1 Fabrication and Installation Fabrication and Installation 1. Processing methods Installation procedures Precautions on fabrication and installation (Important) Examples of installation detail 28 Appendix 1: Equipment list 29 Appendix 2: Typical fabrication procedures 31 Appendix 3: Examples of complicated panel 33 Appendix 4: Welding method 41 Appendix 5: Typical sealing procedures 42 Appendix 6: Examples of installation detail 43 Pag. 1 a 29
2 Fabrication and Installation 1. Processing method ALPOLIC panels can be shaped with ordinary aluminum processing and woodworking machines and tools: (1) Saw cutting Running saws and panel saws for woodworking can cut ALPOLIC panels easily. We recommend the carbide tip blade made for aluminum and plastic. (2) Shear cutting A square shear is the most efficient method for sizing a large quantity of panels. Some shear droop may occur at the cut edge. The appropriate clearance and rake angle is: Panel Thickness Clearance Rake Angle 3mm 0.04mm 1 4mm 0.04mm 1 30' 6mm 0.2mm 2 30' (3) Grooving It is important to leave 0.2 to 0.4mm of core material in U-grooving. We recommend 110 of a grooving angle for 90 bends. Panel saw or NC routing machine is suitable for mass grooving production Router and Trimmer: Use a modified router bit as shown in the drawing. [Example of router bit] Number of teeth: 2-4 Number of rotations: 20,000-30,000 rpm Feeding speed: 8-12 m/min. Material: Solid carbide or carbide tip Groove Cutter: When processing a large quantity of panels, use a circular saw or panel saw equipped with a groove cutter. [Example of groove cutter] Material: Carbide tips Outside diameter: 220mm in diameter Number of teeth: 18 Number of rotations: 3,000 to 5,000rpm Feeding speed: 10-15m/min. (4) Folding Pag. 2 a 29
3 Fabrication and Installation Fold U-grooved panels with a folding jig, press brake or plate punch. To ensure a straight line on folded corners, fold the grooved panel on a flat table. To prevent the coating from cracking, we recommend that you do the folding at a temperature of 10 C or higher. (5) Rout and return system Locate the rout 25-50mm from the sheet edge, and fold it to form a tray type panel. After assembling, seal the corner with sealant to prevent water leaks, if you notch the end of corner out with 90 square. (6) Bending with press brake In case of bending ALPOLIC panel with a press brake, use a top die with the desired radius. The minimum internal bending radius is: Thickness Minimum Bendable Radius (mm) Traverse Parallel ALPOLIC 3mm ALPOLIC 4mm ALPOLIC 6mm Note: In case of ALPOLIC /fr comprising of non-combustible mineral filled core, the minimum radius becomes larger than the above. Please refer to ALPOLIC /fr brochure. (7) Bending with three roll bender For a larger bending radius, use a three-roll bender. Groove and slit the curving edge before bending, as shown below: (8) Rivet & bolt Use an aluminum blind rivet for your junction. Do your fixing work Aluminum from the same direction, and use a stainless steel bolt/nut. When panels are connected with a junction hole, make sure the distance from the hole center to the panel end (e) is larger than twice the hole s diameter (D) to ensure that the hole has sufficient tensile strength (e 2D). Refer to Guidance on Design, 1-3. Strength of junction point. (9) Welding The core of ALPOLIC can be welded with a hot air gun. Use a low-density polyethylene rod for a welding rod, or substitute a scrap piece of ALPOLIC panel. Reinforce it after welding. Refer to Appendix 4 for detail. ALPOLIC Suitable machines and tools for ALPOLIC fabrication is summarized in Appendix 1. Typical fabrication procedures for tray-type panel are summarized in Appendix 2. Sometimes we come across very complicated panels, which might have a three dimensional corner. Fabrication methods of some of these panels are introduced in Appendix 3 Pag. 3 a 29
4 Fabrication and Installation Pag. 4 a 29
5 Fabrication and Installation 2. Installation (1) General Installation is executed in accordance with the drawings and specifications of the project. In the event that those not mentioned in the drawings and specifications should be found or that some modification should be required, consultation with controllers are necessary for approval. (2) Installation procedures Typical installation process consists of the following procedures: Installation procedures Unloading Equipment to be provided Truck and crane Marking Scaffold Substructure work ditto Rust inhibiting coating ditto ALPOLIC work ditto Accessories work ditto Joint sealing ditto Clearing and cleaning Scaffold & it s clearing (3) Comments on each procedure a. Unloading Unload ALPOLIC panels on roof, each floor or suitable places on site. The unloaded panels on each floor will be just those required for the relevant floor. Fasten the panels together with rope and covering sheet for protection. b. Marking Confirm the reference line in the presence of superintendent. Based on the reference line, installation lines will be marked. Installation line will be allotted in accordance with the approved shop drawing. c. Substructure work In order to install the substructure, weld bracket (for example, L t, piece angle, L=70mm) onto hole-in anchor. Weld continuous angle (L t) onto the bracket. All the angles will be finished with rust inhibiting coating, which conforms to Project Standard. During welding operation, watch the spark dropping on cover sheet and veneer, to prevent from fire. During substructure work, Pag. 5 a 29
