1 FPSO Life Extensions Antoine Le Cotty, Andrew Newport, Andrew Peden SBM Offshore 24, Avenue de Fontvieille, P.O. Box 199 MC98007 MONACO CEDEX, MONACO ABSTRACT Since the start of the FPSO lease market, it has been common practice for FPSO leases to be extended at the end of the initial contract period. Depending upon the initial design basis, these extensions have often resulted in revised service lives that go beyond the original design lives of the FPSO s. This trend continues, and a substantial portion of the 150 FPSO s in service are expected to receive lease extensions. A similar situation exists for FSO s. In order for an FPSO to remain in service beyond its initial design life, a number of issues must be considered: The integrity of the unit, particularly with respect to fatigue and corrosion of the hull, topsides and mooring system; the impact of changing performance requirements, regulatory requirements and classification rules. This paper will examine these key technical issues, drawing particularly on the experience of life extension projects within the SBM Offshore fleet of FPSO s. The main life extension activities will be identified, and possible methods of increasing the operating life of a unit will be proposed and discussed. This paper also aims to give feedback on life extension issues and solutions, identifying the key factors that need to be addressed for the successful life extension of FPSO s. DOT 2013 ID 54 FPSO Life Extensions Page 1

2 1.0 Introduction The requirement to extend the operating life of an FPSO or FSO beyond its initial design life can occur for a number of reasons: longer viable production of the reservoir than envisaged during initial appraisal; tie-back of new reservoirs that extend the need for the facility; or late arrival of a replacement facility (or cancelation in case of poor reservoir performance). Life extensions can be required for both new building and converted units, and the issues involved are similar in both cases. However to date there are only six new-built FPSO s that are operating beyond their initial 20 year design life, the oldest (Petrojarl I) being built in All six of these units have been relocated at some time, and life extension work may have been performed as part of the relocation. The large majority of life extension projects concern conversions. At present there are 100 converted FPSO s either in service or on standby, 55 of which are operated under lease contracts. This paper will address the issues associated with life extension of these converted units, with a focus on FPSO s operated under lease. The same technical issues are relevant whether the unit is leased or operated directly by an oil company, but projects for leased units often have less flexibility in schedule, as the operator may be dependent upon the lease extension being signed before commencement of work, which can then impact the project execution approach. A sub-category of life extension projects comprise FPSO relocations, where life extension work is usually performed at quayside or in a shipyard dock. 2.0 Issues to be considered The conversion of a tanker to an FPSO is based upon a specific design life. In the case of leased units, the design life may be identical to the duration of the lease contract, or the owner of the FPSO may elect to use a longer design life in order to provide flexibility for lease extensions or rapid relocations after completion of the contract. Following lessons learned from contracts in the 1980 s and early 1990 s, SBM uses a minimum design life of 15 years for all conversions, but this is not consistent throughout the industry. However, it should be noted that the industry trend is towards longer lease periods, at least for complex units, with contracts now commonly placed for 20 year leases, with a corresponding design life for the most complex units extending up to 25 years. As an indication of this trend, the average lease length for the present SBM fleet of FPSO s is 15 years. The impact of extending the operating life of an FPSO life is primarily an issue of asset integrity. Asset integrity addresses all FPSO systems, but there is a particular focus on performance of the structural components as these are designed for a specific life with regard to fatigue and expected corrosion. The integrity of the hull is clearly of paramount importance, also due to its function as a platform to support the onboard systems and contain the stored oil. The hull should be assessed taking into account several factors, including the tanker trading history, the recent FPSO life and DOT 2013 ID 54 FPSO Life Extensions Page 2

3 the future period of FPSO operations. Hull assessment is generally based on a 3D finite element model of the complete cargo block. Other structural parts, i.e. the mooring systems and the topsides structures, should also be assessed to ensure there are no future failures of structural elements. An FPSO life extension may therefore require steel works spread throughout the unit, including in tanks, which can be a construction challenge with respect to the location of the existing topsides modules. It should be noted that there is considerable relevant experience of structural integrity issues from FSO life extensions on projects, many of which have seen long service. Two such case histories are given in later sections of this paper. The condition and future performance of equipment should be assessed based on operational experience on the field and their maintenance under the planned program. Consultation with the equipment vendors will often be necessary to determine the required refurbishment scope for the new life time, including review of any equipment which may become obsolete during the future period, for which the availability of spares may then not be guaranteed. In addition to the available documented history of the unit, essential information on the condition of the unit should be collected through targeted surveys on structures, marine systems and topsides production systems as discussed in sections below. Although the main issue to be considered in assessing the scope of a life extension project is usually asset integrity, two further issues generally require consideration. The first of these is whether there are any required changes in topsides requirements for the future production of the aging reservoir or to accommodate production from well tie-backs. In the rare cases that this is required, the main issues associated with these changes are available deck space and availability of the required power and utilities. The second potential issue is regulatory compliance, and specifically whether the unit must be upgraded to comply with regulations enacted since the FPSO was installed on-station. The issues of changing performance requirements and regulatory compliance are discussed in later sections of this paper. It should also be noted that relocation projects often include the requirements for life extension, and can include the requirement for major topside upgrades [1]. 3.0 Asset Integrity The integrity of the unit at the time of a life extension project is partially dependent on how the unit has been operated against the terms of the lease contract. The integrity arrangements determined at the contract stage have significant impacts on life extension projects. DOT 2013 ID 54 FPSO Life Extensions Page 3

4 3.1 Onboard Surveys The quality and accuracy of the extension options are heavily dependent on the data gathered in service. Onboard surveys first originated as class compliance exercises, however, as specific failure modes and problems associated with FPSO operations emerged, these surveys later evolved into more focused inspections. Current practice encompasses the output from the design phase, class rule requirements and operation experience, however it is recognized that this alone is rarely adequate as input to a life extension exercise. The realization that inspection data is needed as input to possible life extensions has influenced the adoption of enhanced gauging, better record keeping with database approaches and more scientific measurements of corrosion profiles over the life of the unit Survey types The survey methods utilized during the life of the vessel, covering the hull structure, piping systems & pressure vessels, fall into two basic categories; 1) thickness measurements and 2) visual inspections. There are a variety of techniques for assessing thickness available and the method selected will be driven by location and the type of item being assessed Thickness measurements Initially the approach to the collection of degradation of wall thicknesses were driven by class compliance and establishing extent of required repairs. As the realization of the importance of life extension has evolved the approach to thickness measurements has been driven towards proper bench marking. This effect has resulted in more extensive gauging of hull structure during the conversion to establish the baseline and enhanced gauging in service to facilitate assessments with corrosion coupons, discussed later, being required to accurately determine internal structural degradation rates. In terms of piping and pressure vessel systems there is a shift to risk based inspection techniques with full baseline surveys during conversion Visual inspections Visual inspections have always been subjective to some degree, as personal perspectives change between inspectors and as a result, a lack of consistency can be an issue. Historically coatings and plate condition were assessed by a simple good, fair & poor categorizations. The need to improve this has been widely recognized within the industry and coating manufacturers and classification societies have developed more effective scoring systems. The development of technology has also played a significant role in allowing the transfer of digital images. Visual inspections are now much more stringently monitored than previously, and third party verification has become common practice. An effect of these approaches to onboard surveys is the emergence of centralized databases which facilitate and provide more robust interrogation techniques and enhanced confidence in DOT 2013 ID 54 FPSO Life Extensions Page 4

5 the level of knowledge with respect to the corrosion performance of the structure & piping systems. This has been coupled with more rigorous assessment of the validity of the data prior to entry into the database as the awareness of the long term consequences emerges Underwater Surveys Underwater surveys are taking place to review the condition of hull or mooring components, covering the hull structure, sea chests, the rudder and propeller, and mooring chain inspections. Those components need some cleaning operations in order to be able to assess the condition of steel, coating or welding. Cleaning can take place with high pressure water jetting, allowing to inspect visually or gauge the steel components. Hull Structure after cleaning Mooring chain before and after cleaning 3.2 Condition assessment The information available from condition assessments is used as an input to any life extension program. Such information is typically available as a result of onboard surveys as mentioned above, though is subject to post-processing as part of the assessment. The condition assessments listed below are of particular relevance: Corrosion Assessment Corrosion monitoring by means of coupons and post-processing of results are covered by a number of industry standards [2][3], and examples of their use are given below: Piping, Vessel and Valve corrosion Electrical Resistance (ER) probes or corrosion coupons are used to monitor corrosion of piping, vessels and valves based on a detailed inspection programme prepared following a risk analysis of the anticipated corrosion. The risk analysis includes design and operational data, material data and fluid characteristics. DOT 2013 ID 54 FPSO Life Extensions Page 5

