INSTALLATION GUIDE. Biowood Outdoor Wall Panel BWWPO20018 Shiplap 8x6 Deep. Green Resources Material Australia Pty Ltd

Similar documents
WET AREA PANELLING. Designer Walls. Fast

Wet Area Panelling. Linear Series

INTERNAL LININGS INSTALLATION GUIDE

Make every component count.

CERACLAD.

Duralam Wall Linings. Installation Guide. Duralam 6mm Compact Laminate Wall Panelling Installation Guide

Tape Measure Metal Clippers Screw Bit Set With Extensions

INSTALLATION INSTRUCTIONS

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February

HOW TO INSTALL ELITE PANELED WAINSCOTING Using X-Rails with Either Raised, Flat or Beaded Panels

Installation instructions: Elements Vulcan+ Newport Hector Cladding

PREHUNG DOOR SYSTEM INSTALLATION INSTRUCTIONS: FIBRECOMP COMBINATION UNITS

SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE

rondo exangle drywall finishing sections

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

Balustrade Systems / Installation Instructions

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Pocket Door Installation Instructions

Handrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

LOOKS AND FEELS LIKE TIMBER

Shapes Siding. Perfection Shingles. Chalk Line

INSTALLATION INSTRUCTIONS FOR FORGENT SLIDING PATIO DOORS RECOMMENDATIONS FOR COMMON INSTALLATION OF SLIDING PATIO DOORS.

Bird Feeder. Tool Requirements

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

Endura-Classic Craftsman Information

Parts List. Description. Installation Instructions

How to Install Elite Bayside Beadboard

Pristine Precise Perfection

FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

Sliding Glass Door Assembly and Installation Guide

Balustrade System Installation - Cambridge & Huntington

PIVOT DOOR 3400P INSTALLATION INSTRUCTIONS

woodworkersjournal.com MATERIAL LIST

STEEL FRAMING WEATHERBOARD SYSTEM

Installation Instructions

129 KITCHEN BASE CABINET 480

Dura-Lock Roof System

3.1 Continuous top and bottom lock 3.2 Engineered nailing hem 3.3 Temperature markings

INSTALLATION MANUAL STORAGE

Garage Door Frame Retro-Fit Clad Installation Instructions

Barbecue Trolley MATERIALS YOU WILL NEED

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

SINGLE TRACK BYPASS (patent pending) barn door hardware

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE

16ft Polytunnel Assembly Instructions

Columbia Laminate Installation Instructions

INSTALLING YOUR UNICLIC FLOOR - Small planks / 3 sizes

Installation Manual SOLID CORE SIDING

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes


BUILDING A STORM DOOR

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

Wall Installations. Chapter 16 Wall Installations 16. 1

Residential Fencing Picket. Installation Guide

x2 1/4 (6mm) Floor Anchor

General Installation Guidelines

Ripple Hanger ASSEMBLY INSTRUCTIONS

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

Quick Hook SS & LS Standard and Low Height Hooks for Side Mount Rails

Installation Instructions

INSTALLATION GUIDE. 1. Overview. 2. Measuring. 3. Tools & fixings you will need B C. Opening Width. Opening Height

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

STACKING MULTI-SLIDE DOOR SYSTEM

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

I N S TA L L AT I O N & M A I N T E N A N C E G U I D E

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

Installation Guide. Step-by-Step Guide

4256HM JAMES HARDIE MONOLITHIC CLADDING

Installation Guide. Deckorum. Composite Decking

Kitchen Upper Cabinet: Double Doors Cabinets from Scratch

Wall Panel Installation Instructions

INSTALLATION INSTRUCTIONS

Vanity Installation Instructions

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS.

INSTALLATION INSTRUCTIONS FOR TEUTONIC ENTRANCE DOOR RECOMMENDATIONS FOR COMMON INSTALLATION OF ENTRANCE DOORS.

Panel Installation Instructions

DURACRYL WALL INDEX INTRODUCTION. TOOLS AND MATERIALS REQUIRED. FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

Installation Instructions

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

Panel Installation Instructions

Panel Assembly and Installation

AZEK Trim & Moulding Install Guide

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

Garden Bridge. c D E. All dimensions are in mm- Arch Tread Handrail' Post Reinforcement brace. Written & designed by David Watkins.

