Straight Rib Series Metal Roofing Panel Installation Guide

Similar documents
Tuff-Rib Install Guide

Tuff-Rib. Installation Manual. Nationwide supplier of quality metal roofing. Toll-Free (800) S. Lee Hwy. Cleveland, TN 37311

installation guide Villa

Five Star Panel Installation Instructions

BARRELL VAULT BATTENLESS

METAL ROOFING INSTALLATION GUIDE

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

INSTALLATION GUIDE LEARN MORE AT DECRA.COM

Barrel Vault Counter Batten and Batten

Table of Contents Light Gauge Metal Roof & Wall Panels

Installation Manual. Future Roof Shingle / Slate Products

SmartVent Eave Edge Installation Instructions

DIRECTIONS FOR APPLICATION

TIOGA Table of Contents

A P P L I C A T I O N I N S T R U C T I O N S

ONDUVILLA. The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S

DIRECTIONS FOR APPLICATION

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1

Installation Instructions

Installation Manual. Future Shingle Products

Table of Contents. Roof to Head Wall w/ Side Flashing DECRA Shake XD Roof Overview Roof Penetration - Pipes & Vents...

Installation Instructions

REGAL. Installation Manual

installation guide 7 8 Corrugated corrugated metal panel

RIDGEMASTER PLUS CAUTION INSTALLATION INSTRUCTIONS ALWAYS WEAR SAFETY GLASSES TOOLS NEEDED GENERAL GUIDELINES FOR RIDGEMASTER PLUS AND HIPMASTER

CertainTeed. Shake / Slate Installation Guide

Table of Contents. Important Notices 3. Residential Roofing Application 4. Trims & Accessories 5. Trim Glossary 6, 7, 8. Estimating Material 9

BARDOLINE INSTALLATION INSTRUCTIONS

Terrabella Shake & Shingle Znap Ver. 2.0

Roofing Training - Basics. Sandy Wesch

DIRECTIONS FOR APPLICATION

IRONSTONE SLATE & FLASHING SPECIFICATIONS IRONSTONE SLATE

Table of Contents. Installation Guide for Profile with Hidden Fasteners 3. Installation Steps 4, 5. Prestige Series Moldings 6, 7. Other Accessories 8

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

Inspire Aledora Slate Application Guidelines

Steel Roofing & Siding INSTALLATION GUIDE

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

Table of Contents. Important Notices 3. Residential Roofing Application 4. Trims & Accessories 5. Trim Glossary 6, 7, 8, 9

Polytegola N. Bitumen Roof shingles. Application guide

IRONWOOD SHAKE & FLASHING SPECIFICATIONS

E-Z BUILD STEEL BARN 12' 12' 12' 16' 12' 20'

MasterRib. Installation Manual. July Toll-Free (888) MTL-ROOF. PO Box 229 Fayetteville, NC Rev.

Storing, Handling, and Cutting Steel Panels

DETAIL MANUAL for Standing Seam / Image II

eco-shake INSTALLATION INSTRUCTION

HipMaster Installation Instructions

Table of Contents. Notes to Designer/User Map of Typical Roof Conditions Fastener Placement Fastener Selection...

DETAIL MANUAL. Metal Roofing Wholesalers. Classic Rib Roofing Panels

TABLE OF CONTENTS A. PBR

Best Buy Metals Toll Free / Phone / Fax

Tuff Rib Panel Installation Specifications

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

Shapes Siding. Perfection Shingles. Chalk Line

1 Roof Substrate (Deck) OWENS CORNING BERKSHIRE SHINGLES INSTALLATION INSTRUCTIONS

PBR Panel Installation Specifications

SLATE & SHINGLE INSTALLATION

6 STEP INSTALLATION GUIDE BY DCI

2 ½ Corrugated Panel Installation Specifications

GlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

Roof Only Lean-to Instruction Manual

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

GIRTS ON BACK OF BUILDING

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD

INSTALLATION GIUDE.

C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l. and Carriage House STEEP. Slope Application. (over 21/12)

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

Installation Instructions

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25

westmansteel.com Installation Guide Proudly Canadian. Family Owned. Cambridge (ON) TF. (855) F. (855)

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

8 x 10 Timber-frame Garden Shed

lindab cover line installation instructions lindab roca Lindab CoverlineTM Lindab Roca Installation instructions