6 The corrosion monitoring and post processing starts at a frequency allowing verification of the corrosive nature of the environment (typically 6 month intervals) which can then be lengthened if longer intervals are deemed adequate Hull coupons Example of new and corroded coupons Similarly to the monitoring of piping and vessels corrosion, racks of coupons have been introduced into cargo tanks allowing retrieval of individual coupons to monitor the corrosion at regular intervals during the operational life. This supplements the standard Class Society requirements for hull gauging. Furthermore, such coupons provide valuable information on the distribution of corrosion depending on the location within the tank and the associated environment (crude, vapour space of the tank, inert gas or hydrocarbon gas atmosphere) Hull Gaugings Typical rack of coupons installed in Cargo Oil tanks Whether corrosion is monitored by means of coupons or not, hull structure must gauged at regular intervals in accordance with Classification Society Rules. These gaugings can then be entered into a Hull Maintenance Programs allowing trending of corrosion rates and anticipation of possible corrosion issues. Such gauging campaigns are complementary to visual inspection. DOT 2013 ID 54 FPSO Life Extensions Page 6

7 Hull Maintenance program - Screenshot Whether for Piping, Vessels, of Hull structure, the monitoring of corrosion allows confirmation that the initial design assumptions are valid and development of possible corrective actions if required Coating condition assessment The assessment of coating condition for life extensions to date has been focused on internal tank coatings. External coatings are covered by the general fabric and maintenance program and providing this has been maintained the provision for this is relatively straight forward in terms of life extensions. There may also be the need to campaign the topsides where an asset has been winding down to the end of contract where extension prospects were not realised. Tank coatings however can be more problematic as the task of recoating ballast and cargo tanks offshore are significant exercises running into many months per tank. The life extensions undertaken so far and vessel redeployments has shown that vessel operation as FSO/FPSO is favourable to cargo tank coatings. The figures below show the typical condition experience for bottom coatings within cargo tanks after 10 years operation. This is currently put down to the high through put of oil and associate low residency periods. That is not to say issues do not occur, but those that have are generally found to revolve around isolated pitting corrosion. For this reason it is important either on a periodic basis throughout the vessels inspection regime and/or as part of the life extension work that tanks are fully cleaned and inspected for these problems. DOT 2013 ID 54 FPSO Life Extensions Page 7

8 Cargo tank Before cleaning Cargo tank After cleaning Localized pitting Ballast tanks also seem to fair well as FSO/FPSO in SBM s experience with large scale coating programs consistently limited to coating touch up campaigns. Whilst it may not be true for all cases SBM s experience is that through life internal coating condition assessments will tend towards relatively easy to achieve maintenance programs within the context of life extensions Fatigue assessment The fatigue life of a unit (Hull, Topsides, and Mooring) is determined during the initial design stage with its appropriate safety factors. However, where units are required to remain on station longer than initially anticipated, further fatigue assessment is required and would include: an assessment of environmental conditions, a fatigue analysis, providing input to the surveys described earlier, a monitoring plan for the remaining operational life. In case where elements fail to meet the extended operational life, a repair/upgrade solution supported by fatigue analysis can be implemented. Many scenarios are then possible dependent upon several parameters: Access to the structural elements while the unit is in operation Location of the elements, e.g. whether on the outer shell or on the inner structure of the unit, or above deck Type of proposed repair. Repairs should preferably be by means of adding material rather than cropping and renew to simplify the work logistics However, an alternative solution can be to combining an initial inspection of the details concerned to detect the start of any deficiency (cracks, coating breakdown revealing high stress areas) with an enhanced survey program of those details. This assessment should be made on a case by case basis, considering the criticality of the details, the targeted lifetime increase, and the ease of inspection. In some cases, there are clear benefits to implement an enhanced survey program rather than major preventive modifications which may result in quality issues and for which the associated welding executed offshore is subject to residual stress. DOT 2013 ID 54 FPSO Life Extensions Page 8

9 Rotating Equipment Condition Monitoring Condition Monitoring is used to provide awareness on the equipment running condition on an operating unit and to allow detailed preparation of the maintenance tasks. The target is to ensure reliable production and cost-effective operations throughout the life of an installation. A number of condition monitoring tools are available to assist in assessing and optimizing assets integrity in operation. In particular, rotating equipment condition monitoring comes with recording and trending facilities for several parameters on the installed machinery including bearing vibrations, casing/skid vibrations, operating temperatures, lube oil temperatures, lube oil conditions and equipment performances Lube Oil Analysis The sampling and testing of lube oils is also very effective in determining mechanical wear of internal machinery components such as bearings, piston rings, etc. Lube oil analysis techniques detect metallic particles in the samples that can be indicative of wear, as well as the degradation of oil properties. It can also determine if contaminants such as water are present Life Extension of Rotating Machinery As noted above, the monitoring of rotating equipment is planned as part of initial design activities by specifying the instrumentation to be implemented on the equipment. The combination of time based maintenance, condition based maintenance, and corrective maintenance promotes the long lasting operation of equipment. The available information, supplemented with specific onboard surveys, allows determination of the equipment condition, and determination of the action needed for a given life extension duration. 4.0 Changes in Performance Requirements Based on SBM s experience of life extension projects associated with the extension of a lease, it is rare for process performance requirements to change as part of the project. However, there are cases when topside upgrades have been made in advance of the lease extension, and where the enhanced performance has been a factor in the decision to extend the lease. Such upgrades have included enhanced water injection, upgrades to chemical injection capabilities, and process debottlenecking. The main issues associated with these changes have been available deck space and availability of the required power and utilities. It should also be noted that relocation projects often include major topside upgrades in addition to the requirements for life extension [1], but such projects are not considered in detail here. DOT 2013 ID 54 FPSO Life Extensions Page 9

10 5.0 Regulatory Compliance In recent years there has been a considerable effort amongst regulatory bodies to develop specific FPSO Rules that differ from those for tankers or ships, which take account of the specifics of FPSO design and operation. Consequently, there will often be a gap between the rules in force at the time of the initial FPSO construction/conversion, and those in force at the time of the life extension: Feedback from units in operation has been included in the new FPSO Rules which generally results in more analysis being required. In tandem, there has been continuous developments in analytical methods and increases in computing capacities, Applicability of International Rules are continuously clarified for FPSO, eg Marpol Annex I for oil pollution, Environmental issues are given increased attention, Permanent mooring systems are covered more widely by the Rules and rather than relying solely on the practices of the relevant contractors. For a life extension project, one of two cases generally applies: i. The FPSO unit stays connected in the field It is generally accepted that new Rules for FPSOs are not applicable to life extension projects if the FPSO stays connected on station, eg no requirement for partitioning of tanks, facilities/retention tanks for treatment of effluents, side collision protection, etc. It is however a requirement to confirm and document that the extended design life is met, particularly for the fatigue aspects. The use of original fatigue calculations is acceptable if they demonstrate the required service life is within the conversion design life initial predicted, in which case no new analysis would be required. In the case that a new fatigue analysis is required, they shall generally be performed under the Rules in force at the time of the life extension project. This has a practical aspect in that may be difficult to carry out assessment under the former Rules with analytical software that have also evolved to meet the requirements of the new Rules, the older version not being maintained. ii. The FPSO unit is disconnected with life extension works executed in a Yard This case applies when either the FPSO unit is relocated to another field, or when the extent of the works is so large that there is benefit for a disconnection and refurbishment in a Yard. In cases encountered so far, the FPSO was required to be upgraded to be compliant with the Rules of the new Contract date. The observed practice is that the above principles are applied for Class Rules and International/Coastal Regulations. DOT 2013 ID 54 FPSO Life Extensions Page 10

