i) Short narrative of the Proposal for Project : The Government of Telangana
|
|
- Adela Tamsin Nichols
- 5 years ago
- Views:
Transcription
1 GOVERNMENT OF TELANGANA RURAL WATER SUPPLY AND SANITATION DEPARTMENT APPENDEX (See Rule 6) t< FORM-'A' Form for seeking prior approval under section 2 of the proposals by the state Government and other authorities. PART-l (TO BE FILLED BY USER AGENCY) 1. Project Details : TELANGANADRINKING WATER SUPPLY PROJECT for Laying Pipe line and Construction of the Other Structures for Providing safe Drinking Water in Manakondur,Huzurabad,Husnabad,Peddapally, Ramagundam,Choppadandi Constituencies of Karimnagar and Parkal in Warangal District - Segments 16" (East Division) i) Short narrative of the Proposal for Project : The Government of Telangana has decided to improve the drinking water Supply level to all the habitations in the new State to Provide safe Drinking the State. To avoid Water to all in Quantitative and Qualitative problems it is proposed to supply surface water from LMD and Ellampally in Manthani(M) in Karimnagar District. The Raw Water and Treated Water Pipe lines are to be laid to cover in the Segment - 16 in the all habitations in the Manakondur,Huzurabad,Husnabad, Peddapally,Ramagundam,Choppada ndy Constituencies in Karimnagar and Parkal in Warangal Constituencies. The proposed Pipe line alignment is passing through the Reserve Forest for which Forest Land Diversion is required to
2 complete the Telangana Drinking Water Project for Karimnagar District covering above Constituencies. ii) Map showing the required forest land Map showing the reserve forest and Boundary of adjoining Forest on a 1 in boundary is enclosed. 50,000 Scale topo map. The land is meant for Laying Pipe line And Construction of the Other Structures For Providing safe Drinking Water in Manakondur,Huzurabad,Husnabad, Peddapally,Ramagundam,Choppadandi Constituencies of of Karimnagar and Parka! Constituencies in Waranga! District _ Segment No _ 16. iii) Cost of the Project. Rs Crores. iv) Justification for location the project in forest area The proposed Pipe lines of Telangana Drinking Water Project have no other alternative routes to cover all the habitations. And the proposed Structures in the Forest Area are essential to cover the habitations in the Karimnagar & Warangal Districts. As per the Hydraulic Designs and Topography of the Area the proposed locations are very much essential and there is no other alternative alignment. v) Cost benefit analysis (to be enclosed) vi) Employment likely to be generated Not applicable, as there is no other alternate to compare the cost. Mandays 2. Purpose wise breakup of the total Land required Extent After working out various options in execution of the Pipe Line Works in the forest Land, the diversion of forest land to the minimum requirement is worked out. The details of the land requirement are here with enclosed for more clarity. The purpose wise land requirement for 1. Pipe lines Hect. 2. For Structures Hect. 3.For Head Works Hect. 4.For Ghat Roads Hect. Total Hect. 2
3 East Division 1. Pipe lines Hect. 2. For Structures Hect. 3. For Ghat Roads Hect 4.For Head works Hect " Total Hect 3. Details of displacement of people due to the project if any: i) Number of families ii) Number of Schedule Caste / Schedule Tribal families. iii) Rehabilitation Plan 4. Where Clearance under Environment (Protection) Act, 1986 Required? (Yes/No) No 5. Undertaking to bear the cost of rising and maintenance of compensatory Afforestation and lor penal ompensatory afforestation as well as cost are protection and regeneration of Safety zone., etc., as perthe Scheme prepared by the state Government (under taking to be enclosed). 6. Details of Certificates / Documents Enclosed as required Enclosed under the instructions. Enclosed M Superintending Engineer, TDWSP,Circle,Karimnagar "Counter Signed", Chief Engin~WSp, v~ Hyderabad 3
