1 A13. SHADOW FLICKER 13.1 Introduction The purpose of this chapter is to review amendments to the Project design and to advise of any consequent alterations to potential shadow flicker impacts as previously reported in ES Chapter 13. The assessment has been carried out by SgurrEnergy Ltd Scope of the Assessment Study Area and Assessment Criteria There have been no updates to guidance, of relevance to the shadow flicker assessment, since the ES was submitted. Therefore the assessment criteria remain as detailed in Section of ES Chapter 13. Using the ReSoft WindFarm software, a potential shadow flicker impact map was produced for the revised layout of 17 WTGs (see Figure A13.1) which highlights proties potentially affected by the Project Consultation Responses The Section 36 application was submitted to the Scottish Government ECDU on 27 September 2013 with responses received in November and December No consultation responses were received in relation to shadow flicker Assessment Methodology Analysis Software Parameters The shadow flicker analysis was conducted using the Shadow Flicker module of the ReSoft WindFarm software. Please refer to Section of ES Chapter 13 which provides further detail Parameters used in the Analysis WTG dimensions and layout The modelling was undertaken based on the proposed 17 WTG layout and a WTG with a 101m rotor diameter and 76m hub height, which is a larger rotor diameter and lower hub height than originally modelled. 14/7048/001/GLA/O/R/001 Revision B1 Page 1 of 7
2 Shadow flicker potential impact area and receptor locations As identified in section of the ES, the shadow flicker impact is likely to be negligible beyond a distance of 10 rotor diameters. This is equal to 1,010m for a WTG with a 101m rotor diameter. Using the WindFarm software, a potential shadow flicker impact area map has been produced (Figure A13.1). As shown on the figure, only certain houses are predicted to be within this potential impact area. Consequently, only these proties would be expected to exience shadow flicker effects and therefore have been included in the modelling analysis. It should be noted that the amended Project design, with 17 WTGs, has a reduced impact area compared with the layout in the ES. Consequently, proty numbers 1, 2 and 3 which were considered in the ES Chapter 13, are no longer relevant to the shadow flicker assessment. Proty number 5 consists of non-residential outbuildings and has therefore been removed from the assessment. The numbering of proties remains consistent with the original ES. Window distribution, orientation and size The same approach was adopted as described in section of the ES Assessment Results WindFarm Shadow Flicker Analysis Results For each of the potential shadow flicker receptors, a total number of shadow flicker hours in a year was modelled. The results of this modelling are shown in Table A13-1. It should be noted that these results represent theoretical hours for which the individual receptor could potentially be affected by shadow flicker based on worse case scenario modelling. Again it should be noted that the results do not take into account factors that would reduce shadow flicker such as iods when there is insufficient sunshine due to cloud-cover, iods when the WTG is not rotating or screening from any existing vegetation and buildings. The sensitivity is considered to be High at the proties which are residential receptors. The results have been provided and then examined in relation to the guidance limits, as section of the ES, of 30 hours year or 30 minutes day on the worst affected day, based on an astronomical worst case scenario. 14/7048/001/GLA/O/R/001 Revision B1 Page 2 of 7
3 Table A13-1: Potential Shadow Flicker Occurrence at Identified Proties (WTG with 76 m Hub Height and 101 m Rotor Diameter) No. Name Co-ordinates Window Orientation (degrees from north) Days year* Max hrs day* Mean hrs day* Total hrs year* 4 Knockskae Linfairn Genoch Cottage *Theoretical modelled values As can be seen in Table A13-1, only one proty (proty number 6: Linfairn) is predicted to exience more than 30 hours of shadow flicker year, using worst case modelling. It is understood that the owner and occupier of proty 6 (Linfairn) has a financial interest in the project. Proties 4 (Knockskae) and 7 (Genoch Cottage) do not exceed 30 hours year. Proty 4 (Knockskae) is predicted to exience slightly over 30 minutes in the maximum hours day assessment. A summary of when shadow flicker is expected to occur at Proties 4, 6 and 7 is given in Table A13-2 