11 6.0 Project Execution Strategy A major factor in ensuring the success of life extensions projects is the project execution strategy. If the life extension scope of work is to be carried out on station, bed space availability and environmental constraints may favour an enhanced maintenance route where the required system upgrades are implemented over an extended period. On other units, where the life extension scope is significant, a shutdown and use of an accommodation barge may be the approach taken with large numbers of personnel being involved and a shorter duration achieved. Alternatively the solution may be a hybrid of these two basic options. For an optimum project solution, it is important that both of these options are developed in parallel to ensure the most efficient solution is selected. The execution strategy selected will influence the scopes that can be achieved, and the associated methodology and complexity of operation. The cost models will require continuous modifications during the review process, and it is essential to remain open minded during this process as the preferable solution can change quickly as more survey data becomes available. In determining the execution strategy it is important to account for factors such as statutory inspections and class cycle due date. Availability of materials and work force in the area of operation are also a consideration. 7.0 Case Histories The following sections give details of two life extension projects within the SBM fleet. The examples include a recent life extension performed on station (LPG FSO K KOSSA II), and an older case (FSO DOMY) performed in a ship repair yard. 7.1 LPG FSO N KOSSA II In 1996 the 4 year old LPG tanker (Inger Maresk) was converted into the FSO N Kossa II and deployed offshore Congo. The initial FSO design life was 15 years, thus allowing operation until 2011.The life extension project considered an additional 10 years of operation, until LPG FSO N Kossa II DOT 2013 ID 54 FPSO Life Extensions Page 11

12 This life extension project was performed without any fundamental modification of the field characteristics or project requirements. Attention was therefore focused on condition assessment on the various FSO components, a check of their suitability for the new lifetime, and determination of any resulting preventive repair or inspection program. The following components were reviewed as part of the project: Hull structure Turret structure Helideck structure Underwater parts Rotating Equipment Piping systems Electrical and Instrumentation systems Offshore Surveys The available documentation from the operation of the unit was analyzed by the life extension Project Team. This exercise was conducted independently of the unit operating team to ensure an objective assessment of the unit condition. Based on the available information, the requirement for additional surveys was determined. The additional surveys were conducted in several campaigns, each based on a clear scope of work providing guidance for the survey teams. When surveys required Non Destructive Examination (NDE), certified third parties were used to conduct the work. There is considerable added value in the engineering team that prepared the survey scope of work and who will perform the analyses participate in those surveys, ensuring strict compliance with the survey programs and developing a good level of awareness of the unit condition. The following surveys were completed: General Survey for Accommodation, Engine Room, Deck Turret survey with NDE General Underwater survey Mooring system survey with Underwater Inspection Hull Structure survey Electrical and instrumentation Survey The hull structure survey and turret survey are described below as examples of the work undertaken. DOT 2013 ID 54 FPSO Life Extensions Page 12

13 Hull Survey The survey included close-up visual inspection, a gauging campaign, and pitting maps as necessary. The close-up visual survey examined the general condition of all area, identifying possible coating breakdown and areas prone to corrosion and structural failure. Since the unit is in operation and continuously monitored, identification of new unknown issues was not expected. It was nevertheless beneficial to perform surveys and closely inspect areas identified by the engineering team as potential issues for the future lifetime. A typical graphic identifying details for close-up inspection is shown below: Turret Survey Details given specific attention during close-up surveys The turret is a critical component of the unit, and the structure and all main components were surveyed. These surveys included: An inspection of the turret chamber, including chain table, swivel support structure, coating condition, weld condition, and condition of drain pipes. Inspection and condition assessment of the chains and chains connectors, with thickness measurements on the chain hawse plating to determine the presence of any wear. An inspection of turret access means An inspection of turret fixed parts, including riser and umbilical terminations, ESD valve condition, and pig catcher condition. An inspection of the rotating part, including the slewing bearing. For this component, grease sampling were taken and sent onshore for analysis. In addition, a review was made of all past turret survey reports. DOT 2013 ID 54 FPSO Life Extensions Page 13

14 Chain hawse Slewing Bearing Review of Hull Structure Strength A global finite element model was available from the original conversion engineering and this allowed the hull strength to be determined once the model was modified to include corrosion values. Hull strength analysis was started early in the initial phase of the life extension engineering, in order to obtain the sensitivity of the hull structure to future corrosion, irrespective of the actual condition of the hull structure (that was unknown at that time). In parallel, a survey scope was prepared which included both close-up visual inspections as well as thickness gauging, as reported above. Areas sensitive to buckling when performing the strength analysis were considered in 2 ways: The actual corrosion of those areas was compared with the values assumed in the structural analysis in order to validate or modify the assumptions used in the model. The areas sensitive to buckling are identified in future inspection programs, even if their condition appeared adequate at the time of the analysis. Overall, due to the very limited corrosion of the unit, no areas required buckling reinforcement. However, it should be noted that in general the addition of such reinforcement is a likely requirement in life extension projects. However, a number of areas were identified for inclusion in the operational inspection plan, to ensure that they are included in future surveys and that the intended lifetime is actually achieved. Ultimately, it is important to consider that achieving a lifetime is not only dependent upon good initial design, but a combination of sound design with appropriate assumptions, well targeted surveys, and preventive maintenance Review of Hull Structure Fatigue A hull structural analysis was performed to determine areas where remaining fatigue life could be insufficient for the extended duration. This assessment included a hydrodynamic analysis on the N Kossa field considering 4 representative loading conditions. The past fatigue damage DOT 2013 ID 54 FPSO Life Extensions Page 14

15 incurred as a LPG Carrier and as an FGSO have been calculated, in addition to the future expected fatigue damaged during the extended period on station. As a conservative approach, fatigue damage was calculated assuming net thickness for the last 15 years of operations. The fatigue analysis identified a limited number of details requiring attention, and two such details using different solutions are reported below: Web frames Lower bracket flange The fatigue life of detail number 1 below was less than required (probably due to the flange thickness not tapering towards the snipped end). By contrast, detail number 2 had a future fatigue life of over 100 years. Lower bracket flange Based on this result, several considerations were made: The thickness gaugings revealed a unit in very good conditions with no specific corrosion issue in the area of the details concerned. The fatigue analysis performed with net thickness was therefore conservative. The cargo hold space were these details are present are inerted and consequently substantial future corrosion is not expected. No coating breakdown was visible around the details at the time of the life extension surveys. An additional calculation without corrosion revealed that the future life would be longer than the required value. The fatigue life was therefore considered to be generally met, but without a substantial safety factor for this area. Fatigue analyses are based on a probability of failure of 2.5% (mean S/N curve 2 x Standard Deviation). In the event that fatigue cracking did occur, it would be unlikely to affect more than a few details out of 220. Based on the above considerations, the following approach was adopted: A proposed repair was defined for the case that a crack developed during the future life. Based on the low likelihood of occurrence and the limited number of brackets involved, no immediate modification of the detail was proposed. DOT 2013 ID 54 FPSO Life Extensions Page 15

16 An inspection program was defined including close-up survey of those details. Should any accelerated coating breakdown or sign of cracking appear, the proposed repair would be implemented and possibly extended to other area still in good condition Tank dome deck hatch corner connection to deck plating The fatigue analysis has revealed similar issues on the tank dome detail number 1 below, with a fatigue life less than required. Tank dome detail In this case, the selection approach was different, due to the consequences of a crack initiation in the area which could affect the main deck, and that repair by means of an insert plate would then need to be executed offshore. Consequently, a preventative structural detail improvement was made and implemented after approval by Class. Repair detail In summary, hull structural analysis, taking account of the past operating history and future operational life, is the starting point for defining the life extension scope of work. However, the analytical results must be treated in a pragmatic manner, allowing definition of preventive solutions that maximize added value, and considering monitoring to avoid repair solutions that may generate additional issues. DOT 2013 ID 54 FPSO Life Extensions Page 16