4 GOVERNMENT OF TELANGANA '- RURAL WATER SUPPLY AND SANITATION DEPARTMENT APPENDEX (See Rule 6) FORM-'A' Form for seeking prior approval under section 2 of the proposals by the state Government and other authorities. PART-l (TO BE FILLED BY USER AGENCY) 1. Project Details : TELANGANA DRINKING WATER SUPPLY PROJECT for Laying Pipe line and Construction of the Other Structures for Providing safe Drinking Water in Manakondur,Huzurabad,Husnabad,Peddapally, Ramagundam,Choppadandi Constituencies of Karimnagar and Parkal in Warangal District - Segments 16" (West Division) i) Short narrative of the Proposal for Project : The Government of Telangana has decided to improve the drinking water Supply level to all the habitations in the new State to Provide safe Drinking Water to all in the State. To avoid Quantitative and Qualitative problems it is proposed to supply surface water from LMD and Ellampally in Manthani(M) in Karimnagar District. The Raw Water and Treated Water Pipe lines are to be laid to cover in the Segment - 16 in the all habitations in the Mana kondu r, Huzu rabad, Husna bad, Peddapally,Ramagundam,Choppada ndy Constituencies in Karimnagar and Parkal in Warangal Constituencies. The proposed Pipe line alignment is passing through the Reserve Forest for which Forest Land Diversion is required to 1
5 complete the Telangana Drinking '---' Water Project for Karimnagar District covering above Constituencies. ii) Map showing the required forest land Map showing the reserve forest and Boundary of adjoining Forest on a 1 in boundary is enclosed. 50,000 Scale topo map. The land is meant for Laying Pipe line And Construction of the Other Structures For Providing safe Drinking Water in Manakondur,Huzurabad,Husnabad, Peddapally,Ramagundam,Choppadandi Constituencies of of Karimnagar and Parkal Constituencies in Warangal District _ Segment No _16. iii) Cost of the Project. Rs Crores. iv) Justification for location the project in forest area The proposed Pipe lines of Telangana Drinking Water Project have no other alternative routes to cover all the habitations. And the proposed Structures in the Forest Area are essential to cover the habitations in the Karimnagar & Warangal Districts. As per the Hydraulic Designs and Topography of the Area the proposed locations are very much essential and there is no other alternative alignment. v) Cost benefit analysis (to be enclosed) vi) Employment likely to be generated Not applicable, as there is no other alternate to compare the cost. Mandays 2. Purpose wise breakup of the total Land required Extent After working out various options in execution of the Pipe Line Works in the forest Land, the diversion of forest land to the minimum requirement is worked out. The details of the land requirement are here with enclosed for more clarity. The purpose wise land requirement for 1. Pipe lines Hect. 2. For Structures Hect. 3.For Head Works Hect. 4.For Ghat Roads Hect. Total Hect. 2
6 West Division 1. Pipe lines Hect. 2. For Structures Hect. 3. For Ghat Roads Hect Total Hect 3. Details of displacement of people due to the project if any: i) Number of families ii) Number of Schedule Caste / Schedule Tribal families. iii) Rehabilitation Plan 4. Where Clearance under Environment (Protection) Act, 1986 Required? (Yesl No) No 5. Undertaking to bear the cost of rising and maintenance of compensatory Afforestation and lor penal ompensatory afforestation as well as cost are protection and regeneration of Safety zone., etc., as perthe Scheme prepared by the state Government (under taking to be enclosed). 6. Details of Certificates I Documents Enclosed as required Enclosed under the instructions. Enclosed #f- Superintending Engineer, TDWSP,Circle,Karimnagar "Counter Signed", Chief Engin~, v~ Hyderabad 3
Read the following: ORDER:-
GOVERNMENT OF TELANGANA ABSTRACT RWS&S- Telangana Water Supply Project Administrative Sanction for Water Supply to habitations in Mahabubnabar, Rangareddy, Nalgonda,, Nizamabad, Adilabad and Karimnagar
More informationEntrepreneurs-64,Senior Citizens-96, ANDHRA BANK NALGONDA FARMERS-328,SHG`s-432,Micro and Small
ANNEX III- PART C QUARTERLY REPORT ON CONDUCT OF CAMPS BY RURAL BRANCHES OF BANKS State TELANGANA Quarter ended 03/16 Year 2015-2016 BANK SBH, SLBC TELANGANA FARMERS-122,SHG`s-117,Micro and Small ADILABAD
More informationAPPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST
VI-K -1 of 8 APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST Final Submittal Major Subdivision Project Name Subdivision Number Location (Street
More informationPLANNING AND DEVELOPMENT
OVERVIEW Effective January 1, 1992 all applications for multi-family residential and all non-residential building permits require site plan approval before permit issuance. All new developments and existing
More informationCHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2
SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW
More informationFORM FOR COMMUNITY, NATIVITY AND DATE OF BIRTH CERTIFICATE COMMUNITY, NATIVITY AND DATE OF BIRTH CERTIFICATE