Ultra-Rib Installation Manual

Installation Guide. Guardian Slate Roof System. England, Scotland & Wales

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

INSTALLATION DETAILS

Roofs. Installation instructions Models Classic C and D

Installation Manual SOLID CORE SIDING

I n s t a l l i n g Enviroshingle APPLICATION INSTALLATION GUIDELINE

GLOSSARY OF TERMS SECTION 8

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Dura-Lock Roof System

Ekoroof LiteTile Dimensions

ROOF FRAMING INFORMATION BATTEN INSTALLATION CORONA SHAKE INSTALLATION ACCESSORY INSTALLATION ESTIMATING DATA GENERAL INFORMATION

or Ordering Installation and Self-Help Guide

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

Capstone Application Instructions

Light Gauge Metal Roof and Wall Panels. Installation Guide for Delta Rib, Delta Rib III, Nor-Clad, Strata Rib & Corrugated

6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015

MetroCOTTAGE Shingle

Tapersawn Shake Installation Instructions

Ledger Board Lean-to Instruction Manual

Gambrel Barn with Overhang Manual

Slate Shingle Specifications

ZIP System Roof Sheathing INSTALLATION MANUAL A REVOLUTION IN ROOFING

Transcription:

D-Rib G-Rib C-Rib Straight Rib Series Metal Roofing Panel Installation Guide 7000 AIRPORT LINE R.R., BOX 7 HENSALL, ONTARIO N0M X0 EASY BUILDING PRODUCTS TEL. : 5-6-07 TOLL FREE : -888-76-777 FAX: 5-6-08 EMAIL : easybp@tcc.on.ca www.easybuildingproducts.ca March 0

8 8 IMPORTANT NOTICE Upon delivery: check the packing slip to ensure all goods have arrived and are in good condition. The panels must be installed within 6 months from the date they reach the designated job site. The recommended installation procedures in this guide are meant to assist you in properly installing a metal roof on your home. The recommended application details are for illustrative purposes only and may not be deemed appropriate for all building designs and environmental conditions. Always consult your local building codes and regulations before installation. The contents of this manual include the guidelines that were in effect at the time this publication was originally printed. In an effort to keep pace with the ever-changing code environment, Easy Building Products retains the right to change specifications and designs at any time without incurring any obligations. For the most up to date information please inquire within or check our website. Proper Storage Indoor Storage: Plain and prepainted galvanized/ galvalume roofing and siding panels are best kept under a roof in a cool, dry, well-ventilated area. To avoid condensation when storing indoors, leave the panels on blocks uncovered for best air circulation. Outdoor Storage: When storing outdoors place the panels on blocks for proper ventilation (use more blocks in the centre to prevent sagging). Slightly elevate one end for drainage. Cover for added protection from the elements. DO NOT use a tight fitting plastic-type tarp, as they tend to trap in heat and moisture which could accelerate corrosion. If bundles get wet the panels must be set aside to dry separately. Note: ACQ treated lumber is corrosive to steel products. DO NOT allow panel or flashing to come directly into contact with treated wood. Store away from material contaminants and aggressive chemicals i.e.; salt, fertilizers, oil, cement, grease, paint. Proper Handling Handling: To get the roof panels up onto your roof, place a ladder or two boards up against the fascia board sloping to the ground as far from the building as possible. Place the panel on the boards/ladder. With the help of another slowly pull the panel on to the roof. When handling individual panels, it is best to hang them from the edge seam. Support the full length of the panel as much as possible. DO NOT allow the roof panels to rub against each other. Note: Exercise extreme caution when handling roofing panels on windy days. Cutting Panels: For straight lines use a chalk line. Cutting is best done on the ground. Never use abrasive rotating blades to cut panels. The heat and sparks produced when using these saws could cause damage to the painted surface. Walking on Panels: Avoid walking on panels whenever possible. If you must do so, wear clean rubber-soled shoes to avoid marking the surface and slipping off the roof. Note: Walk along the flat sections of the panel never along the ribs. Place your foot where the strapping lies. Recommended Tools DO NOT use on metal panel Power Shear Hand Snips Cordless Drill Circular Saw Framing Nailer Measuring Tape Hand Bender Chalk Line Strapping ONLY Any Rotating Blade /Angle Grinder Panel Installation 0

