Human Factors Engineering in FLNG Projects D. Chandrasegaran, H. Al Sharifi, M.H. Mohd Noor, and M.K. Abdullah, TechnipFMC

Size: px
Start display at page:

Download "Human Factors Engineering in FLNG Projects D. Chandrasegaran, H. Al Sharifi, M.H. Mohd Noor, and M.K. Abdullah, TechnipFMC"

Transcription

1 Human Factors Engineering in FLNG Projects D. Chandrasegaran, H. Al Sharifi, M.H. Mohd Noor, and M.K. Abdullah, TechnipFMC This paper was prepared for presentation at the Gastech Conference held in Tokyo, Japan, April This paper was selected for presentation by an Gastech program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not been reviewed by the Gastech Conference and are subject to correction by the author(s). The material does not necessarily reflect any position of the Gastech Conference, its officers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Gastech Conference and the authors is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of where and by whom the paper was presented. Abstract Human Factor Engineering (HFE) addresses interactions in the work environment between people, a facility and its management. FLNG projects bring new HFE challenges with more equipment items that are often larger and often more sophisticated than previously deployed offshore. Deployment of HFE is most cost efficient when started in the early design stages. Timely application of HFE can bring many benefits such as: Designing to allow operation and maintenance throughout the facility s life considering every single task requiring handling of mechanical components and verification of the FLNG operation and maintenance teams resources. Holistic material handling system design Better construction planning This paper will present the findings and lessons learned from engineering and construction of recent offshore LNG facilities by TechnipFMC. The perspective of operation and maintenance teams is considered in the HFE process to ensure that past experience and needs are incorporated in the new design. The findings and lessons learned are summarized under keywords for further discussion and recommendation. Codes, standards and guidelines that are relevant to HFE and material handling are discussed to establish if there is adequate coverage of the requirements for the design, construction and operation of FLNG. Although the discussions of human factors are based on case studies from offshore facilities such as FLNG and large gas processing platforms, the observations and recommendations could be extended to other types of oil and gas facilities. Keywords: Facilities, Operations, Maintenance, Material Handling, Human Factors Abbreviations: BBS Behaviour Based Safety HFE Human Factors Engineering DDE Detailed Design Engineering HMI Human Machine Interface FEED Front End Engineering Design HSE Health, Safety and Environment FLNG Floating Liquified Natural Gas LNG Liquefied Natural Gas FPSO Floating, Production, Storage and Offloading MH Material Handling

2 2 Human Factors Enginering in FLNG Projects 1. Introduction Global liquefaction capacity stands at 301MTPA. This is almost double the capacities 10 years ago. The International Energy Agency (IEA) has projected that global energy demand will rise and is set to grow by 30% by year In addition, natural gas demand growth fares best in this projection, even though there would be a shift in capital expenditures towards low carbon environment. Looking at these scenarios, investments on LNG facilities are expected to increase in the foreseeable future. LNG facilities cover liquefaction, regasification, land storage, and distributions, which are mostly land-based. Recent technological developments have made it possible for similar facilities to be built and operated offshore. This has since become a reality in the LNG sector with the achievement of the first gas on Petronas first FLNG unit, SATU, on December This technology had been under development for years, combining the design and installation of liquefaction units with a traditional floating production, storage, and offloading facility; enabling the development of stranded offshore gas resources economically. The design, construction and operation of FLNG units present significant challenges compared to an onshore plant - vessels motions, relatively small and congested environment, and harsh marine conditions. Therefore, these constraints present further risks on the human factors front in the work environment and much technical and human factors challenges that need to be tackled. In this paper, the deployment of human factors engineering in FLNG Unit projects in general will be discussed. The benefits of HFE in early design stages of FLNG projects will be highlighted. Considering the novelty and the new technologies in FLNG projects, there is a lack of design and operation references. Nevertheless, proven standards, good engineering practice, and valued operators experience form the basis of design. Lessons learned during the engineering and construction of FLNG units by TechnipFMC are shared here. Perspectives of past experiences of designing, constructing and operating similar facilities are taken into account during the HFE process. In addition, codes, standards and guidelines that are relevant to HFE and material handling are discussed. 1.1 Overview of FLNG Units FLNG unit is a versatile floating LNG facility that relates to many technical skill sets that require prior knowledge and experience. These include natural gas liquefaction, design and construction of large FPSO units, and the design of the riser and mooring system that link offshore gas fields to the floating unit. With FLNG units, stranded offshore gas resources could be monetised well, especially when 60% of the world s natural gas is located in areas which conventional rigs and pipelines cannot access. FLNG technology presents the hybridization of a 5-step process into a compact structure. These are: 1) Resources: extraction of natural gas from the wellheads to the floating unit; 2) Pre-treatment: extracted natural gas processed on board prior to liquefaction; 3) Liquefaction: liquefies natural gas to approximately -150 C and shrinks the gas volumes;

3 Human Factors Engineering in FLNG Projects 3 4) Storage: the liquefied natural gas is stored in dual membrane type cargo containment system before offloading; and 5) Offloading: LNG is offloaded to the LNG carrier for delivery Figure 1 encapsulates these steps in a sequential diagram. Resource Pretereatment Liquefaction Storage Offloading Figure 1: FLNG 5-Step Process Figure 2: Overview of know-hows required to develop FLNG LNG production in the offshore setting presents serious challenges - bearing in mind that FLNG whether in a large or small scale will be amongst the largest and most complex capital investments in the oil and gas sector. Among them are: 1) Every part of conventional LNG facility needs to fit in a fraction of footprint of a land-based facility, concurrently without compromising the level of safety; 2) LNG containments must be able to withstand the forces due to sea waves and current motions, affecting facility safety, integrity, reliability and operations; 3) Safety concerns such as eliminating ignition sources and cryogenic spills, reducing flammable inventories, and providing a safe haven for operating personnel; 4) Equipment for FLNGs are generally larger and heavier than that of FPSOs. In addition, FLNG may have a number of tall vertical columns and exchanger as part

4 4 Human Factors Enginering in FLNG Projects of the process system. Performance of these equipment is critical to maintain the availability and production of the FLNG unit; and 5) There is little historical data available to benchmark weight and cost estimates. Nevertheless, past experiences in building offshore modules and FPSOs would help to provide some confidence in this area. In addition, lessons learned from designing and building FPSOs and onshore LNG modules could be integrated when executing FLNG projects. FLNG projects, once it overcame its challenges, present significant gas field development opportunities in the offshore oil and gas sector. Figure 2 shows the technology know-how required to develop this FLNG innovation. 2. Human Factors Engineering Human Factors Engineering in the oil and gas sector are interpreted more broadly and is approached at a multidisciplinary level; encompassing people, environment, equipment, organisation and work. This is done with the aim of addressing risks issues, reducing consequences of human errors and improving user acceptance of the facilities or equipment. In fact, major players in the industries recognise that human factors engineering has a significant role in ensuring quality, safety and fit for the purpose the equipment and facilities are used in the oil and gas industry. Figure 3 presents the model for human factors based on the OGP model. Facilites & Equipment workspace design maintenance reliability physical characteristics Management leadership procedures hazard identification risk assessment training commitment change management People human characteristics behaviour fitness stress fatigue Figure 3: A human factors model based on OGP