1 FORM FOR COMMUNITY, NATIVITY AND DATE OF BIRTH CERTIFICATE Serial No. S.C. District Code : S.T. Mandal Code : B.C. Village Code : Certificate No.: COMMUNITY, NATIVITY AND DATE OF BIRTH CERTIFICATE (1)
More informationTABLE OF CONTENTS 1200 PLAN PREPARATION
1200 PLAN PREPARATION TABLE OF CONTENTS PAGE 1201 General Plan Sheet Information... 12-1 1201.1 Introduction... 12-1 1201.2 Unit of Measure... 12-1 1201.3 Plan Sheet Materials and File Format... 12-1 1201.4
More informationConsortium model for electronic Journals for Indian Social Science Journals
Consortium model for electronic Journals for Indian Social Science Journals By G.K.Manjunath Chief Librarian Indira Gandhi Institute of Development Research Mumbai Inter-library cooperation among Indian
More informationPrasar Bharati (India s Public Service Broadcaster) Regional News Unit : Doordarshan Kendra : Hyderabad
Prasar Bharati (India s Public Service Broadcaster) Regional News Unit : Doordarshan Kendra : Hyderabad 500 013. No. TVH/News/Stringers/2018/ Dated: 10 th Sept. 2018. Sub: Empanelment of Stringers in RNU
More informationBrief Note Survey of Indian Pharmaceutical Enterprises for Meeting National and Global Health Needs
Brief Note Survey of Indian Pharmaceutical Enterprises for Meeting National and Global Health Needs Background The pharmaceutical sector is one of the key 25 sectors identified by the Government of India
More informationMaintenance of Traffic sequence of operations including any phasing and detour maps;
All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise
More informationPorter County Plan Commission
Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer
More informationREVISED DRAFT - 8/21/00 BIOLOGICAL OPINION ON THE OPERATION OF THE MISSOURI RIVER MAIN STEM RESERVOIR SYSTEM,
REVISED DRAFT - 8/21/00 BIOLOGICAL OPINION ON THE OPERATION OF THE MISSOURI RIVER MAIN STEM RESERVOIR SYSTEM, OPERATION AND MAINTENANCE OF THE MISSOURI RIVER BANK STABILIZATION AND NAVIGATION PROJECT,
More informationMATERIALS DIVISION MEMORANDUM
MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Precast Concrete and Concrete Pipe Quality Control/Quality Assurance Programs SPECIFIC SUBJECT: Sections 204.22(c), 204.26(d) and Minimum Acceptance Sampling
More informationAnne Arundel County Dept. of Inspections and Permits Storm Drain Checklist
Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated
More informationB.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST
B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary
More informationAdvanced Dimensional Management LLC
Index: Mechanical Tolerance Stackup and Analysis Bryan R. Fischer Accuracy and precision 8-9 Advanced Dimensional Management 14, 21, 78, 118, 208, 251, 286, 329-366 Ambiguity 4, 8-14 ASME B89 48 ASME Y14.5M-1994
More informationPREPARATION OF PHOTO ELECTORAL ROLLS. Pre Bid Conference 5 th October, 2007 GAD(Elections) Department Govt. of Andhra Pradesh
PREPARATION OF PHOTO ELECTORAL ROLLS Pre Bid Conference 5 th October, 2007 GAD(Elections) Department Govt. of Andhra Pradesh OBJECTIVE Photo electoral rolls will have photo of each eligible voter (Age
More informationSANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS
SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS All plans for sanitary sewer main extensions, improvements and modifications
More informationRequired Supporting Information and Documentation for Historic Preservation Certification Applications
Required Supporting Information and Documentation for Historic Preservation Certification Applications Part 1 Submittal- Evaluation of Significance Descriptive Information Describe the major features of
More informationState College Area School District
State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee
More informationDEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name
GWINNETT COUNTY Department of Planning and Development One Justice Square 446 West Crogan Street Suite 150 1 st Floor Lawrenceville, GA 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com
More informationList of Figures. List of Forms
City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan
More informationDEVELOPMENT PLAN CHECKLIST
Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature
More informationAPPLICATION FORM TO OPERATE WIRELESS LINK/NETWORK UNDER INDIAN TELEGRAFPH ACT 1885 (To be submitted in triplicate)
APPLICATION FORM TO OPERATE WIRELESS LINK/NETWORK UNDER INDIAN TELEGRAFPH ACT 1885 (To be submitted in triplicate) 1. Name of applicant : 2. Address of correspondence : (With telephone/telex nos.) : 3
