Uncertainty Analysis for Target SIL Determination in the Offshore Industry

Size: px
Start display at page:

Download "Uncertainty Analysis for Target SIL Determination in the Offshore Industry"

Transcription

1 Uncertainty Analysis for Target SIL Determination in the Offshore Industry Sungteak Kim a*, Kwangpil Chang a, Younghun Kim a, and Eunhyun Park a a Hyundai Heavy Industries, Yongin, Korea Abstract: The requirements on design of SIS (Safety Instrumented System) based on SIL (Safety Integrity Level) has been developed continuously in the offshore industry. Especially, IEC and IEC illustrates various methodologies to determine a target SIL for specified safety function such as risk graph, hazard matrix, etc. These methods could derive different target SILs for the identical safety function. Model uncertainty might be the main cause of the result. In addition, since various methods require many input parameters, parameter uncertainties contribute to a target SIL with variance, either. In the offshore industry, engineers usually utilize two or even more methods to assess target SILs for the same function simultaneously and determine the more conservative value as the target SILs from the results. The conservatism would keep the system safe, but sometimes it could be too safe by installing excessive safety systems. For better decision-making, this article identifies the uncertainty factors in determining target SILs and evaluates the effects of the uncertainties on target SILs. Case studies have been performed for the practical systems used in the offshore industry. Keywords: SIL determination, Uncertainty analysis, Offshore industry. 1. INTRODUCTION In the offshore industry, safety instrumented systems (SIS) are installed for reducing risks to allowable level by detecting hazardous events and taking actions to prevent them from developing into further accidents. Elements of SIS consist of initiators, a logic solver, and final elements, as illustrated in Figure 1. According to the safety lifecycle approach in Figure 2, based on the international standards IEC [1] and IEC [2], the series of activities should be conducted: identifying safety instrumented functions (SIFs), assessing target safety integrity level (SIL) for each SIF, designing SIS, calculating the achieved SIL and verifying by comparison to target SIL, and putting SIS into the operation phases. Defined target SIL would affect whole SIS lifecycles including design and operation since these target values draw the upper limit of the reliability performance. From this point of view, target SIL should be derived carefully in order to not only satisfy the required risk reduction but also to get rid of unnecessary additional SISs upon existing safety systems which are already in place. Figure 1: Safety Instrumented System Initiator I Input Logic Solver O Output Final Element According to IEC [2], SIL requirement for each identified SIF would be determined using the following methods: semi-quantitative method, qualitative method, and semi-qualitative method. Choosing the proper one among the methods follows the criteria as follows: complexity, regulatory authorities, experience, accessibility of information on the input parameters, and whether the required risk reduction is given in a quantitative or qualitative form. * Contact author: sungteak.kim@gmail.com

2 Figure 2: Safety Lifecycle Approach regarding SIL SIF Identification Target SIL Determination SIS Design Modification SIL Verification Target SIL Calculated SIL? No Yes SIS Installation, Commissioning, Operation, Maintenance, and Decommissioning Abovementioned methods have both advantages and disadvantages with respect to rigor and effort, fit with SIL lifecycle, inputs required, etc. Above all, however, the methods are required to show consistency in target SIL determination. For example, if a SIF is identified from SIL workshop, the target SIL for this SIF should be the same regardless of the persons who take part in the SIL determination. Subjectivity is the main contributor of inconsistency in target SIL [3]. In practice, to avoid the problem of inconsistency, engineers and analysts usually utilize at least two methods simultaneously and apply the more conservative result as target SIL. This approach of conservatism would help the system have sufficient safeguards and keep it safe. However, there could be an argument of excessive safety system design resulting in increasing cost in terms of CAPEX as well as OPEX due to more frequent maintenance. Assessment of target SIL always involves uncertainties due to its nature decision-making based on either qualitative experts opinion or quantitative statistical data with variance. Managing these uncertainties might lead the system to be optimized via setting the appropriate level of system reliability target. Uncertainty analysis for target SIL determination would be the starting point of effective SIL lifecycle management by checking the current uncertainty level in target SIL and identifying dominant factors which contribute to output uncertainties. The objectives of this article are to (i) explain the characteristics of SIL determination methods, and (ii) propose the relevant application of the results obtained from uncertainty analysis. The article is organized as follows: introduction of methods for target SIL determination, which are popular in the offshore industry in Section 2, identification of uncertainty factors and applicable proposed procedures for uncertainty analysis in SIL determination phase in Section 3, case studies performed to show the effects of the uncertainty analysis in Section 4, and conclusion with some future works in Section 5.

3 2. TARGET SIL DETERMINATION FREQUENTLY USED IN THE OFFSHORE INDUSTRY 2.1. Risk Graph Risk graph is the one of popular methods used for target SIL determination in the offshore industry. Hazard matrix, another frequently used one, is known as the similar method to the risk graph. The common thing of two methods is that some parameters are combined to present the level of unmitigated risks based on decisions made by experts. However, the risk graphs consider likelihood (or demand rate), consequence, occupancy and probability of personnel avoiding hazard while the hazard matrices consider only likelihood and consequence [4]. This means that the risk graphs enable engineers to model more detailed situation. Still, the risk graph method has a limitation. The method is suitable for assessing target SIL of SIS with defined equipment under control (EUC), for instance a pressure vessel, which is defined as local safety functions. On the other hand, safety functions where the whole platform is the EUC, e.g. emergency shutdown and fire & gas safety functions, defined as global safety functions, are not easily assessed through risk graphs [3] Minimum SIL Requirements in OLF 070 Since IEC and IEC provide a variety of methods for SIL requirement determination, but without the specified guideline of which method to be used, it is difficult to choose the proper method. Additionally, it is known that the risk graphs and/or hazard matrices can result in non-consistent SIL requirement [3]. In this respect, OLF 070 suggests the use of minimum SIL requirements for target SIL. Minimum SIL requirements are developed for the most typically used safety functions in the oil and gas production plants. The table 7.1 in OLF 070 [3] contains the description of each safety function, functional boundaries and minimum SIL requirements. The goal of the minimum SIL requirements is for checking the minimum safety level of frequently used safety functions, simplifying calculation and documentation, and thus encouraging the standardization of target SIL determination in the industries [4]. Minimum SIL requirements are based on the typical loop assumption and estimated using the industrially verified component reliability data. Since the minimum SIL values are literally the minimum requirements, it is possible to establish stricter requirements where overall risk levels are much higher, which result from quantitative risk assessment (QRA) using the minimum SIL values as input data. However, because of plant specific conditions and technological improvements, deviations from the defined minimum SIL requirements may be identified. To handle the deviations, OLF 070 Appendix C [3] suggests compensating methods using the tabulated minimum SIL requirements, whereas practical oil and gas projects go back to the original approach using IEC and IEC methodologies [4]. 3. UNCERTAINTY ANALYSIS IN DETERMINING TARGET SIL 3.1. Concept of Uncertainty Uncertainty is incomplete knowledge and information about a system as well as inaccuracy of the behaviour of systems [5]. Based on its nature, uncertainty is classified into two categories; epistemic or aleatory uncertainty. Epistemic uncertainty stems from the lack of knowledge. Accordingly, this kind of uncertainty can be reduced or controlled if additional knowledge becomes available. Aleatory uncertainty arises from inherent and natural randomness and variability. In this respect, aleatory