below. Table A13-2: Timing of Shadow Flicker Occurrence at Key Proties (WTG with 76 m Hub Height and 101 m Rotor Diameter) Proty Distance to WTG (m) Potential Shadow Flicker Occurrence Time of the Year Time of the Day 4: Knockskae 695 Winter Late morning 6: Linfairn 837 Autumn, Winter Afternoon 7: Genoch Cottage 992 Autumn, Winter Afternoon Based on this worst case modelling exercise, proties 4 (Knockskae) and 6 (Linfairn) are both predicted to exience a maximum daily duration above 30 minutes day, specifically 0.6 hours (36 minutes) and 0.9 hours (54 minutes) respectively Potential Factors Reducing Shadow Flicker Impact There are a number of factors that are likely to reduce the incidence of shadow flicker. Details of these and annual average sunshine for the study area can be found in Section of the ES. The annual average sunshine, as the ES, was 25.1%. This was applied to the annual shadow flicker results for proties 4, 6 and 7. 14/7048/001/GLA/O/R/001 Revision B1 Page 3 of 7
4 The adjusted shadow flicker hours for individual proties are given in Table A13-3. Table A13-3: Adjusted Shadow Flicker Results based on Sunshine Hours (WTG with 76m Hub Height and 101m Rotor Diameter) Proty Total Shadow Flicker Hours Year (as modelled) Adjusted Shadow Flicker Hours 4: Knockskae : Linfairn : Genoch Cottage As can be seen, proty 6: Linfairn is predicted to exience 18.1 hours of shadow flicker year following the adjustment to account for sunshine hours. This equates to approximately 0.4% of the available daylight hours year, which is not considered to represent a significant impact. The adjusted shadow flicker hours for proties 4 and 7 are lower still and are likewise deemed insignificant impacts. This adjustment for sunshine hours results in a more realistic prediction of shadow flicker effect and duration. However, the adjusted results are still considered to be conservative because the modelling assumes a worst case scenario with regard to wind direction / WTG alignments and screening effects. In addition, the results are still based on a conservative window size, window orientation and minimum sun height. Accounting for sunshine hours and the other considerations discussed in the ES would also be expected to reduce the maximum daily duration of shadow flicker exienced at nearby proties 4 (Knockskae), 6 (Linfairn) and 7 (Genoch Cottage) Assessment of Effects Following assessment of the revised Project layout design and WTG dimensions, the potential magnitude of change in relation to shadow flicker is considered to be Negligible at the oational phase. Mitigation has however been provided to address the potential shadow flicker effects on the three proties identified above Mitigation Measures Mitigation includes software control on relevant WTGs during iods when conditions exist that could result in shadow flicker effects. The potential impact from shadow flicker will be monitored for 12 months after commissioning has been completed and a shadow flicker mitigation scheme will be submitted and approved as part of a suitable condition. This will address any potential significant effects on affected proties. 14/7048/001/GLA/O/R/001 Revision B1 Page 4 of 7
5 13.6 Summary of Effects Table A13-4 provides a summary of the potential effects associated with the revised Project. 14/7048/001/GLA/O/R/001 Revision B1 Page 5 of 7
6 Table A13-4: Summary of Effects Receptor Development Stage Sensitivity Magnitude of Change Predicted Effect Prior to Mitigation Mitigation Residual Effect Proty No. 4: Knockskae Proty No. 6: Linfairn. Proty No. 7: Genoch Cottage Oational Oational High High Software control on relevant WTGs during iods when conditions exist which could result in shadow flicker effects. Oational High 12 month monitoring scheme following commissioning of the Project. Shadow flicker mitigation scheme produced as part of any relevant condition. 14/7048/001/GLA/O/R/001 Revision B1 Page 6 of 7
7 13.7 Statement of Significance The assessment has concluded that there will be no significant impacts on proties in the vicinity of the Project as a result of shadow flicker. 14/7048/001/GLA/O/R/001 Revision B1 Page 7 of 7
A10 Electronic Interference: Application 2 - LBHF
A10 Electronic Interference: Application 2 - LBHF Addendum to the Environmental Statement Volume I January 2012 Introduction A10.1 This Chapter of the Addendum to the June 2011 Environmental Statement
More informationAppendix 8.2 Information to be Read in Conjunction with Visualisations