More informationIndustrial Mechanic (Millwright) On-the-Job Training Guide
Industrial Mechanic (Millwright) On-the-Job Training Guide Industrial Mechanics (Millwright) install, maintain and repair machinery in factories, mines and production facilities. Training Requirements:
More informationSPECIAL PUBLIC NOTICE
SPECIAL PUBLIC NOTICE Draft Map and Drawing Standards for the South Pacific Division Regulatory Program August 6, 2012 Corps contacts: Sacramento District: Michael Finan (916) 557-5324 (Michael.C.Finan@usace.army.mil)
More informationSpace Assets and the Sustainable Development Goals
Space Assets and the Sustainable Development Goals Michael Simpson, Secure World Foundation In cooperation with Krystal Wilson Breakout Session #2 - Space Society Monday, November 21, 2016 United Nations/United
More informationApplication of FTTH Access Scheme in Digital Television System Juan ZHANG
2016 International Conference on Informatics, Management Engineering and Industrial Application (IMEIA 2016) ISBN: 978-1-60595-345-8 Application of FTTH Access Scheme in Digital Television System Juan
More informationCity of Massillon Site Plan Checklist
City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete
More informationSurvey Data and TOPO Checklist
Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand
More informationPROFILE OF THE DISTRICT
PROFILE OF THE DISTRICT Koraput is a mosaic of tribal life and culture. The District of Koraput derives its name from its headquarters, the present town of Koraput. Koraput with her rolling mountains,
More informationPipeline Technology Conference 2010
THRESHOLDS, ACCURACIES AND RESOLUTION: QUANTITATIVE MEASUREMENT AND ITS ADVANTAGES FOR METAL LOSS INSPECTION A. Barbian, M. Beller, A. Hugger, C. Jäger, A. Pfanger NDT Systems & Services Stutensee, Germany
More informationCHAPTER I INTRODUCTION. Village and cottage industry is defined to be an. enterprise or series of operations carried on by a workman
CHAPTER I INTRODUCTION 1.0 Village and cottage industries offer employment opportunities to the rural masses. They provide an outlet for creative urge among individuals and promote their entrepreneurial
More informationJOB DESCRIPTION. Coachella Valley Water District October 12, DEPARTMENT: Facilities and Maintenance REPORTING RELATIONSHIP:
Coachella Valley Water District October 12, 2017 TITLE: Electronic Technician II SECTION: Electronics Shop DEPARTMENT: Facilities and Maintenance REPORTING RELATIONSHIP: Reports to: Electronics Supervisor,
More informationStandards for 14 to 19 education
citb.co.uk Standards for 14 to 19 education The advisory committee for 14 to 19 construction and the built environment education Contents Background 3 Purpose 4 14 to 19 standards and guidance on the design
More informationCITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES
CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES I. PURPOSE AND COMPLIANCE In implementing City Code, Chapter 8, Section 815, the City Council of the City of Pine City (the City ) finds that
More informationAgency Information Collection Activities: Submission for Review; Information
This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28096, and on FDsys.gov 9110-9F DEPARTMENT OF HOMELAND SECURITY
More informationDISTRICT COOPERATIVE CENTRAL BANK LTD. (Bring this Bio-Data form duly filled in and submit four copies at the time of Interview)
DISTRICT COOPERATIVE CENTRAL BANK LTD. (Bring this Bio-Data form duly filled in and submit four copies at the time of Interview) BIO-DATA FORM FOR RECRUITMENT OF STAFF ASSISTANT / CLERK PLEASE FILL THE
More informationABC-UTC Progress Report
1 ABC-UTC 2015 Progress Report This document provides the problem statement, objective and scope of the project, followed by list of tasks and their status A. PROJECT TITLE: An Integrated Project- to Enterprise-Level
More informationMap and Drawing Standards for the South Pacific Division Regulatory Program
Map and Drawing Standards for the South Pacific Division Regulatory Program Hollis Jencks Project Manager, Nevada/Utah Section Sacramento District Regulatory Program Workshop 31 May 2018 US Army Corps
More informationGetting Through the Green: Smarter Traffic Management with Adaptive Signal Control
Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control Presented by: C. William (Bill) Kingsland, Assistant Commissioner, Transportation Systems Management Outline 1. What is
More informationHAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review
HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.