4 uncertainty may be associated with observable quantities while epistemic uncertainty with unobservable quantities such as a failure rate [6]. In practice, a system cannot be characterized exactly due to epistemic uncertainties in both values of the model parameters and assumptions supporting the model itself [7]. The former and the latter are called parameter uncertainty and model uncertainty, respectively. An uncertainty analysis aims at identifying uncertainty factors and presenting uncertainties in analysis results for better decision making in terms of parameter and model uncertainty Parameter Uncertainty Parameter uncertainty is about uncertainty in quantitative parameter values [5]. In this paper, concerning parameters are failure rates of components, beta-factors for common cause failure, proof or diagnostic test coverage factors, etc. Main influencing factors to parameter uncertainty are relevance and amount of generic data for a specific application and environment. In terms of epistemic or aleatory uncertainty, parameter uncertainty can be deemed epistemic, aleatory, or both [10]. Regarding epistemic uncertainty, parameter uncertainty comes from imperfect knowledge about distribution types and values of the parameters. For aleatory uncertainty, the distribution of parameters represents its inherent variability. In the same context, the distribution includes combined effect of aleatory and epistemic uncertainty. The effect of parameter uncertainty can be analyzed by observing uncertainty propagation [8]. Uncertainty propagation results in the distribution of uncertainty measures of interest (in our case, average of PFD or SIL). The techniques used for uncertainty propagation are Monte Carlo simulation, moment propagation, or discrete probability distribution [9]. It is recommended that sensitive analysis can be utilized to rank the importance of parameters in addition to uncertainty propagation [6] Model Uncertainty Model uncertainty mainly concerns the validity of model assumptions [11]. A model is the interpretation of real world. To design and develop a model, a lot of assumptions and hypotheses have to be defined. Even if these assumptions are well-defined logically, validation should be taken into account in order to check how much the model reflects real world. Moreover, selection of models contributes to model uncertainty. Since the interpretations can vary, it is necessary that the models have gaps. Various models show the differences especially in the number and the kind of parameters used. Model selection is also influenced by regulations, standards, guidelines, and internal company policies. Further, the more the model deals with detailed level, the much time and effort are needed [11]. Assuming that the models have similar level of validity, model uncertainty can be reviewed by comparing the results of various models. However, it is sometimes hard to decide which model should be selected for the analysis where validation cannot be performed. In this case, a consensus model [8], which has been publicly published, peer reviewed, and widely adopted by stakeholders, is recommended to be used Uncertainty Analysis for Target SIL Determination Technically, there are two representative methods for analysis of uncertainty, fuzzy set approach and probabilistic approach [12]. The fuzzy set approach is a set of mathematical principles for knowledge representation as degrees of belief using membership functions. It reflects how people think and attempts to model sense of words and intent of decision making [13]. The structure of a fuzzy set approach consists of three main components: a fuzzifier, which converts parameters into membership functions; an inference engine, based on a set of rules that reflects experts opinions about how to link

5 input to output; and a defuzzifier that re-convert the obtained output parameters into scalar value, in this case the target SILs. Probabilistic uncertainty analysis is mainly based on sampling techniques: Monte Carlo sampling or Latin Hypercube sampling [12]. These methods generally involve the generation of random samples of input random variables, the deterministic evaluations of the performance function at these samples, and the post-processing to extract the probabilistic characteristic (statistical moments, reliability, and PDF) of the performance function. Considering qualitative features of the risk graph methodology into uncertainty modeling, the fuzzy set approach should be utilized since experts knowledge and consensus are key factors for target SIL determination [14]. On the other hand, sampling-based method is applicable to quantitative SIL determination methods such as OLF 070 minimum SIL requirement. Input parameters can be modeled as assumed probability distributions and this makes the basis of sampling technique. 4. CASE STUDIES 4.1. System Description An example study has been illustrated for the local safety function, MEG Subsea Injection Pump Discharge PSHH. This protection function is to prevent overpressure in discharge of MEG injection pump, which is positive displacement type. Any obstruction at the user point or no MEG injection due to process shutdown might lead to this hazard. To prevent this hazard, MEG injection pump should be stopped on high-high pressure detected at the pump discharge. There will be not only MEG spill as an environmental consequence but loss of containment with very high pressure in terms of personnel risk. The dangerous undetected failure includes all possible modes of failure leading to any of the following effects: the transmitter failing to signal high pressure on demand, the logic solver failing to initiate pump stop, the circuit breaker failing to stop the pump motor on demand. For this reason, the MEG pump is not included in the reliability calculation. Figure 3 shows the configuration of this SIF. Figure 3: MEG Subsea Injection Pump Discharge PSHH Configuration It is assumed that there are already existing protective measures, so-called non-sis. One measure is two pressure safety valves (PSVs) provided on the MEG injection pump discharge, sized for blocked outlet condition. Another is the valve that will be open to maintain the pressure in the header. However, if obstruction is sudden, pressure control may not act Effects of the Uncertainties on Target SIL Target SIL obtained from risk graph using fuzzy set approach To investigate the effects of the uncertainties on determined target SIL, uncertainty analysis, using either fuzzy set approach or sampling-based method, has been performed for two different SIL determination methods; risk graph and OLF 070 minimum SIL requirement. Previously, in section 3.4, the fuzzy set approach is appropriate for uncertainty analysis of risk graph model. For this case study, the calibrated risk graph has been used as shown in Figure 4, which conveys the result of SIL assessment for the SIF in deterministic way. The first step of the fuzzy set approach is to fuzzify the parameters into membership functions. Parameters used here are listed in

6 Figure 5 with corresponding membership functions, respectively. Membership functions are modelled using both trapezoidal and triangular shaped functions. For parameter P, the mark with a star indicates as follows: P A should be selected if only all the following are true; a) facilities are provided to alert the operator that the SIS has failed, b) independent facilities are provided to shutdown such that the hazard can be avoided or which enable all persons to escape to a safe area, c) the time between the operator being alerted and a hazardous event occurring exceeds 1 hour or is definitely sufficient for the necessary actions. After the fuzzification, the fuzzy inference system is modelled using If-then rule, for example, If (C is Medium_high) and (F is Low) and (P is High) and (W is Medium_high) then (SIL is SIL 2). In this case study, total 52 rules are generated. The last stage is to defuzzify the results obtained back into the scalar value. There are several methods of defuzzification such as Center-of-Maximum (CoM), Mean-of-Maximum (MoM), Center-of-Area (CoA), etc. For this case, CoA has been used because this method can produce more accurate results [15] and the result is shown in Figure 6. Figure 4: Calibrated Risk Graph and Determined Target SIL for the SIF

7 Figure 5: Membership Functions for Risk Graph Parameters

8 Figure 6: Target SIL Obtained using the Fuzzy Set Approach Target SIL obtained from OLF 070 minimum SIL requirement using sampling method As mentioned in section 2.2, minimum SIL requirements in OLF 070 are derived based on the typical loop assumption and PFD estimation using industrially verified component reliability data. Thus, the uncertainty analysis, applied to determination of target SIL using the method from OLF 070, would be performed by the sampling methods to investigate the effect of uncertainty propagation. To calculate the target SIL of the SIF, PDS method [16] has been used for maintaining consistency with OLF 070. Since every component has simple configuration, 1oo1, the average of PFD follows the formula (1) without consideration of common cause failure. It should be noted that the probability of so-called test independent failure (TIF) can be added to the PFD to reflect the effect of incomplete testing. OLF 070 takes P TIF into consideration when calculating PFD. The values for P TIF come from the PDS data handbook [17]. PFD A = λ DU τ/2 + P TIF (1) In addition to the abovementioned model (1), another model has been used in the case study for the purpose of comparison. In order to replace the effect of imperfect testing with P TIF, proof test coverage (PTC) is added to the input parameters [16] and the PFD model is modified as follows: PFD B = PTC λ DU τ/2 + (1 PTC) λ DU T/2 (2) T is the assumed interval of complete testing that the residual failure modes will be detected. If some failure modes are not able to be tested for, then T should be taken as the lifetime of the equipment. In this case, T is assumed to be 5 years, the periodic overhaul duration of the offshore plant where the SIF would be installed. Table 1 shows the reliability data used for the calculation of minimum SIL requirement of the SIF. Among the parameters, λ DU and PTC are assumed to be random variables due to uncertainties from incompleteness of data. The uncertainty of the DU failure rate is given by a lognormal distribution with median equal to the values in Table 1. The error factors are assumed to be 3 [11]. The PTC and P TIF are given by a uniform distribution with the intervals shown in Table 1. In regard to proof test coverage, this assumption is due to lack of accumulated data from generic databases in the offshore industry. Also, P TIF has certain amount of uncertainty because its value is determined by experts opinion. On the other hand, number of components and τ are assumed to be constant since the uncertainties of configurations and proof test intervals can be controlled [8]. Table 1: Reliability Data for the SIF Components Component No. of λ DU τ PTC Components (/hour) (hours) (%) P TIF Pressure transmitter ~ ~ Logic solver ~ ~ Circuit breaker ~ ~