17 7.2 FSO XV DOMY The FSO XV Domy was converted from the trading tanker SS Nielstor in 1992 in order to operate offshore Nigeria. The Domy ended operations in 2003, and was then laid-up in Labuan Offshore East Malaysia. FSO XV - DOMY In 2005, the Domy was brought to a Singaporean yard for hull refurbishment and a life extension program in preparation for a future project, and in 2006 to 2007 the hull was then converted into the FPSO Espirito Santo for operation offshore Brazil. The main steps of this life extension program followed the same basic methodology adopted for the FGSO N Kossa II, though the following paragraphs will focus on aspects specific to the FSO Domy. In general, the hull was a well-built VLCC with good structural details and no overlap connections. The 2003 conditions of the unit was generally good, with the exception of the uncoated wing tanks 3 aft which had been used to store seawater for a prolonged period. Starting from the list of known defects, an extended structural analysis was conducted combined with a visual inspection and a campaign of NDE and extended UTM throughout the vessel. The known defects were: Severe corrosion in wing tank 3 aft (Port and Starboard), due to sea water loading when using the uncoated tanks for ballast. Cracks at bottom longitudinal penetration through the transverse bulkhead between centre tank 2 and centre tank 3. The fatigue analysis confirmed high damage ratio in these locations, which were solved by the addition of backing brackets: DOT 2013 ID 54 FPSO Life Extensions Page 17

18 Steel cropped in way of penetration Repair by addition of backing bracket The structural analysis revealed a few additional fatigue sensitive details which were then subject to close visual inspection and NDE. These details includes connections between horizontal girder and webframe, Slots in way of bottom longitudinals, and a number penetrations of side shell longitudinals in way of webframes. Connection of horizontal girder number 38 and webframe Side Shell Longitudinal penetration in way of webframe The table below summarises the reinforcement and repairs conducted following the structural analysis results: DOT 2013 ID 54 FPSO Life Extensions Page 18

19 LOCATION CAUSE ACTION TAKEN Bottom longi's iwo transverse bulkhead centre tanks Fatigue Additional brackets & intermediate flat bars Bottom longi's iwo transverse bulkhead wing tanks Fatigue Additional brackets & intermediate flat bars Side Shell longi's iwo transverse bulkhead Fatigue Additional brackets Cracks iwo stringer 38 and struts Corrosion buckling Replaced to as-built values buckling stiffener added Longitudinal bulkhead Buckling Intermediate stiffener added Longitudinal bulkhead wing tanks 1 Sloshing Brackets added to reduce the unsupported span In addition to the structural analysis and subsequent repairs, the UTM gauging campaign identified areas for steel renewal. Significant renewals were required on the main deck, as shown in the adjacent figure. Renewal of main deck plate started Wing tank 3 Aft Much of wing tank 3 Aft was subject to general corrosion, and it was therefore decided to, cut and remove the existing tanks, and insert newly fabricated tanks, as shown below. This approach removed the risk of missing defects in such a larger generally corroded structure. The total block weight for one side was 980t and was lifted using a floating crane. New tank under construction Preparation works in the hull Lifting and installation DOT 2013 ID 54 FPSO Life Extensions Page 19

20 8.0 Discussion The industry has shown a recent trend towards longer lease contracts for converted FPSO s, at least for the more complex units, with many new lease durations ranging from 15 to 20 years. However, many earlier lease contracts were shorter, and these continue to be subject to extensions, sometimes requiring units to stay in operation beyond their original design life. Extending the operating life of a unit beyond it s design life is primarily an issue of asset integrity, and the age related mechanisms of fatigue and corrosion require particular attention. However, experience of life extension projects, including the example of the FSO N Kossa II reported in this paper, has demonstrated that considerable extensions in life can be achieved through a combination of detail modifications and enhanced inspection programs. The analysis of asset condition requires accurate and comprehensive survey information, often obtained from a combination of in-service surveys. These are supplemented by specific project surveys based on a scope derived from the initial structural survey and a thorough review of the in-service survey records. Translation of structural analysis results into a life extension scope of work requires a pragmatic approach if the work is to be completed on station, accounting for the risk and consequence of failure. When the probability and consequence of failure are low, enhanced inspection with a remedial plan in case of future failure can be considered as an alternative to immediate modification of structural details. In contrast, the case history of the FSO XV Domy detailed the life extension of a unit that had completed its contract, and was being prepared for use in a new project. In this situation the survey requirements, analysis and methodology are essentially the same as for a life extension project to be undertaken on station. However, the availability of yard facilities focused the life extension scope on modifications rather than future in-service enhanced inspections. A further difference was the need to modify the hull to satisfy the requirement of regulatory compliance to the current legislation. Life extensions of this type can allow the continued supply of single hull vessels to projects when such a hull configuration is advantageous. 9.0 References [1] George, B., Le Cotty, A., and Newport, A., The Challenges and Opportunities of FPSO Relocations, Proc. Offshore Technology Conference, OTC-23122, May [2] ASTM G4 95 Standard Guide for Conducting Corrosion Coupon tests in Field Applications [3] ASTM G1 90 Standard Practice for Preparing, Cleaning, and Evaluating Corrosion test Specimens DOT 2013 ID 54 FPSO Life Extensions Page 20

Asset Integrity For Floaters

Asset Integrity For Floaters eni Ss.p.aA. upstream & technical services 2013-2014 Master in Petroleum Engineering and Operations Asset Integrity For Floaters Author: Oladejo Oluwasegun San Donato Milanese 13-14-15 October 2014 Master

More information

Implementing FPSO Digital Twins in the Field. David Hartell Premier Oil

Implementing FPSO Digital Twins in the Field. David Hartell Premier Oil Implementing FPSO Digital Twins in the Field David Hartell Premier Oil Digital Twins A Digital Twin consists of several key elements and features: 1. A virtual, dynamic simulation model of an asset; 2.

More information

Floating LNG facilities

Floating LNG facilities Lessons learned from three of the industry s first FLNG contracts position TechnipFMC as the pioneer developer for the next generation of FLNG facilities facilities As one of the pioneers in the provision

More information

Offshore Construction Management Services. Capability & Experience

Offshore Construction Management Services. Capability & Experience Offshore Construction Management Services Capability & Experience Capability Overview INTECSEA has a proven track record for providing solutions to problems faced when implementing frontier projects, by

More information

Subsea Pipeline IMR. PT Hallin Marine June 18 th, 2014!

Subsea Pipeline IMR. PT Hallin Marine June 18 th, 2014! PT Hallin Marine June 18 th, 2014! Introduction Issues and Risks Inspection, Maintenance & Repair Case Study Conclusions and Recommendations 2 Introduction Subsea Pipeline IMR q Obtain data to assess the

More information

NAUTICUS - a life-cycle approach to ship design and decision support

NAUTICUS - a life-cycle approach to ship design and decision support NAUTICUS - a life-cycle approach to ship design and decision support Morten L0vstad ^ and Simon H0jby Behrens-Nielsen ^ ^DetNorske Veritas, Product Development, Division Technology and Products, Veritasveien

More information

Delivering Subsea Solutions Using a Systems Engineering Approach

Delivering Subsea Solutions Using a Systems Engineering Approach Delivering Subsea Solutions Using a Systems Engineering Approach William Kilpatrick, PhD, CEng MIMechE February 2018 Agenda 1. Frazer-Nash Consultancy Overview i. Systems Engineering 2. Using a Systems

More information

OFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants

OFFSHORE SPECIALIST ENGINEERING SERVICES. ZEE Engineering Consultants OFFSHORE SPECIALIST ENGINEERING SERVICES ZEE Engineering Consultants With experienced engineers, with advanced knowledge in FEA modeling and backed by state of the art software, ZEE Engineering Consultants

More information

Using Critical Zone Inspection and Response Monitoring To Prove Riser Condition. M Cerkovnik -2H Offshore

Using Critical Zone Inspection and Response Monitoring To Prove Riser Condition. M Cerkovnik -2H Offshore Using Critical Zone Inspection and Response Monitoring To Prove Riser Condition M Cerkovnik -2H Offshore Agenda 1. Introduction 2. High level methodology 3. Verifying condition 4. Defining requirements