More informationPRODUCT DESIGN AND TECHNOLOGY
Victorian Certificate of Education 2016 SUPERVISOR TO ATTACH PROCESSING LABEL HERE Letter STUDENT NUMBER PRODUCT DESIGN AND TECHNOLOGY Written examination Thursday 3 November 2016 Reading time: 9.00 am
More informationDrawbridge Operation Regulation; Oakland Inner Harbor, ACTION: Notice of deviation from drawbridge regulation.
This document is scheduled to be published in the Federal Register on 03/06/2015 and available online at http://federalregister.gov/a/2015-05231, and on FDsys.gov 9110-04-P DEPARTMENT OF HOMELAND SECURITY
More informationLight In Architecture
Designing with Light Light plays a central role in the design of a visual environment. The architecture, people and objects are all made visible by the lighting. Light influences our well-being, the aesthetic
More informationInstallation Guide. SUPERWOOD decking with groove
Installation Guide SUPERWOOD decking with groove (Plastic T-clip) (V2014 1.1) Key points: Before installing our SUPERWOOD products, it's necessary to read the Installation Guide. The installation is suitable
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (February 2009) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (January 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
More informationBOARD MEMBER REQUESTS & INFORMATIONAL ITEMS
NON-AGENDA September 1, 2017 Board Policy: EL-7 Communication and Support to the Board The BAOs shall inform and support the Board in its work. Page # CEO BULLETIN / NEWSLETTERS 4 CEO Bulletin: 08/25/17
More informationINDUSTRIAL MECHANIC (MILLWRIGHT)
Interim Logbook Department of Advanced Education and Skills Apprenticeship and Trades Certification Division INDUSTRIAL MECHANIC (MILLWRIGHT) Note to Apprenticeship Applicants This form can only be used
More informationEssential Skills: Reading and Interpreting Maps and Plans
Essential Skills: Reading and Interpreting Maps and Plans Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Stages of Plan Review Concept /
More informationNational 5 Graphic Communication Assignment Assessment task
National 5 Graphic Communication Assignment Assessment task Specimen valid from session 2017 18 and until further notice. This edition: September 2017 (version 1.1) The information in this publication
More informationPROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA
PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval
More informationPART XIII: HYDRAULIC/ HYDROLOGY SURVEYS
PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS 13.1 Purpose and Scope Hydraulic surveys are required for flow analysis to determine bridge and culvert design characteristics. A hydraulic survey is usually but
More informationMarine Renewable-energy Application
Marine Renewable-energy Application OFFICE USE ONLY Date Received: Application #: Time Received: Date of Complete Application: Received by: Processed by: Type of Application Permit (unconnected) Permit
More informationB-PERMIT PLAN CHECK MANUAL
B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases
More informationRe: Scheduling of a Project Certificate Workshop for TMAC Resources Inc. s Phase 2 Hope Bay Belt Project week of October 29, 2018
NIRB File No.: 12MN001 NWB File No. 2AM-DOH1323 and 2AM-BOS---- October 15, 2018 To: Phase 2 Hope Bay Belt Distribution List Sent via email Re: Scheduling of a Project Certificate Workshop for TMAC Resources
More informationINVITATION FOR RESEARCH PROPOSALS
1. Introduction INVITATION FOR RESEARCH PROPOSALS On Mahatma Gandhi NREGA Guidelines for Research Studies under (from Invited Institutions) Last Date for Submission of Proposals: 12.8.2016 The Mahatma
More informationGIS & Remote Sensing 15 th Feb, 2010
Mahatma Gandhi National Rural Employment Guarantee Act GIS & Remote Sensing 15 th Feb, 2010 To prepare a strategy and evolve parameters for standardization with an objective to link GIS with planning,
More informationOhio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 5 GEOTECHNICAL SUBMISSION GUIDELINES Geotechnical Bulletin GB5 was developed
More informationCity of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA Phone: Fax:
City of Lompoc Building & Safety Services Section 100 Civic Center Plaza Lompoc, CA 93436 Phone: 805-875-8220 Fax: 805-875-8198 RESIDENTIAL BUILDING PLANS SUBMITTAL REQUIREMENTS A. APPLICATION PROCESS
More informationOption 1. Design Options are diverse e.g. new route alignments covering a wide area. Option 2. Design Options are restricted
MINIMUM STANDARD Z/16 SURVEY SPECIFICATIONS 1. GENERAL This specification sets out the Consultant s requirements for topographical survey (ground and aerial) for the Detailed Business Case (DBC) and Pre-Implementation
More informationCreate styles that control the display of Civil 3D objects. Copy styles from one drawing to another drawing.