9 The uncertainty propagation has been studied by Monte Carlo simulation. For each simulation run, random values for each uncertain parameter have been obtained and then used as an input to calculate target SIL A and SIL B based on PFD A and PFD B, respectively. 50,000 simulation runs are performed for the precision of results. The target SIL distributions are shown in Figure 7 with input parameter distributions. Also, the statistics of target SIL simulation results are arranged in Table 2, where P α represents α% percentile of each output value. Figure 7: Target SIL Distribution using Monte Carlo Simulation Table 2: Statistics of Target SIL Simulation Results Output Mean Standard Coefficient of Deviation Variation P 10 P 50 P 90 PFD A 9.94 x x x x x x 10-2 PFD B 1.27 x x x x x x 10-2 SIL A x x SIL B x x

10 4.3. Discussions Without any uncertainty taken into consideration, i.e. in deterministic way, SIL 2 requirement has been derived when using calibrated risk graph as shown in Figure 4. Moreover, OLF 070 [3] refers that the PSD function for PAHH is required to satisfy SIL 2. The function is defined to start with the pressure sensor and terminates with closing of the critical valve. On the minimum SIL table, it is noted that the final element of this function could be different from a valve, e.g. a pump which must be stopped. From the viewpoint of OLF 070, MEG Subsea Injection Pump Discharge PSHH is also classified in the PSD function for PAHH and SIL 2 requirement can be applied. Unlike the target SILs determined by deterministic way, the results show differences when considering underlying uncertainties together. For the same SIF, the fuzzy risk graph result and sampling-based PFD A show similar tendency that SIL 2 is dominant than SIL 1. However, sampling-based PFD B results in SIL 1 as a target SIL since the mean value of PFD is slightly over the 1.00 x 10-2, which is the boundary of SIL 1 and SIL 2. Although the distributions of PFD A and PFD B approximate each other in terms of both location of center and amount of relative variation, the final outputs are distinguished. It can be guessed that the reason of the difference in target SILs mainly comes from the difference in models between PFD A and PFD B. Since PTC shows much sensitivity than other parameters [4], the PFD B model including PTC can be vulnerable to the parameter uncertainty. Even if P TIF is exposed to a certain level of uncertainties since the values are general based on expert judgment [16], trustworthy and reliable database dealing with PTC does not exist yet. Thus, as of now, PFD A model has much, even a little, robustness that PFD B model. The fuzzy risk graph, in Figure 6, shows that target SIL values range from SIL 1 to SIL 3. It is not necessary to take the result into account seriously because the portion of SIL 3 is small, 7% of all results. However, a situation is likely to occur when there is no dominant target SIL value. For instance, target SIL results have values from SIL 1 to SIL 3 with relative frequencies of 35%, 35%, 30%, respectively. In this case, some decision-makers can think and act cautiously by choosing SIL 3 as the target SIL. Still, other decision-makers consider the result as the average of PFD or SIL. From this point of view, SIL 2 is determined since the median and/or mean value is located in SIL 2 range. It is not easy to judge which decision is more reasonable. The same problem can also occur when using sampling-based method. 5. CONCLUSION This article has given overall understandings of uncertainty analysis for target SIL determination phase. Especially, risk graph method and minimum SIL requirement in OLF 070 have been introduced and studied as subjects for uncertainty analysis since these are popular methods in offshore industry. Both model and parameter uncertainty contribute to uncertainties of determined target SIL values when using either risk graph or minimum SIL requirement. To investigate the effect of uncertainties, the fuzzy set approach and sampling-based simulation have been used for risk graph and OLF 070 minimum SIL requirement, respectively. The case studies have been performed on the SIF, MEG subsea injection pump discharge PSHH. When applying deterministic approach, SIL 2 is derived as the target SIL by risk graph and OLF 070 minimum SIL requirement. Similarly, the fuzzy set approach and the sampling-based method for PFD A model show the same result, SIL 2 on average. PFD B model, however, shows the difference which results in SIL 1. The main reason was due to the high sensitivity parameter, PTC. In conclusion, uncertainty analysis can provide broader possibility of having various output values when determining target SIL. When making decisions on target SILs based on the results obtained from the uncertainty analysis, balance is the most considerable issue between sufficient safety margins and economic feasibility.

11 Acknowledgements This work was supported by the Korea Evaluation Institute of Industrial Technology ( , Development of 500 MPa URF & SIL 3 Manifold and Subsea System Engineering for Deepsea Field) funded by the Ministry of Trade, Industry & Energy (MI, Korea). References [1] IEC Functional safety of electrical / electronic / programmable electronic safetyrelated systems, International Electrotechnical Commission, 2010, Geneva. [2] IEC Functional safety safety instrumented systems for the process industry, International Electrotechnical Commission, 2010, Geneva. [3] OLF-070. Application of IEC and IEC in the Norwegian petroleum industry, Technical report. The Norwegian Oil Industry Association, 2004, Stavanger, Norway. [4] S. Kim, K. Chang, and Y. Kim. Risk-based design for implementation of SIS functional safety in the offshore industry, In: Steenbergen RDJM, van Gelder PHAJM, Miraglia S, Vrouwenvelder ACWM, editors. Amsterdam, The Netherlands, 29 September-2 October 2013 Safety, reliability and risk analysis: Beyond the horizon. Proceedings of the European safety and reliability conference 2013 (ESREL 2013), CRC Press, pp , (2013), London. [5] M. Rausand. Reliability of safety-critical systems, John Wiley & Sons, Inc., 2014, Hoboken, New Jersey. [6] M.A. Lundteigen. Safety instrumented systems in the oil and gas industry: concepts and methods for safety and reliability assessments in design and operation, Doctoral thesis, Norwegian University of Science and Technology (NTNU), 2009, Trondheim, Norway. [7] T. Aven and E. Zio. Some considerations on the treatment of uncertainties in risk assessment for practical decision making, The Journal of Reliability Engineering and System Safety, volume 96, pp.64-74, (2011). [8] H. Jin, M.A. Lundteigen, and M. Rausand. Uncertainty assessment of reliability estimates for safety instrumented systems, In: Berenguer C, Grall A, Guedes Soares C, editors. Troyes, France, September 2011 Advances in safety, reliability and risk management. Proceedings of the European safety and reliability conference 2011 (ESREL 2011), CRC Press, pp , (2011), London. [9] NASA, Probabilistic risk assessment procedures guide for NASA managers and practitioners, Technical report, NASA Office of Safety and Mission Assurance, 2002, Washington, DC. [10] Abrahamsson, M. Uncertainty in quantitative risk analysis characterization and methods of treatment, Doctoral thesis, Lund University, 2002, Lund, Sweden. [11] A.F. Janbu. Treatment of uncertainties in reliability assessment of safety instrumented systems, Master s thesis, Norwegian University of Science and Technology (NTNU), 2009, Trondheim, Norway. [12] G. Rausand. Uncertainty management in reliability analyses, Master s thesis. Norwegian University of Science and Technology (NTNU), 2005, Trondheim, Norway. [13] O.Y. Abul-Haggag, and W. Barakat. Application of fuzzy logic for the determination of safety integrity in light of IEC & standards, International Journal of Emerging Technology and Advanced Engineering, volume 3, pp.41-48, (2013). [14] C. Simon, M. Sallak, and J.F. Aubry. SIL allocation of SIS by aggregation of experts opinions, Proceedings of the European safety and reliability conference 2007 (ESREL 2007), 2007, Stavanger, Norway. [15] I. Elaamvazuthi, P. Vasant, and J. Webb, The application of Mamdani fuzzy model for auto zoom function of a digital camera, International Journal of Computer Science and Information Security, volume 6, pp , (2009). [16] Sintef. Reliability prediction methods for safety instrumented systems, PDS method handbook, Sintef, 2013, Trondheim, Norway. [17] Sintef. Reliability data for safety instrumented systems, PDS data handbook, Sintef, 2013, Trondheim, Norway.