5 Human Factors Engineering in FLNG Projects Human Error Generally, we come across human error many times as a cause for mishaps in the workplace and facilities while operating, constructing or designing. Rarely, it is due to a single mistake by any one person; as shown by Reason s Swiss cheese model. Therefore, it is important to know where the deviations occur and understand where simple human failure may prove detrimental to the facilities. Human errors generally could be defined in two groups, which are skill-based and rulesbased; relating to slips and mistakes. Other than that, violations are defined where operators deliberately carry out an action contrary to the procedures. Lapses are due to failure of memory. Slips arise from the right intention of the operator, but where fault occurs during execution. Meanwhile, mistakes occur during decision-making based on the operators knowledge or the procedure concerned. Once we understand the nature of the errors that we may make, it is necessary to consider the management of these errors when engineering the system, equipment or facilities. These would be the main aim of Human Factors Engineering during the project execution. 2.2 Facilities and Equipment Facilities and equipment is one of the components of the HF model; in consideration of physical characteristics, workspace, maintenance and reliability concerns. Also, it covers a wide range of topics from initial design up to the labelling at completion. In this section, three key items will be elaborated on, which are the equipment design, facilities and workstation design, and HMIs. The main aim when performing equipment design is to address the relationship between man and machine (or equipment) in a synergistic manner. People have different traits such as physical capabilities and skills that need to be matched with the equipment s design parameters. These overlapping areas could be summarised in nine-point human factors design principles: Suitability Simplicity Labelling Accessibility Detectability Availability Logic and consistency Flexibility Conformity with user experience These design iterations which should be taken care of holistically should consider the processes involved and the people who operate it. Tools such as BBS and standards provide guidance to achieve these principles. Meanwhile, for workplace and facilities, a good design is reflected when it satisfies biomechanical, physiological and psychological needs of the users. It should accommodate to the extremes of the user population and be physically accessible. Also, other environmental conditions such as lighting and comfort are considered. Facilities operation and maintenance cost time and resources. Operators must be able to access the equipment safely and easily. Apart from that, equipment must be designed for easy

6 6 Human Factors Enginering in FLNG Projects maintenance. Task analysis and checklists methods could be used during the early design stage to assess potential HF issues and appropriate interventions could be made in time. Human-Machine Interfaces or more commonly known as HMIs, key purpose is to interact with the control systems. Botches when dealing with control systems usually result in catastrophic events. HF elements that involve HMIs are the ergonomics with the computer equipment, operators interaction with the software, and individual human characteristics. Significant technological leaps in the past decades have made it more reliant on control software and its various display devices. Also, process control software information are being delivered in a compact manner; audio and visually. Therefore, audio visual devices or VDUs design are becoming more important and necessitates for HF intervention. Presently, there is not a single set of guidelines or standard that addresses all the HF concerns related to it. Nevertheless, there are guidelines documents from other industries which could be adopted. 2.3 People The People component relates to the individual contribution; in terms of skills, perceptions, communications, fatigue and more. At times, it overlaps with human machine interface subject. A few key topics under this subject are touched on in the succeeding paragraphs. Training is related to development of skills within the people or available human resource. They tend to be trained in many areas; some are skill-based, technical or managerial. An overall training and human resources development programme should be established in any organisation. This would enable the workforce to meet the ever-changing demands, technical needs and hazards of operation. The issues here revolve around the training design, its quality, and alignment with job needs. Many incidents at the workplace occur due to breakdown in communications. In any situation, intention and meaning must be transmitted correctly. Therefore, a feedback system should be present to ensure that correct information is transmitted. One form of communication is through writings or documents. Documentation should be designed from the users perspective, considering users perception of experiences, knowledge and psychology. There are document design guidelines from a number of sources that could assist in the development of new documents and reviewing existing ones. In current times, it is important to have documentation and information that could transcend the cultural differences and is effective in conveying the necessary intent and information. Environmental factors such as lighting, noise, vibration and temperature are also aspects that fall under People. These factors should be within the comfort range of the operators. Staffing levels should commensurate with the workload available. In other words, adequate resources are provided to complete the task in hand. Ideal workload should be sufficiently challenging to get the worker s attention and interest as well. There are specific design tools available to assess the needs of the operator (from environment condition to workloads) and implement the requirements during the design phase.

7 Human Factors Engineering in FLNG Projects Management Systems A management system refers to the structure where the work is carried out. It could be broadly linked to procedures, planning, safety practices, competencies management, change management and emergency preparedness. All these and many more should contribute positively to the risk management within the organisation. One of the key management elements within the organisation is safety culture which will be elaborated here. Every organisation endeavours to develop a positive health, safety and environment climate throughout its people; which in turn, impacts the HSE performance. When members of the organisation engage in HSE as a value system, it would be meaningful and practical for them to take action on it, especially on their day-to-day tasks - consequently contributing to successful business performance to the organisation as well. There are many theoretical models available to develop a safety culture in an organisation; the focus would be on Schein s, Cooper s and Reason s. These also have evolved to a certain extent to suit the organisational needs. Positive outcomes are expected in terms of hardware, management system, people, behaviour and organisational climate factors when safety culture programmes are implemented successfully. For instance, a good plant design and working conditions will be tangible results that could be achieved with positive safety culture. Many safety culture improvement programmes have been conducted successfully worldwide and the interest is growing also. In the end, it would help the personnel in project and operating plant have a good understanding on how their individual behaviour influences safety performance and to take ownership of improvement actions throughout the project life-cycle. 2.5 Material Handling All offshore facilities including FLNGs comprise many sub-systems that require routine inspection, maintenance and repairs, ensuring they achieve the intended production and reliability. In order to facilitate such activities efficiently, material handling as a specialty topic has been of much interest in recent years. During the engineering stage, MH methodology, accessibility and equipment are identified as well-procured. In the oil and gas sector, many operators have defined manual handling limits at 25 kg for a single person. Consequently, MH equipment will be utilised for lifting of parts that exceed the pre-determined limits. Also, customised solutions or complex methodology will be employed to complete the MH and maintenance activities. For example, an offshore platform crane is a major feature of material handling system within the platform specifically, for personnel transfer and equipment transfer. For these reasons, platform cranes can be considered among the most high-risk and high-demand equipment, hence inspections and maintenance of platform cranes are scheduled throughout its life. Provisions to carry out maintenance activities are usually included as part of its supply for instance, jib cranes to lift lube oil drums, and walkways along the crane boom to inspect the wire rope. Gas turbines for offshore use are designed for that as they are able to withstand harsh climates and heavy-duty usage. As such, condition-monitoring and preventive maintenance must adhere to a strict schedule. Gas turbine frames and casings are generally split axially to lift them from the top. Without removing the rotor, variable inlet guide vanes can be removed radially, and bearing liners can be replaced using an integral monorail hoist within the package.