NOTES Module 03 Settings and Styles In this module, you learn about the various settings and styles that are used in AutoCAD Civil 3D. A strong understanding of these basics leads to more efficient use
More informationA STUDY ON KASHMIR HANDICRAFTS
4D INTERNATIONAL JOURNALOF MANAGEMENT AND SCIENCE ISSN-2250-0669 @4dcrossconnect.com.Inc2012 www.4dinternationaljournal.com Volume-4,Issue-1-2013 A STUDY ON KASHMIR HANDICRAFTS Naseem-ul- Gani ABSTRACT:
More informationIn practice, the question is frequently raised of what legislation applies to clamping devices that are intended to be used on machines.
VDMA Position Paper (Version from 22 nd June, 2017) Machine tools and manufacturing systems Precision Tools Clamping devices for use on machines This position paper is intended as information on how clamping
More informationICT LIBRARY UPDATE. Bi-monthly Nov. Dec Vol. 15 : No. 6. Contents
1 Internal Circulation Only ICT LIBRARY UPDATE Bi-monthly Nov. Dec. Vol. 15 : No. 6 Contents - Articles - Pages (Subject wise Alphabetically Indexed) - 2-3 - Addition of Books - 4 - Reports - 5-15 Prepared
More informationCHAPTER 11 SURVEY CADD
CHAPTER 11 SURVEY CADD Chapter Contents Sec. 11.01 Sec. 11.02 Sec. 11.03 Sec. 11.04 Sec. 11.05 Sec. 11.06 Sec. 11.07 Sec. 11.08 Sec. 11.09 Sec. 11.10 General Description of Survey File Contents of Survey
More informationInstructions for Robust Fiber Appendix 5 Documentation. Ver 1.2
Instructions for Robust Fiber Appendix 5 Documentation Ver 1.2 2 CONTENTS 1. Introduction 3 2. Documentation 4 2.1 General requirements 4 2.2 Scope 5 2.3 Requirements regarding documentation that must
More informationWORLDSKILLS STANDARD SPECIFICATION
WORLDSKILLS STANDARD SPECIFICATION Skill 04 Mechatronics WSC2015_WSSS04 THE WORLDSKILLS STANDARDS SPECIFICATION (WSSS) GENERAL NOTES ON THE WSSS The WSSS specifies the knowledge, understanding and specific
More informationAnne Johnson U.S. Government Accountability Office. Association of Food and Drug Officials 116 th Annual Educational Conference June 3, 2012
Anne Johnson U.S. Government Accountability Office Association of Food and Drug Officials 116 th Annual Educational Conference June 3, 2012 GAO s Role Help Congress ensure that the federal government is
More informationMAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (Autonomous) (ISO/IEC certified)
MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (Autonomous) (ISO/IEC -270001 2005 certified) SUMMER -2017 EXAMINATION Subject code: Model Answer Page No: 01/13 Important Instructions to examiners: 1) The
More informationIntroductory remarks
Introductory remarks This document is a draft of a permit for Gaz System to construct a natural gas pipeline on the Danish continental shelf in the Baltic Sea. It should be emphasised that it has not yet
More informationCutting, Drilling and Beveling
Pipe Hole Cutter JK150 The Hongli Model JK150 pipe hole cutter is designed to cut holes up to 152mm into steel pipe. The multiple hole sizes allow the use of Mechanical fittings for branching unpressurized
More informationWrought Copper and Wrought Copper Alloy Solder-Joint Drainage Fittings DWV
ASME B16.29-2017 (Revision of ASME B16.29-2012) Wrought Copper and Wrought Copper Alloy Solder-Joint Drainage Fittings DWV AN AMERICAN NATIONAL STANDARD ASME B16.29-2017 (Revision of ASME B16.29-2012)
More informationIAF MD 10:2013 IAF Mandatory Document for Assessment of CB Management of Competence in Accordance with ISO/IEC 17021:2011