6 Fabrication and Installation check the level with flush thread and plumb-bob line, or water level, if necessary. d. Rust inhibiting coating Apply rust inhibiting paint that conforms to Project Standard onto all the welded points including back and edge. e. ALPOLIC work Mark the installation line in accordance with shop drawing. Fix ALPOLIC panel onto substructure with self-tapping screw, 4mm in diameter, after confirming left, right, top and bottom of the panel. The fixing interval will be normally mm depending on strength calculation. After confirming the fixed conditions, peel off the protective film and clear the removed film. f. Accessories work Bring the accessories to scaffold passage, as allotted in shop drawing. The quantity of accessories brought to scaffold passage must be reasonable to avoid precipitation. The large accessory will be placed diagonally on scaffold. Mark the installation line onto substructure to meet the position of window frame. The joint line can be ignored in case of aluminium extrusions. Fix the accessory with self-tapping screw, 4mm in diameter, interval. After installation, check the installed level and precision. After the check, peel off the protective film. Clear the removed film. g. Clearing and cleaning Clear and clean the working area everyday after work. Especially, whenever the work is completed in the area, transfer the area smoothly to the next procedure, not to hinder the next work. Collect and clear remains to damp point everyday, to transport out from the site immediately. Sealing work is outlined in Appendix 5. Pag. 6 a 29
7 Fabrication and Installation 3. General precautions on fabrication and installation (Important) (1) Weatherability of protective film The protective film on ALPOLIC consists of two polyethylene layers of white and black. Do not peel off the protective film during fabrication and installation to protect the surface from scratching and soiling. Under normal weather conditions, the protective film will withstand six months exposure without losing any of its original peel-off characteristics or causing stains or other damages. However, peel off the protective film as soon as possible after completion. (2) Slight color difference due to coating direction In the cases of our Metallic Colors, Sparkling Colors and Stone Series, always install panels in the same direction as marked on the protective film. Slight color differences will be noticeable if you install panels in different directions. In our Solid Colors, any color difference due to coating direction is negligible. (3) Gloss increase due to plasticizer Do not stick, put or apply PVC tapes, polyurethane sealant and modified Silicone sealant onto our protective film. The plasticizer contained in these materials can penetrate the protective film and cause a gloss change in the coating. 4. Examples of installation detail Refer to Appendix 6. Pag. 7 a 29
8 Fabrication and Installation Appendix 1 Equipment list for ALPOLIC fabrication Cutting & grooving Panel saw Grooving Handy grooving machine Cutting Circular saw blade Precision grooving Handy router & bit Grooving Grooving cutter blade Grooving, cutting and notching CNC Router Corner-notching Notching tool Drilling & assembling Pneumatic drill & rivet tool Pag. 8 a 29
9 Fabrication and Installation Appendix 1 Punching for hanging holes Punching press Folding, assembling & inspection Flat working table Cutting for aluminum extrusions Circular saw and dust-collector Utility for pneumatic tools Air compressor Bending after grooving Bending jigs Pag. 9 a 29
10 Fabrication and Installation Appendix 2 Typical fabrication procedures 1. Check fabrication drawings 2. Check ALPOLIC panels 3. Marking on panels Check up on every fabrication drawing, to confirm the details. Check ALPOLIC panels, to confirm the size, color and quantity, based on the drawing. Mark the cutting and grooving lines on panels, based on the drawing. 4. Cut 5. Groove 6. Corner-cutout Cut the panel with circular saw, based on the drawing. Remaining thickness and bending radius to be confirmed after pre-test. The panel corners are removed by a notching tool or punching press. 7. Punch for hanging holes 8. Cut aluminum extrusions 9. Fold Hanging holes are removed by punching or press machine. Cut aluminum extrusions, if any, based of the details. Fold the grooved edge with a folding jig. The bent angle to be confirmed after folding. Pag. 10 a 29
11 Fabrication and Installation Appendix Cut off protective film 11. Fix corner angle pieces 12. Fix aluminum flange The protective film of edge is peeled and cut off by a utility knife. Corner angle pieces are fixed with rivets. Aluminum flange bars are fixed with rivets, to complete the tray panels. 13. If necessary, apply sealant on panel corners 14. Final check A suitable sealant is applied on the panel corner from the backside, to ensure the waterproof, if necessary. Inspect the completed panels. Pag. 11 a 29
12 Fabrication and Installation Appendix 3 Examples of complicated panel Example 1: 3-dimension curving panel Example 2: Corner panel of cornice Example 3: Corner panel of coping Example 4: Corner panel of water drip Example 5: Corner panel of recessed window Example 6: Corner panel of curving canopy Note: Dimensions of fabricated panels below are those for miniature samples scaled down to 1/2 to 1/5. Please replace the dimensions so as to fit to your case. Pag. 12 a 29
13 Fabrication and Installation Appendix 3 Example 1: 3-dimension curving panel Front view 25mm or less Application example 3-dimension curving panel 1300mmR or larger Flat panel 3-dimension curving panel Elevation Section Cutting and grooving method Flat panel 3-dimensional curving panel Cutting Grooving Notching Bending method Bend ALPOLIC panel and filling board together. Filling board ALPOLIC Pag. 13 a 29
14 Fabrication and Installation Appendix 3 Pag. 14 a 29
15 Fabrication and Installation Appendix 3 Example 2: Corner panel of cornice Completed panel Elevations aluminum flange, large A-A section B-B section aluminum flange, small aluminum angle, 20x20 C-C section aluminum angle, 20x20 D-D section aluminum sheet, continuous water gutter, aluminum sheet, continuous behind upper junction line, adhered with VHB tape. Grooving & cutting method Cutting Grooving Notching A detail Pag. 15 a 29
16 Fabrication and Installation Appendix 3 Example 3: Corner panel of coping Completed panel Section Elevations aluminum flange, large aluminum flange, small A-A section B-B section C-C section D-D section aluminum flange, large drain hole water gutter, adhered with 3M s VHB tape Pag. 16 a 29