Shepherds Rig Wind Farm EIA Report Appendix 8.2 Information to be Read in Conjunction with Visualisations Contents Contents i Introduction 1 Viewpoint Photography 1 Stitching of Panoramas and Post-Photographic
More informationNon-Technical Summary of Environmental Statement
Non-Technical Summary of Environmental Statement Speedway World Cup Introduction This document is the Non-Technical Summary (NTS) of the Environmental Statement (ES) prepared for the proposed Speedway
More informationControl of noise from the operation of stationary systems
Control of noise from the operation of stationary systems This factsheet aims to explain the objectives which are expected to be adopted and the measures that are expected to be put in place to control
More informationREVISED NOISE IMPACT STUDY
REVISED NOISE IMPACT STUDY Benton Boarding and Daycare 5673 Fourth Line Road Ottawa, Ontario City of Ottawa File No. D07-12-13-0024 Integral DX Engineering Ltd. Page 2 of 24 TABLE OF CONTENTS 1.0 INTRODUCTION
More informationControl of Noise from the Operation of Stationary Systems
Control of Noise from the Operation of Stationary Systems This factsheet explains the objectives that are expected to be adopted and the measures that are expected to be put in place to control the effects
More informationNoise Monitoring Program
for Document Table of Contents for... 1 1 Purpose... 3 1.1 Purpose... 3 2 Noise Impact Assessment Criteria... 3 2.1 Noise Criteria... 3 3 Measurement and Evaluation... 6 3.1 Monitoring Locations... 6 3.2
More informationAppendix 8.F Additional Great Crested Newt Survey 2009
Appendix 8.F Additional Great Crested Newt Survey 2009 Technical Note 1 Proposed Kelmarsh Wind Farm Additional Great Crested Newt Survey 2009 1. Introduction Entec UK Ltd (Entec) was commissioned by E.ON
More informationNOISE IMPACT STUDY. Benton Boarding and Daycare 5673 Fourth Line Road Ottawa, Ontario City of Ottawa File No. D
NOISE IMPACT STUDY Benton Boarding and Daycare 5673 Fourth Line Road Ottawa, Ontario City of Ottawa File No. D07-12-13-0024 Page 2 of 23 TABLE OF CONTENTS 1.0 INTRODUCTION / BACKGROUND INFORMATION...6
More informationCHAPTER ELECTRIC AND MAGNETIC FIELDS
CHAPTER 62-814 ELECTRIC AND MAGNETIC FIELDS 62-814.100 Intent, Findings, Basis of Standards, and Research Needs 62-814.200 Electric and Magnetic Fields; Definitions 62-814.300 General Technical Requirements
More informationNoise Mitigation Study Pilot Program Summary Report Contract No
Ohio Turnpike Commission Noise Mitigation Study Pilot Program Summary Report Contract No. 71-08-02 Prepared For: Ohio Turnpike Commission 682 Prospect Street Berea, Ohio 44017 Prepared By: November 2009
More informationNOISE IMPACT ASSESSMENT 2016
Panther Environmental Solutions Ltd, Unit 4, Innovation Centre, Institute of Technology, Green Road, Carlow, Ireland. Mobile: 087-8519284 Telephone /Fax: 059-9134222 Email: info@pantherwms.com Website:
More informationAntenna rotation variability and effects on antenna coupling for radar interference analysis
Recommendation ITU-R M.269- (12/214) Antenna rotation variability and effects on antenna coupling for radar interference analysis M Series Mobile, radiodetermination, amateur and related satellite services
More informationIEEE c-00/11. IEEE Broadband Wireless Access Working Group <
Project Title Date Submitted IEEE 802.16 Broadband Wireless Access Working Group Co-ordination Criteria for BWA Systems 2000-04-28 Source Philip Whitehead Radiant Networks PLC London
More informationDEP 2008 ELECTRIC AND MAGNETIC FIELDS CHAPTER ELECTRIC AND MAGNETIC FIELDS
CHAPTER 62-814 ELECTRIC AND MAGNETIC FIELDS TABLE OF CONTENTS PAGE 62-814.100 Intent, Findings, Basis of Standards, and Research Needs. 2 62-814.200 Electric and Magnetic Fields; Definitions. 3 62-814.300
More informationEnergy Networks Association
The Voice of the Networks Version 1 (ISSUED) Energy Networks Association Insert presentation title here ENA EREC P28 Issue 2 2018 Key Technical Modifications Grid Code and SQSS Mods Name Position Date
More informationAppendix 7-6 Collision Risk Assessment. Proposed Ardderroo Wind Farm, Co. Galway
Appendix 7-6 Collision Risk Assessment Proposed Ardderroo Wind Farm, Co. Galway DOCUMENT DETAILS Client: Project title: Ardderroo Wind Farm Ltd. Proposed Ardderroo Wind Farm, Co. Galway Project Number:
More informationAssured Monitoring Group
Assured Monitoring Group YARRANLEA SOLAR FARM NOISE & VIBRATION IMPACT ASSESSMENT JANUARY 2017 I3 CONSULTING PTY LTD Project ID. 10734 R_1 DATE OF RELEASE: 15/02/2017 Table 1: Document approval Name Position
More informationWFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS
WFPS1 WIND FARM POWER STATION GRID CODE PROVISIONS WFPS1.1 INTRODUCTION 2 WFPS1.2 OBJECTIVE 2 WFPS1.3 SCOPE 3 WFPS1.4 FAULT RIDE THROUGH REQUIREMENTS 4 WFPS1.5 FREQUENCY REQUIREMENTS 5 WFPS1.6 VOLTAGE
More informationRECOMMENDATION ITU-R M * Definition of availability for radiocommunication circuits in the mobile-satellite service
Rec. ITU-R M.828-2 1 RECOMMENDATION ITU-R M.828-2 * Definition of availability for radiocommunication circuits in the mobile-satellite service (Question ITU-R 85/8) (1992-1994-2006) Scope This Recommendation
More informationOWA Floating LiDAR Roadmap Supplementary Guidance Note
OWA Floating LiDAR Roadmap Supplementary Guidance Note List of abbreviations Abbreviation FLS IEA FL Recommended Practices KPI OEM OPDACA OSACA OWA OWA FL Roadmap Meaning Floating LiDAR System IEA Wind
More informationTPS 49 EDITION 2 JUNE 2009
TPS 49 EDITION 2 JUNE 2009 Interim arrangements & guidance on the interpretation of IEC 61672 Sound Level Meters - Periodic Tests CONTENTS SECTION PAGE 1 Purpose and duration 2 2 Statement 2 3 Specific
More informationDESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN
Approval Amendment Record Approval Date Version Description 01/04/2014 1 Initial Issue under MTM PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 7 Table of Contents
More informationPower Quality Requirements for Connection to the Transmission System
Power Quality Requirements for Connection to the Transmission System Revision: 1.0 Date: September 2015 Introduction and Purpose of this Document The purpose of this document is to provide clarity to Customers
More informationAC Voltage- Pipeline Safety and Corrosion MEA 2015
AC Voltage- Pipeline Safety and Corrosion MEA 2015 WHAT ARE THE CONCERNS ASSOCIATED WITH AC VOLTAGES ON PIPELINES? AC concerns Induced AC Faults Lightning Capacitive coupling Safety Code Induced AC Corrosion
More informationWireless Facility Peer Engineering Review
Page 1 of 11 Wireless Facility Peer Engineering Review Regarding Verizon Wireless Application 2750 Dwight Way, Berkeley, CA August 10, 2015 Page 2 of 11 Introduction RCC Consultants, Inc. has been engaged
More informationMRO Delay Line. Performance of Beam Compressor for Agilent Laser Head INT-406-VEN The Cambridge Delay Line Team. rev 0.
MRO Delay Line Performance of Beam Compressor for Agilent Laser Head INT-406-VEN-0123 The Cambridge Delay Line Team rev 0.45 1 April 2011 Cavendish Laboratory Madingley Road Cambridge CB3 0HE UK Change
More informationTemplate Planning Condition on Amplitude Modulation Noise Guidance Notes
www.renewableuk.com Template Planning Condition on Amplitude Modulation Noise Guidance Notes December 2013 Template Planning Condition on Amplitude Noise Guidance Notes Modulation Introduction Introduction
More informationJanuary 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4
January 2012 Noise Impact Assessment Report for Proposed Cable Tow System For Wakeboarding & Water-skiing Grand Canal Dock, Dublin 4 MALONE O REGAN 2B Richview Office Park, Clonskeagh, Dublin 14. Tel:
More informationSolar control devices; balance between thermal performance and daylight
International Conference Passive and Low Energy Cooling 991 Solar control devices; balance between thermal performance and daylight M. Mehrotra Architectural Association, Graduate School, London ABSTRACT
More informationDESIGN REVIEW PROCESS AND APPLICATION
DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring
More informationSeagreen Wind Energy Limited C/o SSE Renewables 1 Waterloo Street Glasgow G2 6AY
Date: 30 th March 2018 Ref: A4MR-SEAG-Z-LGL810-SLE-548 Dr. Nicola Bain Marine Renewables Section Leader Licensing Operations Team Marine Scotland Marine Laboratory 375 Victoria Road Aberdeen AB11 9DB Seagreen
More informationSite Name. Bird Dimensions Species Hen harrier = data input required length (m) 0.55 = model calculates value wing span (m) 1.
Site Name Loch Urr Bird Dimensions Species Hen harrier = data input required length (m) 0.55 = model calculates value wing span (m) 1.4 speed (m/sec) 8 Turbine Dimensions Height of tower (m) 80 Blade length
More informationCity of Keizer Floodplain/Greenway Development Application
City of Keizer Floodplain/Greenway Development Application If there are any questions about this application, who should be contacted (Agent)? Name: Address: Daytime Phone Number(s): Fax: Email: 1. Applicant
More informationGalloper Wind Farm Limited. Galloper Wind Farm Project Environmental Statement Chapter 1 Introduction October 2011 Document Reference 5.2.