IAF Mandatory Document for Assessment of CB Management of Competence in Accordance with ISO/IEC 17021:2011 4. Table of Contents 1. INTRODUCTION 2. DEFINITIONS 3. GENERAL 4. TECHNICAL AREAS 5. DETERMINATION
More informationANNEXURE II. PROFORMA I PROFORMA FOR NEW RESEARCH UNIVERSITY RESEARCH PROJECT PROPOSAL (Single copy only)
ANNEXURE II PROFORMA I PROFORMA FOR NEW RESEARCH UNIVERSITY RESEARCH PROJECT PROPOSAL (Single copy only) 1. Name of the Dept. / Research Station 2. Title of the university research project 3. Source of
More informationUSE OF GIS IN CENSUS MANAGEMENT AND MAPPING: THE KENYAN EXPERIENCE
USE OF GIS IN CENSUS MANAGEMENT AND MAPPING: THE KENYAN EXPERIENCE United Nations Regional Workshop on Census Cartography and Management 8 th October 12 th October 2007, Lusaka, Zambia Presented By JOSEPH
More informationPart 1 - Common Comments on Erosion and Sediment Control Plans (Walter Hamilton, SDID)
COMMON ERRORS Typical Site Review issues Part 1 - Common Comments on Erosion and Sediment Control Plans (Walter Hamilton, SDID) E&S Phase I Constructability (PFM 11-0109.3) Safety during construction and
More informationExperimental Evaluation of Metal Composite Multi Bolt Radial Joint on Laminate Level, under uni Axial Tensile Loading
RESEARCH ARTICLE OPEN ACCESS Experimental Evaluation of Metal Composite Multi Bolt Radial Joint on Laminate Level, under uni Axial Tensile Loading C Sharada Prabhakar *, P Rameshbabu** *Scientist, Advanced
More informationChapter Four AIRPORT LAYOUT PLAN SET COMPONENTS
The purpose of this chapter is to present the graphic representation of the items addressed and recommended in Chapter Three Demand Capacity Analysis and Facility Requirements (page 3-1). The Airport Layout
More information1. Introduction Aim of the Teachers' Guide Key Features of the Design and Technology Specification Managing the Course 6
GCE AS and A DESIGN AND TECHNOLOGY Teachers' Guide 1 Contents GCE AS and A Level Design and Technology Teachers Guide 1. Introduction 3 Page 2. Aim of the Teachers' Guide 4 3. Key Features of the Design
More informationAuthorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:
CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT
More informationCERTIFICATE OF APPROPRIATENESS APPLICATION INSTRUCTIONS AND CHECK LIST
Certificate of Appropriateness Instructions and Checklist (revised 1/18) SYRACUSE LANDMARK PRESERVATION BOARD CERTIFICATE OF APPROPRIATENESS APPLICATION INSTRUCTIONS AND CHECK LIST INSTRUCTIONS: Please
More informationAPPLICANT GUIDE ENGINEERING OCCUPATIONS
ENGINEERING OCCUPATIONS OCCUPATION: Fitter - General (ANZSCO 323211) QUALIFICATION: MEM30205 - Certificate III in Engineering Mechanical Trade SKILLS ASSESSMENT - Occupational Requirements A person who
More informationDie Life Checklist. Part Consideration. Critical to Function & Cosmetic. Cosmetic, No Function. Critical to Function. Not Critical but Functional
Tooling for Die Casting NADCA T-2-2-00 Guidelines Guidelines to increase die life are as follows: Before the start of tooling 1) Redesign of part to reduce or eliminate sharp internal corners or features
More informationSECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS
SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of
More informationREQUEST FOR PROPOSAL For Color Orthogonal & Color Oblique Imagery
REQUEST FOR PROPOSAL For Color Orthogonal & Color Oblique Imagery OVERVIEW Austin County Appraisal District is seeking services from a qualified and experienced vendor for the delivery of color Orthogonal