17 Fabrication and Installation Appendix 3 Grooving & cutting method Cutting Grooving Notching A A detail water gutter, adhered with 3M s VHB tape Pag. 17 a 29
18 Fabrication and Installation Appendix 3 Example 4: Corner panel of water drip Completed panel Section detail A-A section ALPOLIC support, adhered with 3M s VHB tape edge to be touched up Cutting and grooving method Cutting Grooving Notching Pag. 18 a 29
19 Fabrication and Installation Appendix 3 Example 5: Corner panel of recessed window Completed panel Application example Corner panel of recessed window A-A section ALPOLIC support, adhered with 3M s VHB tape edge to be touched up Grooving & cutting method Main panel Cutting Grooving Notching Supplementary panel Aluminum support plate Pag. 19 a 29
20 Fabrication and Installation Appendix 3 Example 6: Corner panel of curving canopy Completed panel Elevations A section B section Cutting and grooving method Pag. 20 a 29
21 Fabrication and Installation Appendix 4 Welding method An edge of ALPOLIC can be connected to another edge by means of welding core with hot jet gun. The rod for welding can be produced by cutting a piece of ALPOLIC waste to a slender rod of core material. The welded point is less strong, and so, normally reinforcement is necessary after welding. 1. Example of welding machine 2. Welding rod 3. Milling for welding 4. Suitable pushing pressure 5. Support plate 1. Tools for welding: Welding machine: Hot jet gun for thermoplastic resin 2. Preparation of welding rod Cut a piece of ALPOLIC waste to 3 to 5mm slender rod of ALPOLIC. Peel off aluminum skins of both sides, to have a rod of core material. Sharpen the starting edge of the welding rod (approx. 45 ). 3. Milling for welding Mill or rout ALPOLIC panel edge with grooving or routing machine, to fit to welding. 4. Welding Prior to welding, pre-heat the tip of welding rod and ALPOLIC core surface with hot jet gun. When both surfaces become wet, push the rod against ALPOLIC core, and slide the rod forward with a feeding speed of 5 to 6 cm per min. Note 1: The temperature of the air blown from the hot jet gun is approx. 130 C around the welding area. Note 2: Push the welding rod against the core surface with such pressure as the rod can bend to approx. 45, as shown in the left illustration. Note 3: Heating too much will cause a thermal decomposition of the core material, and the rod will not adhere to the core. Note 4: The feeding speed must be neither too quick nor too slow. The feeding must be uniform and continuous. 5. Reinforcement with support plate Finally, adhere a support plate of ALPOLIC or aluminum sheet with a suitable adhesive or a both-sided tape, to reinforce the welded pint. Note 5: In case adhesives are applied, pre-testing is necessary to confirm that the adhesive does not cause a distortion on the surface side, since some adhesives will cause a distortion due to shrinkage after hardening. Pag. 21 a 29
22 Fabrication and Installation Appendix 5 Typical sealing procedures 1. Clean work surface Remove gravel. Clean joints, to remove moisture, oil and dust. Dry the joint, if moist. 2. Insert back-up material Back-up material is necessary as a bond breaker to avoid triangle adhesion. 3. Apply masking tape Apply masking tape to both sides of joint, to avoid smearing the adjacent area. 4. Apply primer Apply primer with brush or spray, if primer is required for compatibility. 5. Mixing (2-component type) In case of 2-component type, mix base component and curing agent, and stir it. 6. Filling operation (2-component type): Before filling, wash and wipe the gun and nozzle to remove smear and oil. Avoid bubble. 7. Filling operation (1-component type): In case of 1-component type, cut the nozzle at 45 and fit the cartridge into a caulking gun. 8. Tooling Tooling is carried out for uniform adhesion, clean finish and elimination of bubble. 9. Remove masking tape After tooling, remove masking tape. Small bar is often used for efficient work. Note 1. The above is excerpt from a sealant manufacturer s brochure. Refer to manufacturer s brochure for details and particular notice to the sealant. 10. Curing After completion, the joint is carefully cured until completely hardening. Note 2. Gloss increase due to plasticizer: Do not stick polyurethane sealant and modified Silicone sealant on ALPOLIC protective film. The plasticizer contained in these materials can penetrate the protective film and cause a gloss change in the coating. During tooling, do not smear ALPOLIC protective film with surplus of sealant. Pag. 22 a 29
23 Fabrication and Installation Appendix 6 Examples of installation detail (1) Canopy of petrol service station This detail is just an idea and does not refer to a particular project. Renovation work of petrol service station generally requires simplicity and promptness in installation. Therefore, supposedly, suspending method has become widely applied. Aluminum substructure is installed on the existing canopy, so as to permit the sub-structure surface sufficiently flat. ALPOLIC panel is suspended on the substructure by aluminum support plates and suspension bolts. Afterward, panel top and bottom are fixed to the substructure with screw. (2) Corporate sign board This corporate sign was organised for a newspaper company s distribution network consisting of 2,300 shops countrywide in Japan. The panel finish is blue color of polyester coating and 3M Scotchcal film is applied for logo-mark and lettering. ALPOLIC panel is inserted in pocket of aluminum flange coated with the same color as ALPOLIC. The flange is fixed to steel substructure. The panel is reinforced with stiffeners, which is adhered to the panel with 3M s VHB tape and also fastened to flange at top and bottom with aluminum angles. Water drip is provided on the top to prevent from staining by rain. Water drain holes are provided on the bottom. (3 & 4) Facade This is an example of facade with sealing joint, rubber gasket and hanging system. (5) Cover panel for balcony ALPOLIC is widely used for cover panel of flat balcony in Japan. The panel is fixed to aluminum substructure with bolt/nut of stainless steel. (6) Guide sign (interior) This example is an interior guide sign in subway station. The map and letters are printed by screen print. ALPOLIC is inserted in aluminum flange and two pieces of panels are connected by rivet and aluminum sheet behind the panel. Pag. 23 a 29