A NEW APPROACH FOR VERIFICATION OF SAFETY INTEGRITY LEVELS ABSTRACT

A NEW APPROACH FOR VERIFICATION OF SAFETY INTEGRITY LEVELS ABSTRACT A NEW APPROACH FOR VERIFICATION OF SAFETY INTEGRITY LEVELS E.B. Abrahamsen University of Stavanger, Norway e-mail: eirik.b.abrahamsen@uis.no W. Røed Proactima AS, Norway e-mail: wr@proactima.com ABSTRACT

More information

Logic Solver for Tank Overfill Protection

Logic Solver for Tank Overfill Protection Introduction A growing level of attention has recently been given to the automated control of potentially hazardous processes such as the overpressure or containment of dangerous substances. Several independent

More information

Combining field failure data with new instrument design margins to predict failure rates for SIS Verification. Abstract

Combining field failure data with new instrument design margins to predict failure rates for SIS Verification. Abstract Combining field failure data with new instrument design margins to predict failure rates for SIS Verification. Website: www.exida.com Iwan van Beurden, Dr. William M. Goble exida 64 N Main St. Sellersville,

More information

Faculty of Science and Technology MASTER S THESIS. Faculty supervisor: Prof. Eirik Bjorheim Abrahamsen (University of Stavanger)

Faculty of Science and Technology MASTER S THESIS. Faculty supervisor: Prof. Eirik Bjorheim Abrahamsen (University of Stavanger) Faculty of Science and Technology MASTER S THESIS Study program/ Specialization: Offshore Technology / Risk management Spring semester, 2012 Open / Restricted access Writer: Md. Jahedul Islam (Writer s

More information

PRIMATECH WHITE PAPER COMPARISON OF FIRST AND SECOND EDITIONS OF HAZOP APPLICATION GUIDE, IEC 61882: A PROCESS SAFETY PERSPECTIVE

PRIMATECH WHITE PAPER COMPARISON OF FIRST AND SECOND EDITIONS OF HAZOP APPLICATION GUIDE, IEC 61882: A PROCESS SAFETY PERSPECTIVE PRIMATECH WHITE PAPER COMPARISON OF FIRST AND SECOND EDITIONS OF HAZOP APPLICATION GUIDE, IEC 61882: A PROCESS SAFETY PERSPECTIVE Summary Modifications made to IEC 61882 in the second edition have been

More information

Identification and Reduction of Risks in Remote Operations of Offshore Oil and Gas Installations

Identification and Reduction of Risks in Remote Operations of Offshore Oil and Gas Installations Identification and Reduction of Risks in Remote Operations of Offshore Oil and Gas Installations S. O. Johnsen, M.A.Lundteigen/SINTEF H.Fartum/STATOIL John Monsen/Norsk Hydro 1 Safety Challenges Introduction

More information

IAEA Training in level 1 PSA and PSA applications. PSA Project. IAEA Guidelines for PSA

IAEA Training in level 1 PSA and PSA applications. PSA Project. IAEA Guidelines for PSA IAEA Training in level 1 PSA and PSA applications PSA Project IAEA Guidelines for PSA Introduction The following slides present the IAEA documents that deal with procedures, guidance and good practices

More information

SAFETY CASE ON A PAGE

SAFETY CASE ON A PAGE SAFETY CASE ON A PAGE Dr Sally A. Forbes, Nuclear Safety Department, AWE, Aldermaston, Reading, Berkshire RG7 4PR, UK Keywords: Safety Case, SHAPED, Hazard Awareness Introduction Safety Case on a Page

More information

DEVELOPMENT OF A STRUCTURAL SYSTEM RELIABILITY FRAMEWORK FOR OFFSHORE PLATFORMS

DEVELOPMENT OF A STRUCTURAL SYSTEM RELIABILITY FRAMEWORK FOR OFFSHORE PLATFORMS JIP: Structural reliability analysis framework for fixed offshore platforms DEVELOPMENT OF A STRUCTURAL SYSTEM RELIABILITY FRAMEWORK FOR OFFSHORE PLATFORMS May 1998 Document No. JHA003 University of Surrey,

More information

Case 1 - ENVISAT Gyroscope Monitoring: Case Summary

Case 1 - ENVISAT Gyroscope Monitoring: Case Summary Code FUZZY_134_005_1-0 Edition 1-0 Date 22.03.02 Customer ESOC-ESA: European Space Agency Ref. Customer AO/1-3874/01/D/HK Fuzzy Logic for Mission Control Processes Case 1 - ENVISAT Gyroscope Monitoring:

More information

Digital Control of MS-150 Modular Position Servo System

Digital Control of MS-150 Modular Position Servo System IEEE NECEC Nov. 8, 2007 St. John's NL 1 Digital Control of MS-150 Modular Position Servo System Farid Arvani, Syeda N. Ferdaus, M. Tariq Iqbal Faculty of Engineering, Memorial University of Newfoundland

More information

Goals, progress and difficulties with regard to the development of German nuclear standards on the example of KTA 2000

Goals, progress and difficulties with regard to the development of German nuclear standards on the example of KTA 2000 Goals, progress and difficulties with regard to the development of German nuclear standards on the example of KTA 2000 Dr. M. Mertins Gesellschaft für Anlagen- und Reaktorsicherheit (GRS) mbh ABSTRACT:

More information

Project and self- Introduction

Project and self- Introduction Project and self- Introduction RAMS seminar Renny Arismendi renny.j.arismendi@ntnu.no Formation / topic Agenda Diagnosis Background Academic formation, industrial experience. Prognosis PhD position Present

More information

TECHNOLOGY QUALIFICATION MANAGEMENT

TECHNOLOGY QUALIFICATION MANAGEMENT OFFSHORE SERVICE SPECIFICATION DNV-OSS-401 TECHNOLOGY QUALIFICATION MANAGEMENT OCTOBER 2010 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property

More information

Faculty of Mining, Geology and Petroleum Engineering, Zagreb, Croatia

Faculty of Mining, Geology and Petroleum Engineering, Zagreb, Croatia Some Possibilities for Construction of Linguistic Variables for Sustainable Development Decision-Making D. Rajković Faculty of Mining, Geology and Petroleum Engineering, Zagreb, Croatia Email: drajkovi@rgn.hr

