CONSTRUCTION CERTIFICATION PACKAGE

Similar documents
Attachment A Construction Inspection Log (Required for initial certification of stormwater treatment facilities)

STORM M ANHOLE FOR 42" PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30"MAX 3 OR 3.5 PRECAST ECCENTIC CONC

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

StormTrap Guide Specification. StormTrap 2 SingleTrap on Aggregate Foundation Groundwater BELOW Invert Revised 11/30/17

SECTION MANHOLES

SPECIFICATIONS FOR THE INSTALLATION OF CONDUIT SYSTEMS IN RESIDENTIAL SUBDIVISIONS. Notification of Completed Conduit Sections

SECTION DEWATERING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

A. Dewatering observation wells are part of dewatering allowance.

VISUAL INSPECTION CHECKLIST FOR GENERAL NPDES PERMIT FOR STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITIES (PAG-02)

CHAPTER 11. Plan Standards

Application for Site Plan Review

CONSTRUCTION SPECIFICATION FOR MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

MSD STANDARD DRAWINGS LOUISVILLE AND JEFFERSON COUNTY METROPOLITAN SEWER DISTRICT 700 WEST LIBERTY STREET LOUISVILLE, KENTUCKY

City of Massillon Site Plan Checklist

StormTrap Guide Specification. StormTrap SingleTrap on Pad Foundation Groundwater BELOW Invert Revised 11/21/18

B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422

Section 1. Introduction

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS

PARKING IMPROVEMENT AIRPORT CAMPUS AMENDED SITE PLAN APPROVAL DRAWINGS 113 KING STREET TOWN OF NORTH CASTLE, NEW YORK AIRPORT CAMPUS I-V LLC

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

GCG ASSOCIATES, INC. February 8, Mr. Nathaniel Strosberg, Town Planner 101 Main Street Town of Ashland Ashland, MA 01721

1.1 GENERAL RECORD DRAWING REQUIREMENTS

PLANNING AND DEVELOPMENT

INTENT An Administrative Site Plan is required for the following situations, excluding single-family detached development:

STANDARD BID ITEM NUMBERS

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

Part 1 - Common Comments on Erosion and Sediment Control Plans (Walter Hamilton, SDID)

SECTION 8: DRAINAGE, SEWER AND WATER SUPPLY NETWORKS

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

Documents: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

Owner / Architect Certification of Complete Documentation for the Additions and Remodels Conditional Approval Review

CITY OF DANA POINT DEVELOPMENT REVIEW

VARIANCE APPLICATION (NO SITE PLAN OR SUBDIVISION)

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court

Stormwater & Water Quality Training Programs for Colorado

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

VILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

B17. Sewer Site Plans BULLETIN

MILL HILL ARTS VILLAGE

NWP of 9 Enclosure

EXCAVATION AND BACKFILL

Thurston County Permitting System Policies &Procedures Page: 1 of 3

VICINITY MAP LOCATION MAP GRAPHIC SCALES

ATTACHMENT H TACOMA HYDROELECTRIC PROJECT DESCRIPTION OF PROJECT FEATURES

Consultant s As Constructed Survey Certification Check List

2. What are the estimated volumes for the Residuum Harvesting See response to Question 1

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

Town of Apex, North Carolina

Guidelines and Checklist For SAWS Sanitary Sewer. Developmental Engineering Division

City of Regina Standard Construction Specifications SECTION LIST OF SEWER STANDARD DRAWINGS

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

I. GENERAL: The Bidding and Contract Documents for Riverside North Parking Lot are modified as described in this Addendum.

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

City of Aspen Water Review for Pitkin County Permits Submission Packet

MAJOR GRADING PLAN CHECKLIST

b. Building Areas or Building Pads having an average grade steeper than 5% (some elevation information may be required to verify grade).

UNDERGROUND UTILITY TRENCHES AND VAULTS Page 1 of 6 ADDENDUM #1

SECTION 2 GENERAL REQUIREMENTS

1 MUNICIPAL INFRASTRUCTURE

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

Oakdale Primary School, Peterborough Civil Engineering NBS Specification

Chapter 13 Plan Submittals

Peters Township Sanitary Authority 3244 Washington Road McMurray, PA 15317

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

SECTION 39 - MANHOLES TABLE OF CONTENTS

Minor Site Plan Application and Checklist Land Disturbing Activities

Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

Porter County Plan Commission

MULTIPLE-FAMILY DESIGN REVIEW SUBMITTAL CHECKLIST

W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603

Grading, Erosion and Sediment Control (GESC) Checklist

TOWN of LAKESHORE SITE PLAN CHECKLIST

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

Last Name: First Name: M.I:

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

RECORD DRAWINGS REVISED TO CONFORM TO CONSTRUCTION RECORDS PROVIDED BY CONTRACTOR GMG BY DATE 11/13 CRS NO.