8 GLOSSARY/ TERMS 8 Underlayment: Strapping: Plywood Sheathing: Chalk Line: Eaves: Gable: Gable/Pitched Roof: Gable/Eave Fascia Board: Flashing/Trim: Hip: Cottage Hip Roof: Ridge: Ridge Cap: Valley: Dormer: Skylight: A material installed over the plywood sheathing prior to the installation of the roofing panel. Helps reduce condensation. x solid wood boards used to provide the fixing point for roofing panels. Nailed over top of the roofing underlayment on existing roofs. The base layer of material attached to the structural frame of the roof. A tool for marking long, straight lines on relatively flat surfaces. The projecting overhang at the lower edge of a roof. The generally triangular portion of a wall between the edges of a sloping roof. A roof sloping downward in two parts at an angle from a central ridge, so as to leave a gable at each end. A band running horizontally and situated vertically under the eaves/gable of the roof. Sheet metal used to weatherproof the joints and angles of a roof. The outer angle portion where two sloped roof areas meet. A roof where all sides slope downwards to the walls. The line of intersection at the top between the opposite slopes or sides of a roof. The roofing material specifically purposed / manufactured for installation on the ridge. A depression or angle formed by the meeting of two inclined sides of a roof. A gabled extension built out from a sloping roof to accommodate a vertical window. A roof accessory used to add light, normally mounted on a curbed framed opening. Legend May require special attention: Steel panels may have sharp edges. Protective clothing and gloves should be utilized. To prevent eye injury, safety glasses must be worn when drilling or cutting steel panels. Use extreme care when walking on the roof panels. Steel panels become slippery when wet. Do not work on the steel panels when wet or when weather conditions are not suitable for safe installation. 0

8 8 PRE - INSTALLATION * Always follow local * building codes Easy Building Products straight rib series (G-Rib, C-Rib, D-Rib) can be installed on x rough-sawn wood strapping with approved synthetic underlayment, / plywood with underlayment or directly to wood frame. Re-roofing an existing roof? In most cases our straight rib series can be installed right over top of your existing shingled roof (Figure.). Trim all existing shingles flush with the fascia board. Inspect all joint locations and plywood condition. Then follow the installation options below. Note: Screws should not hit joints between plywood sheets; this can Installation options and will reduce their holding power. Figure. Figure. Figure. May Vary Gap Trusses Gap May Vary Gap Underlayment Fascia Board Strapping at on Centre Fascia Board Underlayment Old Existing Shingles Fascia Board / Plywood Deck Install Panel Directly to Wood Frame Use maximum strapping spacing Install metal panel directly on top of strapping. Install Panel Over Existing Shingles Apply synthetic underlayment Install x wood strapping Install metal panel Install Panel on Solid Deck Lay plywood deck Apply synthetic underlayment Install metal panel Plywood Installation: Install plywood on top of the roof framing. Be sure to leave a gap at the ridge (Figure.) for proper ventilation. In areas where ice and snow damns are possible install eave protection or underlayment. *Check with your local building code. A Square Roof: (Figure.) Before installation it is crucial to check how square the roof is. Panels are installed at 0 degrees (right angle) to the eaves. At a corner where the gable and eave meet, measure six feet up the gable edge from the eave and make a mark. Then measure eight feet along the eave face and make another mark. Measure the distance between the two marks. If it measures out to be 0 exactly then you have a square roof. Check all roof corners using this method. Correction: If the panel deviation is minimal it can be corrected a small amount from panel to panel taking advantage of the tolerances in the panel. For more significant deviations, the panels along the gable can be trimmed along its length to match. A gable trim is used to cover up the un-even edge of a trimmed panel. Strapping Installation: Install underlayment on top of roof framing. Starting flush with the fascia board, install x strapping at on centre. The last x should be down from the ridge with a second x nailed right against it (Figure.). Be sure to make a slit in the underlayment along the ridge line gap to allow for proper ventilation. Strap around all vent pipes. Double up strapping at all valleys, hips and anticipated snow stop areas(same as ridge (Figure., without gap)). Square Roof Figure. Eave 8 0 0 Ridge 6 Panel Cut-off Eave Gable Note: Slopes of less than on (/ pitch) are not recommended.? 8 0 Ridge 6 Panel Cut-off Gable Figure.5 Un-Square Roof 0

8 INSTALLATION SEQUENCE 8 The example below is specific to installation option two, re-roofing over existing shingles (Page, Figure.). The actual sequence may vary based on specific roof plan and conditions. Always follow local building codes. Note: If installing roof panels on / plywood remember to install underlayment above the plywood (Page, Figure.) Underlayment + x Strapping Eave Trim Install Underlayment as per manufacturer instructions. Gable Trim Install Eave Trim along all eaves(figure., Page 6). Valley Trim Install the Gable Trim over all gable ends(figure., Page 6). Install the Valley Trim over the Eave Trim starting from eave to the valley peak(figure 5., Page 6). 5 6 Reverse Hip Install Panels over Eave Trims and Valley Trims. Do not install panels where the Reverse Hip laps under the panels. Install the Reverse Hip over the low slope panels and underlayment (Figure 6., Page 7). 0