More information

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN

THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN THE USE OF A SAFETY CASE APPROACH TO SUPPORT DECISION MAKING IN DESIGN W.A.T. Alder and J. Perkins Binnie Black and Veatch, Redhill, UK In many of the high hazard industries the safety case and safety

More information

MU064: Mechanical Integrity & Reliability in Refineries, Petrochemical & Process Plant

MU064: Mechanical Integrity & Reliability in Refineries, Petrochemical & Process Plant MU064: Mechanical Integrity & Reliability in Refineries, Petrochemical & Process Plant MU064 Rev.001 CMCT COURSE OUTLINE Page 1 of 7 Training Description: This course will provide a comprehensive review

More information

AHRI Standard Standard for Performance Rating of Modulating Positive Displacement Refrigerant Compressors

AHRI Standard Standard for Performance Rating of Modulating Positive Displacement Refrigerant Compressors AHRI Standard 545 2017 Standard for Performance Rating of Modulating Positive Displacement Refrigerant Compressors IMPORTANT SAFETY RECOMMENDATIONS AHRI does not set safety standards and does not certify

More information

SAFETY CASES: ARGUING THE SAFETY OF AUTONOMOUS SYSTEMS SIMON BURTON DAGSTUHL,

SAFETY CASES: ARGUING THE SAFETY OF AUTONOMOUS SYSTEMS SIMON BURTON DAGSTUHL, SAFETY CASES: ARGUING THE SAFETY OF AUTONOMOUS SYSTEMS SIMON BURTON DAGSTUHL, 17.02.2017 The need for safety cases Interaction and Security is becoming more than what happens when things break functional

More information

intelligent subsea control

intelligent subsea control 40 SUBSEA CONTROL How artificial intelligence can be used to minimise well shutdown through integrated fault detection and analysis. By E Altamiranda and E Colina. While there might be topside, there are

More information

Petroleum Safety Authority Norway Trends in Risk Level Risk Level Measuring Scheme

Petroleum Safety Authority Norway Trends in Risk Level Risk Level Measuring Scheme Petroleum Safety Authority Norway Trends in Risk Level Risk Level Measuring Scheme Methodology Petroleum Safety Authority First as part of the Norwegian Petroleum Directorate. Safety regulator since 1973.

More information

Basic Level 1. PSA course for analysts

Basic Level 1. PSA course for analysts IAEA Training in level 1 PSA and PSA applications Basic Level 1. PSA course for analysts Reliability data analysis - use of generic and/or plant- specific data Content Types of data for PSA Reliability

More information

This document is a preview generated by EVS

This document is a preview generated by EVS INTERNATIONAL STANDARD ISO 2394 Fourth edition 2015-03-01 General principles on reliability for structures Principes généraux de la fiabilité des constructions Reference number ISO 2015 COPYRIGHT PROTECTED

More information

Fundamentals of Industrial Control

Fundamentals of Industrial Control Fundamentals of Industrial Control 2nd Edition D. A. Coggan, Editor Practical Guides for Measurement and Control Preface ix Contributors xi Chapter 1 Sensors 1 Applications of Instrumentation 1 Introduction

More information

DNVGL-RP-A203 Edition June 2017

DNVGL-RP-A203 Edition June 2017 RECOMMENDED PRACTICE DNVGL-RP-A203 Edition June 2017 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL

More information

Module 7-4 N-Area Reliability Program (NARP)

Module 7-4 N-Area Reliability Program (NARP) Module 7-4 N-Area Reliability Program (NARP) Chanan Singh Associated Power Analysts College Station, Texas N-Area Reliability Program A Monte Carlo Simulation Program, originally developed for studying

More information

Bayesian Reliability Testing for New Generation Semiconductor Processing Equipment Paul Tobias and Michael Pore

Bayesian Reliability Testing for New Generation Semiconductor Processing Equipment Paul Tobias and Michael Pore Bayesian Reliability Testing for New Generation Semiconductor Processing Equipment Paul Tobias and Michael Pore CONTENTS A. Review of Classical Approach for Planning an Equipment Reliability Qualification

More information

DeltaV SIS Logic Solver

DeltaV SIS Logic Solver DeltaV SIS Process Safety System Product Data Sheet September 2017 DeltaV SIS Logic Solver World s first smart SIS Logic Solver Integrated, yet separate from the control system Easy compliance with IEC

More information

International Journal of Marine Engineering Innovation and Research, Vol. 2(2), Mar (pissn: , eissn:

International Journal of Marine Engineering Innovation and Research, Vol. 2(2), Mar (pissn: , eissn: (pissn: 2541-5972, eissn: 2548-1479 117 Configuration Selection Based On Lifecycle Cost Of Subsea Production System: Case Of Indonesia Deepwater Field Christoffel.F.B. Sa u 1, Daniel.M.Rosyid 2 Abstract

More information

Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014

Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014 Standard for Subsea High Integrity Pressure Protection Systems (HIPPS) API STANDARD 17O SECOND EDITION, JULY 2014 Special Notes API publications necessarily address problems of a general nature. With respect

More information

Scientific Certification

Scientific Certification Scientific Certification John Rushby Computer Science Laboratory SRI International Menlo Park, California, USA John Rushby, SR I Scientific Certification: 1 Does The Current Approach Work? Fuel emergency

More information

Design and Development of an Optimized Fuzzy Proportional-Integral-Derivative Controller using Genetic Algorithm

Design and Development of an Optimized Fuzzy Proportional-Integral-Derivative Controller using Genetic Algorithm INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION, COMMUNICATION AND ENERGY CONSERVATION 2009, KEC/INCACEC/708 Design and Development of an Optimized Fuzzy Proportional-Integral-Derivative Controller using

More information

New concepts are emerging frequently in various fields such as: microprocessor sensors,

New concepts are emerging frequently in various fields such as: microprocessor sensors, EMERGENCY SHUT DOWN SYSTEMS IN ONSHORE AND OFFSHORE PROCESS OPERATIONS J PEARSON, PRINCIPAL SPECIALIST INSPECTOR HEALTH & SAFETY EXECUTIVE LIVERPOOL SYNOPSIS This paper describes some of the latest developments

More information

IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS

IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS A Thesis Proposal By Marshall T. Cheek Submitted to the Office of Graduate Studies Texas A&M University

More information

Design of an Intelligent Pressure Control System Based on the Fuzzy Self-tuning PID Controller

Design of an Intelligent Pressure Control System Based on the Fuzzy Self-tuning PID Controller Design of an Intelligent Pressure Control System Based on the Fuzzy Self-tuning PID Controller 1 Deepa S. Bhandare, 2 N. R.Kulkarni 1,2 Department of Electrical Engineering, Modern College of Engineering,

More information

JOHANN CATTY CETIM, 52 Avenue Félix Louat, Senlis Cedex, France. What is the effect of operating conditions on the result of the testing?