More information

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa 1 SAFER, SMARTER, GREENER Content Going Deeper Scale/Size of Deepwater Mega

More information

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa

InterMoor Innovation in Action. InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa InterMoor Innovation in Action InterMoor: USA Mexico Brazil Norway Singapore & Malaysia UK West Africa InterMoor is an Acteon Company linking subsea services 3 InterMoor Services MOORINGS Rig Moves Permanent

More information

Floating Systems. Capability & Experience

Floating Systems. Capability & Experience Floating Systems Capability & Experience Capability Overview INTECSEA has more than 30 years of extensive experience with all types of floating systems: TLPs, spars, monohulls and semi-submersibles. Key

More information

Engineering. Drafting & Design. Regulatory Interface. Project & Construction Management. Marine Operations Services

Engineering. Drafting & Design. Regulatory Interface. Project & Construction Management. Marine Operations Services Engineering Drafting & Design Regulatory Interface Project & Construction Management Marine Operations Services Corporate Overview EXMAR Offshore is dedicated to the ownership and leasing of offshore assets

More information

FPSO Operation and Maintenance

FPSO Operation and Maintenance An Intensive 5 Day Training Course FPSO Operation and Maintenance (Floating Production Storage and Offloading) This course is Designed, Developed, and will be Delivered under iso Quality Standards FPSO

More information

Dry trees for cost effective solution with the Wellhead Barge: WHB

Dry trees for cost effective solution with the Wellhead Barge: WHB Dry trees for cost effective solution with the Wellhead Barge: WHB Benjamin MAURIES SAIPEM PAU, FRANCE 5 7 APRIL 2016 Dry Tree Solution for Mild Environments Dry Tree solutions have been developed and

More information

2 THE PROPOSED WHITE ROSE OILFIELD DEVELOPMENT 2.1 PROJECT DESCRIPTION

2 THE PROPOSED WHITE ROSE OILFIELD DEVELOPMENT 2.1 PROJECT DESCRIPTION 2 THE PROPOSED WHITE ROSE OILFIELD DEVELOPMENT 2.1 PROJECT DESCRIPTION The White Rose oilfield will be developed using subsea completions tied back to a mono-hull type FPSO unit, moored in approximately

More information

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Prepared by Maritime NZ Contents Introduction... 3 Purpose... 3 Definitions... 4 Contents of a Well Control Contingency Plan (WCCP)...

More information

Opportunities and Challenges in Deepwater West Africa Projects

Opportunities and Challenges in Deepwater West Africa Projects Opportunities and Challenges in Deepwater West Africa Projects Finding Petroleum - Finding African Oil Mark Jones - INTECSEA (UK) Royal Society of Chemistry, London 28th January 2015 Opportunities and

More information

MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES

MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES STRENGTH IN THE REGION ENGINEERING CENTRE AND OFFSHORE BASE IN SINGAPORE InterMoor is an Acteon

More information

CALM CALM. Our Activities

CALM CALM. Our Activities CALM CALM Our Activities 2 SBM Offshore CALM Brochure Catenary Anchor Leg Mooring (CALM) The CALM is the most popular and widely-used type of Offshore Loading Terminal with more than 500 systems installed

More information

Pipeline Design & Installation Systems

Pipeline Design & Installation Systems Pipeline Design & Installation Systems Rigid pipeline subsea tie-backs new operational challenges Paul Georgeson Operations Support Manager Wood Group Kenny Agenda - Overview - Materials - Inspection -

More information

Summary of Changes and Current Document Status

Summary of Changes and Current Document Status DNV SERVICE DOCUMENTS Summary of Changes and Current Document Status FEBRUARY 2012 FOREWORD DET NORSKE VERITAS (DNV) is an autonomous and independent foundation with the objectives of safeguarding life,

More information

Discipline. Technology TECHNOLOGY DEVELOPMENT. Technology WITHIN SBM OFFSHORE

Discipline. Technology TECHNOLOGY DEVELOPMENT. Technology WITHIN SBM OFFSHORE Project Discipline Technology Product Line TECHNOLOGY DEVELOPMENT Technology WITHIN SBM OFFSHORE TECHNOLOGY CREATING VALUE 1959 1960 1972 1973 1977 1981 1985 1985 1986 CALM Buoy Drilling Jack-up DP Drillship

More information

Thickness tolerances of steel plates and wide flats

Thickness tolerances of steel plates and wide flats (1981) (Rev.1 1989) (Rev.2 1992) (Rev.3 1995) (Rev.4 Oct 2009) (Rev.5 Feb 2012) Thickness tolerances of steel plates and wide flats.1 Scope.1.1 These requirements apply to the tolerance on thickness of

More information

Nauticus (Propulsion) - the modern survey scheme for machinery

Nauticus (Propulsion) - the modern survey scheme for machinery Nauticus (Propulsion) - the modern survey scheme for machinery Jon Rysst, Department ofsystems and Components, Division of Technology and Products, DetNorske Veritas, N-1322 H0VIK e-mail Jon.Rysst@dnv.com

More information

Effective Implementation of Subsea Integrity Management

Effective Implementation of Subsea Integrity Management Effective Implementation of Subsea Integrity Management Himanshu Maheshwari Engineering Specialist 2H Offshore Inc Houston, TX, USA Peter Falconer Global Subsea IM Business Manager 2H Offshore Inc Houston,

More information

Improve your productivity fast

Improve your productivity fast Improve your productivity fast Executive summary: Up until the recent downturn in the oil and gas industry the previous decade saw unprecedented levels of new construction projects across many industry

More information

Global Energy Group s multi-client contract showcases UK-based engineering talent to achieve first oil for Catcher

Global Energy Group s multi-client contract showcases UK-based engineering talent to achieve first oil for Catcher News release 12 January 2018 Global Energy Group s multi-client contract showcases UK-based engineering talent to achieve first oil for Catcher Global Energy Group (GEG), a Scotland-headquartered energy

More information

Life Extension of Subsea Umbilical Systems Assessment Process Marian Copilet Technical Solutions Manager - APAC November 2016

Life Extension of Subsea Umbilical Systems Assessment Process Marian Copilet Technical Solutions Manager - APAC November 2016 Life Extension of Subsea Umbilical Systems Assessment Process Marian Copilet Technical Solutions Manager - APAC November 2016 2016 Oceaneering International, Inc. All rights reserved. About Oceaneering

More information

RENEWABLE ENERGY SOLUTIONS. oceaneering.com

RENEWABLE ENERGY SOLUTIONS. oceaneering.com RENEWABLE ENERGY SOLUTIONS oceaneering.com 2 Oceaneering / Renewable Energy Solutions From initial site surveys through decommissioning, our products and services deliver unmatched value designed to lower

More information

SIMON HINDLEY MENG, AMRINA MANAGING DIRECTOR, NAVAL ARCHITECT

SIMON HINDLEY MENG, AMRINA MANAGING DIRECTOR, NAVAL ARCHITECT SIMON HINDLEY MENG, AMRINA MANAGING DIRECTOR, NAVAL ARCHITECT University of Southampton, Master of Engineering (Hons) Ship Science 2007 Associate Member of Royal Institution of Naval Architects 2007 s.hindley@solis-marine.com

More information

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA Dagang Zhang COTEC Offshore Engineering Solutions China Offshore Oil Engineering Company 2011 China-America Frontiers of Engineering Symposium San Diego, USA Presentation Outline Current Status of Deepwater

More information

Emerging Subsea Networks

Emerging Subsea Networks FIBRE-TO-PLATFORM CONNECTIVITY, WORKING IN THE 500m ZONE Andrew Lloyd (Global Marine Systems Limited) Email: andrew.lloyd@globalmarinesystems.com Global Marine Systems Ltd, New Saxon House, 1 Winsford

More information

Early-on HAZOP (PHAZOP) Advocacy: Best Practices

Early-on HAZOP (PHAZOP) Advocacy: Best Practices Mary Kay O Connor Process Safety Center International Symposium Early-on HAZOP (PHAZOP) Advocacy: Best Practices Building from the past to the future in integrity management Bob Wittkower, Adriana Botto,

