum Membership includes; 8 members of the board of Oil

More information

Fact Sheet IP specificities in research for the benefit of SMEs

Fact Sheet IP specificities in research for the benefit of SMEs European IPR Helpdesk Fact Sheet IP specificities in research for the benefit of SMEs June 2015 1 Introduction... 1 1. Actions for the benefit of SMEs... 2 1.1 Research for SMEs... 2 1.2 Research for SME-Associations...

More information

PORT OF POOLE DEVELOPING FOR THE FUTURE

PORT OF POOLE DEVELOPING FOR THE FUTURE PORT OF POOLE DEVELOPING FOR THE FUTURE Nick Clarke & Kim Moore INTRODUCTION Masterplan the benefits EIA & SEA (Strategic Environmental ) Changes in Marine Licensing. PORT DEVELOPMENT PROCESS Development

More information

THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 INNOVATION

THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 INNOVATION 73 INNOVATION 74 VISION A dynamic industry that innovates to evolve, grow and attract the best entrepreneurial talent OBJECTIVES Innovation makes a significant and continuing contribution to rail business

More information

Stewardship. Expectations. SE-06 Production Optimisation Implementation Guide

Stewardship. Expectations. SE-06 Production Optimisation Implementation Guide Stewardship Expectations SE-06 Production Optimisation Implementation Guide June 2017 2 SE-06 Production Optimisation Implementation Guide 1. Objectives The objectives of this Stewardship Expectation are

More information

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value SUBSEA 7 AND GRANHERNE ALLIANCE Viable Solutions Operators are seeking novel and reliable concepts to overcome industry challenges such as complex reservoirs, cost, growth and schedule creep and to optimise

More information

Decommissioning - The Cost Challenge

Decommissioning - The Cost Challenge OGA 2018 This presentation is for illustrative purposes only. The OGA makes no representations or warranties, express or implied, regarding the quality, completeness or accuracy of the information contained

More information

BRAZIL ENERGY AND POWER CONFERENCE. Americo Oliveira McDermott Brazil General Manager September 20, 2015

BRAZIL ENERGY AND POWER CONFERENCE. Americo Oliveira McDermott Brazil General Manager September 20, 2015 BRAZIL ENERGY AND POWER CONFERENCE Americo Oliveira McDermott Brazil General Manager September 20, 2015 Forward-Looking Statement In accordance with the Safe Harbor provisions of the Private Securities

More information

World Offshore Wind Market Forecast Prospects, Technologies, World Markets

World Offshore Wind Market Forecast Prospects, Technologies, World Markets 2016 World Offshore Wind Market Forecast 2016-2025 Prospects, Technologies, World Markets Contents Table of Contents 1 Summary and Conclusions...7 Summary... 8 Conclusions... 9 2 Drivers and Indicators...

More information

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World

Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World 1 Overview About Subsea UK Facts and figures UK industry evolution Centre of Excellence Technology and Innovation

More information

Floating LNG facilities

Floating LNG facilities Lessons learned from three of the industry s first FLNG contracts position TechnipFMC as the pioneer developer for the next generation of FLNG facilities facilities As one of the pioneers in the provision

More information

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Prepared by Maritime NZ Contents Introduction... 3 Purpose... 3 Definitions... 4 Contents of a Well Control Contingency Plan (WCCP)...

More information

ENGINEERING SOLUTIONS FOR THE OIL & GAS INDUSTRY

ENGINEERING SOLUTIONS FOR THE OIL & GAS INDUSTRY ENGINEERING SOLUTIONS FOR THE OIL & GAS INDUSTRY BACK GROUND BASIS ENGINEERING IS A PROVIDER OF FACILITIES SOLUTION DESIGN TO THE OIL & GAS UPSTREAM MIDSTREAM MARKETS Founded in 1981, Basis Engineering