JOHANN CATTY CETIM, 52 Avenue Félix Louat, Senlis Cedex, France. What is the effect of operating conditions on the result of the testing? ACOUSTIC EMISSION TESTING - DEFINING A NEW STANDARD OF ACOUSTIC EMISSION TESTING FOR PRESSURE VESSELS Part 2: Performance analysis of different configurations of real case testing and recommendations for

More information

CHAPTER 4 FUZZY LOGIC CONTROLLER

CHAPTER 4 FUZZY LOGIC CONTROLLER 62 CHAPTER 4 FUZZY LOGIC CONTROLLER 4.1 INTRODUCTION Unlike digital logic, the Fuzzy Logic is a multivalued logic. It deals with approximate perceptive rather than precise. The effective and efficient

More information

Using reliability growth testing to reveal systematic faults in safety-instrumented systems

Using reliability growth testing to reveal systematic faults in safety-instrumented systems Using reliability growth testing to reveal systematic faults in safety-instrumented systems Rowland Mbah Reliability, Availability, Maintainability and Safety (RAMS) Submission date: June 2014 Supervisor:

More information

Springer Series in Reliability Engineering

Springer Series in Reliability Engineering Springer Series in Reliability Engineering Series Editor Professor Hoang Pham Department of Industrial Engineering Rutgers The State University of New Jersey 96 Frelinghuysen Road Piscataway, NJ 08854-8018

More information

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity

Report. Temporary abandoned wells on NCS. Subtitle. Author(s) Nils Totland. SINTEF Petroleum Research Well Integrity - Unrestricted Report Temporary abandoned wells on NCS Subtitle Author(s) Nils Totland SINTEF Petroleum Research Well Integrity 2011-08-24 SINTEF Petroleumsforskning AS SINTEF Petroleum Research Address:

More information

Provision of Reliability Data for New Technology Equipment in Subsea Production Systems

Provision of Reliability Data for New Technology Equipment in Subsea Production Systems Provision of Reliability Data for New Technology Equipment in Subsea Production Systems Ishita Dash Reliability, Availability, Maintainability and Safety (RAMS) Submission date: June 2012 Supervisor: Mary

More information

Top 10 Questions About Aspen HYSYS Dynamics FAQ

Top 10 Questions About Aspen HYSYS Dynamics FAQ Top 10 Questions About Aspen HYSYS Dynamics FAQ 1. I already have my equipment modeled in steady state with Aspen HYSYS. Do I need to recreate it from scratch in Aspen HYSYS Dynamics? No, Aspen HYSYS Dynamics

More information

87R14 PETROLEUMEXPLORATI

87R14 PETROLEUMEXPLORATI E 87R14 SA M PL COSTESTI MATECLASSI FI CATI ON SYSTEM-ASAPPLI EDFORTHE PETROLEUMEXPLORATI ONAND PRODUCTI ONI NDUSTRY AACE International Recommended Practice No. 87R-14 COST ESTIMATE CLASSIFICATION SYSTEM

More information

A Hybrid Risk Management Process for Interconnected Infrastructures

A Hybrid Risk Management Process for Interconnected Infrastructures A Hybrid Management Process for Interconnected Infrastructures Stefan Schauer Workshop on Novel Approaches in and Security Management for Critical Infrastructures Vienna, 19.09.2017 Contents Motivation

More information

MATRIX SAMPLING DESIGNS FOR THE YEAR2000 CENSUS. Alfredo Navarro and Richard A. Griffin l Alfredo Navarro, Bureau of the Census, Washington DC 20233

MATRIX SAMPLING DESIGNS FOR THE YEAR2000 CENSUS. Alfredo Navarro and Richard A. Griffin l Alfredo Navarro, Bureau of the Census, Washington DC 20233 MATRIX SAMPLING DESIGNS FOR THE YEAR2000 CENSUS Alfredo Navarro and Richard A. Griffin l Alfredo Navarro, Bureau of the Census, Washington DC 20233 I. Introduction and Background Over the past fifty years,

More information

ISO INTERNATIONAL STANDARD. Safety of machinery Basic concepts, general principles for design Part 1: Basic terminology, methodology

ISO INTERNATIONAL STANDARD. Safety of machinery Basic concepts, general principles for design Part 1: Basic terminology, methodology INTERNATIONAL STANDARD ISO 12100-1 First edition 2003-11-01 Safety of machinery Basic concepts, general principles for design Part 1: Basic terminology, methodology Sécurité des machines Notions fondamentales,

More information

EUROPEAN GUIDANCE MATERIAL ON CONTINUITY OF SERVICE EVALUATION IN SUPPORT OF THE CERTIFICATION OF ILS & MLS GROUND SYSTEMS

EUROPEAN GUIDANCE MATERIAL ON CONTINUITY OF SERVICE EVALUATION IN SUPPORT OF THE CERTIFICATION OF ILS & MLS GROUND SYSTEMS EUR DOC 012 EUROPEAN GUIDANCE MATERIAL ON CONTINUITY OF SERVICE EVALUATION IN SUPPORT OF THE CERTIFICATION OF ILS & MLS GROUND SYSTEMS First Edition Approved by the European Air Navigation Planning Group

More information

On-site Safety Management Using Image Processing and Fuzzy Inference

On-site Safety Management Using Image Processing and Fuzzy Inference 1013 On-site Safety Management Using Image Processing and Fuzzy Inference Hongjo Kim 1, Bakri Elhamim 2, Hoyoung Jeong 3, Changyoon Kim 4, and Hyoungkwan Kim 5 1 Graduate Student, School of Civil and Environmental

More information

Surveillance and Calibration Verification Using Autoassociative Neural Networks

Surveillance and Calibration Verification Using Autoassociative Neural Networks Surveillance and Calibration Verification Using Autoassociative Neural Networks Darryl J. Wrest, J. Wesley Hines, and Robert E. Uhrig* Department of Nuclear Engineering, University of Tennessee, Knoxville,

More information

GAO INTERNATIONAL SPACE STATION

GAO INTERNATIONAL SPACE STATION GAO United States Government Accountability Office Report to Congressional Committees December 2011 INTERNATIONAL SPACE STATION Approaches for Ensuring Utilization through 2020 Are Reasonable but Should

More information

PETROLEUM ENGINEERING

PETROLEUM ENGINEERING PETROLEUM ENGINEERING Subject Code: PE Course Structure Sections/Units Section 1 Section 2 Section 3 Section 4 Linear Algebra Calculus Differential equations Complex variables Topics Section 5 Section

More information

Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate)

Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate) API Manual of Petroleum Measurement Standards TR 2570 EI Hydrocarbon Management HM 56 Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate) First Edition, October 2010

More information

Correlation of Model Simulations and Measurements

Correlation of Model Simulations and Measurements Correlation of Model Simulations and Measurements Roy Leventhal Leventhal Design & Communications Presented June 5, 2007 IBIS Summit Meeting, San Diego, California Correlation of Model Simulations and

More information

Validation of ultra-high dependability 20 years on

Validation of ultra-high dependability 20 years on Bev Littlewood, Lorenzo Strigini Centre for Software Reliability, City University, London EC1V 0HB In 1990, we submitted a paper to the Communications of the Association for Computing Machinery, with the

More information

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems

ISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Offshore production installations Basic surface process safety systems INTERNATIONAL STANDARD ISO 10418 Second edition 2003-10-01 Petroleum and natural gas industries Offshore production installations Basic surface process safety systems Industries du pétrole et du gaz naturel

More information

Developing the Model

Developing the Model Team # 9866 Page 1 of 10 Radio Riot Introduction In this paper we present our solution to the 2011 MCM problem B. The problem pertains to finding the minimum number of very high frequency (VHF) radio repeaters

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION 1 CHAPTER 1 INTRODUCTION 1.1 BACKGROUND The increased use of non-linear loads and the occurrence of fault on the power system have resulted in deterioration in the quality of power supplied to the customers.