Galloper Wind Farm Limited Galloper Wind Farm Project Environmental Statement Chapter 1 Introduction October 2011 Document Reference 5.2.1 Document title Galloper Wind Farm Project Environmental Statement
More informationREPORT ITU-R M Impact of radar detection requirements of dynamic frequency selection on 5 GHz wireless access system receivers
Rep. ITU-R M.2034 1 REPORT ITU-R M.2034 Impact of radar detection requirements of dynamic frequency selection on 5 GHz wireless access system receivers (2003) 1 Introduction Recommendation ITU-R M.1652
More informationAPPENDIX M NOISE ANALYSIS
APPENDIX M NOISE ANALYSIS McCORMICK RANKIN CORPORATION 2655 North Sheridan Way, Suite 300 Mississauga, Ontario, L5K 2P8 Tel: (905)823-8500 Fax: (905) 823-8503 E-mail: mrc@mrc.ca Website: www.mrc.ca MEMO
More informationWhen surge arres t ers are installed close to a power transformer, overvoltage TRANSFORMER IN GRID ABSTRACT KEYWORDS
TRANSFORMER IN GRID When surge arres t ers are installed close to a power transformer, they provide protection against lightning overvoltage ABSTRACT The aim of this research article is to determine the
More informationRecommended Changes to the Public Hearing Draft Zoning Ordinance
DATE: December 6, 2016 TO: Village of Oak Park FROM: Arista Strungys SUBJECT: Recommended Changes Recommended Changes to the Public Hearing Draft Zoning Ordinance ZONING MAP» Edit to remove right-of-way
More informationTransformer Thermal Impact Assessment White Paper TPL Transmission System Planned Performance for Geomagnetic Disturbance Events
Transformer Thermal Impact Assessment White Paper TPL-007-2 Transmission System Planned Performance for Geomagnetic Disturbance Events Background Proposed TPL 007 2 includes requirements for entities to
More informationLow Frequency Demand Disconnection Summary
Low Frequency Demand Disconnection Summary This article assesses the suitability of current low frequency protection on the network as more distributed generation is connected to WPD s network. DSOF June
More informationBlack. LWECS Site Permit. Stearns County. Permit Section:
PERMIT COMPLIANCE FILING Permittee: Permit Type: Project Location: Docket No: Permit Section: Date of Submission : Black Oak Wind,, LLC LWECS Site Permit Stearns County IP6853/WS-10-1240 and IP6866/WS-11-831
More information2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town.
Subject: Antenna Systems Policy Number: Date Developed: 2008/09 Date Approved: April 8, 2009 Lead Department: Planning and Development Date Modified: (if applicable) November 26, 2014 A. PROTOCOL STATEMENT:
More informationJanuary 15, File: A. Urban Systems Ltd Homer Street Vancouver, BC V6B 2W9. Attention: Tim Stevens. Dear Tim:
January 15, 2016 File: 0890-15A Urban Systems Ltd. 1090 Homer Street Vancouver, BC V6B 2W9 Attention: Tim Stevens Dear Tim: Re: Highway 1 - Admirals McKenzie Interchange Project Baseline Noise Monitoring
More informationVerizon Wireless Proposed Base Station (Site No Berkeley Bekins ) 2721 Shattuck Avenue Berkeley, California
Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications
More informationDesign guide to separating distances during construction
Design guide to separating distances during construction For timber frame buildings and projects above 600m 2 total floor area Part 2 - Standard timber frame and construction process mitigation methods
More informationDESIGN OF A 45 CIRCUIT DUCT BANK
DESIGN OF A 45 CIRCUIT DUCT BANK Mark COATES, ERA Technology Ltd, (UK), mark.coates@era.co.uk Liam G O SULLIVAN, EDF Energy Networks, (UK), liam.o sullivan@edfenergy.com ABSTRACT Bankside power station
More informationISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems
INTERNATIONAL STANDARD ISO 10418 Second edition 2003-10-01 Petroleum and natural gas industries Offshore production installations Basic surface process safety systems Industries du pétrole et du gaz naturel
More informationModify Section , Major Impact Services and Utilities, of Chapter (Civic Use Types):
ORDINANCE NO. AN ORDINANCE CHANGING THE ZONING CODE FOR MENDOCINO COUNTY The Board of Supervisors of the County of Mendocino, State of California, ordains as follows: Pursuant to Division I of Title 20,
More informationUnit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition
Unit Auxiliary Transformer Overcurrent Relay Loadability During a Transmission Depressed Voltage Condition NERC System Protection and Control Subcommittee March 2016 NERC Report Title Report Date I Table
More informationBoa Vista Wind Farm Ponta do Sol