Sewer Line Extension Permit Design Checklist

"A" "A" SECTION "A-A" X-SECTION VERTICAL CURB (TYPE B) Village STREET & PAVEMENT STR-05. Engineering Department

SECTION PUBLIC UTILITY MANHOLES AND STRUCTURES. 2. Modular precast concrete pump wetwell. 5. Manhole bedding and cover materials.

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS

Miscellaneous. Demolition

This addendum forms a part of the Contract Documents dated: August 10, 2012.

Zoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801

City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS

RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST

Information for File # RMM

CITY OF MUSKEGO DRAFTING STANDARDS

Transcription:

Purpose: The intent of this Construction Certification Package is to ensure that acceptable documentation is maintained during the construction of stormwater management practices (SMPs). For general information and design requirements for different types of SMPs, please refer to Chapter 4 of the PWD Stormwater Management Guidance Manual. General Construction Requirements: During construction, the contractor must ensure that a copy of the Approved Post-Construction Stormwater Management Plan (PCSMP) and Erosion and Sediment Control (E&S) Plan are available on-site at all times. Prior to any earth disturbance activities, a preconstruction meeting must be held. All parties including, but not limited to, the property owner s representative, the design professional, the contractor, the PWD Inspector, and state and municipal authorities are required to attend. As part of the preconstruction meeting, a time table for the project s construction sequence stages must be provided. The PWD Inspector must be contacted at least seven (7) days prior to the date of the preconstruction meeting to ensure that appropriate staff can be present. If at least seven (7) days notice is not provided, PWD cannot guarantee that the preconstruction meeting will be held on the requested date. Further, earth disturbance activities should not commence until the preconstruction meeting is held. The PWD Inspector must be notified at least three (3) days prior to the start of construction of any SMP elements. If the required notice is not provided, the project site may be subject to the enforcement actions outlined in the Stormwater Regulations. Any SMP, or portion of a SMP, that is constructed without prior notice to PWD or without the PWD Inspector present on-site may be required to be removed and reconstructed. SMP Construction Certification Forms: The Construction Certification Package contains a separate SMP Construction Certification Form for each SMP. Please note that the items identified within these forms represent the minimum documentation required. Additional documentation may be deemed necessary by PWD staff on a project-specific basis. SMP Construction Certification Forms must be prepared by the project s design professional, reviewed by PWD during the PCSMP Review Phase, and completed by one of the following registered professionals during construction: Professional Engineer, Registered Architect, Landscape Architect, Professional Land Surveyor, Professional Geologist, or Licensed Contractor. The registered professional who completes each SMP Construction Certification Form must complete the Registered Professional section of that form. These registered professionals may also prepare and submit Record Drawings to PWD. Please note that PA DEP may have different requirements regarding the types of professionals who may prepare Record Drawings. For projects that require a NPDES Permit, the applicant is strongly encouraged to refer to PA DEP s

requirements for Record Drawings before selecting a professional to prepare Record Drawing(s) for PWD. Each SMP Construction Certification Form must indicate the measurements that are most critical to the listed SMP s ability to perform its designed function (e.g., elevations, outlet control sizes, surface areas, layer depths, etc.). It is recommended that the SMP Construction Certification Form(s) be included in the construction bid documents for the project to ensure that the selected contractor is aware of the requirement that the Forms be completed during construction. The project s sequence of construction will identify all stages of SMP construction for which a registered professional must document the specific elevations and measurements found on the SMP Construction Certification Forms. Each measurement documented on the Forms must be dated and initialed by the registered professional who took, or whose designee took, the measurement. Once all of the required measurements have been appropriately documented, the registered professional must execute and date the Form. The contractor should not cover, backfill, or seal any SMP until the information required for the Record Drawing(s) and the Construction Certification Package has been acquired. Supplementary Documentation: Electronic copies of all photos, material receipts, reports, and certifications required within the SMP Construction Certification Forms (at minimum) must be provided to PWD. Material receipts must clearly specify the types, qualities, and quantities of the materials purchased. Construction Certification Package Submission: The Construction Certification Package must include electronic copies of all completed SMP Construction Certification Forms and all supplementary documentation required by the Forms. The Construction Certification Package must be submitted to PWD along with the project s Record Drawing(s) once construction is completed, all of which will be reviewed as part of the project s Record Drawing Review Phase. Please refer to Section 2.3.1 of the PWD Stormwater Management Guidance Manual for more information regarding the Record Drawing Review Phase. The measurements/specifications required to be documented on the SMP Construction Certification Forms must be reflected on the project s Record Drawing(s). Refer to the Record Drawing Requirements document, provided by PWD at the project preconstruction meeting, for a summary of what information must be reflected on the Record Drawing(s) and how this information must be documented. More detailed information on Record Drawings can be found in Section 5.3.2 of the PWD Stormwater Management Guidance Manual.