8 8 Human Factors Enginering in FLNG Projects 3. Industry Guidance on HFE Application of HFE had been scattered all over the oil and gas industry, succinctly said inconsistent. However, efforts had been shown to implement HFE programme in major capital projects in recent years. Lessons and experienced gained through this implementation are of great value to the industry; improving safety records. The succeeding paragraphs will give an overview of the current state. Regulators are major drivers in coming up with the requirements, ensuring compliance and raising the expectations on HFEs. Several regulators and industry bodies such as Norway s Petroleum Safety Authority and American Bureau of Shipping have come up with their HFE design standards and guidelines for the oil and gas sectors within their jurisdiction. Some of the oil and gas companies have also cited the design standards and developed their in-house or project specific HFE documents. For example, company specific design manual is created to provide guidelines on egress dimension for a plant access and layouts. The International Association of Oil and Gas Producers had produced a practical document that gives an overview of recommended HFE activities over five main project phases. This documents reflects a simplistic model that could implemented in a cost effective way compared to earlier mentioned HFE design standards of which are more comprehensive. Looking from far, it could be said there are sufficient HFE reference documents for the oil and gas sector. Also, a list of commonly agreed HFE methodologies could be established for the offshore project with concurrence with all industry players. Nevertheless, the application of it remain inconsistent so far due to various reasons. 4. Integrating HFE in FLNG Projects Safety performance has improved with the application of human factors programme, especially in reducing accident rates. In the past decades, many oil and gas operators had taken significant steps in integrating human factors requirement as part of the project design process, realising that HFE programmes are most efficient during the design phase. This is when hazards could be designed out. Also, mitigation plans such as procedures and barriers are put into place effectively. Subsequently, verifications are done during the construction and commissioning phase. Active implementation of HFE programmes during project phases will deliver facilities that are better in terms of cost, safety, reliability and maintainability. 4.1 Engineering Design HFE implementation through the project lifecycle could be summarised in three stages. These are conceptual, FEED and detailed engineering stages. The succeeding paragraphs will elaborate more on this. First and foremost, leading HFE integration in the project environment is a large responsibility. They are important tasks that are handled by HFE Specialist and HFE-focused engineering group. In addition, this should also be advocated by the project management team and the operating client or end-user; who have the benefit of influencing project direction. HFE Specialist is required to have the appropriate academic qualification and experience in this field. In addition, engineers within the focus group shall be HFE-trained as well. Usually, qualifications that should be attained by the HFE-focused engineering team are well defined

9 Human Factors Engineering in FLNG Projects 9 by the operating client or end-user. A qualified, credible and experienced HFE team is essential in determining the successful implementation, especially in giving the right direction to all project team members on HFE matters from conceptual to handover of the facilities. During the conceptual phase, HFE strategy or a high level HFE plan will be spelt out. Also, HFE Specialist and associated team will be assembled to formulate the required philosophy and in ensuring that the key design documents take into account the HFE design requirements and its activities. HFE design requirements are compiled by the HFE Specialist from existing technical references and standards that will be mandated by the Client or end-user. These requirements are then imparted to all the design documents including design basis memorandum and layouts. HFE strategy will define that HFE principles shall be applied during the early design phase, where it can have a critical impact on the usability and operators HSE concerns, and an appropriate level of HFE activities are outlined. At this stage, HFE screening exercise will be executed with the project team. Product of the conceptual phase will be HFE Plan for the subsequent FEED phase. This describes the HFE tasks that should be performed during the next project phase. It also establishes the work scope such as review workshops, schedules, deliverables and responsibilities of those involved in implementing it - contractors and vendors. HFE activities during FEED phase will be based on the HFE plan developed earlier. Key activities here covers detailed HFE specifications development, HFE analysis and verification. The point to note is that HFE activities during the FEED phase are most critical, where all activities are design-focused and HF risks are mitigated through design. In general, sub-systems within the facility will be analysed using HFE tools and methodologies. HF analysis during FEED may encompass these: Safety critical task analysis; Valve criticality analysis; and 3D model reviews. In addition, certain scope may require more detailed study efforts and this could be cascaded to next phase. These special studies may include: Alarm management; Material handling; Manning assessment; and Human machine interface for process control. HFE awareness training is provided to all project team members by the HFE Specialist and his/ her team. The content and length of training should be customised to the target groups such as designers and engineers. The HFE-focused team will also be providing assistance to the engineers and designers in order to allow transfer of key outcomes from the HF analyses and studies promptly; whether through documents, drawings and layouts. The FEED phase HFE activities are concluded with an HFE report that demonstrates all analyses outcomes and recommendations that have been implemented or justified accordingly.

10 10 Human Factors Enginering in FLNG Projects In the detailed design engineering phase, HFE activities revolve around validation and ensuring the contractors follow through with the implementation. Here, significant information from vendors and suppliers will be received and updated into the design documents. It may be necessary for specific HFE analysis to be conducted to provide input for other engineering, safety and risk studies based on the current information. In addition, the HFE Specialist and his/ her team will assist the vendor in improving their design and addressing HFE requirements. This could be achieved by means of guidelines, checklists or specific review sessions. Other than that, development of operation and maintenance documentations and procedures may require input to ensure adherence to HFE design requirements. Similar to the FEED phase, an HFE report will be issued to mark the closure of HFE activities in DDE phase. 5. Lessons Learnt and Discussions Based on recent execution of FLNG projects, it would be useful to consider some of the lessons learned for future improvements and approach that could be taken to address it. 5.1 HFE as Part of Safety Culture Management commitment needs to be demonstrated by integrating HFE as an important point in the safety culture messages. Even though the importance of HFE in the project and its benefit are evident in the long run, this has to be reflected in the project environment itself. This has to be shown clearly to all of the project team members and evident in their day to day activities. For example, a project office should provide ergonomically suitable workstation and furniture to reflect the commitment to HFE. In a nutshell, consistency should be reflected between the safety culture messages and HFE implementation in the project. 5.2 Prioritising Resources At times, it has been viewed that adherence to HFE requirements are not necessary. It may even cost more in terms of money, effort and time. It is imperative that for successful integration of HFE in a project, the HFE is mandated through design specifications, contractor s bidding package and others. This could only be achieved through focused effort and adequate provision of resources. Professional HFE practitioners with the approapriate qualifactions must be available to convey the HFE agenda and advise on it. Project management team should ensure that adequate resources are provided for HFE activities in terms time, staffing and budgets. 5.3 Training on HFE Principles Generally, HFE awareness session will be conducted before the design activities goes into full swing, especially during the FEED phase. This training usually lasts between 2 hours to 4 hours. However, a good understanding of HFE principles could only be established with field experience coupled with classroom session. For long term development of designers with HFE knowledge, this aspect should be considered as part of the competencies development within the engineering team. Then only, any HFE issues at design level could be tackled promptly. In addition, awareness training should be expanded to suppliers, vendors, inspectors and others as required.