More information

Title: IEC TS (First Revision of IEC WT 01) The new standard for Wind Turbines and Wind Farms Onshore and Offshore

Title: IEC TS (First Revision of IEC WT 01) The new standard for Wind Turbines and Wind Farms Onshore and Offshore Title: IEC TS 61400-22 (First Revision of IEC WT 01) The new standard for Wind Turbines and Wind Farms Onshore and Offshore Author: Address: Mike Woebbeking Germanischer Lloyd Industrial Services GmbH,

More information

Experienced project management Total flexibility of the workforce Modern drydocking facilities

Experienced project management Total flexibility of the workforce Modern drydocking facilities Engineering Excellence for the Global Shipping, Marine, Defence and Oil & Gas industries from three Strategic locations across the UK NORTH EAST tyne tees Our two North East England facilities provide

More information

Aircraft Structure Service Life Extension Program (SLEP) Planning, Development, and Implementation

Aircraft Structure Service Life Extension Program (SLEP) Planning, Development, and Implementation Structures Bulletin AFLCMC/EZ Bldg. 28, 2145 Monohan Way WPAFB, OH 45433-7101 Phone 937-255-5312 Number: EZ-SB-16-001 Date: 3 February 2016 Subject: Aircraft Structure Service Life Extension Program (SLEP)

More information

Pressurised Subsea Pipeline Repair Recent Case Studies

Pressurised Subsea Pipeline Repair Recent Case Studies Despite good pipeline design and integrity management schemes, pipelines can and do get damaged and need to be repaired. Damage can be caused by any number of factors, such as dragged anchors, landslides,

More information

Floating Production Installations

Floating Production Installations Floating Production Installations The Preferred Choice for Class MODEC Production Installation Industry Firsts In 1975, ABS took the lead in offshore asset classification when it provided services for

More information

Learn more at

Learn more at RISER AND SUBSEA ASSET FIELD LIFE EXTENSION DHAWAL NASHIKKAR ENGINEER, 2H OFFSHORE INC. WEIHUA MO ENGINEERING SPECIALIST, 2H OFFSHORE INC. VAMSEE ACHANTA SENIOR ENGINEERING SPECIALIST, 2H OFFSHORE INC.

More information

Underwater Signature Management Solutions

Underwater Signature Management Solutions Underwater Signature Management Solutions Samantha Davidson Ultra Electronics PMES, United Kingdom Email:Samantha.Davidson@ultra-pmes.com INTRODUCTION The electromagnetic signature management process for

More information

Prelude FLNG Project. DOT conference presentation. November Jaap de Vries, Prelude FLNG Project Director FINAL

Prelude FLNG Project. DOT conference presentation. November Jaap de Vries, Prelude FLNG Project Director FINAL Prelude FLNG Project DOT conference presentation Jaap de Vries, Prelude FLNG Project Director FINAL Copyright of Royal Dutch Shell plc 1 Prelude FLNG: the largest offshore floating facility ever The Prelude

More information

RELIABILITY OF GUIDED WAVE ULTRASONIC TESTING. Dr. Mark EVANS and Dr. Thomas VOGT Guided Ultrasonics Ltd. Nottingham, UK

RELIABILITY OF GUIDED WAVE ULTRASONIC TESTING. Dr. Mark EVANS and Dr. Thomas VOGT Guided Ultrasonics Ltd. Nottingham, UK RELIABILITY OF GUIDED WAVE ULTRASONIC TESTING Dr. Mark EVANS and Dr. Thomas VOGT Guided Ultrasonics Ltd. Nottingham, UK The Guided wave testing method (GW) is increasingly being used worldwide to test

More information

Joint Rig Committee. Integrity Management of Permanent Mooring Systems

Joint Rig Committee. Integrity Management of Permanent Mooring Systems Joint Rig Committee Integrity Management of Permanent Mooring Systems Commissioning Design rate Performance Test Initial Start-up Mock Operation Trouble Shooting Operation Construction Completion Construction

More information

EUROPEAN GUIDANCE MATERIAL ON CONTINUITY OF SERVICE EVALUATION IN SUPPORT OF THE CERTIFICATION OF ILS & MLS GROUND SYSTEMS

EUROPEAN GUIDANCE MATERIAL ON CONTINUITY OF SERVICE EVALUATION IN SUPPORT OF THE CERTIFICATION OF ILS & MLS GROUND SYSTEMS EUR DOC 012 EUROPEAN GUIDANCE MATERIAL ON CONTINUITY OF SERVICE EVALUATION IN SUPPORT OF THE CERTIFICATION OF ILS & MLS GROUND SYSTEMS First Edition Approved by the European Air Navigation Planning Group

More information

PREDICTION OF INTERACTIONS BETWEEN FPSO AND SUBSEA CATHODIC PROTECTION SYSTEMS

PREDICTION OF INTERACTIONS BETWEEN FPSO AND SUBSEA CATHODIC PROTECTION SYSTEMS Paper No. 08546 PREDICTION OF INTERACTIONS BETWEEN FPSO AND SUBSEA CATHODIC PROTECTION SYSTEMS Robert A Adey and John Baynham. CM BEASY Ltd, Ashurst Lodge, Ashurst, Southampton SO40 7AA, UK Robin Jacob

More information

OMAE AVOIDING DISASTERS: EVOLUTION IN INTEGRITY AND MAINTENANCE MANAGEMENT

OMAE AVOIDING DISASTERS: EVOLUTION IN INTEGRITY AND MAINTENANCE MANAGEMENT Proceedings of the ASME 2011 30th International Conference on Ocean, Offshore and Arctic Engineering OMAE2011 June 19-24, 2011, Rotterdam, The Netherlands OMAE2011-49008 AVOIDING DISASTERS: EVOLUTION IN

More information

Ocean and Naval Architectural Design

Ocean and Naval Architectural Design Ocean and Naval Architectural Design & the ship girder ship girder, ship girder, steel What is the most effective structure to respond to the loading on ships? watertight strong stiff inexpensive materials

More information

Next Generation Training for Subsea & Marine Operations Engineers and Asset Managers

Next Generation Training for Subsea & Marine Operations Engineers and Asset Managers An Intensive 5 Day Training Course Next Generation Training for Subsea & Marine Operations Engineers and Asset Managers 16-20 Dec 2018, Dubai 09-13 Jun 2019, Dubai 15-19 Dec 2019, Dubai 20-NOV-18 This

More information

FPSO Engineering. From Concept to Commissioning. Iv-Oil & Gas

FPSO Engineering. From Concept to Commissioning. Iv-Oil & Gas FPSO Engineering From Concept to Commissioning Iv-Oil & Gas Introducing our company Iv-Groep is a global engineering company, founded in 1949. With 1,000 professionals strong, we offer multidisciplinary

More information

A marginal field (re-)development using several alternative methodologies 1

A marginal field (re-)development using several alternative methodologies 1 Bart Heijermans Helix ESG Chief Operating Officer Company The Phoenix Update Project A marginal field (re-)development using several alternative methodologies 1 Our Mission Helix Producer I Helix Energy

More information

WHITE ROSE DEVELOPMENT PROJECT. Canada-Newfoundland and Labrador Benefits Report. For the Period April 1 June 30, 2004

WHITE ROSE DEVELOPMENT PROJECT. Canada-Newfoundland and Labrador Benefits Report. For the Period April 1 June 30, 2004 WHITE ROSE DEVELOPMENT PROJECT Canada-Newfoundland and Labrador Benefits Report For the Period April 1 June 30, 2004 HDMS ID: 003839954 TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 SUMMARY OF PROJECT ACTIVITIES...