Bioinfiltration/Bioretention (Page 1 of 2) Project Name: PWD Tracking Number: SMP Label (on plans): 1. Contact the project s assigned PWD Inspector at least three (3) days prior to the start of construction of any SMP, including excavation of SMPs and soil testing if applicable. SMP installation must be observed by the PWD Inspector. 2. Provide the PWD Inspector with an estimated schedule for the placement of any of the following: geotextile, stone, storage media, piping, soil, etc. 3. Provide the following information about the SMP: Required Documents Receipt # Copies of receipts for clean washed stone Copies of receipts for geotextile Copies of receipts for underdrain/pipes Copies of receipts for planting soil medium Copies of receipts for vegetation and/or seeding Copies of receipts for impervious liner, if required Required Reports and Certifications Receipt # Report demonstrating that stone was washed per AASHTO T-11 Standards (<0.5 % wash loss) Planting soil medium certifications demonstrating mixture components and organic content per plans Photo(s) verifying that the system location is staked Photo(s) showing the system protected from sediment and compaction during constructions (E&S controls around the basin) Photos showing the bottom of the flat, scarified, non-compacted subgrade soils before installation of geotextile (required if bioinfiltration system) Photos showing bottom of the basin after installation of geotextile (or impervious liner if required) Photos showing installation of stone and perforated pipe(s)/underdrain within system, if required Photo(s) showing installation of stone storage layer Photos showing connection of underdrain to overflow system, if required Photos showing installation of geotextile/filter layer above stone drainage layer, if required Photos showing basin after installation of planting soil medium and fine grading

Bioinfiltration/Bioretention (Page 2 of 2) Photos showing the bioretention area after planting of vegetation (pre-stabilized) Photos showing the bioretention area after planting of vegetation (stabilized) Photos showing outlet structure, including internal weirs and/or orifices, and outlet pipes (with tape measure as size reference) Required Measurement Photo # Measurement Level Planting Surface Elevation Level Bottom (Interface with In Situ Soils) Elevation Planting Soil Medium Depth Stone Storage Layer Depth Depth of Sand/Stone Filter Layer Underdrain Invert Underdrain Orifice Diameter Overflow Riser/Grate Elevation Outlet Structure Outflow Pipe Invert Outlet Structure Orifice Invert Outlet Structure Orifice Diameter Outlet Structure Weir Length Outlet Structure Weir Elevation By signing this form, the registered professional indicated below certifies that they, or a designee, were present during the required measurements associated with the SMP listed above, and that, to the best of their knowledge, information, and belief, these measurements are in general accordance with the Approved PCSMP. Please note that the measurements listed above must be reflected on the project s Record Drawing(s). The Project s Construction Certification Package, which must be submitted with the Record Drawing(s), must include digital copies of all SMP Construction Certification Forms (one per SMP) and digital copies of the material receipts and photographs required on these forms. Registered Professional Signature Date Name (Print) Company License Type & Number