More information

Water, Energy and Environment in the scope of the Circular Economy

Water, Energy and Environment in the scope of the Circular Economy Water, Energy and Environment in the scope of the Circular Economy Maria da Graça Carvalho 11th SDEWES Conference Lisbon 2016 Contents of the Presentation 1. The Circular Economy 2. The Horizon 2020 Program

More information

The petroleum industry, internationalisation, 11 and technology development. Industry development and internationalisation

The petroleum industry, internationalisation, 11 and technology development. Industry development and internationalisation The petroleum industry, internationalisation, employment 11 and technology development Industry development and internationalisation Employment in the petroleum sector The significance of technology development

More information

Strategic Innovation Acceleration - UK marine energy industry: pathway to commercialisation Simon Robertson

Strategic Innovation Acceleration - UK marine energy industry: pathway to commercialisation Simon Robertson Strategic Innovation Acceleration - UK marine energy industry: pathway to commercialisation Simon Robertson Contents Carbon Trust Overview Innovation first principles UK Innovation landscape Marine energy

More information

Risk Management of the First Deepwater Project in China Asia Offshore Energy Conference September 27, 2012

Risk Management of the First Deepwater Project in China Asia Offshore Energy Conference September 27, 2012 Risk Management of the First Deepwater Project in China Asia Offshore Energy Conference September 27, 2012 1 Advisories Forward-Looking Statements Certain statements in this presentation are forward-looking

More information

Accelerating the Deployment of Offshore Renewable Energy Technologies. IEA Implementing Agreement on Renewable Energy Technology Deployment

Accelerating the Deployment of Offshore Renewable Energy Technologies. IEA Implementing Agreement on Renewable Energy Technology Deployment Accelerating the Deployment of Offshore Renewable Energy Technologies IEA Implementing Agreement on Renewable Energy Technology Deployment Background RETD The mission of RETD is to accelerate the large-scale

More information

Nasir, Dao PKM Abdul Partner PwC Legal (Vietnam) Co., Ltd

Nasir, Dao PKM Abdul Partner PwC Legal (Vietnam) Co., Ltd Nasir, Dao PKM Abdul Partner PwC Legal (Vietnam) Co., Ltd Get in touch Tel. (direct): +84 (8) 3824 0109 nasir.pkm@pwc.com Professional profile Nasir is a partner and the Legal Services Leader in Vietnam.

More information

GEAR 2030 WORKING GROUP 2 Roadmap on automated and connected vehicles

GEAR 2030 WORKING GROUP 2 Roadmap on automated and connected vehicles GEAR 2030 WORKING GROUP 2 Roadmap on automated and connected vehicles Europe has a very strong industrial basis on automotive technologies and systems. The sector provides jobs for 12 million people and

More information

Introducing Subsea Connect. Neil Saunders President & CEO, Oilfield Equipment, BHGE

Introducing Subsea Connect. Neil Saunders President & CEO, Oilfield Equipment, BHGE Introducing Subsea Connect Neil Saunders President & CEO, Oilfield Equipment, BHGE Global offshore (E&P CAPEX) 1 14-21 ($B) 400 Global offshore capital investment projected to grow at a CAGR of 16% with

More information

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE 4 What we do 6 Why choose us? 7 Service and product capabilities For more than 35 years, we have been providing clients with standalone and

More information

Submission to the Productivity Commission inquiry into Intellectual Property Arrangements

Submission to the Productivity Commission inquiry into Intellectual Property Arrangements Submission to the Productivity Commission inquiry into Intellectual Property Arrangements DECEMBER 2015 Business Council of Australia December 2015 1 Contents About this submission 2 Key recommendations

More information

Chiyoda Corporation and Ezra Holdings Limited enter into MOU to establish 50:50 Joint Venture, EMAS CHIYODA Subsea

Chiyoda Corporation and Ezra Holdings Limited enter into MOU to establish 50:50 Joint Venture, EMAS CHIYODA Subsea Chiyoda Corporation and Ezra Holdings Limited enter into MOU to establish 50:50 Joint Venture, EMAS CHIYODA Subsea Chiyoda will invest in Ezra s Subsea Services business, EMAS AMC, to form EMAS CHIYODA