8 INSTALLATION SEQUENCE 8 The example below is specific to installation option two, re-roofing over existing shingles (Page, Figure.). The actual sequence may vary based on specific roof plan and conditions. Always follow local building codes. 7 8 Side Wall/ End Wall Trim 8 8 Finish panel installation. Install high slope panels over Reverse Hip and any remaining exposed areas. Install Side Wall and End Wall Trim over panels (Figure 7., Page 7). Hip Trim 0 Ridge Cap 0 0 0 Install Hip Trim over panels (Figure 8., Page 7). Install Ridge Cap over panels (Figure 8., Page 7). 0 5

8 TRIM INSTALLATION 8 * Custom Trims * Available This example is specific to installation option two, re-roofing over existing shingles (Page, Figure.). The actual sequence may vary based on specific roof plan and conditions. Always follow local building codes. Numbers indicate suggested trim assembly sequence. Eave Trim: Figure. Phase One - Pre Panel Installation Underlayment x Strapping Eave Trim: Figure. Phase Two - Panel Installation 6 7 5 Foam Closure Trim Nail Eave Trim Fascia Board Fascia Board Gable Trim: Figure. x Strapping Gable Trim: Figure. 5 Underlayment Trim Nail 6 Gable Trim Eave Face Eave Face Gable Face Gable Face Valley Flashing: Figure 5. Anti-seepage Flange Trim Nail Valley Flashing: Figure 5. Foam Closure Valley Flashing min x Doubled Strapping Underlayment 0 6

8 TRIM INSTALLATION 8 This example is specific to installation option two, re-roofing over existing shingles (Page, Figure.). The actual sequence may vary based on specific roof plan and conditions. Always follow local building codes. Numbers indicate suggested trim assembly sequence. Phase One - Pre Panel Installation Phase Two - Panel Installation Reverse Hip Reverse Hip Figure 6. Reverse Hip Figure 6. 6 Trim Nail 7 Foam Closure 5 Foam Closure End Wall/ Side Wall End Wall/ Side Wall Figure 7. Figure 7. Trim Nail 5 Wall Panel Panel Screw Foam Closure End Wall x Strapping x Strapping 6 Panel Screw Wall Ridge Cap Ridge Cap Ridge/ Hip Cap Figure 8. Figure 8. Foam Closure Ridge/Hip Cap # Ridge/ Hip Cap # Foam Closure Final Ridge /Hip Cap Underlayment 0 7

8 PANEL INSTALLATION 8 s: Panel Placement: Start installing the panels from the eave, at the gable end farthest away from prevailing winds then hips and always towards valleys. D-Rib must be installed from right to left. Maintain an overhang of at the eave and / at the gable. Lapping: Place the panels one at a time from the eave to the ridge before starting with the next row (Figure.). Overlapping panels should be done along the strapping for proper support. For most buildings a single panel will cover from eave to ridge, not requiring any overlaps. If required, overlap sheets by. Panel Alignment: Check the panel alignment every five rows by making a chalk line square to the eave. Wall Panels: To keep the panel laps out of view and for best overall apearance, install wall panels beginning on the opposite side of the main view, often the back of the building. Start by placing the panels at the corner. Fasten in a couple screws to help hold the starting panel in place. Do a quick check to see that the wall is plumb. Finish by following the proper fastener placement on (Figure.). When moving on to the next panel, start by fastening all the way along the panel seam. Next double check the seem lap is tight and the panels are square. Follow this procedure all the way around the building, finishing up with the gable ends. Panel Sequence Figure. Fastener Pattern Figure. Correct - Metal to Wood Fastener Wall Panel - Metal to Wood Fastener Under Driven Over Driven Fastening : (Figure.) Avoid damaging the roofing panel and washers by over tightening. Place the fasteners on each and every large rib across the panel width and every along the rib length. Note: For best results pre-punch all your fastener holes with an awl, NOT A DRILL. Using a drill may allowing hot shavings to stick to the panel, which may cause damage to the paint. Remove left-over fasteners, burrs and filings also. Leaving particles could cause them to rust or stain. Note: DO NOT fasten the seam/open side of the panel before starting with your next panel. Note: DO NOT install fasteners along the ridge until you have properly installed the ridge cap. Remember to fasten through the ridge cap, foam closure and roofing panel. Fastening Wall Panel: (Figure.) Place the fasteners on the flat just next to each large rib across the panel width and every along the rib length. 5 Cottage Hip Roofs: (Figure.) Start with panels in the middle of the hip section. The overlapped rib should be centered with the peak. From this point continue working towards the edges of the roof. Hip Roof Overlapped Rib Figure. Main View Prevailing Winds Top View Perspective View 0 8