Boa Vista Wind Farm Ponta do Sol COLLISION RISK ASSESSMENT REPORT Supplementary Environmental Information Version 2 Final 5 December 2009 Boa Vista Wind Farm Ponta do Sol COLLISION RISK ASSESSMENT REPORT
More informationView flat at a comfortable arm s length Enoch Hill Wind Farm Environmental Statement
Photomontage View flat at a comfortable arm s length E255 385, N601 853 Horizontal field of view: 53.5º (planar projection) Eye level: 336.5m AOD Principal distance: 812.5mm Direction of view: 29º Paper
More informationSYNCHRONISING AND VOLTAGE SELECTION
SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any
More informationVISUALISATION STANDARDS
VISUALISATION STANDARDS INTRODUCTION These standards have been produced to enable the Council to verify that photomontages submitted in support of planning applications and contained with Environmental
More information1. Terrestrial propagation
Rec. ITU-R P.844-1 1 RECOMMENDATION ITU-R P.844-1 * IONOSPHERIC FACTORS AFFECTING FREQUENCY SHARING IN THE VHF AND UHF BANDS (30 MHz-3 GHz) (Question ITU-R 218/3) (1992-1994) Rec. ITU-R PI.844-1 The ITU
More informationTHE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES
THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES Issue 9: May 2013 National Grid National Grid Registered Office National Grid Electricity Transmission plc Registered Office: 1-3 Strand London
More informationDavid J. Gellner, AICP, Principal Planner
Staff Report PLANNING DIVISION COMMUNITY & ECONOMIC DEVELOPMENT To: From: Salt Lake City Planning Commission David J. Gellner, AICP, Principal Planner - 801-535-6107 - david.gellner@slcgov.com Date: October
More informationRadar Signatures and Relations to Radar Cross Section. Mr P E R Galloway. Roke Manor Research Ltd, Romsey, Hampshire, United Kingdom
Radar Signatures and Relations to Radar Cross Section Mr P E R Galloway Roke Manor Research Ltd, Romsey, Hampshire, United Kingdom Philip.Galloway@roke.co.uk Abstract This paper addresses a number of effects
More informationLIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK
LIMITS FOR TEMPORARY OEROLTAGES IN ENGLAND AND WALES NETWORK This document is for internal and contract specific use only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept
More informationREPORT ITU-R M
Rep. ITU-R M.2113-1 1 REPORT ITU-R M.2113-1 Sharing studies in the 2 500-2 690 band between IMT-2000 and fixed broadband wireless access systems including nomadic applications in the same geographical
More informationTransformer Thermal Impact Assessment White Paper TPL Transmission System Planned Performance for Geomagnetic Disturbance Events
Transformer Thermal Impact Assessment White Paper TPL-007-2 Transmission System Planned Performance for Geomagnetic Disturbance Events Background Proposed TPL-007-2 includes requirements for entities to
More informationHigher National Unit specification. General information for centres. Photography: Darkroom Techniques. Unit code: DW81 34
Higher National Unit specification General information for centres Unit title: Photography: Darkroom Techniques Unit code: DW81 34 Unit purpose: This Unit is designed to enable the candidate to research,
More informationPOWER TRANSFORMER. Failure Analysis & Troubleshooting. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E
POWER TRANSFORMER Failure Analysis & Troubleshooting H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: Electricity is high-grade energy. Working
More informationSystem Operating Limit Definition and Exceedance Clarification
System Operating Limit Definition and Exceedance Clarification The NERC-defined term System Operating Limit (SOL) is used extensively in the NERC Reliability Standards; however, there is much confusion
More informationNATS Swanwick. Interface Agreement. Owners: General Manager Swanwick. General Manager XXX
NATS Swanwick Interface Agreement between Swanwick And XXX Airport Owners: General Manager Swanwick General Manager XXX APPROVED BY Title Name Signature Date General Manager LTC Swanwick General Manager
More information1 Guidance to protect MoD systems using the 2.3 GHz band
1 Guidance to protect MoD systems using the 2.3 GHz band A1.1 Amateurs are required to operate in such a way as to not cause interference to other lawful uses of the spectrum. This includes MoD uses. However
More informationEnvironmental Noise Assessment Cambourne to Cambridge options
Environmental Noise Assessment Cambourne to Cambridge options CLIENT: Cambridgeshire County Council Major Infrastructure Delivery Box No SH1311 Shire Hall Cambridge CB3 0AP CONTACT: Tim Watkins REPORTED
More informationTECHNICAL REPORT 2016 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK.