More information

Using BIM to follow up milestones in a project plan during the design phase

Using BIM to follow up milestones in a project plan during the design phase Building Information Modelling (BIM) in Design, Construction and Operations 97 Using BIM to follow up milestones in a project plan during the design phase Ø. Mejlænder-Larsen Norwegian University of Science

More information

4 Briefing. Responsible investor

4 Briefing. Responsible investor Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP

More information

The future of offshore wind in the US

The future of offshore wind in the US The future of offshore wind in the US One of these things is not like the other Why is the adoption of the European Model not the best path forwards for the US offshore wind market? Arup specialists explore

More information

An Australian Company with Growing Onshore Oil Production in Indonesia

An Australian Company with Growing Onshore Oil Production in Indonesia ASX:BAS www.bassoil.com.au An Australian Company with Growing Onshore Oil Production in Indonesia Noosa Mining & Exploration Investor Conference 18 July 2018 Forward Looking Statements This presentation

More information

East Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection

East Anglia TWO and East Anglia ONE North. Summary and Approach to Site Selection East Anglia TWO and East Anglia ONE North Summary and Approach to Site Selection 1 Introduction ScottishPower Renewables (SPR) has recently concluded work in order to inform our onshore site selection

More information

GE OIL & GAS ANNUAL MEETING 2016 Florence, Italy, 1-2 February

GE OIL & GAS ANNUAL MEETING 2016 Florence, Italy, 1-2 February GE OIL & GAS ANNUAL MEETING 2016 Florence, Italy, 1-2 February Value creation and partnership in a challenging business environment Harry Brekelmans Projects and Technology Director Royal Dutch Shell 2016

More information

Repsol E&P T&T Ltd is one of the upstream Repsol YPF Group of companies currently operating in more than 20 countries around the world.

Repsol E&P T&T Ltd is one of the upstream Repsol YPF Group of companies currently operating in more than 20 countries around the world. 1 INTRODUCTION 1.1 Background Repsol E&P T&T Ltd is one of the upstream Repsol YPF Group of companies currently operating in more than 20 countries around the world. Repsol E&P has become one of the major

More information

Optimizing wind farms

Optimizing wind farms Optimizing wind farms We are Uniper We are a leading international energy company with operations in more than 40 countries and around 13,000 employees. We combine a balanced portfolio of modern assets

More information

Arctic and Cold Climate. Capability & Experience

Arctic and Cold Climate. Capability & Experience Arctic and Cold Climate Capability & Experience Capability Overview WorleyParsons and INTECSEA are world leaders in design and construction of oil and gas production facilities located in remote, hostile

More information

Integrity Monitoring? New thinking in the approach to Subsea IMMR. Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017

Integrity Monitoring? New thinking in the approach to Subsea IMMR. Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017 Integrity Monitoring? New thinking in the approach to Subsea IMMR Dr Karl Woods, Snr Subsea Reliability Engineer 22/2/2017 Disclaimer and important notice This presentation contains forward looking statements

More information

NSRI Mastermining Wave & Tidal Workshop 16/05/18. Opening Address. David Rennie Head of Oil and Gas Scottish Enterprise.

NSRI Mastermining Wave & Tidal Workshop 16/05/18. Opening Address. David Rennie Head of Oil and Gas Scottish Enterprise. NSRI Mastermining Wave & Tidal Workshop 16/05/18 Opening Address David Rennie Head of Oil and Gas Scottish Enterprise What I am aiming to cover today The economic opportunity associated with the blue economy

More information

NO. ONGC/EOA/KG-DWN-98/2 Cluster 2/ONSHORE/EOI/2016/ Date: EXPRESSION OF INTEREST (EOI)

NO. ONGC/EOA/KG-DWN-98/2 Cluster 2/ONSHORE/EOI/2016/ Date: EXPRESSION OF INTEREST (EOI) Oil and Natural Gas Corporation Limited Eastern Offshore Asset Office of Project Manager, KG-DWN- 98/2 Project 3rd Floor, Subhadra Arcade, Near Bhanugudi Junction Kakinada - 533 003, Andhra Pradesh, India