24 Fabrication and Installation Appendix 6 Example of installation detail (1) Canopy of petrol service station ALPOLIC, Lumiflon-based fluorocarbon coating 2. Gradient of ALPOLIC for drain 3. Roof plate, aluminum sheet 4. Suspension bolts 5. Suspension plate, aluminum sheet 6. Aluminum rivet 7. Existing wall or steel structure 8. Anchor & level-adjustment 9. Sub-structure for ALPOLIC, aluminum rectangular pipe 10. Bottom cover Note: This detail is just an idea and does not refer to a particular project. Pag. 24 a 29
25 Fabrication and Installation Appendix 6 Example of installation detail (2) Corporate sign board 50mm 20mm mm ALPOLIC, polyester coating with 3M s Scotchcal film for logo-mark and lettering 2. Aluminum drip 3. Aluminum rivet 4. Countersunk tapping 5. Steel sub-structure, L , chromate, piece L= Corner plate, aluminum, L , L=40 8. Aluminum stiffener, square pipe, Aluminum flange coated with the same color as ALPOLIC 10. Drain hole, 10mm diameter 10 Pag. 25 a 29
26 Fabrication and Installation Appendix 6 Example of installation detail (3) Facade Vertical section ALPOLIC, Lumiflon-based fluorocarbon coating 2. Aluminum flange 3. Tapping screw, stainless steel 4. Aluminum rivet 5. Sealing material 6. Back-up material 7. Sub-structure, steel angle galvanized or coated with rust-preventive paint, continuous 8. Adjusting bolt, stainless steel 9. Bracket, steel angle, galvanized or coated with rust-preventive paint, piece 10. Hole-in anchor or built-in bolt 9 10 Horizontal section Pag. 26 a 29
27 Fabrication and Installation Appendix 6 Example of installation detail (4) Facade Double grooving ALPOLIC panel with double grooving 2. Tapping screw Rubber gasket ALPOLIC panel with rout and return system 2. Aluminum rivet 3. Tapping screw 4. Rubber gasket 5. Aluminum angle 6. Sub-structure of ALPOLIC Hanging system ALPOLIC panel with rout and return system 2. Horizontal sub-structure 3. Tapping screw 4. Galvanized steel channel 5. suspension bolt, stainless steel 4 5 Pag. 27 a 29
28 Fabrication and Installation Appendix 6 Example of installation detail (5) Cover panel for balcony ALPOLIC panel Pag. 28 a 29
29 Fabrication and Installation Appendix 6 Example of installation detail (6) Guide sign (interior) ALPOLIC panel 2. Aluminum flange 3. Aluminum reinforcement (Center only) 4. Aluminum rivet Pag. 29 a 29
ALPOLIC /fr LT. Technical Manual. Section 3 Fabrication & installation. Contents
ALPOLIC /fr LT Technical Manual Section 3 Fabrication & installation Contents 1 General 22 2 Notes on handling 22 3 Processing method 23 4 Joining method 31 5 Surface processing 33 6 Examples of installation
More informationFABRICATION MANUAL CCM Copper Composite You discover why ALPOLIC Copper composite material (CCM) is the building material of the future as soon as
FABRICATION MANUAL CCM Copper Composite You discover why ALPOLIC Copper composite material (CCM) is the building material of the future as soon as you fabricate it. Our CCM is as easy to fabricate as wood:
More informationSection 3 Fabrication & installation
Section 3 Fabrication & installation 1. General We can process ALPOLIC and ALPOLIC/fr panels with regular machines and tools for aluminum and wood. We can cut the panels with a circular saw, fold them
More informationVIEWpanel Technical Manual
VIEWpanel Technical Manual VIEWpanel is a prefabricated panel comprising 0.21 aluminium skin (1100 alloy) both sides, apart from our lite grade, which is 0.12 aluminium skin both sides and a polyethylene
More informationSeptember 10, 2009 Page 1 PRODUCT DESCRIPTION PRODUCT FEATURES
September 10, 2009 Page 1 PRODUCT FEATURES BASIC USES/RELATED USES Interior decorative tile. Architectural tile for decorative wall surfaces, backsplashes and other applications. Custom architectural and
More informationKEITH PANEL SYSTEMS FUNDERMAX- MAX EXTERIOR EXPOSED FASTENER PRESSURE EQUALIZED WALL SYSTEM
S Y S T E M D E T A I L S FUNDERMAX- MAX EXTERIOR EXPOSED FASTENER PRESSURE EQUALIZED WALL SYSTEM PAGE TITLE PAGE Table of Contents Fundermax Max Exterior Product Information Design and Installation Information
More informationTable saws are not recommended for cutting sheets larger than 4'X4' I size.
Aluminum Composite Panel (Fabrication) Considerable care should be taken in the layout and handling of Aluminum Composite Panel. The use if coolants or lubricants are not required when sawing. A. Sawing
More informationSECTION METAL FABRICATIONS
SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM
More informationYWE 40 T Window Wall System Installation Manual
Installation Manual 2005 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes........................................ Page ii Frame Types............................................
More informationCONTENTS OVERVIEW. For a complete set of CAD drawing details, please visit LaminatorsInc.com. 1 Essential Equipment. 1 Essential Supplies
LaminatorsInc.com CONTENTS 1 Essential Equipment 1 Essential Supplies 2 Panel Preparation 4 Panel Extrusion Preparation 5 Panel Assembly 6 Wall Sheathing Preparation (Over Plywood) 6 Wall Sheathing Preparation
More informationDuralam Wall Linings. Installation Guide. Duralam 6mm Compact Laminate Wall Panelling Installation Guide
Duralam Wall Linings Installation Guide 2016 Handle Panels with Care Compact Laminate panels are very dense and durable panels, however if they are mistreated, stored or handled incorrectly it could potentially
More informationSection 914. JOINT AND WATERPROOFING MATERIALS
914.01 Section 914. JOINT AND WATERPROOFING MATERIALS 914.01. General Requirements. Joint and waterproofing material for use in concrete construction must meet the requirements of this section. 914.02.