More information

Learn more at

Learn more at Deepwater Riser System Challenges and Issues David Walters 2H Offshore Presentation Objectives Review riser system options Update on current industry status Highlight key issues Discuss current industry

More information

3D OFFSHORE PROJECT SIMULATION. Singapore Shipyard. Replace all chain. Adding a riser

3D OFFSHORE PROJECT SIMULATION. Singapore Shipyard. Replace all chain. Adding a riser PAGE 1 3D OFFSHORE PROJECT SIMULATION 3D Animation of Oil Rig Repairs OFFSHORE OIL RIG UNDERGOING MAJOR UPGRADE ENHANCEMENT PROGRAM IN SINGAPORE GETS AN ANIMATED PREVIEW OF THE CONSTRUCTION PROCESS. Singapore

More information

SD3-60 STRUCTURAL REPAIR MANUAL - STRUCTURAL IDENTIFICATION

SD3-60 STRUCTURAL REPAIR MANUAL - STRUCTURAL IDENTIFICATION SRM 14.0.0.0WING FLAPS - STRUCTURAL IDENTIFICATION 1. General This subject identifies the structural components and the skin plating of the wing flaps. Details are given of specific location, material

More information

Offshore Pipelines. Capability & Experience

Offshore Pipelines. Capability & Experience Offshore Pipelines Capability & Experience Capability Overview INTECSEA is a leading engineering and project delivery company in the offshore oil and gas sector. It operates across the full project cycle

More information

Pipeline Technology Conference 2010

Pipeline Technology Conference 2010 THRESHOLDS, ACCURACIES AND RESOLUTION: QUANTITATIVE MEASUREMENT AND ITS ADVANTAGES FOR METAL LOSS INSPECTION A. Barbian, M. Beller, A. Hugger, C. Jäger, A. Pfanger NDT Systems & Services Stutensee, Germany

More information

INVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES. Y. OLANIYAN TOTAL S.A. France

INVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES. Y. OLANIYAN TOTAL S.A. France INVESTIGATION OF SLUG FLOW IN DEEPWATER ARCHITECTURES Y. OLANIYAN TOTAL S.A. France CONTENTS Introduction Slug flow in field design phase Field case study Conclusion Investigation of Slug flow in Deepwater

More information

Integrity Management of Offshore Assets

Integrity Management of Offshore Assets OIL & GAS Integrity Management of Offshore Assets Opening session Leif Collberg 05 May 2017 1 DNV GL 2015 05 May 2017 SAFER, SMARTER, GREENER How regulations can solve the challenge of being performance

More information

Onshore & Offshore Engineering and Management of Subsea Cables and Pipelines

Onshore & Offshore Engineering and Management of Subsea Cables and Pipelines Established in 1997, Primo Marine is an independent specialist with a wealth of experience in subsea cable engineering, from landfalls to subsea marine infrastructures. With an extensive track record,

More information

Our projects Shell Prelude FLNG

Our projects Shell Prelude FLNG Our projects A new landmark in the Offshore industry milestones Bolo bolo bolo bolo bolo bolo 2009 Master Agreement It all started in 2009 when Shell and the Technip-Samsung Heavy Industries Consortium

More information

Founding Manifesto Friends of Floating Offshore Wind 18 May 2016

Founding Manifesto Friends of Floating Offshore Wind 18 May 2016 Founding Manifesto Friends of Floating Offshore Wind 18 May 2016 Members: Pilot Offshore Renewables Hexicon RES Offshore IDEOL Floating Power Plant Glosten PelaStar Principle Power Inc. Atkins ACS Cobra

More information

SUBSEA PIPELINE SYSTEMS AND RISERS

SUBSEA PIPELINE SYSTEMS AND RISERS GUIDE FOR BUILDING AND CLASSING SUBSEA PIPELINE SYSTEMS AND RISERS MARCH 2001 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright 2001 American Bureau

More information

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value SUBSEA 7 AND GRANHERNE ALLIANCE Viable Solutions Operators are seeking novel and reliable concepts to overcome industry challenges such as complex reservoirs, cost, growth and schedule creep and to optimise

More information

Flexible Pipe Solutions a competitive approach for Shallow water development. Sylvain Cabalery

Flexible Pipe Solutions a competitive approach for Shallow water development. Sylvain Cabalery Flexible Pipe Solutions a competitive approach for Shallow water development Sylvain Cabalery Agenda 1. Subsea at Technip in Brief and Asia Pacific presence 2. Flexible Pipes Solutions a. Main differences

More information

Assemblies according to the Pressure Equipment Directive - a consideration provided by the PED-AdCo Group 1 -

Assemblies according to the Pressure Equipment Directive - a consideration provided by the PED-AdCo Group 1 - Assemblies according to the Pressure Equipment Directive - a consideration provided by the PED-AdCo Group 1-1 Preliminary remark... 1 2 Fundamentals... 2 2.1 Terms / criteria... 2 2.2 Scope / limitations...

More information

Development of Floating Exploration & Production Solutions for Remote and Arctic Environments

Development of Floating Exploration & Production Solutions for Remote and Arctic Environments Development of Floating Exploration & Production Solutions for Remote and Arctic Environments Intsok Seminar Recent Advances in Offshore Technology St. John s, Canada 1 October 2014 Jan Korsnes, VP Floating

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

Implementing a Deepwater- Pipeline-Management System

Implementing a Deepwater- Pipeline-Management System Implementing a Deepwater- Pipeline-Management System L.T.M. Samosir, D. Popineau, and A. Lechon, Total S.A. Summary As an operator, Total has experienced significant deepwater maintenance and repair activities,

More information

The use of Mechanical Connectors throughout Life of Field

The use of Mechanical Connectors throughout Life of Field The use of Mechanical Connectors throughout Life of Field Andrew Woodward Subsea Sales Engineer andrew.woodward@hydratight.com 1 What I will cover Safety Moment Introduction to Hydratight What are Mechanical

More information

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018 Offshore Support Vessels Located in the US Gulf of Mexico in March 18 IMCA March 1, 18 Prepared by IMCA The International Marine Contractors Association (IMCA) is the international trade association representing

More information

Commercial. Committee. Technical Planning. Committee. Development and Construction. Operations

Commercial. Committee. Technical Planning. Committee. Development and Construction. Operations 10 CONSTRUCTION AND INSTALLATION Husky Oil has identified the East Coast as a core business area for the company. The Husky Oil project management team, located in Newfoundland and Labrador, has responsibility

More information

SPOOLBASE & MULTIJOINT SERVICES

SPOOLBASE & MULTIJOINT SERVICES SPOOLBASE & MULTIJOINT SERVICES PIPELINE FABRICATION COMPANY PROFILE Pipeline Technique is a world leading provider of solutions to the oil and gas industry for the most demanding challenges in Welding,

More information

ISO INTERNATIONAL STANDARD. Non-destructive testing Ultrasonic thickness measurement

ISO INTERNATIONAL STANDARD. Non-destructive testing Ultrasonic thickness measurement INTERNATIONAL STANDARD ISO 16809 First edition 2012-11-15 Non-destructive testing Ultrasonic thickness measurement Essais non destructifs Mesurage de l'épaisseur par ultrasons Reference number ISO 2012

More information

Slug Flow Loadings on Offshore Pipelines Integrity

Slug Flow Loadings on Offshore Pipelines Integrity Subsea Asia 2016 Slug Flow Loadings on Offshore Pipelines Integrity Associate Professor Loh Wai Lam Centre for Offshore Research & Engineering (CORE) Centre for Offshore Research and Engineering Faculty

More information

Predictive Subsea Integrity Management: Effective Tools and Techniques

Predictive Subsea Integrity Management: Effective Tools and Techniques Predictive Subsea Integrity Management: Effective Tools and Techniques The Leading Edge of Value-Based Subsea Inspection 1 st November Aberdeen 2017 www.astrimar.com Background Low oil price having major

More information

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States Headquartered in the United States, InterMoor has facilities across the globe: Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States Mooring Capabilities For

More information

Angola Brazil Mooring Egypt Equatorial Guinea Capabilities Malaysia Mexico Norway Singapore United Kingdom United States

Angola Brazil Mooring Egypt Equatorial Guinea Capabilities Malaysia Mexico Norway Singapore United Kingdom United States Mooring Capabilities InterMoor. The Global Mooring Specialist. Deepwater mooring technology has evolved in the past 20 years, and much of the industry s progress has been pioneered by InterMoor, an Acteon