11 Human Factors Engineering in FLNG Projects Operating Experience FLNG Unit are the first being deployed in offshore environment. Therefore, many of the equipment and systems suppliers have almost no prior experience constructing and operating it for the offshore environment. As highlighted earlier, equipment is larger and expected to fit in smaller footprint area; all these pose additional challenges to the designers and operators. Nevertheless, this should be taken as the first benchmark case and where experience will be built upon. 5.5 Single Point of Reference for HFE It is very important that HFE design inputs are consistent throughout the project lifecycle. HFE design input shall be based on the correct standards and have been agreed with the operator client or end-user. Most of the time, HFE related information are located across many clients general specifications and even with the experience client personnels. Therefore, it would be most efficient to implement the Golden Book approach, whereby all the HFE references are consolidated in a single reference point. This will also be used to audit HFE implementation from operability, maintainability and egress point of view. 5.6 Vertical module arrangements In the FLNG layouts, equipment and process modules are arranged vertically to optimise the foot-print requirements. There will be scenarios that equipment location and its critical valve and auxiliaries for frequent access will be located on another level. These arrangements should have followed by smooth movements, clear identification and instruction for an efficient operation. Therefore, during critical tasks analsyis, these scenarios should be considered for detailed evaluation. When possible, such arrangements should be minimized all together. Other than that access, handling and escaper routes should be at the same level between one module to another. 5.7 Crane Operation On the major equipment related to operation and maintenance activities is crane. Location of the crane on the FLNG is usually determined during FEED phase. Location should enable lifting sequences done in a safe and efficient manner. Line of the sight from the crane operator s cabin to the laydown or maintenance areas should not be hindered by equipment or other decks. Otherwise more operation personnel would be required to coordinate the lifting activities and incurring higher operation costs. 5.8 Efficient Reviews It would be expected to have numerous review sessions in order to produce a good design that take into account the multiple stakeholders interest. Design progress of each equipment and process module may differ due to the complexities and information level. HFE reviews which are too brief tend to overlook critical area or design changes that may have impact on operations. HFE reviews should be conducted at the appropriate time when the design is mature and all the concerned parties available. Then, the findings would be significant and meaningful. In short, good reviews done at the right time produces good results.

12 12 Human Factors Enginering in FLNG Projects 5.9 Material handling equipment selection Material handling equipment includes hoists, cranes, trolleys and any other aids that intends to reduce the human effort during operation and maintenance activities. Due to the novelty of the process, many of the equipment will have special tools and equipment that need to be deployed offshore. A calculated approach must be taken considering the needs and practicality to have it available onboard FLNG all the time. Some of the requirement could be streamlined, so that a reduction in quatities and storage could be achieved. 6. Conclusions The importance of implementing HFE in projects is evident. This would contribute positively to the quality and reliability of FLNG facilities and others related to it. The project team including the managers and designer have the responsibilities of ensuring successful implementation of HFE principles in the project to benefit the end-user many years into the operation phase. Nevertheless, it is acknowledged that the journey has just started with the first FLNG put into operation. Acknowledgement Authors thank and acknowledge the support provided by TechnipFMC in presenting this paper in Gastech Conference References Center for Chemical Process Safety. Human Factor Methods for Improving Performance in the Process Industries. NJ: Wiley-Interscience, Chandrasegaran, D., M.H. Mohd Noor, S. Sevah, and E. T. Lok. "A Review: Operational Perspective into Cohesive Design of Offshore Facilities." Offshore Technology Conference Asia. Kuala Lumpur: Society of Petroleum Engineers, International Energy Agency. World Energy Outlook Paris: International Energy Agency, OGP. Human Factors Engineering in Projects (Report No. 454). International Association of Oil & Gas Producers, Robb, Martin, and Gerald Miller. "Human factors engineering in oil and gas - a review of industry guidance." IEA 2012: 18th World congress on Ergonomics - Designing a sustainable future Union, International Gas. "2016 World LNG Report." n.d.

Floating LNG facilities

Floating LNG facilities Lessons learned from three of the industry s first FLNG contracts position TechnipFMC as the pioneer developer for the next generation of FLNG facilities facilities As one of the pioneers in the provision

More information

Engineering. Drafting & Design. Regulatory Interface. Project & Construction Management. Marine Operations Services

Engineering. Drafting & Design. Regulatory Interface. Project & Construction Management. Marine Operations Services Engineering Drafting & Design Regulatory Interface Project & Construction Management Marine Operations Services Corporate Overview EXMAR Offshore is dedicated to the ownership and leasing of offshore assets

More information

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value

SUBSEA 7 AND GRANHERNE ALLIANCE. Engaging Early to Deliver Value SUBSEA 7 AND GRANHERNE ALLIANCE Viable Solutions Operators are seeking novel and reliable concepts to overcome industry challenges such as complex reservoirs, cost, growth and schedule creep and to optimise

More information

INSPIRING TECHNICAL EXCELLENCE

INSPIRING TECHNICAL EXCELLENCE INSPIRING TECHNICAL EXCELLENCE A new world-class training facility for Oman Introducing TPO Takatuf Petrofac Oman (TPO) is a new joint venture founded by Takatuf, the Human Capital solutions provider,

More information

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN W.A.T. Alder and J. Perkins Binnie Black and Veatch, Redhill, UK In many of the high hazard industries the safety case and safety

More information

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa

Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa Technological and Logistical Challenges during Construction & Installation of Deepwater Mega Subsea Development in West Africa 1 SAFER, SMARTER, GREENER Content Going Deeper Scale/Size of Deepwater Mega

More information

Offshore Construction Management Services. Capability & Experience

Offshore Construction Management Services. Capability & Experience Offshore Construction Management Services Capability & Experience Capability Overview INTECSEA has a proven track record for providing solutions to problems faced when implementing frontier projects, by

More information

Offshore Wind Risks - Issues and Mitigations

Offshore Wind Risks - Issues and Mitigations DNV Offshore Wind Soren Karkov DNV an independent foundation Our Purpose To safeguard life, property and the environment Our Vision Global impact for a safe and sustainable future 2 More than 145 Years

More information

COMPREHENSIVE SOLUTIONS

COMPREHENSIVE SOLUTIONS COMPREHENSIVE SOLUTIONS MCDERMOTT IS A PREMIER, FULLY INTEGRATED PROVIDER OF ENGINEERING, CONSTRUCTION AND TECHNOLOGY SOLUTIONS TO THE ENERGY INDUSTRY PROBLEM SOLVERS For more than a century, customers

More information

Next Generation Training for Subsea & Marine Operations Engineers and Asset Managers

Next Generation Training for Subsea & Marine Operations Engineers and Asset Managers An Intensive 5 Day Training Course Next Generation Training for Subsea & Marine Operations Engineers and Asset Managers 16-20 Dec 2018, Dubai 09-13 Jun 2019, Dubai 15-19 Dec 2019, Dubai 20-NOV-18 This

More information

ETSU V/06/00187//REP; DTI Pub/URN 01/799 (for Ove Arup reference:

ETSU V/06/00187//REP; DTI Pub/URN 01/799 (for Ove Arup reference: REFERENCE DTI Technology Road-map Wave Energy Title: DTI Technology Road-map Wave Energy Date: 2002 Author: DTI & Ove Arup Funded by: UK Department of Trade & Industry (DTI) Hard copy ETSU V/06/00187//REP;

More information

TECHNOLOGY QUALIFICATION MANAGEMENT

TECHNOLOGY QUALIFICATION MANAGEMENT OFFSHORE SERVICE SPECIFICATION DNV-OSS-401 TECHNOLOGY QUALIFICATION MANAGEMENT OCTOBER 2010 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property

More information

saipem limited Statoil 2/4S Removal Project GASSCO HSE Summit Removal of the Statoil 2/4 S Platform 23 rd October 2014

saipem limited Statoil 2/4S Removal Project GASSCO HSE Summit Removal of the Statoil 2/4 S Platform 23 rd October 2014 Statoil 2/4S Removal Project GASSCO HSE Summit Removal of the Statoil 2/4 S Platform 23 rd October 2014 Presentation of the Removal of the Statoil 2/4 S Platforms Introduction of the Scope of Saipem Work

More information

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response APPEA AWIC UPDATE Click to edit Mutual Master Aid subtitle style Self Audit Checklist Source Control First Response Presenter: Tom Nolan Perth 1st 4 th March, 2010 2012 WHAT IS APPEA? The Australian Petroleum