Porous Pavement (i.e. Asphalt, Concrete, Pavers, etc.) (Page 1 of 2) Project Name: PWD Tracking Number: SMP Label (on plans): 1. Contact the project s assigned PWD Inspector at least three (3) days prior to the start of construction of any SMP, including excavation of SMPs and soil testing if applicable. SMP installation must be observed by the PWD Inspector. 2. Provide the PWD Inspector with an estimated schedule for the placement of any of the following: geotextile, stone, storage media, piping, soil, etc. 3. Provide the following information about the SMP: Required Documents Receipt # Copies of receipts for clean washed stone subbase Copies of receipts for clean washed choker coarse stone Copies of receipts for geotextile Copies of receipts for porous pavers (if applicable) Copies of receipts for batch amounts of porous asphalt/concrete (if applicable) Copies of receipts for underdrain/pipes, if required Required Reports and Certifications Receipt # Report demonstrating that stone was washed per AASHTO T-11 Standards (<0.5 % wash loss) Photos showing excavation protected from sediment during construction (E&S controls around the proposed porous area) Photos showing the bottom of the flat, scarified, non-compacted excavation before installation of geotextile (where applicable, show terracing) Photos showing the bottom of the basin after installation of geotextile Photos showing the placement of clean washed stone subbase Photos showing the placement of underdain/pipes and connection to overflow, if required Photos showing the installed porous surface (i.e., porous asphalt, concrete, or pavers)

Porous Pavement (i.e. Asphalt, Concrete, Pavers, etc.) (Page 2 of 2) Required Measurement Photo # Measurement Level Bottom (Interface with In Situ Soils/Soil Amendments) Elevation Level Bottom Surface Area Total Surface Area Overflow Elevation Depth of Choker Course Depth of Aggregate Storage Layer Underdrain Invert Outlet Structure Orifice Invert Outlet Structure Orifice Diameter Outlet Structure Weir Length Outlet Structure Weir Elevation By signing this form, the registered professional indicated below certifies that they, or a designee, were present during the required measurements associated with the SMP listed above, and that, to the best of their knowledge, information, and belief, these measurements are in general accordance with the Approved PCSMP. Please note that the measurements listed above must be reflected on the project s Record Drawing(s). The Project s Construction Certification Package, which must be submitted with the Record Drawing(s), must include digital copies of all SMP Construction Certification Forms (one per SMP) and digital copies of the material receipts and photographs required on these forms. Registered Professional Signature Date Name (Print) Company License Type & Number

Green Roof (Page 1 of 2) Project Name: PWD Tracking Number: SMP Label (on plans): 1. Contact the project s assigned PWD Inspector at least three (3) days prior to the start of construction of any SMP. SMP installation must be observed by the PWD Inspector. 2. Provide the PWD Inspector with an estimated schedule for the placement of any of the following: liners, piping, drainage layer, soil media, and plantings. 3. Provide the following information about the SMP: Required Documents Receipt # Copies of receipts for green roof materials (geotextile fabric, waterproofing/root barrier membrane, drainage layer, etc.) Copies of receipts for growing medium Copies of receipts for plantings Required Reports and Certifications Receipt # Growing medium certifications demonstrating mixture components and organic content Photos showing the roof after the installation of impervious liners Photos showing the installation of drainage layer Photos showing the installation of the growing medium (showing thickness measurements) Photos showing entire roof area after installation of vegetation

Green Roof (Page 2 of 2) Required Measurement Photo # Measurement Green Roof Surface Area Growing Medium Thickness Drainage Layer Thickness By signing this form, the registered professional indicated below certifies that they, or a designee, were present during the required measurements associated with the SMP listed above, and that, to the best of their knowledge, information, and belief, these measurements are in general accordance with the Approved PCSMP. Please note that the measurements listed above must be reflected on the project s Record Drawing(s). The Project s Construction Certification Package, which must be submitted with the Record Drawing(s), must include digital copies of all SMP Construction Certification Forms (one per SMP) and digital copies of the material receipts and photographs required on these forms. Registered Professional Signature Date Name (Print) Company License Type & Number