VALENCIA RONDO DOOR WITH RETURN

Windsor Arbor. Parts List: General Information: Tools required: Assembly & installation Instructions

PRO CYC PRO CYC, INC. SYSTEM SUPER 3EZ

SLATTEX (Textured Slatwall) INSTALLATION GUIDE

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

Installation Guidelines EX-Cel & NuCedar PVC Trim, Sheet & Moulding

Installa on Guide: Fence Distributors. YourNextFence.com

Contour Hanger ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

Transcription:

Green esources Material Australia Pty Ltd Congratulations on the fine choice you have made in the selection of this product. outdoor wall panels will give you many years of carefree maintenance. When installed in areas exposed to UV light, it must be coated with Intergrain Ultradeck coating to prevent colour fading. is very stable, it will not move in thickness and with. Unlike timber, it will move marginally in length. How to install Outdoor Wall Panels You will need: > Measuring Tape > > Power Drop Saw or Fine Tooth Hand Saw > Sand Paper 120g > Cordless Screw Driver > Intergrain Ultradeck > Phillips Driver Bits > Stainless Steel Wood Screws C/s Head > Caulking Gun 32x6g, 19x6g, 16x6g > Pencil > Stainless Steel Wood Screws Pan Head 19x8g > Square > 6mm PVC Cap Mould > String Line > 10mm Staples > Paint Brush > Surface Temperature Gauage > 10mm Plug Cutter > 5mm Drill Bit > Staple Gun > S4SO04232 (For External Corners) > 25x12x1.6 Aluminium Angle Setting Out These boards can be laid horizontal, vertical or diagonally. This profile is a shiplap profile with a 200mm cover and a 8mm wide x 6mm deep grove at joints. All boards are to be screwed and glued to the structural elements so as to achieve a bonded fixing method at spacings of not more than 450mm. If installed onto battens, ensure that the battens are securely fastened and true to line to within a plus or minus tolerance of 3mm in 2m for both horizontal and vertical planes. All timbers are to be seasoned. Page 1

Green esources Material Australia Pty Ltd Board Set Out - Horizontal laid boards Ÿ Start laying boards from the base of the wall. Ÿ Install a 6mm PVC cap mould as starter strips at base of wall to support and lock the first board in place. Ÿ Fix the starter strip with 10mm long staples fixed at 120mm frequency, a minimum of 5mm from the edge and to a straight line. Ÿ Position the base of the starter strip 11mm above the bottom of the first board. (See Diagram 1/20018) Ÿ Cut the first board and th remainder of the boards to be fixed to this wall to desired length. The temperature of the boards should be about 18 c when cutting to length. It is most important that all boards to be cut to length and installed in one wall be at the same temperature when cut. If this is not observed, the boards may expand and contract at different rates resulting in uneven board lengths. Leave a 5mm gap at the end of each board. Ÿ Apply 3 beads of to the face of every stud for the full length of the board. Ÿ Lay the first board with grove facing down and insert the inner leg into the starter strip. Ÿ Fix the tongue in the countersunk grove with 2 x 32mm x 6g Stainless Steel screws through a 3mm pilot hole. Position the screws 10mm in from the stud edge. Do not over tighten the screws. Best results are between.5 and 1mm of adhesive bed is achieved. Ÿ epeat this process for the remainder of the wall. DIAGAM 1 / 20018. WPO20018 laid horizontal - Starter strip detail. Bonded fixing method. Vertical section. 90x45 Studs @ 450 c s 10 10 LAYING DIECTION Full width of every stud 32 x 6g Ss C/s Wood Screws 2 per Stud per board through a 3mm pilot hole. Do not overtighten. Obtain.5-1mm of glue thickness for best results. 45mm WPO20018 Flashing 10mm Staples @ 120c s 6 PVC Continuous Cap Mould Starter Strip CONCETE FLOO Page 2

Green esources Material Australia Pty Ltd External Corner - Horizontal Laid Boards Ÿ Diagram 2/20018 shows the recommended method of creating an external corner for horizontal laid boards. Ÿ Install the 25x12x1.6 aluminium angle first as set out in diagram 2/20018. Ÿ Secure the S4SO04232 faces. Ÿ Caulk the 5mm gaps with backer rod and coloured sikaflex or similar jointing compound. DIAGAM 2 / 20018. Horizontal Section - External Corner Detail for WPO20018 for Horizontal laid boards. Bonded fixing method Applied to full width of studs at every board WPO20018 32 x 6g Ss C/s Screws 2 per stud 5mm Backer od 12 x 25 x 1.6 Aluminium Angle Fixed to stud @ 450 c s to full height of corner with 19 x 6g Ss C/s Screws Sika ex Caulking 16 x 6g Ss Screws S4SO04232 Backer od Sika ex Caulking 32 x 6g Ss C/s Screws 2 per stud WPO20018 5mm Page 3

Green esources Material Australia Pty Ltd DIAGAM 3 / 20018. External Corner Detail for WPO20018 for Vertical laid boards. Bonded fixing method 90x45 nogging @ 450 c s with 90 face facing out 32 x 6g Ss C/s Screws 2 per nogging per board through a 3mm pilot hole. Do not overtighten. Obtain.5-1mm glue thickness for best results 90x45 nogging @ 450 c s with 90 face facing out 6 PVC Continuous Cap Mould Starter Strips Fixed with 10mm Staples at 120 c s full width of nogging and stud Page 4