More information

New Realities Facing the Mining and Metals Industry

New Realities Facing the Mining and Metals Industry New Realities Facing the Mining and Metals Industry The business of sustainability 2 ERM New Realities Facing the Mining and Metals Industry Working within the new realities in mining Changing global geo-political

More information

ENGINEERING SERVICES CONSULTANCY

ENGINEERING SERVICES CONSULTANCY ENGINEERING SERVICES CONSULTANCY Managing complexity, unlocking value Petrofac Engineering & Production Services 02 03 Discover the difference Consultancy services Petrofac is an international service

More information

OWA Floating LiDAR Roadmap Supplementary Guidance Note

OWA Floating LiDAR Roadmap Supplementary Guidance Note OWA Floating LiDAR Roadmap Supplementary Guidance Note List of abbreviations Abbreviation FLS IEA FL Recommended Practices KPI OEM OPDACA OSACA OWA OWA FL Roadmap Meaning Floating LiDAR System IEA Wind

More information

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Prepared by Maritime NZ Contents Introduction... 3 Purpose... 3 Definitions... 4 Contents of a Well Control Contingency Plan (WCCP)...

More information

Our projects Shell Prelude FLNG

Our projects Shell Prelude FLNG Our projects A new landmark in the Offshore industry milestones Bolo bolo bolo bolo bolo bolo 2009 Master Agreement It all started in 2009 when Shell and the Technip-Samsung Heavy Industries Consortium

More information

Prelude FLNG Project. DOT conference presentation. November Jaap de Vries, Prelude FLNG Project Director FINAL

Prelude FLNG Project. DOT conference presentation. November Jaap de Vries, Prelude FLNG Project Director FINAL Prelude FLNG Project DOT conference presentation Jaap de Vries, Prelude FLNG Project Director FINAL Copyright of Royal Dutch Shell plc 1 Prelude FLNG: the largest offshore floating facility ever The Prelude

More information

PtD Evolution The Role of Safety/Health Professional In Moving PtD Forward

PtD Evolution The Role of Safety/Health Professional In Moving PtD Forward PtD Evolution The Role of Safety/Health Professional In Moving PtD Forward By: John H. Borowski, CIH, CSP Director, Health, Safety, Security and Environment WorleyParsons, Westerns Operations Monrovia,

More information

Instrumentation and Control

Instrumentation and Control Program Description Instrumentation and Control Program Overview Instrumentation and control (I&C) and information systems impact nuclear power plant reliability, efficiency, and operations and maintenance

More information

ENGINEERING INNOVATION

ENGINEERING INNOVATION ENGINEERING INNOVATION ENGINEERING INNOVATION Viper Subsea provides control system distribution solutions for the global subsea oil and gas industry. Our product and service offering covers the full life

More information

Marine Risers. Capability & Experience

Marine Risers. Capability & Experience Marine Risers Capability & Experience Capability Overview INTECSEA now offers, in a single company, industry leading capability for all marine riser systems including top-tensioned risers (TTRs) for direct

More information

SUMMARY REPORT AND RECOMMENDATIONS ON THE PREVENTION OF MARINE OIL POLLUTION IN THE ARCTIC.

SUMMARY REPORT AND RECOMMENDATIONS ON THE PREVENTION OF MARINE OIL POLLUTION IN THE ARCTIC. Arctic Council Open Access Repository Arctic Council http://www.arctic-council.org/ 1.8 Sweden Chairmanship I (May 2011 - May 2013) 4. SAO Meeting, March 2013, Stockholm, Sweden SUMMARY REPORT AND RECOMMENDATIONS

More information

LICENSING THE PALLAS-REACTOR USING THE CONCEPTUAL SAFETY DOCUMENT

LICENSING THE PALLAS-REACTOR USING THE CONCEPTUAL SAFETY DOCUMENT LICENSING THE PALLAS-REACTOR USING THE CONCEPTUAL SAFETY DOCUMENT M. VISSER, N.D. VAN DER LINDEN Licensing and compliance department, PALLAS Comeniusstraat 8, 1018 MS Alkmaar, The Netherlands 1. Abstract

More information

MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES

MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES MOORING SOLUTIONS IN ASIA PACIFIC A SINGLE, LOCAL SOURCE OF MOORING, POSITIONING AND RIG MOVING SERVICES STRENGTH IN THE REGION ENGINEERING CENTRE AND OFFSHORE BASE IN SINGAPORE InterMoor is an Acteon

More information

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro

SPE A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro SPE 123201 A Systematic Approach to Well Integrity Management Alex Annandale, Marathon Oil UK; Simon Copping, Expro Copyright 2009, Society of Petroleum Engineers This paper was prepared for presentation

More information

Technology qualification management and verification

Technology qualification management and verification SERVICE SPECIFICATION DNVGL-SE-0160 Edition December 2015 Technology qualification management and verification The electronic pdf version of this document found through http://www.dnvgl.com is the officially

More information

SAFETY CASE ON A PAGE

SAFETY CASE ON A PAGE SAFETY CASE ON A PAGE Dr Sally A. Forbes, Nuclear Safety Department, AWE, Aldermaston, Reading, Berkshire RG7 4PR, UK Keywords: Safety Case, SHAPED, Hazard Awareness Introduction Safety Case on a Page

More information

Rolling workplan of the Technology Executive Committee for

Rolling workplan of the Technology Executive Committee for Technology Eecutive Committee Anne Rolling workplan of the Technology Eecutive Committee for 2016 2018 I. Introduction 1. Technology development and transfer is one the pillars of the UNFCCC. In 2010 in

More information

Virtual Reality Immersion: A Tool for Early Human Factors Intervention

Virtual Reality Immersion: A Tool for Early Human Factors Intervention Virtual Reality Immersion: A Tool for Early Human Factors Intervention Oil & Gas Alert October 26, 2016 Authors - Sunil D. Lakhiani, Ph.D., P.E. and Trey Morrison, Ph.D., P.E., CFEI Widely used virtual

More information

Implementing FPSO Digital Twins in the Field. David Hartell Premier Oil

Implementing FPSO Digital Twins in the Field. David Hartell Premier Oil Implementing FPSO Digital Twins in the Field David Hartell Premier Oil Digital Twins A Digital Twin consists of several key elements and features: 1. A virtual, dynamic simulation model of an asset; 2.