More informationPlatinum Swing Panel Installation Instructions
Platinum Swing Panel Installation Instructions The Standard Platinum Swing Panel is designed to fit baths with a perimeter lip no taller than 20mm. If installing onto baths without a perimeter lip an optional
More informationInstallation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR
www.quakerwindows.comv www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR
More informationKEITH PANEL SYSTEMS FUNDERMAX- MAX EXTERIOR CONCEALED FASTENERS PRESSURE EQUALIZED WALL SYSTEM
S Y S T E M D E T A I L S FUNDERMAX- MAX EXTERIOR CONCEALED FASTENERS PRESSURE EQUALIZED WALL SYSTEM PAGE TITLE PAGE Table of Contents Fundermax Max Exterior Product Information Design and Installation
More informationCardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY.
Cardo DOOR & RETURN SHOWER ENCLOSURE INSTALLATION PLEASE READ THESE INSTRUCTIONS CAREFULLY. IT IS RECOMMENDED TO USE A TRAINED SHOWER INSTALLER FOR THIS SHOWER TO OBTAIN THE BEST INSTALLATION. D Square
More informationInstallation Instructions
www.marlite.com Effective Date 03/01/2018 ARTIZAN FRP, SYMMETRIX FRP, ENVUE FRP, STANDARD FRP Installation Instructions Statements expressed in this technical bulletin are recommendations for the application
More informationYES 600 Thermal Clip Storefront System Installation Manual
Installation Manual 2004 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes........................................ Page ii Frame Types............................................
More informationInstallation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts
Capped Cellular PVC Fencing Installation Guide Table of Contents Storage and Handling Tools Needed Fence Layout and Locating Posts Installation instructions 4 x 4 Over Sleeve Post - 3.5 Rail Privacy Shadowbox
More informationTENANT IMPROVEMENT 16 FEBRUARY WEST 27TH STREET, 4TH FLOOR 100% CD OWNER/BID ADD 1-03/08/2018
SECTION 055000 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationSeries Sloped glazed Curtain wall. Installation Instructions
Series 5600 Sloped glazed Curtain wall Installation Instructions Part NO. Y308 February 2013 SECTION TABLE OF CONTENTS PAGE I. General Notes & Guidelines. 3-4 II. Gutter and Mullion Assembly.. 5 III. End
More information1 Nu-core. Nu-core panels are an innovative step forward in the decorative cladding industry.
Fabrication Manual While keeping with the advantages of common Aluminium and Metal composite panel materials, Nu-core have greatly improved panel characteristics by utilizing more natural core materials,
More informationYES 40 FS/FI Storefront System Installation Manual
Installation Manual 2014 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes... Page ii PARTS DESCRIPTION YES 40 FS Framing Members... Page 1 YES 40
More informationINFUSIONS and METALWORKS Wings Accent and Acoustical Clouds
INFUSIONS and METALWORKS Wings Accent and Acoustical Clouds Assembly and Installation Instructions 1. GENERAL 1.1 Product Description Wings is a decorative ceiling element consisting of a 10 foot long
More informationANCHOR PLATE ATTACHMENT STEEL STUD FRAMING OR FURRING CONSTRUCTION WITH ACCESS FROM PANEL SIDE ONLY
ANCHOR PLATE ATTACHMENT STEEL STUD FRAMING OR FURRING CONSTRUCTION WITH ACCESS FROM PANEL SIDE ONLY INSTALLATION MATERIALS No. 8 Phillips Head Tek Screws Glazier's horseshoe shaped shims 1/16 inch, 1/8
More informationSECTION SHEET METAL FLASHING AND TRIM
SECTION 07620 PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Formed roof drainage sheet metal fabrications. 2. Formed low-slope roof sheet metal fabrications. 1.2 SUBMITTALS A. Shop Drawings: Show
More informationALLORA SWING PANEL INSTALLATION INSTRUCTIONS
ALLORA SWING PANEL INSTALLATION INSTRUCTIONS Before Installation Please check that your Allora Swing Panel is undamaged SEQUENCE OF INSTALLATION These instructions are also available from the Athena website:
More informationFrameless Inline Door With Return QCI5263
INSTALLATION INSTRUCTIONS Frameless Inline Door With Return QCI5263 WALL MOUNT HINGES FRAMELESS DOOR / PANEL / RETURN PANEL QCI5263 REV. 0 Page 1 Certified 06/17/2016 Parts List with wall mount hinges
More informationMECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA
MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA 7/16 PETRARCH ARCHITECTURAL WALL PANELS APPLIED OVER A STUDWALL BY MEANS OF A FIELD ASSEMBLED BACK FASTENED SYSTEM DESIGN CONCEPT 7/16 panels may be installed
More informationHow-to-Install. Laminate Countertops and Sheet Laminate. FREE brochure Reverso en español
FREE brochure Reverso en español How-to-Install Laminate Countertops and Easy to install instructions provided inside Multiple colors available for unique design options Durable and easy to care for Accessory
More informationFRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274
FRAMELESS DOOR / PANEL WITH WALL MOUNT HINGES QCI5274 QCI0274 QCI5274 REV. Rev. 1 0 Page Page 1 1 Date Certified: Certified 06/16/2016 10/01/10 Parts List with wall mount hinges ITEM NO. Part # DESCRIPTION
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationRead guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.