TECHNICAL REPORT 16 IEL ENVIRONMENTAL NOISE SURVEY OF THE DAIRYGOLD CASTLEFARM FACILITY, MITCHELSTOWN, CO. CORK. FOR Gabriel Kelly Group Environmental Manager Dairygold Food ingredients Castlefarm Mitchelstown
More informationWIRELESS TELECOMMUNICATION FACILITIES. Chapter 15
Title 9 Land Management Code WIRELESS TELECOMMUNICATION FACILITIES Chapter 15 9-15-1: PURPOSE: 9-15-2: DEFINITIONS: 9-15-3: APPLICABILITY: 9-15-4: MASTER PLAN REQUIRED: 9-15-5: ALLOWABLE USES: 9-15-6:
More informationAPPENDIX K.1 TELECOMMUNICATIONS AND AVIATION IMPACT STUDY
Grousemount Wind Farm, Co. Kerry Environmental Impact Statement - Volume 2 of 3 August 2015 APPENDIX K.1 TELECOMMUNICATIONS AND AVIATION IMPACT STUDY Appendix K: Material Assets LTD Wind farm developments
More informationHome CSP Inc. Trackers and electronics for home solar energy
Home CSP Inc. Trackers and electronics for home solar energy www.homecsp.com csp@homecsp.com TinyTracker version 1.06 reve Thanks for purchasing your TinyTracker from Home CSP Inc. The TinyTracker provides
More informationMidAmerican Energy Company 69 kv Facility Ratings Methodology
MidAmerican Energy Company 69 kv Facility Ratings Methodology Version 1.0 Issued by: Luke Erichsen Reviewed by: Tom Mielnik Last Reviewed: 8/29/2012 1 1.0 Scope: This document provides MidAmerican Energy
More informationConceptual, Preliminary and Final Site Plan Review in Holladay City
Conceptual, Preliminary and Final Site Plan Review in Holladay City The City of Holladay incorporated in December, 1999 and adopted its own zoning ordinance in May, 2000. All land use decisions are made
More informationINFCIRC/57. 72/Rev.6. under. Safetyy. read in. Convention. involve. National Reports. on Nuclear 2015.
Atoms for Peace and Development Information Circular INFCIRC/57 72/Rev.6 Date: 19 January 2018 General Distribution Original: English Guidelines regarding Convention National Reports under the on Nuclear
More information17 Telecommunication Interference
17 Telecommunication Interference 17.1 Introduction This Chapter of the ES assesses the potential impacts and likely effects of the Proposed Development on local television (TV) broadcast reception during
More informationGraphic Communication Assignment General assessment information
Graphic Communication Assignment General assessment information This pack contains general assessment information for centres preparing candidates for the assignment Component of Higher Graphic Communication
More informationTransformer Thermal Impact Assessment White Paper Project (Geomagnetic Disturbance Mitigation)
Transformer Thermal Impact Assessment White Paper Project 2013-03 (Geomagnetic Disturbance Mitigation) TPL-007-1 Transmission System Planned Performance for Geomagnetic Disturbance Events Background On
More informationGovernment of Karnataka Department of Technical Education Board of Technical Examinations, Bengaluru
Government of Karnataka Department of Technical Education Board of Technical Examinations, Bengaluru Course Title :COMPUTER AIDED Course Code : 15EE47P ELECTRICAL DRAFTING Semester : IV Course Group :
More informationADDAM (Atmospheric Dispersion and Dose Analysis Method)
ADDAM (Atmospheric Dispersion and Dose Analysis Method) Presentation for IAEA Environmental Modelling for Radiation Safety (EMRAS-II), Technical Meeting, Vienna Urban Areas Working Group Nuclear Power
More informationApplication for Site Plan Review
Application for Site Plan Review 3275 Central Blvd., Hudsonville, Michigan 49426-1450, 616.669.0200 fax 616.669.2330 It is STRONGLY recommended that any application that must go before the Planning Commission
More informationLiddell Coal Operations
Liddell Coal Operations Environmental Noise Monitoring April 2016 Prepared for Liddell Coal Operations Pty Ltd Page i Liddell Coal Operations Environmental Noise Monitoring April 2016 Reference: Report
More informationENGINEERING REPORT CONCERNING THE EFFECTS UPON FCC LICENSED RF FACILITIES DUE TO CONSTRUCTION OF THE (Name of Project) WIND PROJECT Near (City, State)
ENGINEERING REPORT CONCERNING THE EFFECTS UPON FCC LICENSED RF FACILITIES DUE TO CONSTRUCTION OF THE (Name of Project) WIND PROJECT Near (City, State) for (Name of Company) January 3, 2011 By: B. Benjamin
More informationABERDEEN HARBOUR EXPANSION PROJECT November Volume 2: Environmental Statement
ABERDEEN HARBOUR EXPANSION PROJECT November 2015 Volume 2: Environmental Statement Chapter 23: OTHER USERS 23. OTHER USERS 23.1 Introduction This chapter assesses the potential effects on other users
More informationPetroleum Safety Levy Methodology. Decision Paper
Petroleum Safety Levy Methodology Decision Paper DOCUMENT TYPE: REFERENCE: Decision Paper CER/14/429 DATE PUBLISHED: 7 th August 2014 VERSION 3.0 The Commission for Energy Regulation, The Exchange, Belgard