More informationPRESSURE SEWER CODE OF AUSTRALIA AGENCY REQUIREMENTS PART 1 - DESIGN
PRESSURE SEWER CODE OF AUSTRALIA AGENCY REQUIREMENTS PART 1 - DESIGN Clause Description Requirement Supporting Document 1.5 Planning and Design In addition, SA Water s requirements for the initial Pt1
More informationGUIDELINES FOR TAKING UP WORKS RELATING TO ACCESS TO SANITATION FACILITIES. INSTRUCTIONS UNDER SCHEDULE 1 PARA 1(ix) OF MAHATMA GANDHI NREGA
(Comments on the Guidelines can be communicated before 15 th August, 2011 on the e-mail, fanail@ias.nic.in or gnsharma123@yahoo.com) GUIDELINES FOR TAKING UP WORKS RELATING TO ACCESS TO SANITATION FACILITIES
More informationCambridge International Examinations Cambridge Ordinary Level
Cambridge International Examinations Cambridge Ordinary Level *7009284021* PAKISTAN STUDIES 2059/02 Paper 2 The Environment of Pakistan May/June 2016 Candidates answer on the Question Paper. READ THESE
More informationNauticus (Propulsion) - the modern survey scheme for machinery
Nauticus (Propulsion) - the modern survey scheme for machinery Jon Rysst, Department ofsystems and Components, Division of Technology and Products, DetNorske Veritas, N-1322 H0VIK e-mail Jon.Rysst@dnv.com
More informationCHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN
N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional
More informationChapter Three. Research Methodology:
Chapter Three Research Methodology: The previous chapter has given an overview on relevant literature. This chapter provides details regarding the methodology that has been adopted to carry out the present
More informationTHE INDIAN PAINT ASSOCIATION A PROFILE
THE INDIAN PAINT ASSOCIATION A PROFILE The Indian Paint Association (IPA), affiliated to the Confederation of Indian Industry (CII) is a national body which represents both the organized and the Small
More informationBNP Paribas India Solutions Pvt Ltd CSR Policy
BNP Paribas India Solutions Pvt Ltd CSR Policy About BNP Paribas India Solutions Pvt Ltd Established in 2005, BNP Paribas India Solutions Pvt Ltd is a wholly owned subsidiary of BNP Paribas SA, which is
More informationCertified Precision Sheet Metal Operator Level I
Certified Precision Sheet Metal Operator Level I 13 Sections Total of 136 tasks/skills/knowledge areas Section B. Metals, Metallurgy, and Metal Working Processes Section C. Paperwork and Documentation
More informationSite Plan/Building Permit Review
Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required
More informationMINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY
MINISTRY OF AGRICULTURE, LIVESTOCK & FISHERIES STATE DEPARTMENT OF FISHERIES AND BLUE ECONOMY KENYA MARINE FISHERIES AND SOCIO-ECONOMIC DEVELOPMENT PROJECT (KEMFSED) TERMS OF REFERENCE For an Individual
More informationEditor & Director Dr. R.K. Thukral. Research Editor Dr. Shafeeq Rahman
Editor & Director Dr. R.K. Thukral Research Editor Dr. Shafeeq Rahman Compiled, Researched and Published by Datanet India Pvt. Ltd. D 100, 1st Floor, Okhla Industrial Area, Phase I, New Delhi 110020. Ph.:
More informationRole of BIM. in Plumbing System -K Chandrakanth and M Vinay Kumar. Abstract. 3 Dimension. Introduction: Collaborative Design:
Role of BIM in Plumbing System -K Chandrakanth and M Vinay Kumar Abstract As we look at the plumbing industry, especially in the building sector from design stage to operation & maintenance, huge amount
More information