More information

SYSTEMIC APPROACH TO THE CHOICE OF OPTIMUM VARIANT OF RADIOACTIVE WASTE MANAGEMENT 1

SYSTEMIC APPROACH TO THE CHOICE OF OPTIMUM VARIANT OF RADIOACTIVE WASTE MANAGEMENT 1 ISAHP 2001, Berne, Switzerland, August 2-4, 2001 SYSTEMIC APPROACH TO THE CHOICE OF OPTIMUM VARIANT OF RADIOACTIVE WASTE MANAGEMENT 1 Jaroslava Halova Academy of Sciences of The Czech Republic, Institute

More information

REVIEW AND APPROVAL OF NOVEL CONCEPTS

REVIEW AND APPROVAL OF NOVEL CONCEPTS Guidance Notes on Review and Approval of Novel Concepts GUIDANCE NOTES ON REVIEW AND APPROVAL OF NOVEL CONCEPTS APRIL 2017 American Bureau of Shipping Incorporated by Act of Legislature of the State of

More information

CHAPTER 4 FUZZY BASED DYNAMIC PWM CONTROL

CHAPTER 4 FUZZY BASED DYNAMIC PWM CONTROL 47 CHAPTER 4 FUZZY BASED DYNAMIC PWM CONTROL 4.1 INTRODUCTION Passive filters are used to minimize the harmonic components present in the stator voltage and current of the BLDC motor. Based on the design,

More information

Site-specific seismic hazard analysis

Site-specific seismic hazard analysis Site-specific seismic hazard analysis ABSTRACT : R.K. McGuire 1 and G.R. Toro 2 1 President, Risk Engineering, Inc, Boulder, Colorado, USA 2 Vice-President, Risk Engineering, Inc, Acton, Massachusetts,

More information

User Experience Questionnaire Handbook

User Experience Questionnaire Handbook User Experience Questionnaire Handbook All you need to know to apply the UEQ successfully in your projects Author: Dr. Martin Schrepp 21.09.2015 Introduction The knowledge required to apply the User Experience

More information

Why partial discharge testing makes good sense

Why partial discharge testing makes good sense Why partial discharge testing makes good sense PD measurement and analysis have proven to be reliable for detecting defects in the insulation system of electrical assets before major damage or a breakdown

More information

CHAPTER 6. CALCULATION OF TUNING PARAMETERS FOR VIBRATION CONTROL USING LabVIEW

CHAPTER 6. CALCULATION OF TUNING PARAMETERS FOR VIBRATION CONTROL USING LabVIEW 130 CHAPTER 6 CALCULATION OF TUNING PARAMETERS FOR VIBRATION CONTROL USING LabVIEW 6.1 INTRODUCTION Vibration control of rotating machinery is tougher and a challenging challengerical technical problem.

More information

33 rd International North Sea Flow Measurement Workshop October 2015

33 rd International North Sea Flow Measurement Workshop October 2015 Tie Backs and Partner Allocation A Model Based System for meter verification and monitoring Kjartan Bryne Berg, Lundin Norway AS, Håvard Ausen, Steinar Gregersen, Asbjørn Bakken, Knut Vannes, Skule E.

More information

INCIDENTS CLASSIFICATION SCALE METHODOLOGY

INCIDENTS CLASSIFICATION SCALE METHODOLOGY 8 May 2014 WORKING GROUP INCIDENT CLASSIFICATION UNDER SYSTEM OPERATIONS COMMITTEE Contents Revisions... 5 References and Related documents... 5 Change request... 5 1. Overview... 6 1.1 Objectives and

More information

Process Equipment Design

Process Equipment Design CHAPTER 4 Process Equipment Design 4.1 INTRODUCTION People operate and maintain processes by interacting with process equipment. Process equipment includes displays, alarms, controls, computers, manual

More information

NUGENIA position paper. Ageing of Low Voltage Cable in Nuclear Environment. 12 February 2015

NUGENIA position paper. Ageing of Low Voltage Cable in Nuclear Environment. 12 February 2015 NUGENIA position paper Ageing of Low Voltage Cable in Nuclear Environment 12 February 2015 NUGENIA is an international non-profit association under Belgian law established in 2011. Dedicated to the research

More information

Simulation of Synchronous Machine in Stability Study for Power System: Garri Station as a Case Study

Simulation of Synchronous Machine in Stability Study for Power System: Garri Station as a Case Study Simulation of Synchronous Machine in Stability Study for Power System: Garri Station as a Case Study Bahar A. Elmahi. Industrial Research & Consultancy Center, baharelmahi@yahoo.com Abstract- This paper

More information

Research on the evaluation model of the software reliability for

Research on the evaluation model of the software reliability for Research on the evaluation model of the software reliability for nuclear safety class digital instrumentation and control system CHI Miao 1, and YANG Ming 2 1. School of Economics & Management, Harbin

More information

Process Leak Detection Diagnostic with Intelligent Differential Pressure Transmitter

Process Leak Detection Diagnostic with Intelligent Differential Pressure Transmitter August 2008 Page 1 Process Leak Detection Diagnostic with Intelligent Differential Pressure Transmitter The use of impulse lines, manifolds and bleed valves in measurement instrumentation process connections

More information

Criteria for the Application of IEC 61508:2010 Route 2H

Criteria for the Application of IEC 61508:2010 Route 2H Criteria for the Application of IEC 61508:2010 Route 2H Abstract Dr. William M. Goble, CFSE exida Sellersville, PA 18960, USA wgoble@exida.com Dr. Julia V. Bukowski Villanova University Villanova, PA 19085

More information

United Nations Statistics Division Programme in Support of the 2020 Round of Population and Housing Censuses

United Nations Statistics Division Programme in Support of the 2020 Round of Population and Housing Censuses United Nations Statistics Division Programme in Support of the 2020 Round of Population and Housing Censuses Srdjan Mrkić United Nations Statistics Division Definitions A population census is the total

More information

4D-Particle filter localization for a simulated UAV

4D-Particle filter localization for a simulated UAV 4D-Particle filter localization for a simulated UAV Anna Chiara Bellini annachiara.bellini@gmail.com Abstract. Particle filters are a mathematical method that can be used to build a belief about the location

More information

Ground Target Signal Simulation by Real Signal Data Modification

Ground Target Signal Simulation by Real Signal Data Modification Ground Target Signal Simulation by Real Signal Data Modification Witold CZARNECKI MUT Military University of Technology ul.s.kaliskiego 2, 00-908 Warszawa Poland w.czarnecki@tele.pw.edu.pl SUMMARY Simulation

More information

TEST AND CALIBRATION FACILITY FOR HLS AND WPS SENSORS

TEST AND CALIBRATION FACILITY FOR HLS AND WPS SENSORS IWAA2004, CERN, Geneva, 4-7 October 2004 TEST AND CALIBRATION FACILITY FOR HLS AND WPS SENSORS Andreas Herty, Hélène Mainaud-Durand, Antonio Marin CERN, TS/SU/MTI, 1211 Geneva 23, Switzerland 1. ABSTRACT

More information

State-Space Models with Kalman Filtering for Freeway Traffic Forecasting

State-Space Models with Kalman Filtering for Freeway Traffic Forecasting State-Space Models with Kalman Filtering for Freeway Traffic Forecasting Brian Portugais Boise State University brianportugais@u.boisestate.edu Mandar Khanal Boise State University mkhanal@boisestate.edu

More information

Using BIM to follow up milestones in a project plan during the design phase

Using BIM to follow up milestones in a project plan during the design phase Building Information Modelling (BIM) in Design, Construction and Operations 97 Using BIM to follow up milestones in a project plan during the design phase Ø. Mejlænder-Larsen Norwegian University of Science

More information

Design Science Research Methods. Prof. Dr. Roel Wieringa University of Twente, The Netherlands

Design Science Research Methods. Prof. Dr. Roel Wieringa University of Twente, The Netherlands Design Science Research Methods Prof. Dr. Roel Wieringa University of Twente, The Netherlands www.cs.utwente.nl/~roelw UFPE 26 sept 2016 R.J. Wieringa 1 Research methodology accross the disciplines Do

More information

Time And Resource Characteristics Of Radical New Product Development (NPD) Projects And their Dynamic Control. Introduction. Problem Description.