Subsurface Infiltration (Page 1 of 2) Project Name: PWD Tracking Number: SMP Label (on plans): 1. Contact the project s assigned PWD Inspector at least three (3) days prior to the start of construction of any SMP, including excavation of SMPs and soil testing if applicable. SMP installation must be observed by the PWD Inspector. 2. Provide the PWD Inspector with an estimated schedule for the placement of any of the following: geotextile, stone, storage media, piping, soil, etc. 3. Provide the following information about the SMP: Required Documents Receipt # Copies of receipts for clean washed stone Copies of receipts for geotextile Copies of receipts for perforated pipes or storage units Copies of receipts for soil amendments, if required Required Reports and Certifications Receipt # Report demonstrating that stone was washed per AASHTO T-11 Standards (< 0.5% wash loss) Infiltration Testing Report for soil amendments, if required Photo(s) showing basin protected from sediment and compaction during construction (E&S controls around the basin) Photo(s) verifying that the system location is staked Photo(s) showing the bottom of the flat, scarified, non-compacted basin before installation of geotextile or pea gravel Photo(s) showing the bottom of the basin after installation of geotextile or pea gravel Photos showing outlet structure, including internal weirs and/or orifices, and outlet pipes (with tape measure as size reference) Photo(s) showing the installation of perforated pipes/storage units (tops showing with stone filled around them) Photo(s) showing installation of observation well(s) Photo(s) showing the completed installation with stone to finished bed elevation and geotextile in place (prior to backfill)

Subsurface Infiltration (Page 2 of 2) Required Measurement Photo # Measurement Level Bottom Elevation (Interface with In Situ Soils/Soil Amendments) Level Bottom Footprint Surface Area (Length and Width) Top of Stone Storage Layer Elevation Invert of Modular Storage Devices Storage/Distribution Pipe Invert Basin Outflow Pipe Invert Observation Well Invert Outlet Structure Bottom Invert Outlet Structure Outflow Pipe Invert Outlet Structure Orifice Invert Outlet Structure Orifice Diameter Outlet Structure Weir Length Outlet Structure Weir Elevation By signing this form, the registered professional indicated below certifies that they, or a designee, were present during the required measurements associated with the SMP listed above, and that, to the best of their knowledge, information, and belief, these measurements are in general accordance with the Approved PCSMP. Please note that the measurements listed above must be reflected on the project s Record Drawing(s). The Project s Construction Certification Package, which must be submitted with the Record Drawing(s), must include digital copies of all SMP Construction Certification Forms (one per SMP) and digital copies of the material receipts and photographs required on these forms. Registered Professional Signature Date Name (Print) Company License Type & Number

Cistern (Page 1 of 1) Project Name: PWD Tracking Number: SMP Label (on plans): 1. Contact the project s assigned PWD Inspector at least three (3) days prior to the start of construction of any SMP, including installation of a cistern. SMP installation must be observed by the PWD Inspector. 2. Provide the following information about the SMP: Required Documents Receipt # Copies of receipts for cistern tank, including model number (if applicable) Copies of receipts for slow release mechanism or pump Photo(s) of debris screening from roof connection Photo(s) of installed cistern Photo(s) of slow release mechanism or pump Photo(s) of overflow (with tape measure as size reference) Required Measurement/Specification Cistern Volume Overflow Elevation/Height Overflow Orifice Diameter Photo # Measurement/ Specification By signing this form, the registered professional indicated below certifies that they, or a designee, verified the manufacturer s specifications for the SMP listed above, and that, to the best of their knowledge, information, and belief, these specifications are in general accordance with the Approved PCSMP. Please note that the specifications listed above must be reflected on the project s Record Drawing(s). The Project s Construction Certification Package, which must be submitted with the Record Drawing(s), must include digital copies of all SMP Construction Certification Forms (one per SMP) and digital copies of the material receipts and photographs required on these forms. Registered Professional Signature Date Name (Print) Company License Type & Number

Blue Roof (Page 1 of 2) Project Name: PWD Tracking Number: SMP Label (on plans): 1. Contact the project s assigned PWD Inspector at least three (3) days prior to the start of construction of any SMP. SMP installation must be observed by the PWD Inspector. 2. Provide the PWD Inspector with an estimated schedule for the placement of any of the following: liners, piping, drainage layer, soil media, and plantings. 3. Provide the following information about the SMP: Required Documents Receipt # Copies of receipts for blue roof materials (geotextile fabric, waterproofing membrane, etc.) Copies of receipts for clean washed stone Photos showing the roof after the installation of waterproofing membrane Photos showing the installation of check dams Photos showing roof drain restrictor prior to installation, if required (with tape measure as size reference) Photos showing the installation of stone ballast, if required (showing thickness measurements) Photos showing entire roof area when installation is complete