More information

European Charter for Access to Research Infrastructures - DRAFT

European Charter for Access to Research Infrastructures - DRAFT 13 May 2014 European Charter for Access to Research Infrastructures PREAMBLE - DRAFT Research Infrastructures are at the heart of the knowledge triangle of research, education and innovation and therefore

More information

MERMAID MARINE AUSTRALIA LTD INVESTOR BRIEFING DEVELOPMENT OF DAMPIER SUPPLY BASE

MERMAID MARINE AUSTRALIA LTD INVESTOR BRIEFING DEVELOPMENT OF DAMPIER SUPPLY BASE MERMAID MARINE AUSTRALIA LTD INVESTOR BRIEFING DEVELOPMENT OF DAMPIER SUPPLY BASE 1 May 2008 Agenda Overview Sector Highlights - Record Offshore Activity Levels - The Gorgon Project Mermaid s Strategy

More information

Worldwide Technip in Turkmenistan

Worldwide Technip in Turkmenistan Worldwide Technip in Turkmenistan Technip brings its worldwide expertise to the economic growth of Turkmenistan Technip at a glance Technip is a world leader in project management, engineering and construction

More information

Pan-Canadian Trust Framework Overview

Pan-Canadian Trust Framework Overview Pan-Canadian Trust Framework Overview A collaborative approach to developing a Pan- Canadian Trust Framework Authors: DIACC Trust Framework Expert Committee August 2016 Abstract: The purpose of this document

More information

Kinsale Area Gas Fields Decommissioning Project Information Leaflet

Kinsale Area Gas Fields Decommissioning Project Information Leaflet Kinsale Area s Decommissioning Project Information Leaflet About Kinsale Energy PSE Kinsale Energy Limited has been operating a number of gas fields in the Celtic Sea, off the County Cork coast, since

More information

Survey and Geosciences. Capability & Experience

Survey and Geosciences. Capability & Experience Survey and Geosciences Capability & Experience Capability Overview INTECSEA s Survey and Geoscience group is a team of Subject-Matter Experts in survey, geology and geophysics, geohazards, geotechnical

More information

Violent Intent Modeling System

Violent Intent Modeling System for the Violent Intent Modeling System April 25, 2008 Contact Point Dr. Jennifer O Connor Science Advisor, Human Factors Division Science and Technology Directorate Department of Homeland Security 202.254.6716

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

Globalisation increasingly affects how companies in OECD countries

Globalisation increasingly affects how companies in OECD countries ISBN 978-92-64-04767-9 Open Innovation in Global Networks OECD 2008 Executive Summary Globalisation increasingly affects how companies in OECD countries operate, compete and innovate, both at home and

More information

Investor Presentation

Investor Presentation Connecting What s Needed with What s Next Investor Presentation September 2017 Forward-Looking Statements Statements we make in this presentation that express a belief, expectation, or intention are forward

More information

Score grid for SBO projects with a societal finality version January 2018

Score grid for SBO projects with a societal finality version January 2018 Score grid for SBO projects with a societal finality version January 2018 Scientific dimension (S) Scientific dimension S S1.1 Scientific added value relative to the international state of the art and

More information

7 Briefing. Responsible investor

7 Briefing. Responsible investor Issue Responsible investor 7 Briefing Monday, 5 th October 202 In 200, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP has committed

More information

FY2013 Indicative Work Programme and Budget Co-regulatory Forum. 18 November 2011

FY2013 Indicative Work Programme and Budget Co-regulatory Forum. 18 November 2011 FY2013 Indicative Work Programme and Budget Co-regulatory Forum 18 November 2011 Agenda Strategic context Work programmes Funding Initial feedback Forum discussion 18 November 2011 Gas Industry Company