More information

REVIEW AND APPROVAL OF NOVEL CONCEPTS

REVIEW AND APPROVAL OF NOVEL CONCEPTS Guidance Notes on Review and Approval of Novel Concepts GUIDANCE NOTES ON REVIEW AND APPROVAL OF NOVEL CONCEPTS APRIL 2017 American Bureau of Shipping Incorporated by Act of Legislature of the State of

More information

4 Briefing. Responsible investor

4 Briefing. Responsible investor Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP

More information

OCS leasing program draft PEIS comments Attachment A

OCS leasing program draft PEIS comments Attachment A Effective Oversight Requires Key Legislative, Regulatory, Enforcement and Transparency Upgrades Analysis by Lois N. Epstein, P.E. Engineer and Arctic Program Director The Wilderness Society Anchorage,

More information

CREDITING-RELATED READINESS ACTIVITIES UNDER THE PMR: UPDATE AND SUGGESTED NEXT STEPS

CREDITING-RELATED READINESS ACTIVITIES UNDER THE PMR: UPDATE AND SUGGESTED NEXT STEPS CREDITING-RELATED READINESS ACTIVITIES UNDER THE PMR: UPDATE AND SUGGESTED NEXT STEPS PMR Note PA12 2015-1 May 15, 2015 1 I. INTRODUCTION 1. The Partnership for Market Readiness (PMR) was established in

More information

Wave & Tidal Safety & Construction Guidelines

Wave & Tidal Safety & Construction Guidelines Wave & Tidal Safety & Construction Guidelines Malcolm Bowie Ltd All-Energy, Aberdeen, 24 th May 2012 Principal Challenges - Energetic environment with very unique construction risks. - Many new / radical

More information

Getting the evidence: Using research in policy making

Getting the evidence: Using research in policy making Getting the evidence: Using research in policy making REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 586-I Session 2002-2003: 16 April 2003 LONDON: The Stationery Office 14.00 Two volumes not to be sold

More information

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application 2 Virtus Subsea Connectors Delivering Long-Lasting Reliability at Each Subsea Connection Subsea production

More information

Employability Enhancement Program for Engineers. Transformation of an engineering degree holder to a real Engineer, who can do more at work.

Employability Enhancement Program for Engineers. Transformation of an engineering degree holder to a real Engineer, who can do more at work. TRACEZ Training Services Oman www.tracezglobal.com Employability Enhancement Program for Engineers Transformation of an engineering degree holder to a real Engineer, who can do more at work. EEP- Introduction

More information

Asset Integrity Management for Purpose-Built FPSO s and Subsea System Facilities

Asset Integrity Management for Purpose-Built FPSO s and Subsea System Facilities An Intensive 5 Day Training Course Asset Integrity Management for Purpose-Built FPSO s and Subsea System Facilities 09-13 Jul 2017, Dubai 09-APR-17 This course is Designed, Developed, and will be Delivered

More information

THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 INNOVATION

THEFUTURERAILWAY THE INDUSTRY S RAIL TECHNICAL STRATEGY 2012 INNOVATION 73 INNOVATION 74 VISION A dynamic industry that innovates to evolve, grow and attract the best entrepreneurial talent OBJECTIVES Innovation makes a significant and continuing contribution to rail business

More information

Onshore & Offshore Engineering and Management of Subsea Cables and Pipelines

Onshore & Offshore Engineering and Management of Subsea Cables and Pipelines Established in 1997, Primo Marine is an independent specialist with a wealth of experience in subsea cable engineering, from landfalls to subsea marine infrastructures. With an extensive track record,

More information

DEPUIS project: Design of Environmentallyfriendly Products Using Information Standards

DEPUIS project: Design of Environmentallyfriendly Products Using Information Standards DEPUIS project: Design of Environmentallyfriendly Products Using Information Standards Anna Amato 1, Anna Moreno 2 and Norman Swindells 3 1 ENEA, Italy, anna.amato@casaccia.enea.it 2 ENEA, Italy, anna.moreno@casaccia.enea.it

More information

NCRIS Capability 5.7: Population Health and Clinical Data Linkage

NCRIS Capability 5.7: Population Health and Clinical Data Linkage NCRIS Capability 5.7: Population Health and Clinical Data Linkage National Collaborative Research Infrastructure Strategy Issues Paper July 2007 Issues Paper Version 1: Population Health and Clinical Data

More information

Joint Industry Programme on E&P Sound and Marine Life - Phase III

Joint Industry Programme on E&P Sound and Marine Life - Phase III Joint Industry Programme on E&P Sound and Marine Life - Phase III Request for Proposals Number: JIP III-15-03 Long Term Fixed Acoustic Monitoring of Marine Mammals throughout the Life Cycle of an Offshore

More information

EXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1

EXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1 EXPERIENCES OF IMPLEMENTING BIM IN SKANSKA FACILITIES MANAGEMENT 1 Medina Jordan & Howard Jeffrey Skanska ABSTRACT The benefits of BIM (Building Information Modeling) in design, construction and facilities

More information

II. The mandates, activities and outputs of the Technology Executive Committee

II. The mandates, activities and outputs of the Technology Executive Committee TEC/2018/16/13 Technology Executive Committee 27 February 2018 Sixteenth meeting Bonn, Germany, 13 16 March 2018 Monitoring and evaluation of the impacts of the implementation of the mandates of the Technology

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

7 Briefing. Responsible investor

7 Briefing. Responsible investor Issue Responsible investor 7 Briefing Monday, 5 th October 202 In 200, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP has committed

More information

Passion at work. Renewables

Passion at work. Renewables Passion at work Renewables Our profile Driven by Our profile challenges Seaway Heavy Lifting is a leading offshore contractor in the global Oil & Gas and Renewables industry, offering tailored T&I and

More information

November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS

November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS Note: At the joint meeting of the CTF and SCF Trust Fund Committees held on November 3, 2011, the meeting reviewed the

More information

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018 Offshore Support Vessels Located in the US Gulf of Mexico in March 18 IMCA March 1, 18 Prepared by IMCA The International Marine Contractors Association (IMCA) is the international trade association representing

More information

SEMCO MARITIME. Projects, solutions and competences for the energy sector

SEMCO MARITIME. Projects, solutions and competences for the energy sector SEMCO MARITIME Projects, solutions and competences for the energy sector Contents... 4 Work with us... 6 Protecting people, assets and the environment... 8 Oil and Gas...10 Rig projects...12 Windpower...14

More information

Turning the wheels of your success

Turning the wheels of your success INDUSTRIAL SERVICES Turning the wheels of your success A comprehensive package of integrated services combining traditional certification and inspection with innovative business solutions based on the

More information

Tidal Energy. Transmission & Distribution Network. Wind Energy. Offshore Substation. Onshore Substation. Tidal Stream Energy.

Tidal Energy. Transmission & Distribution Network. Wind Energy. Offshore Substation. Onshore Substation. Tidal Stream Energy. Offshore Renewables Tidal Energy Transmission & Distribution Network Offshore Substation Wind Energy Onshore Substation Tidal Stream Energy Consumer Atkins in Offshore Renewables The offshore wind journey

More information

SEMCO MARITIME Projects, solutions and competences for the energy sector

SEMCO MARITIME Projects, solutions and competences for the energy sector SEMCO MARITIME Projects, solutions and competences for the energy sector Contents... 4 Work with us... 6 Protecting people, assets and the environment... 8 Oil and Gas... 10 Rig projects... 12 Windpower...