8 TRIM INSTALLATION 8 Valley Flashing: (Figure 5., Page 6) Begin by placing the valley flashing from the base of the valley. Apply pressure to allow the flashing to conform to the roof slope. Nail the sides of the flashing to the / plywood or x strapping. Place nails as far away from the centre as possible. DO NOT cut the base of the valley flashing to form to the eaves. Leave a / overhang in the centre to form to the eave. Taper it back to / at over, then / for the rest. When overlapping valley flashing, overlap approximately. When dealing with a low-slope roof be sure to give extra overlap. Apply the next valley flashing on top with sealant between the flashing. Dormers: At the top of the valley flashing, draw a line on the valley flashing along the dormer ridge. Cut over that line (Figure 0.). Fold the valley flashing along the ridge line and nail it down. Do the same for the second flashing using a sealant between the overlapping flashings. Ridge/Hip Cap: (Figure 8., Page 7) To ensure a straight installation and proper location of the ridge cap, use a chalk line to mark both sides of the roof. Lay down the closure strip along the chalk line with the adhesive (make sure the closure is not placed too far under the capping). Next place the ridge cap on top. Fasten through the closure strip down into the roofing panel. Caulk the overlap section and place the next ridge cap on top (repeat as necessary). Three way intersection: (Figure 8., Page 7) Fit the first two caps together, then fit the third and final cap on top. Note: When installing on a hip, always begin from the base of the hip. Dormer Valley - Panel Figure 0. Dormer Valley - Panel Install: (Figure 0. - 0.) The idea here is to have the roofing panel notched out in a way that allows for the valley flashing to be above the panel on the bottom end and under the panel on the top end. Make a similar notch in the panel as seen in Figure 0.. Make a cut just past the end of the notch. Slide the valley flashing through/under that cut. Be careful when cutting into the panel (if you go too far, you ll need some sealant to fill the cut). Apply a sealant to the valley flashing and the roofing panel(figure 0.). Note: Some dormers may require Side Wall and End Wall Flashing (Figure 7., Page 7) Cut Notch Dormer Flashing Figure 0. Dormer Flashing Figure 0. Nail Line Cut Line Panel Edge Line st Valley Flashing Fold Line Seal Overlap 5 nd Valley Flashing Nail Line Panel Edge Line Side Wall Flashing End Wall Flashing Side Wall Flashing End Wall Flashing 0

8 EXTRA INSTALLATIONS 8 Closures: (Figure.) Fasten straight through the closures to keep them in place. Foam closures are used under a variety of roof flashings (Page 6-7) and anywhere that driving rain and wind have the potential to get under the roofing panel. The E.B.P straight rib series use Enviro-Vent under the ridge cap. Snow Stop Figure. Snow Stop Pipe Flashing: (Figure.) Pipe flashings are used around any pipe protruding from your roof i.e.; insulated steel chimney s, hydro stacks and vent pipes. Start by putting sealant between the flashing and the roof panel. Apply pressure to allow the flashing to conform to the roof panel. Screw the flashing down. Seal the edges with sealant. Closures Small Tab Foam Closure Figure. x Extra Strapping/ / Plywood for the addition of future Snow Stop. Large Tab Foam Closure Enviro-Vent Snow Stop: (Figure.) These should be installed in areas where sliding snow and ice is a safety concern. Pipe Flashing: Pipe Flashing Figure. Sealant Skylight/Chimney: (Figure.5) Skylights should be curb mounted on a x 6 frame. Start with installing the bottom skylight/chimney flashing. Cut and bend the flashing around the corners of the skylight/chimney. Make sure to install a foam closure between the bottom flashing and the roofing panel. Next install the side flashings to overlap the lower flashing. Cut and bend the flashing same as before. Apply sealant at all overlaps. Install the final top flashing to go underneath of the roofing panel but on top of the side flashings. Cut, bend and seal the flashing same as before (Apply sealant between the top flashing and roofing panel). Skylight/Chimney Figure.5 Sealant Side View Sealant Figure. Pipe Flashing Placed over the side flashings and under the roofing panel x Doubled Strapping/ / Plywood Sealant x 6 Frame Placed over the bottom flashings Placed over top roofing panel 0 0

EBP Straight Rib Series G-Rib /8 / / / / / 6 Net Coverage 7/ D-Rib / 5/8 /8 /8 / /8 6 Net Coverage 7 / C-Rib 5/6 6 Net Coverage / /6 /8 / 7000 AIRPORT LINE R.R., BOX 7 HENSALL, ONTARIO N0M X0 EASY BUILDING PRODUCTS www.easybuildingproducts.ca TEL. : 5-6-07 TOLL FREE : -888-76-777 FAX: 5-6-08 EMAIL : easybp@tcc.on.ca March 0