More information

API COPM CPMA Chapter 20.X

API COPM CPMA Chapter 20.X API COPM CPMA Chapter 20.X David Courtney Pamela Chacon Matt Zimmerman Dan Cutting 24 23 February 2017 Houston, TX Copyright 2017, Letton Hall Group. This paper was developed for the UPM Forum, 22 23 February

More information

Gas Storage and Oil & Gas Exploration in County Antrim

Gas Storage and Oil & Gas Exploration in County Antrim Gas Storage and Oil & Gas Exploration in County Antrim Dr Andrew Hindle InfraStrata plc 17 October 2012 1 Agenda Introduction Islandmagee gas storage project PL1/10 licence oil & gas exploration 2 Introduction

More information

Please send your responses by to: This consultation closes on Friday, 8 April 2016.

Please send your responses by  to: This consultation closes on Friday, 8 April 2016. CONSULTATION OF STAKEHOLDERS ON POTENTIAL PRIORITIES FOR RESEARCH AND INNOVATION IN THE 2018-2020 WORK PROGRAMME OF HORIZON 2020 SOCIETAL CHALLENGE 5 'CLIMATE ACTION, ENVIRONMENT, RESOURCE EFFICIENCY AND

More information

RURAL ECONOMY AND CONNECTIVITY COMMITTEE SALMON FARMING IN SCOTLAND SUBMISSION FROM ANNE-MICHELLE SLATER. School of Law, University of Aberdeen

RURAL ECONOMY AND CONNECTIVITY COMMITTEE SALMON FARMING IN SCOTLAND SUBMISSION FROM ANNE-MICHELLE SLATER. School of Law, University of Aberdeen RURAL ECONOMY AND CONNECTIVITY COMMITTEE SALMON FARMING IN SCOTLAND SUBMISSION FROM ANNE-MICHELLE SLATER School of Law, University of Aberdeen In Aquaculture Law and Policy Global, Regional and National

More information

FP7 Cooperation Programme - Theme 6 Environment (including climate change) Tentative Work Programme 2011

FP7 Cooperation Programme - Theme 6 Environment (including climate change) Tentative Work Programme 2011 FP7 Cooperation Programme - Theme 6 Environment (including climate change) Tentative Work Programme 2011 European Commission Research DG Michele Galatola Unit I.3 Environmental Technologies and Pollution

More information

ENGINEERING INNOVATION

ENGINEERING INNOVATION ENGINEERING INNOVATION ENGINEERING INNOVATION Viper Subsea provides control system distribution solutions for the global subsea oil and gas industry. Our product and service offering covers the full life

More information

Executive Summary and Table of Contents

Executive Summary and Table of Contents UK UPSTREAM OIL & GAS SECTOR REPORT 2012/13 Executive Summary and Table of Contents Focused, cutting edge information on the UK Upstream oil and gas industry. Providing detailed and robust analysis of

More information

OWA Floating LiDAR Roadmap Supplementary Guidance Note

OWA Floating LiDAR Roadmap Supplementary Guidance Note OWA Floating LiDAR Roadmap Supplementary Guidance Note List of abbreviations Abbreviation FLS IEA FL Recommended Practices KPI OEM OPDACA OSACA OWA OWA FL Roadmap Meaning Floating LiDAR System IEA Wind

More information

WORKING IN PARTNERSHIP TO IMPROVE COMMUNITY ENGAGEMENT: A CASE STUDY FROM THE PROPOSED PETERHEAD CCS PROJECT

WORKING IN PARTNERSHIP TO IMPROVE COMMUNITY ENGAGEMENT: A CASE STUDY FROM THE PROPOSED PETERHEAD CCS PROJECT WORKING IN PARTNERSHIP TO IMPROVE COMMUNITY ENGAGEMENT: A CASE STUDY FROM THE PROPOSED PETERHEAD CCS PROJECT SCCS Conference 28 October, 2015 Denise Horan Stakeholder Engagement & Communications Manager,