Installation Guide for E-Series/Eagle High-Performance Mullion Windows with LVL Reinforcement and Installed Using Type B Clips Thank you for choosing Andersen. Instructions are for typical, new wood-framed
More informationSawn Baluster Sizing and Installation Guide
Sawn Baluster Sizing and Installation Guide Welcome to the Durabrac sizing and installation guide for Sawn Balusters. This guide has been prepared to answer any questions you may have about our Sawn Balusters
More informationSubframe Installation Guide
FACADE TECHNOLOGY THE FIXING DOES NOT REQUIRE A RAINSCREEN AND HAS PASSED CSIRO AS484-995 WEATHER PERFORMANCE 7.5 AND STRUCTURAL TEST 7.3 HAS ALSO PASSED NATA ACCREDITATION CYCLONE TESTING AS4040.3 600mm
More informationBalustrade Systems / Installation Instructions
A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column
More informationInstallation Instructions
Please read all instructions before installing products. STORAGE: Keep crates in the upright position. When unpacking, store panels flat in a clean dry place. BEFORE INSTALLATION: Check for damage that
More informationSeries 1500 Aluminum Door Canopy
Series 500 Aluminum Door Canopy with Sidewings It is our recommendation that you read instructions carefully prior to assembly and installation. Series 500 with Sidewings mounting bar (A) top trim (B)
More informationYES 45 TU Thermal Storefront System Installation Manual
Installation Manual 2004 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes........................................ Page ii PARTS DESCRIPTION Framing
More informationQuick Hook SS & LS Standard and Low Height Hooks for Side Mount Rails
Quick Hook SS & LS Standard and Low Height Hooks for Side Mount Rails Installation Instructions Quick Hook SS & LS Instructions for Installing Standard and Low Height Hooks for Side Mount Rails Installation
More informationAluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement
Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement 1 Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement The following instructions are a supplement
More informationProcessing and design Solid Textile Board
Processing and design Solid Textile Board List of contents Introduction Kerfing Joints and assembly Increasing thickness and stiffness Edges Cutting Milling and drilling Three-dimensional pressing Surface
More informationDurabrac Gable Bracket Installation Guide
Durabrac Gable Bracket Installation Guide Durabrac vinyl gable brackets are manufactured from high quality natural white vinyl with UV inhibitors. There are currently six styles and three sizes to choose
More informationInstallation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window
Installation Guidelines Next Dimension Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window Windsor Windows & Doors Windsor Windows & Doors 900 S. 19 th St. 2210 Stafford St. Extn
More informationRev. 05/16 01 ACRYLIC INSTALLATION GUIDE
Rev. 05/16 01 ACRYLIC INSTALLATION GUIDE Contents 1.0 Inspection 3 2.0 Storage 3 3.0 Handling 3 4.0 Planning & Preparation 3 5.0 Panels 4 6.0 Accessories 4 7.0 Tools & Fixings 4 8.0 Fitting Tips 5 9.0
More informationINSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.
INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS. Installer: DO NOT DISCARD Please leave the Installation Guide
More informationAssembly Instruction. 9,2 m² Grillkota
Assembly Instruction 9,2 m² Grillkota Dear customers, Thank you for purchasing our product. We recommend that you read these instructions before installation and make the necessary preparations for building.
More informationPolyCarb has good resistance to many chemicals. Some chemicals may harm the PolyCarb sheets. Contact us when in doubt about any chemical.
Polycarbonate Panels This manual provides the basic information for working with and installing PolyCarb sheets. Due to their hollow core, prior preparation is needed before the actual installation, with
More informationA-935 RODA WALL MOUNT HINGES
INSTALLATION INSTRUCTIONS A-935 RODA WALL MOUNT HINGES NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday 8:00 A.M. - 4:30 P.M. Eastern Time FRAMELESS DOOR / PANEL CELESTA QCI0274 REV.
More informationInstallation Instructions
Installation Instructions Alcove Enclosure Before Installation please check that your shower enclosure system is undamaged Please read these instructions carefully March 2015 TOOLS REQUIRED Electric or
More informationYSG 40/50/50T Window Wall System Installation Manual
Installation Manual 2004 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS Installation Notes........................................ Page ii PARTS DESCRIPTION YSG 40
More informationLuxCore Installation Instructions
LuxCore Installation Instructions ATTENTION: LuxCore PANELS MUST BE ACCLIMATIZED FOR 24 HOURS BEFORE INSTALLATION PLEASE READ ALL INSTRUCTIONS PRIOR TO INSTALLATION The guidelines provided herein have
More informationInstallation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation
Step 7. Transition s and Accessories Step 3. Valley Step 6. Hip and Ridge Installation Step 2. Rake Trim Step 5. Installing the Shingles Step 1. Eave Starter Installation Step 4. Endwall s Installation
More informationUNIT No FRAMELESS PIVOT SHOWER DOOR
INSTALLATION INSTRUCTIONS UNIT No. 3600 FRAMELESS PIVOT SHOWER DOOR NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday 8:00 A.M. - 4:30 P.M. Eastern Time QCI0020 Rev. 3 Page 1 of 8
More informationExtruded sheet (FF) #3 Other Methods of Cutting. Technical information. This brief gives advice for:
Technical information Extruded sheet (FF) WARNING: This product can expose you to chemicals including Ethyl acrylate, CAS 140-88-5, which are known to the State of California to cause cancer. For more
More informationCare Instruction: Wash vehicle roof prior to installing Rhino Tracks.