More information

Petroleum Safety Levy Methodology. Decision Paper

Petroleum Safety Levy Methodology. Decision Paper Petroleum Safety Levy Methodology Decision Paper DOCUMENT TYPE: REFERENCE: Decision Paper CER/14/429 DATE PUBLISHED: 7 th August 2014 VERSION 3.0 The Commission for Energy Regulation, The Exchange, Belgard

More information

ORGANISATION FOR THE PROHIBITION OF CHEMICAL WEAPONS ADDRESS BY AMBASSADOR AHMET ÜZÜMCÜ DIRECTOR-GENERAL

ORGANISATION FOR THE PROHIBITION OF CHEMICAL WEAPONS ADDRESS BY AMBASSADOR AHMET ÜZÜMCÜ DIRECTOR-GENERAL ORGANISATION FOR THE PROHIBITION OF CHEMICAL WEAPONS ADDRESS BY AMBASSADOR AHMET ÜZÜMCÜ DIRECTOR-GENERAL AT THE SEMINAR ON THE CHEMICAL WEAPONS CONVENTION AND CHEMICAL-SAFETY-AND-SECURITY MANAGEMENT FOR

More information

Lifting Engineering. Capability & Experience

Lifting Engineering. Capability & Experience Lifting Engineering Capability & Experience Results for our customers The WorleyParsons consulting group is a collaborative, multidisciplinary team with a broad range of strategic, technical and project

More information

STATUTORY INSTRUMENTS SUPPLEMENT No th June, 2016 STATUTORY INSTRUMENTS SUPPLEMENT

STATUTORY INSTRUMENTS SUPPLEMENT No th June, 2016 STATUTORY INSTRUMENTS SUPPLEMENT STATUTORY INSTRUMENTS SUPPLEMENT No. 18 24th June, 2016 STATUTORY INSTRUMENTS SUPPLEMENT to The Uganda Gazette No. 45, Volume CIX, dated 24th June, 2016 Printed by UPPC, Entebbe, by Order of the Government.

More information

Effects of the Work Improvement on Board (WIB) program for improving safety and health of seamen

Effects of the Work Improvement on Board (WIB) program for improving safety and health of seamen Effects of the Work Improvement on Board (WIB) program for improving safety and health of seamen Shuji Hisamune a, Kazutaka Kogi b a Faculty of Economic, Takasaki City University of Economics, Takasaki,

More information

ENERGY TECHNOLOGY ROADMAPS SYNTHESIS: OCEAN ENERGY. 1. Overview, Discussion. 2. International Energy Agency, Ocean Energy Systems

ENERGY TECHNOLOGY ROADMAPS SYNTHESIS: OCEAN ENERGY. 1. Overview, Discussion. 2. International Energy Agency, Ocean Energy Systems ENERGY TECHNOLOGY ROADMAPS SYNTHESIS: OCEAN ENERGY 1. Overview, Discussion 2. International Energy Agency, Ocean Energy Systems 3. DTI Arup Technology Roadmap, Wave Energy 4. World Energy Council, Survey

More information

Driving Cost Reductions in Offshore Wind THE LEANWIND PROJECT FINAL PUBLICATION

Driving Cost Reductions in Offshore Wind THE LEANWIND PROJECT FINAL PUBLICATION Driving Cost Reductions in Offshore Wind THE LEANWIND PROJECT FINAL PUBLICATION This project has received funding from the European Union s Co-funded by the Intelligent Energy Europe Seventh Programme

More information

Oil and Gas UK Well Integrity Guidelines

Oil and Gas UK Well Integrity Guidelines Oil and Gas UK Well Integrity Guidelines The Well, the Completion and the Xmas Tree The Equipment and the People A Definition of Well Integrity Key UK Legislative Requirement for Well Integrity Oil and

More information

Port radio data networks

Port radio data networks Port radio data networks A WHITE PAPER Abstract: This document is intended to provide a management level summary of the considerations for implementing radio data networks in port and terminal environments.

More information

Independent Communications Authority of South Africa Pinmill Farm, 164 Katherine Street, Sandton Private Bag X10002, Sandton, 2146

Independent Communications Authority of South Africa Pinmill Farm, 164 Katherine Street, Sandton Private Bag X10002, Sandton, 2146 Independent Communications Authority of South Africa Pinmill Farm, 164 Katherine Street, Sandton Private Bag X10002, Sandton, 2146 ANNEXURE A TECHNICAL SPECIFICATIONS ICASA 09/2018 1. Purpose of the Request

More information

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session

Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session Extract of Advance copy of the Report of the International Conference on Chemicals Management on the work of its second session Resolution II/4 on Emerging policy issues A Introduction Recognizing the

More information

Principles and structure of the technology framework and scope and modalities for the periodic assessment of the Technology Mechanism

Principles and structure of the technology framework and scope and modalities for the periodic assessment of the Technology Mechanism SUBMISSION BY GUATEMALA ON BEHALF OF THE AILAC GROUP OF COUNTRIES COMPOSED BY CHILE, COLOMBIA, COSTA RICA, HONDURAS, GUATEMALA, PANAMA, PARAGUAY AND PERU Subject: Principles and structure of the technology

More information

INFCIRC/57. 72/Rev.6. under. Safetyy. read in. Convention. involve. National Reports. on Nuclear 2015.

INFCIRC/57. 72/Rev.6. under. Safetyy. read in. Convention. involve. National Reports. on Nuclear 2015. Atoms for Peace and Development Information Circular INFCIRC/57 72/Rev.6 Date: 19 January 2018 General Distribution Original: English Guidelines regarding Convention National Reports under the on Nuclear

More information

Competency Standard for Registration as a Professional Engineer

Competency Standard for Registration as a Professional Engineer ENGINEERING COUNCIL OF SOUTH AFRICA Standards and Procedures System Competency Standard for Registration as a Professional Engineer Status: Approved by Council Document : R-02-PE Rev-1.3 24 November 2012

More information

Floating Systems. Capability & Experience

Floating Systems. Capability & Experience Floating Systems Capability & Experience Capability Overview INTECSEA has more than 30 years of extensive experience with all types of floating systems: TLPs, spars, monohulls and semi-submersibles. Key

More information

National Petroleum Council

National Petroleum Council National Petroleum Council 125th Meeting March 27, 2015 National Petroleum Council 1 National Petroleum Council Arctic Potential Realizing the Promise of U.S. Arctic Oil and Gas Resources March 27, 2015

More information

Years 5 and 6 standard elaborations Australian Curriculum: Design and Technologies

Years 5 and 6 standard elaborations Australian Curriculum: Design and Technologies Purpose The standard elaborations (SEs) provide additional clarity when using the Australian Curriculum achievement standard to make judgments on a five-point scale. They can be used as a tool for: making

More information

BUILDING STRATEGIC SOLUTIONS

BUILDING STRATEGIC SOLUTIONS BUILDING STRATEGIC SOLUTIONS WHO WE ARE? We are a group of companies integrated by professional with wide experience in the energetic sector. Our philosophy is based in understanding our customers needs

More information

National Petroleum Council. Arctic Potential

National Petroleum Council. Arctic Potential National Petroleum Council Arctic Potential Realizing the Promise of U.S. Arctic Oil and Gas Resources March 27, 2015 National Petroleum Council 1 Introduction In October 2013, the Secretary of Energy

More information

"Are lessons truly learnt?"

Are lessons truly learnt? Author: Arti Chopra, Spill Response Specialist, Oil Spill Response Limited Abstract In a fiercely competitive energy industry, one area where the oil industry never normally competes is oil spill response.