More information

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO

Brief to the. Senate Standing Committee on Social Affairs, Science and Technology. Dr. Eliot A. Phillipson President and CEO Brief to the Senate Standing Committee on Social Affairs, Science and Technology Dr. Eliot A. Phillipson President and CEO June 14, 2010 Table of Contents Role of the Canada Foundation for Innovation (CFI)...1

More information

RFP No. 794/18/10/2017. Research Design and Implementation Requirements: Centres of Competence Research Project

RFP No. 794/18/10/2017. Research Design and Implementation Requirements: Centres of Competence Research Project RFP No. 794/18/10/2017 Research Design and Implementation Requirements: Centres of Competence Research Project 1 Table of Contents 1. BACKGROUND AND CONTEXT... 4 2. BACKGROUND TO THE DST CoC CONCEPT...

More information

April 2015 newsletter. Efficient Energy Planning #3

April 2015 newsletter. Efficient Energy Planning #3 STEEP (Systems Thinking for Efficient Energy Planning) is an innovative European project delivered in a partnership between the three cities of San Sebastian (Spain), Bristol (UK) and Florence (Italy).

More information

The Energy Sector of the Blue Economy Kristian Petrick eco-union

The Energy Sector of the Blue Economy Kristian Petrick eco-union The Energy Sector of the Blue Economy Kristian Petrick eco-union Workshop, Marseille, 31 May 2017 Med Trends Report 2015 Getting an idea of the importance of the sectors (today vs. 2030 globally) 2 Energy

More information

Abstract. Mission. Exceptions

Abstract. Mission. Exceptions Marine transportation manual - a year 2000 joint industry project J.M.R. Lloyd Noble Denton Europe Ltd, Noble House, 131 Aldersgate Street, London EC1A 4EB, UK Abstract Mission To develop and publish a

More information

ECU Research Commercialisation

ECU Research Commercialisation The Framework This framework describes the principles, elements and organisational characteristics that define the commercialisation function and its place and priority within ECU. Firstly, care has been

More information

What is on the Horizon? 2020

What is on the Horizon? 2020 What is on the Horizon? 2020 Dr Jane Watkins - NCP for FP7 KBBE Dublin May 2013 Main topics The political context Innovation Union turning the European Union into an Innovation Union Horizon 2020 the future

More information

SHELL CANSOLV AT THE TCM DEMONSTRATION PLANT Delivering the CANSOLV DC-201 enhanced solvent

SHELL CANSOLV AT THE TCM DEMONSTRATION PLANT Delivering the CANSOLV DC-201 enhanced solvent SHELL CANSOLV AT THE TCM DEMONSTRATION PLANT Delivering the CANSOLV DC-201 enhanced solvent Matthew Campbell M.SC.Eng Development Engineer DEFINITIONS & CAUTIONARY NOTE Reserves: Our use of the term reserves

More information

PGNiG. Code. of Responsible Gas and Oil Production

PGNiG. Code. of Responsible Gas and Oil Production PGNiG Code of Responsible Gas and Oil Production The Code of Responsible Gas and Oil Production of Polskie Górnictwo Naftowe i Gazownictwo SA is designed to help us foster relations with the local communities

More information

Shell Project Delivery Best Practices Dick L. Wynberg, GM NOV Projects Integrated Gas Shell Global Solutions International B.V

Shell Project Delivery Best Practices Dick L. Wynberg, GM NOV Projects Integrated Gas Shell Global Solutions International B.V Shell Project Delivery Best Practices Dick L. Wynberg, GM NOV Projects Integrated Gas Shell Global Solutions International B.V SEPTEMBER 26, 2017, ST. PETERSBURG, HOTEL ASTORIA Definitions and cautionary

More information

ITF Subsea Processing Initiative. Ian McCabe - Technology Project Team Leader

ITF Subsea Processing Initiative. Ian McCabe - Technology Project Team Leader ITF Subsea Processing Initiative Ian McCabe - Technology Project Team Leader Scope Background to ITF Membership The Collaborative Technology Space Why ITF? Subsea Processing Initiative Low Cost Separator

More information