More information

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States

Mooring Capabilities. Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States Headquartered in the United States, InterMoor has facilities across the globe: Angola Brazil Egypt Equatorial Guinea Malaysia Mexico Norway Singapore United Kingdom United States Mooring Capabilities For

More information

FIELD CASE STUDIES: CATHODIC PROTECTION SYSTEMS

FIELD CASE STUDIES: CATHODIC PROTECTION SYSTEMS FIELD CASE STUDIES: CATHODIC PROTECTION SYSTEMS NEW CONCEPTS IN LIFE EXTENSION FOR BROWNFIELD OFFSHORE ASSETS INTRODUCTION As offshore infrastructure ages and the price of oil remains low, the corrosion

More information

Driving Cost Reductions in Offshore Wind THE LEANWIND PROJECT FINAL PUBLICATION

Driving Cost Reductions in Offshore Wind THE LEANWIND PROJECT FINAL PUBLICATION Driving Cost Reductions in Offshore Wind THE LEANWIND PROJECT FINAL PUBLICATION This project has received funding from the European Union s Co-funded by the Intelligent Energy Europe Seventh Programme

More information

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems INTERNATIONAL STANDARD ISO 10418 Second edition 2003-10-01 Petroleum and natural gas industries Offshore production installations Basic surface process safety systems Industries du pétrole et du gaz naturel

More information

saipem limited Statoil 2/4S Removal Project GASSCO HSE Summit Removal of the Statoil 2/4 S Platform 23 rd October 2014

saipem limited Statoil 2/4S Removal Project GASSCO HSE Summit Removal of the Statoil 2/4 S Platform 23 rd October 2014 Statoil 2/4S Removal Project GASSCO HSE Summit Removal of the Statoil 2/4 S Platform 23 rd October 2014 Presentation of the Removal of the Statoil 2/4 S Platforms Introduction of the Scope of Saipem Work

More information

UNDERWATER ACFM CRACK MICROGAUGE MODEL U31D PRODUCT INFORMATION

UNDERWATER ACFM CRACK MICROGAUGE MODEL U31D PRODUCT INFORMATION TSC INSPECTION SYSTEMS UNDERWATER ACFM CRACK MICROGAUGE MODEL U31D PRODUCT INFORMATION The Model U31 Underwater ACFM Crack Microgauge represents the latest in ACFM subsea inspection technology. The new

More information

Emergency Pipeline Repair Solutions and Future Contingency Planning

Emergency Pipeline Repair Solutions and Future Contingency Planning Emergency Pipeline Repair Solutions and Future Contingency Planning SubseaEurope 2010 Espace Grande Arche, Paris 28/10/10 Paul Hughes, Product Manager - Connectors Hydratight Products & Services Part of

More information

Richard Rickett, General Manager Engineering and Procurement - March Case Study

Richard Rickett, General Manager Engineering and Procurement - March Case Study Richard Rickett, General Manager Engineering and Procurement - March 2015 Case Study Case Study : Diverless Fast Track Repair of Mooring System Introduction ~ 300 floating production units in use around

More information

Subsea Chemical Storage and Injection collaboration project

Subsea Chemical Storage and Injection collaboration project Subsea Chemical Storage and Injection collaboration project François-Xavier Pasquet, TOTAL Eldar Lundanes, TechnipFMC October 2018 Agenda 1. SCS&I What is it? 2. Project justification 3. Scope of work

More information

Managing Offshore Field Development & Marine Asset October 2017 Dubai, United Arab Emirates

Managing Offshore Field Development & Marine Asset October 2017 Dubai, United Arab Emirates Managing Offshore Field Development & Marine Asset 22-26 October 2017 Dubai, United Arab Emirates This course is Designed, Developed, and will be Delivered under ISO Quality Standards Managing Offshore

More information

Closing the Collaboration Gap

Closing the Collaboration Gap Closing the Collaboration Gap Technology for Improved Offshore Piping and Structural Analysis Projects Bilal Shah MSc Structural Engineering (Hons) Software Development Manager, Piping Mark Upston B Mechanical

More information

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions Edgerail System Specification & Installation Instructions Hill & Smith, Inc 1000 Buckeye Park Road Columbus, Ohio 43207 Tel: 614-340-6294 Fax: 614-340-6296 www.hillandsmith.com Section A System Specification

More information

Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017

Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017 Decommissioning in Practice Tony Owen, Subsea and Pipelines Decommissioning Delivery Manager AOG February 2017 Disclaimer and important notice This presentation contains forward looking statements that

More information

Requirement for Holes - Holes for Hanging

Requirement for Holes - Holes for Hanging Requirement for Holes - Holes for Hanging In order for items to progress through the series of pretreatment and galvanizing baths at our facility, they must be suspended in a suitable manner to ensure

More information

MARINE ENVIRONMENT PROTECTION COMMITTEE 6 March th Session Original: ENGLISH Agenda item 2 HARMFUL AQUATIC ORGANISMS IN BALLAST WATER

MARINE ENVIRONMENT PROTECTION COMMITTEE 6 March th Session Original: ENGLISH Agenda item 2 HARMFUL AQUATIC ORGANISMS IN BALLAST WATER MARINE ENVIRONMENT PROTECTION MEPC 68/2/X COMMITTEE 6 March 2015 68 th Session Original: ENGLISH Agenda item 2 HARMFUL AQUATIC ORGANISMS IN BALLAST WATER Clarification of Resolution MEPC.253(67) On Measures

More information

DNVGL-CP-0293 Edition July 2018

DNVGL-CP-0293 Edition July 2018 CLASS PROGRAMME Type approval DNVGL-CP-0293 Edition July 2018 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that it is prohibited

More information

MODERN NON-DESTRUCTIVE TESTING TRENDS IN THE SHIPPING INDUSTRIES. Dr. P.Mishra DY. Chief Surveyer Director General of Shipping. Dr. DARA E.

MODERN NON-DESTRUCTIVE TESTING TRENDS IN THE SHIPPING INDUSTRIES. Dr. P.Mishra DY. Chief Surveyer Director General of Shipping. Dr. DARA E. MODERN NON-DESTRUCTIVE TESTING TRENDS IN THE SHIPPING INDUSTRIES NDE2002 predict. assure. improve. National Seminar of ISNT Chennai, 5. 7. 12. 2002 www.nde2002.org Dr. P.Mishra DY. Chief Surveyer Director

More information

Asset Integrity Services for Water Injection by means of OSIsoft Connected Services

Asset Integrity Services for Water Injection by means of OSIsoft Connected Services Asset Integrity Services for Water Injection by means of OSIsoft Connected Services Presented by About Our Companies Global leader in Resource Management Listed on Paris Euronext: VIE Veolia provides a

More information

Ring Pair Corrosion Monitor : RPCM

Ring Pair Corrosion Monitor : RPCM Ring Pair Corrosion Monitor : RPCM RPCM is an in-line, piggable, monitor for pipelines, flow lines and process pipework giving true corrosion rate measurement in all service conditions due to full inner

More information

FPSO Design and Technology

FPSO Design and Technology An Intensive 5 Day Training Course FPSO Design and Technology 14-OCT-18 13-17 Oct 2019, Dubai www.petroknowledge.com FPSO Design and Technology WHY CHOOSE THIS TRAINING COURSE? This 5-day Design and Technology

More information

2018 Tulane Engineering Forum

2018 Tulane Engineering Forum 2018 Tulane Engineering Forum Friday, April 20, 2018, Morial Convention Center, New Orleans, LA Offshore Oil & Gas Exploration & Production An Overview from a Technical Perspective Okite Obakponovwe BEng

More information

PRE-INSPECTION CLEANING OF UNPIGGABLE SUBSEA OPERATIONAL PIPELINES

PRE-INSPECTION CLEANING OF UNPIGGABLE SUBSEA OPERATIONAL PIPELINES PRE-INSPECTION CLEANING OF UNPIGGABLE SUBSEA OPERATIONAL PIPELINES By: Jakub Budzowski and Robert Davidson, Halliburton Pipeline and Process Services Europe Abstract Subsequent to risk based inspection

More information