Important: Please read these instructions carefully prior to installation. Please refer to your fitting instruction to ensure that the roof racks are installed in the correct locations. Check the contents
More informationFrameless Inline Door QCI5248
INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5248 FRAMELESS PANEL / DOOR / PANEL QCI5248 REV. 0 Page 1 Certified 06/16/2016 Parts List with glass to glass hinges *Quantities may vary. **Support Bar
More informationMasking: Each mirrored sheet is well protected by a durable paint backing and
STORAGE Horizontal storage: If mirror sheets are stored flat, care must be taken to avoid warping, slipping and scratching. If different sizes are stored together the largest panels should at the bottom
More informationCare Instruction: Wash vehicle roof prior to installing Rhino Tracks.
Important: Please read these instructions carefully prior to installation. Please refer to your fitting instruction to ensure that the roof racks are installed in the correct locations. Check the contents
More informationFrameless Inline Door QCI5254
INSTALLATION INSTRUCTIONS Frameless Inline Door QCI5254 FRAMELESS DOOR / PANEL QCI5254 REV. 0 Page 1 Cer fied 06/16/2016 Parts List with wall mount hinges *Quanes may vary QCI5254 REV. 0 Page 2 Cer fied
More informationInstallation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.
Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installer: Read these instructions completely before starting any installation.
More informationMAGNUM BOARD INTERIOR INSTALLATION GUIDELINES
TECHNICAL BULLETIN No.: 090509-1405 Subject: Issue Date: September 4, 2009 Issue No.: II MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES 1. CUTTING MAGNUM BOARD You can easily cut Magnum Board with carbide
More informationQuick Hook SB & LB Standard and Low Height Hooks for Bottom Mount Rails
Quick Hook SB & LB Standard and Low Height Hooks for Bottom Mount Rails Installation Instructions Quick Hook SB & LB Instructions for Installing Standard and Low Height Hooks for Bottom Mount Rails Installation
More informationCOMPOSITE SIDING INSTALLATION GUIDE
CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,
More informationSalter Industries Spiral Stair
Salter Industries Spiral Stair The Leader in Spiral Staircases Continuous Sleeve Stair Installation Instructions TOOLS NEEDED: 1. Electric drill with hex chuck and Phillips bit 2. Drill bits 1/8", 1/4",
More informationSHEET METAL FLASHING AND TRIM Christ on the Mountain
SECTION 076200 - SHEET METAL FLASHING AND TRIM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Compatibly with the bumping of flashings and trim as identified in the Membrane Roofing Section 075000.
More informationTOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL
ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose
More informationTool 3-1 A2 Bushing 6 Check if the bushing supports (angle iron) are properly welded with the upper part of the structure pipes. welded bushing suppor
Rope Pump MANUFACTURING checklist for quality control A Welding General 1 Check if welding jigs are used for welding of the main parts (wheel, structure frame and bushings) 2 Check if the pump parts are
More informationRobert Bosch GmbH. Wall organiser
Wall organiser The organisational talent Wall organiser Say goodbye to messiness! The wall organiser is the ideal place to store everything that tends to lie around. 1 Introduction Wardrobes, drawers and
More information675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure
INSTALLATION INSTRUCTIONS 675 Quick N Stall Neo Angle Framed Hinge Shower Enclosure Call Technical Dept @ 1-800-452-2726 QCI1003 Page 1 of 9 Certified 10/01/09 INSTALLATION NOTES: Unpack your unit carefully
More informationInstallation Guide Simplicity Alfresco. V1.9 Lu070318
0333 305 5272 www.canoports.co.uk Installation Guide Simplicity Alfresco V1.9 Lu070318 Tools Required Below is a list of tools that you will require to install your the Simplicity Alfresco System. Cordless
More informationKentucky 4H Wood Science Plans Notebook. Plans Level 1
Kentucky 4H Wood Science Plans Notebook Plans Level 1 MATERIALS NEEDED: 1 piece wood 3/4" x 2 x 2 1 piece wood 3/4" x 3 x 3 1/2" 1 wooden spring-type clothespin 2-1 1/2" nails 1-1/2 woodscrew Wood Glue
More informationBUILDING A GOAL WALL DO IT YOURSELF! INSTRUCTIONS FOR A GOAL WALL
INSTRUCTIONS FOR A In just a few steps, we show you how to build your own goal wall and paint it perfectly. COMPILED BY 1 PREPARING Purchase the materials from the enclosed list. The DIY store should be
More informationMISCELLANEOUS CABINET REPAIRS
MISCELLANEOUS CABINET REPAIRS 167 168 NOTES MISCELLANEOUS CABINET REPAIRS Cabinet Panel Repairs 175 SIDE PANEL REPLACEMENT - GDM SERIES INSTALLATION INSTRUCTIONS Tools Required 1/8" drill Rivet Tool Silicone
More informationCobra X Q Construction Tips Construction: Bel y pan
Cobra X Q Construction Tips : The white plastic in this kit is high impact styrene. It can be painted with most types of coatings if light coats are applied this is necessary due to the thickness of the
More informationPORTA-FAB Cleanroom Wall Systems
PORTA-FAB Cleanroom Wall Systems FABLINE BATTEN 2000 INSTALLATION INSTRUCTIONS IMPORTANT Porta-Fab Advises A Thorough Reading of These Instructions Before Beginning Installation. INTRODUCTION Porta-Fab
More informationSide and rear window, assembly overview
64-7 Side and rear window, assembly overview 1 - Side/rear window Removing Unbroken Page 64-9 Broken Page 64-11 Installing Page 64-13 Curing time Page 64-21 Re-sealing Page 64-25 2 - PUR adhesive sealant
More informationIMPORTANT INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION
INSTALLATION GUIDE VALENCIA ANGLE CORNER SHOWER SEALANT REQUIRED TO COMPLETE THIS INSTALLATION: (Supplied) Sika Sikasil NG (Arctic White) To seal the WHITE shower door and returns to the shower tray. Usage:
More informationInstallation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )
Installation Guide A Subsidiary of Panolam Surface Systems SMPBRO00-012 6/14 Pionite decorative laminates are designed for finished interior surfaces which require high impact, wear and stain resistance
More informationlindab we simplify construction LindabSandwichPanels Installation instructions PIR Panels
lindab we simplify construction LindabSandwichPanels Installation instructions PIR Panels Assembly instructions Before you start Check that the panel support structures are level. Position the packages
More informationSeries 1100 Aluminum Door Canopy
Series 00 Aluminum Door Canopy with Support Arms It is our recommendation that you read instructions carefully prior to assembly and installation. Series 00 with Support Arms MOUNTING BAR (A) TOP TRIM
More informationDHS-500 IMPACT SYSTEM INSTALLATION MANUAL
DHS-500 IMPACT SYSTEM INSTALLATION MANUAL TABLE OF CONTENTS SECTION PAGE GENERAL NOTES 3 EXTRUSION & PARTS IDENTIFICATION 4-5 DETERMINE FRAME SIZE 6 FABRICATE VERTICAL MULLIONS & FILLERS 7-8 FABRICATE
More informationINSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION
INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION SLIMLINE STEP-BY-STEP INSTALLATION GUIDE Thank you for choosing Roof Maker, we hope you are delighted with your new rooflight. Our roof lanterns
More informationParts List. Description. Installation Instructions
Page 1 of 7 Parts List Aluminum Coping Hardware Kit 1 pkg Tek screws 1 tek screw nut driver 1 Snap strip removal tool 1 can Touch up spray paint 1 11/64 drill bit 8 pieces 1/8 Gray PVC 4 long 2 boxes Aluminum
More informationDESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS
DESIGNER SERIES GUTTER SYSTEM INSTALLATION INSTRUCTIONS GENERAL DESCRIPTION: The Designer Series Gutter System is a specially designed roof edge drainage product for industrial, commercial, and high end
More informationINSTALLATION INSTRUCTIONS
CERBER FIBER CEMENT SIDING - SIERRA PREMIUM SHAKE Construction Requirements Sierra Premium Shake boards must be installed over vertical wood framing spaced no greater than 16 oc. with an APA rated 7/16
More informationWET AREA PANELLING. Designer Walls. Fast
WET AREA PANELLING Designer Walls. Fast AU/a5 WallART Brochure_ART BUNNINGS.qxp_Layout 1 7/6/18 10:16 am Page 3 LINEAR SERIES WET AREA PANELLING Add a touch of class to your SHEET COLOURS home or workplace
More informationINSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233
INSTALLATION INSTRUCTIONS FRAMELESS CONTINUOUS HINGE SHOWER ENCLOSURE QCI5233 QCI5233 Rev 0 Page 1 Certified 06/20/2016 INSTALLATION NOTES: Unpack your unit carefully and inspect for freight damage. Lay
More informationINSTRUCTION GUIDE SANCTUARY CANOPY. C & A SUPPLIES LTD, Bidder Street, London E16 4ST tel: WEB:
INSTRUCTION GUIDE SANCTUARY CANOPY 1. Add gasket to wall plate 2. Drill holes in wall plate along the two rib lines The first pair of holes should be 25mm from the edge and then spaced every 525mm along
More information40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)
http://www.sundancesupply.com 40mm Thermoclick Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial) U-Profile 12' Lengths $39 Out System offers a complete set of extrusions and accessories
More informationBARRIER FREE SHOWER PAN INSTALLATION INSTRUCTIONS
BARRIER FREE SHOWER PAN INSTALLATION INSTRUCTIONS 1. 2. 3. 4. 5. 6. READ ALL INSTRUCTIONS BEFORE INSTALLATION Avoid exposure to weather. Product carton is not waterproof. Carton exposed to rain or snow
More informationHOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels
HOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels 1. First, remove the cover plates from all electrical outlets. All baseboards should also be removed; the
More informationSTACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS
STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions
More informationSeries Advanced and alternate. Installation Instructions
Series 5500 Advanced and alternate Installation Instructions Part NO. Y557 February 2013 TABLE OF CONTENTS SECTION S-5500 ADVANCED INSTALLATION INSTUCTIONS PAGE I. General Notes and Guidelines...... 3-4
More informationwindow installation Guide wood FRaMinG New Construction
window installation Guide wood FRaMinG New Construction IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements supersede
More informationSTART HERE BEFORE YOU BEGIN FIG 1 STEP 2
PROFESSIONAL INSTALL RECOMMENDED REAR MODULAR / MULTI LED ROOF MOUNTS PART#: Z350040 / Z350050 REAR ROOF LED LIGHT MOUNTS Parts included (1) - Driver Side Roof Mount Upright (1) - Passenger Side Roof Mount
More informationFABRICATION MANUAL HLZ / HPA. Visual Consistency
FABRICATION MANUAL HLZ / HPA You discover why ALPOLIC HLZ /HPA aluminum composite materials (ACM) are the building materials of the future as soon as you fabricate it. The HLZ / HPA panels have a thin
More informationRequirement for Holes - Holes for Hanging
Requirement for Holes - Holes for Hanging In order for items to progress through the series of pretreatment and galvanizing baths at our facility, they must be suspended in a suitable manner to ensure
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationFold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE
Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE This instruction guide provides the minimum recommended procedures to correctly prepare the rough opening, install a fold-a-way patio door unit and apply
More information