Green esources Material Australia Pty Ltd Window Surround - Horizontal laid boards Ÿ Most windows and doors surrounds can be lined with WP16016. This is a solid section 160x16mm smooth on all faces. Ÿ For reveals that are wider than 160, the WP16016 can be joined by fixing together with PVC solvent cement. Ÿ Use 32 x 6g Ss C/s screws to fix reveal to treated pine grounds and plug screws with plugs. See Diagram 4 / 20018. DIAGAM 4 / 20018. Window Surround - Detail Typical Stud Wall Hebel Powerpanel Plug Selleys Liquid Nails Direct Stick WP16016 Cut to required reveal depth. Screw x to treated pine spacer with 32 x 6g Ss C/s Screws @ 600 c s and plug with Plug, sanded ush Plug WPO20018 Backer od Coloured Caulking Page 5

Green esources Material Australia Pty Ltd Internal Corner - Horizontal laid boards Ÿ A simple butt joint is recommended for an internal corner. Ÿ Leave a 5mm gap at the end of each board. Ÿ Caulk the vertical expansion gap with coloured caulking compound over backer rod. See Diagram 5 / 20018. DIAGAM 5 / 20018. Horizontal Laid WPO20018 Selleys Liquid Nails Direct Stick 5 5 WPO20018 Backer od 32 x 6g Ss C/s Screws at every stud @ 450 c s Coloured Caulking Compound WPO20018 Soffit Lining The installation of WPO20018 as a soffit lining is carried out in the same method as the wall installation. End of profile detail Ÿ Where the end or the long edge of WPO20018 will be visible, it can be capped off with a cut to width WPO6516 Ÿ See Diagram 6 / 20018 A, B & C. Page 6

Green esources Material Australia Pty Ltd DIAGAM 6 / 20018. Edge & end details DETAIL A FAMING 20x20x1.6 Aluminium Angle WPO6516 Cut to required width Backer od WPO20018 5 Coloured Caulking Compound FAMING 45 12x12x1.6 Aluminium Angle DETAIL B 18 WPO20018 5 FAMING 45 12x12x1.6 Aluminium Angle DETAIL C 18 WPO20018 5 Page 7

Green esources Material Australia Pty Ltd Butt joints and control joints will expand and contract in length due to weather conditions. Although this movement will be minor, it is important to make allowances in your design to accommodate this movement. At each end of every board an expansion gap must be allowed of widths varying from a minimum of 3mm to a maximum of 6mm. See below tables 1 and 2. TABLE 1. Single Board un Expansion Gaps BOAD LENGTH 1000mm to 3000mm 3001mm to 4500mm 4501mm to 5850mm GAP AT EACH END 3mm 4mm 5mm DIAGAM 7 / 20018. Cross Section: Typical Expansion Joint Stud or Batten @ 450 c s 32 x 6g Ss C/s screw 32 x 6g Ss C/s screw Selleys Direct Stick Selleys Direct Stick 6mm Outdoor Wall Panel BWWPO20018 Coloured Caulking Outdoor Wall Panel BWWPO20018 5850mm maximum 6mm 5850mm maximum Page 8

Green esources Material Australia Pty Ltd Coating of boards When exposed to UV light, must be coated to control colour fading. products consist of 70% wood fiber and will turn grey if left unprotected. In order to maintain the best appearance of your wall panels, must be coated with Intergrain Ultradeck in Natural for Spotted Gum, ed Cedar for ed Cedar and Grey for Weatherwood. When two coats are applied in the correct thickness, recoating will not be required for 3 to 5 years depending on exposure. Apply coating in accordance with instructions on the can and printed literature. Maintenance Your outdoor wall panel will deliver many years of carefree maintenance. To maintain your pride in the beauty of this product it is recommended that the whole wall is washed down with clean tap water and lightly brushed with a soft hair brush or broom every three months. This action will remove dust, dirt, debris and atmospheric fall out which will accumulate on the shiplap shoulder where boards have been laid horizontal (see diagram G). Vertically laid boards are naturally self cleaning. Wash every 6 months. DIAGAM 8 / 20018. Cross Section: Joint OUTSIDE FACE Dirt will accumulate here Wash thoroughly HOIZONTAL JOINT IN BOADS Some grime will accumulate on the face of the boards STUD For further information, please contact Australia P. +61 (2) 9644 6766 E. info@biowoodaustralia.com.au biowoodaustralia.com.au ev1.62015 Page 9