More informationClair Creek Meadows 30T Blocks 47, 48 & 49 Zone Change Functional Servicing and Stormwater Management Brief
Stantec Consulting Ltd. 49 Frederick Street Kitchener ON N2H 6M7 November 11, 2011 File: 603-10620/29 Stantec Consulting 49 Frederick Street Kitchener ON N2H 6M7 Attention: Mr. Douglas Stewart, MCIP, RPP
More informationHerts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution
Herts Valleys Clinical Commissioning Group Review of NHS Herts Valleys CCG s constitution Agenda Item: 14 REPORT TO: HVCCG Board DATE of MEETING: 30 January 2014 SUBJECT: Review of NHS Herts Valleys CCG
More informationRadiowave Propagation Prediction in a Wind Farm Environment and Wind Turbine Scattering Model
International Renewable Energy Congress November 5-7, 21 Sousse, Tunisia Radiowave Propagation Prediction in a Wind Farm Environment and Wind Turbine Scattering Model A. Calo 1, M. Calvo 1, L. de Haro
More informationTransformer Thermal Impact Assessment White Paper (Draft) Project (Geomagnetic Disturbance Mitigation)
Transformer Thermal Impact Assessment White Paper (Draft) Project 2013-03 (Geomagnetic Disturbance Mitigation) TPL-007-1 Transmission System Planned Performance during Geomagnetic Disturbances Background
More informationVerizon Wireless Proposed Base Station (Site No South Goleta ) 4500 Hollister Avenue Santa Barbara, California
Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications
More informationPfizer Ireland Pharmaceuticals
Allegro Acoustics Limited, Unit 2A Riverside, Tallaght Business Park, Tallaght, Dublin 24 Tel/Fax: +33 () 1 4148 Pfizer Ireland Pharmaceuticals Pfizer Grange Castle, Grange Castle Business Park, Clondalkin,
More informationRe. Invitation to Comment on a Proposed Small Cell Telecommunications Installation Near (Road reserve) Coogee Bay Road COOGEE NSW 2034
The Occupier 22 nd February 2018 Dear Sir/Madam Re. Invitation to Comment on a Proposed Small Cell Telecommunications Installation Near (Road reserve) 146-148 Coogee Bay Road COOGEE NSW 2034 Urbis is writing
More informationCHAPTER 26 SITE PLAN REVIEW
CHAPTER 26 SITE PLAN REVIEW Section 26.1. Committee. The Planning Commission shall appoint three members of the Planning Commission to the site plan review committee which shall be responsible for site
More informationInnogy Renewables UK Ltd i Harryburn Wind Farm: ES Technical Appendix 8.6: Bird Collision Modelling April 2017
Harryburn Wind Farm Technical Appendix 8.6 Bird Collision Modelling Ref: 405-06525-00001 April 2017 Ref: 405.06525.00001 Version No: Final April 2017 Innogy Renewables UK Ltd i 405.06525.00001 CONTENTS
More informationAGN 022 Conditions for Parallel Operation
Application Guidance Notes: Technical Information from Cummins Generator Technologies AGN 022 Conditions for Parallel Operation SYNCHRONISATION The parallel operation of Generating Sets is common, to share
More informationMigration of Birds MARC
Migration of Birds MARC TABLE OF CONTENTS Migration of birds 1. Abstract....3 2. Description of a domain......3 3. Block diagram....... 4 4. Description of the program that is wanted. 4 5. Detailed requirements....
More informationAT&T Mobility Proposed Base Station (Site No. CN4779A) 1101 Keaveny Court Walnut Creek, California
Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of AT&T Mobility, a personal wireless telecommunications
More informationSee Benchmark Geomagnetic Disturbance Event Description white paper, May 12, Filed by NERC in Docket No. RM15 11 on June 28, 2016.
Screening Criterion for Transformer Thermal Impact Assessment White Paper TPL-007-2 Transmission System Planned Performance for Geomagnetic Disturbance Events Summary Proposed TPL 007 2 includes requirements
More informationThe following is the summary of Keane Acoustics community mechanical noise study for the City of St. Petersburg.
August 11, 2017 David Goodwin Director Planning & Economic Development Department City of St. Petersburg Re: City of St. Petersburg Dear Mr. Goodwin, The following is the summary of Keane Acoustics community
More informationVerizon Wireless Proposed Base Station (Site No Lake Cachuma ) 2680 Highway 154 Santa Barbara County, California
Statement of Hammett & Edison, Inc., Consulting Engineers The firm of Hammett & Edison, Inc., Consulting Engineers, has been retained on behalf of Verizon Wireless, a personal wireless telecommunications
More informationMemorandum 1.0 Highway Traffic Noise
Memorandum Date: September 18, 2009 To: Chris Hiniker, SEH From: Stephen B. Platisha, P.E. Re: Updated CSAH 14 Noise Analysis The purpose of this memorandum is to provide the results of the revised traffic
More information