More information

Reliance Industries Limited. Notice Inviting Expression of Interest

Reliance Industries Limited. Notice Inviting Expression of Interest Reliance Industries Limited Notice Inviting Expression of Interest (RIL/E&P/EOI/2010/02) (Under International Competitive Bidding) For Oil & Gas Field Developments A) Block ALL BLOCKS Reliance Industries

More information

GENERAL DESCRIPTION OF THE CMC SERVICES

GENERAL DESCRIPTION OF THE CMC SERVICES STANDARD FOR CERTIFICATION No.1.1 GENERAL DESCRIPTION OF THE CMC SERVICES MAY 2007 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property and the

More information

Strengthening the Safety Culture of the Offshore Oil and Gas Industry A Workshop

Strengthening the Safety Culture of the Offshore Oil and Gas Industry A Workshop Strengthening the Safety Culture of the Offshore Oil and Gas Industry A Workshop October 2, 2017 National Academies of Sciences, Engineering, and Medicine Washington, DC Committee Nancy T. Tippins, Chair,

More information

INTELLIGENT ENGINEERING

INTELLIGENT ENGINEERING INTELLIGENT ENGINEERING Leading marine design through innovation Compass Energy was established in 2004 to provide engineering services for the offshore oil and gas industry in Southeast Asia. We are an

More information

Chief Nuclear Inspector s Inspection of NNB GenCo Ltd. s Supply Chain Management Arrangements for the Hinkley Point C Project

Chief Nuclear Inspector s Inspection of NNB GenCo Ltd. s Supply Chain Management Arrangements for the Hinkley Point C Project Chief Nuclear Inspector s Inspection of NNB GenCo Ltd. s Supply Chain Management Arrangements for the Hinkley Point C Project 15 March 2018 Chief Nuclear Inspector s Inspection of NNB GenCo Ltd. s Supply

More information

Information & Communication Technology Strategy

Information & Communication Technology Strategy Information & Communication Technology Strategy 2012-18 Information & Communication Technology (ICT) 2 Our Vision To provide a contemporary and integrated technological environment, which sustains and

More information

(EC) ), 11(8) 347/ /2009, (EC)

(EC) ), 11(8) 347/ /2009, (EC) ENTSOs consistent and interlinked electricity and gas model in accordance with Article 11(8) of Regulation (EU) No 347/2013 of the European Parliament and of the Council of 17 April 2013 21 December 2016

More information

Totally Integrated Power (TIP) for the Oil and Gas Industry

Totally Integrated Power (TIP) for the Oil and Gas Industry Totally Integrated Power (TIP) for the Oil and Gas Industry Power for challenging environments Reliable. Safe. Efficient. Totally Integrated Power (TIP) Our comprehensive portfolio and extensive integration

More information

CAPETANO OIL LIMITED (+233) (+233)

CAPETANO OIL LIMITED (+233) (+233) 1 CAPETANO OIL LIMITED (+233) 202 027 485 (+233) 209 985 175 www.capetano.com info@capetano.com C90/24 Osu Badu Street, Airport Residential Area, Accra Ghana. 2017 Capetano Oil Limited. All rights reserved.

More information

C R I O P. a scenario based risk analysis of control centres.

C R I O P. a scenario based risk analysis of control centres. C R I O P a scenario based risk analysis of control centres CRIOP verification and validation of control centre CRIOP is a human factors (HF) based method to verify and validate the ability of a control

More information

Abstracts of our X-pert Center presentations

Abstracts of our X-pert Center presentations Meet our X-perts at ONS 2012 The Siemens ONS X-pert Center: Innovation and firsthand information at your service! Visit the X-pert Center at the Siemens ONS booth, meet our experts, and learn more about

More information

SAUDI ARABIAN STANDARDS ORGANIZATION (SASO) TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY

SAUDI ARABIAN STANDARDS ORGANIZATION (SASO) TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY SAUDI ARABIAN STANDARDS ORGANIZATION (SASO) TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY D8-19 7-2005 FOREWORD This Part of SASO s Technical Directives is Adopted

More information

LAW ON TECHNOLOGY TRANSFER 1998

LAW ON TECHNOLOGY TRANSFER 1998 LAW ON TECHNOLOGY TRANSFER 1998 LAW ON TECHNOLOGY TRANSFER May 7, 1998 Ulaanbaatar city CHAPTER ONE COMMON PROVISIONS Article 1. Purpose of the law The purpose of this law is to regulate relationships

More information

Innovation Oil & Gas. Safety R&D Integrated capabilities. Project Management. Technology. Engineering Expertise FROM DESIGN TO DELIVERY

Innovation Oil & Gas. Safety R&D Integrated capabilities. Project Management. Technology. Engineering Expertise FROM DESIGN TO DELIVERY FROM DESIGN TO DELIVERY Subsea, Offshore, Onshore Technology Innovation Oil & Gas Safety R&D Integrated capabilities Project Management www.technip.com Engineering Expertise SUBSEA Pioneer and world leader

More information

CHAPTER 1: INTRODUCTION TO SOFTWARE ENGINEERING DESIGN

CHAPTER 1: INTRODUCTION TO SOFTWARE ENGINEERING DESIGN CHAPTER 1: INTRODUCTION TO SOFTWARE ENGINEERING DESIGN SESSION II: OVERVIEW OF SOFTWARE ENGINEERING DESIGN Software Engineering Design: Theory and Practice by Carlos E. Otero Slides copyright 2012 by Carlos

More information

Subject: IADC s three year tactical plan:

Subject: IADC s three year tactical plan: Paper from the IADC President & CEO, 7 October 2014 Subject: IADC s three year tactical plan: 2015 2017 Purpose of the paper To provide IADC s Executive Committee (ExCom) with an overview of the IADC President

More information

Understanding your limits

Understanding your limits Understanding your limits 27 th September 2018 Ian Downie Crane & Lifting Manager 1 Subsea 7-2018 The Problem: Engineers, offshore operations teams, ship owners, marine warranty surveyors, clients and

More information

Copyright: Conference website: Date deposited:

Copyright: Conference website: Date deposited: Coleman M, Ferguson A, Hanson G, Blythe PT. Deriving transport benefits from Big Data and the Internet of Things in Smart Cities. In: 12th Intelligent Transport Systems European Congress 2017. 2017, Strasbourg,

More information

MedTech Europe position on future EU cooperation on Health Technology Assessment (21 March 2017)

MedTech Europe position on future EU cooperation on Health Technology Assessment (21 March 2017) MedTech Europe position on future EU cooperation on Health Technology Assessment (21 March 2017) Table of Contents Executive Summary...3 The need for healthcare reform...4 The medical technology industry

More information

PRIMATECH WHITE PAPER COMPARISON OF FIRST AND SECOND EDITIONS OF HAZOP APPLICATION GUIDE, IEC 61882: A PROCESS SAFETY PERSPECTIVE

PRIMATECH WHITE PAPER COMPARISON OF FIRST AND SECOND EDITIONS OF HAZOP APPLICATION GUIDE, IEC 61882: A PROCESS SAFETY PERSPECTIVE PRIMATECH WHITE PAPER COMPARISON OF FIRST AND SECOND EDITIONS OF HAZOP APPLICATION GUIDE, IEC 61882: A PROCESS SAFETY PERSPECTIVE Summary Modifications made to IEC 61882 in the second edition have been

More information

Keeping Your House in order?

Keeping Your House in order? Keeping Your House in order? A view on Safety Reviews from UK Offshore experience Ian Wright Business Development Director, Upstream DNV Energy, Europe & North Africa March 2009 Introduction Safety Performance

More information

in the New Zealand Curriculum

in the New Zealand Curriculum Technology in the New Zealand Curriculum We ve revised the Technology learning area to strengthen the positioning of digital technologies in the New Zealand Curriculum. The goal of this change is to ensure

More information