Time And Resource Characteristics Of Radical New Product Development (NPD) Projects And their Dynamic Control. Introduction. Problem Description. Time And Resource Characteristics Of Radical New Product Development (NPD) Projects And their Dynamic Control Track: Product and Process Design In many industries the innovation rate increased while the

More information

Propagation Modelling White Paper

Propagation Modelling White Paper Propagation Modelling White Paper Propagation Modelling White Paper Abstract: One of the key determinants of a radio link s received signal strength, whether wanted or interfering, is how the radio waves

More information

Process Control Calibration Made Easy with Agilent U1401A

Process Control Calibration Made Easy with Agilent U1401A Process Control Calibration Made Easy with Agilent U1401A Application Note This application note explains how the Agilent U1401A with simultaneous source and measure functions eases technicians calibration

More information

Integrity of safety-related systems in the gas industry

Integrity of safety-related systems in the gas industry IGEM/SR/15 Edition 5 - with amendments December 2015 Communication 1784 Integrity of safety-related systems in the gas industry This publication is produced for the sole use of the licensee. Use by any

More information

Integrated approach to upstream decision making. London January 2010

Integrated approach to upstream decision making. London January 2010 Integrated approach to upstream decision making London 20 21 January 2010 MSm3oe/Year MSm3oe % Setting the scene 300,0 250,0 200,0 150,0 100,0 50,0 90 80 70 60 50 40 30 20 10 0 60 50 40 30 20 10 0 0,0

More information

AN AIDED NAVIGATION POST PROCESSING FILTER FOR DETAILED SEABED MAPPING UUVS

AN AIDED NAVIGATION POST PROCESSING FILTER FOR DETAILED SEABED MAPPING UUVS MODELING, IDENTIFICATION AND CONTROL, 1999, VOL. 20, NO. 3, 165-175 doi: 10.4173/mic.1999.3.2 AN AIDED NAVIGATION POST PROCESSING FILTER FOR DETAILED SEABED MAPPING UUVS Kenneth Gade and Bjørn Jalving

More information

Tutorial on the Statistical Basis of ACE-PT Inc. s Proficiency Testing Schemes

Tutorial on the Statistical Basis of ACE-PT Inc. s Proficiency Testing Schemes Tutorial on the Statistical Basis of ACE-PT Inc. s Proficiency Testing Schemes Note: For the benefit of those who are not familiar with details of ISO 13528:2015 and with the underlying statistical principles

More information

PD Diagnostic Applications and TechImp solutions

PD Diagnostic Applications and TechImp solutions PD Diagnostic Applications and TechImp solutions Condition Assessment Solutions for Electrical Systems. PD based innovative tools for the Condition Based Maintenance. MD-04.05.004 - rev. 00-29/08/2006

More information

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A EUOAG Workshop Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A Johnny Gundersen Principal Engineer, PSA Norway Content Requirements for PP&A in Norway

More information

Application of Lean Six-Sigma Methodology to Reduce the Failure Rate of Valves at Oil Field

Application of Lean Six-Sigma Methodology to Reduce the Failure Rate of Valves at Oil Field , 22-24 October, 2014, San Francisco, USA Application of Lean Six-Sigma Methodology to Reduce the Failure Rate of Valves at Oil Field Abdulaziz A. Bubshait, Member, IAENG and Abdullah A. Al-Dosary Abstract

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

DATA ANALYSIS FOR VALVE LEAK DETECTION OF NUCLEAR POWER PLANT SAFETY CRITICAL COMPONENTS

DATA ANALYSIS FOR VALVE LEAK DETECTION OF NUCLEAR POWER PLANT SAFETY CRITICAL COMPONENTS DATA ANALYSIS FOR VALVE LEAK DETECTION OF NUCLEAR POWER PLANT SAFETY CRITICAL COMPONENTS Jung-Taek Kim, Hyeonmin Kim, Wan Man Park Korea Atomic Energy Research Institute 145 Daedeok-daero, Yuseong-gu,

More information

Chapter 5. Signal Analysis. 5.1 Denoising fiber optic sensor signal

Chapter 5. Signal Analysis. 5.1 Denoising fiber optic sensor signal Chapter 5 Signal Analysis 5.1 Denoising fiber optic sensor signal We first perform wavelet-based denoising on fiber optic sensor signals. Examine the fiber optic signal data (see Appendix B). Across all

More information

2017 Award Nomination Title of Innovation: Wells Materials Design & Performance enhancement

2017 Award Nomination Title of Innovation: Wells Materials Design & Performance enhancement 2017 Award Nomination Title of Innovation: Wells Materials Design & Performance enhancement Nominee(s) Pedro Rincon Flores Petroleum Development Oman Nasser Behlani - Petroleum Development Oman Dr Janardhan

More information

Improve Safety and Reliability with Dynamic Simulation

Improve Safety and Reliability with Dynamic Simulation Improve Safety and Reliability with Dynamic Simulation M. A. K. Rasel and P. C. Richmond Department of Chemical Engineering, Lamar University, Beaumont, TX 77710 0053; PEYTON.RICHMOND@lamar.edu (for correspondence)

More information

Reading List for the Subsea Engineering Masters Programme

Reading List for the Subsea Engineering Masters Programme Reading List for the Subsea Engineering Masters Programme 1 Introduction This document provides an initial reading list for each course on the Subsea Engineering Masters Programme. The list is not exhaustive,

More information

Tuning Of Conventional Pid And Fuzzy Logic Controller Using Different Defuzzification Techniques

Tuning Of Conventional Pid And Fuzzy Logic Controller Using Different Defuzzification Techniques Tuning Of Conventional Pid And Fuzzy Logic Controller Using Different Defuzzification Techniques Afshan Ilyas, Shagufta Jahan, Mohammad Ayyub Abstract:- This paper presents a method for tuning of conventional

More information

ICES Special Request Advice Greater North Sea Ecoregion Published 29 May /ices.pub.4374

ICES Special Request Advice Greater North Sea Ecoregion Published 29 May /ices.pub.4374 ICES Special Request Advice Greater North Sea Ecoregion Published 29 May 2018 https://doi.org/ 10.17895/ices.pub.4374 EU/Norway request to ICES on evaluation of long-term management strategies for Norway

More information

Subsea Innovation : a key for cost reduction?

Subsea Innovation : a key for cost reduction? PAU, FRANCE 5-7 APRIL 2016 Subsea Innovation : a key for cost reduction? Luc RIVIERE, Clément BOIREAU, Jérôme ANFRAY TOTAL SA INTRODUCTION 2 Facilities CAPEX = 100% Power Generation, Chemicals Storage

More information

Fuzzy Logic-based Maintenance Optimization

Fuzzy Logic-based Maintenance Optimization International Journal of Advance Industrial Engineering ISSN 2320 5539 2014 INPRESSCO, All Rights Reserved. Available at http://inpressco.com/category/ijaie Research Article T.Sahoo Ȧ*, P.K.Sarkar Ḃ and

More information

Instrumentation, Controls, and Automation - Program 68

Instrumentation, Controls, and Automation - Program 68 Instrumentation, Controls, and Automation - Program 68 Program Description Program Overview Utilities need to improve the capability to detect damage to plant equipment while preserving the focus of skilled

More information