Blue Roof (Page 2 of 2) Required Measurement Photo # Measurement Storage Area Footprint Check Dam Height Ballast Stone Depth Roof Drain Riser Height Roof Drain Riser Diameter Roof Drain Restrictor Orifice Diameter By signing this form, the registered professional indicated below certifies that they, or a designee, were present during the required measurements associated with the SMP listed above, and that, to the best of their knowledge, information, and belief, these measurements are in general accordance with the Approved PCSMP. Please note that the measurements listed above must be reflected on the project s Record Drawing(s). The Project s Construction Certification Package, which must be submitted with the Record Drawing(s), must include digital copies of all SMP Construction Certification Forms (one per SMP) and digital copies of the material receipts and photographs required on these forms. Registered Professional Signature Date Name (Print) Company License Type & Number

Ponds and Wet Basins (Page 1 of 2) Project Name: PWD Tracking Number: SMP Label (on plans): 1. Contact the project s assigned PWD Inspector at least three (3) days prior to the start of construction of any SMP, including excavation of SMPs and soil testing if applicable. SMP installation must be observed by the PWD Inspector. 2. Provide the PWD Inspector with an estimated schedule for the placement of any of the following: geotextile, impervious liner, stone, storage media, piping, soil, etc. 3. Provide the following information about the SMP: Required Documents Receipt # Copies of receipts for vegetation and/or seeding Copies of receipts for impervious liner, if required Photo(s) showing basin protected from sediment and compaction during construction (E&S controls around the basin) Photo(s) verifying that the system location is staked, if required Photos showing final grading of basin, including the bottom, berm, side slopes, and spillway Photos showing the basin after planting of vegetation (prestabilized) Photos showing the basin after planting of vegetation (stabilized) Photos showing outlet structure, including internal weirs and/or orifices, and outlet pipes (with tape measure as size reference) Photos showing orifice protection, if required Photos showing completed spillway (with tape measure as size reference)

Ponds and Wet Basins (Page 2 of 2) Required Measurement Photo # Measurement Level Planting Media Surface Elevation Level Bottom (Interface with In Situ Soils/Soil Amendments) Elevation Outflow Pipe Invert Overflow Riser/Grate Elevation Outlet Structure Orifice Invert Outlet Structure Orifice Diameter Outlet Structure Weir Length Outlet Structure Weir Elevation Spillway Invert Elevation Spillway Width By signing this form, the registered professional indicated below certifies that they, or a designee, were present during the required measurements associated with the SMP listed above, and that, to the best of their knowledge, information, and belief, these measurements are in general accordance with the Approved PCSMP. Please note that the measurements listed above must be reflected on the project s Record Drawing(s). The Project s Construction Certification Package, which must be submitted with the Record Drawing(s), must include digital copies of all SMP Construction Certification Forms (one per SMP) and digital copies of the material receipts and photographs required on these forms. Registered Professional Signature Date Name (Print) Company License Type & Number

Subsurface Detention (Page 1 of 2) Project Name: PWD Tracking Number: SMP Label (on plans): 1. Contact the project s assigned PWD Inspector at least three (3) days prior to the start of construction of any SMP, including excavation of SMPs and soil testing if applicable. SMP installation must be observed by the PWD Inspector. 2. Provide the PWD Inspector with an estimated schedule for the placement of any of the following: geotextile, stone, storage media, piping, soil, etc. 3. Provide the following information about the SMP: Required Documents Receipt # Copies of receipts for pipes or storage units Copies of receipts for vault structure Copies of receipts for clean washed stone, if required per plans Copies of receipts for geotextile, if required per plans Copies of receipts for impervious liner, if required per plans Photos showing the bottom of the basin before installation of geotextile and/or impervious liner Photos showing the bottom of the basin after installation of geotextile and/or impervious liner Photos showing the installation of pipes/storage units (tops showing with stone filled around them). Photos showing the installation of the vault structure Photos showing outlet structure, including internal weirs and/or orifices, and outlet pipes (with tape measure as size reference) Photos showing orifice protection, if required Photo(s) showing installation of observation well(s) Photo(s) showing the completed installation with stone to finished bed elevation and geotextile in place (prior to backfill)

Subsurface Detention (Page 2 of 2) Required Measurement Photo # Measurement Bottom Footprint Surface Area (Length and Width) Bottom of Stone Storage Layer Elevation Top of Stone Storage Layer Elevation Observation Well Invert Storage/Distribution Pipe Invert Invert of Modular Storage Devices Invert of Vault Structure Outflow Pipe Invert Outlet Structure Bottom Invert Outlet Structure Outflow Pipe Invert Outlet Structure Orifice Invert Outlet Structure Orifice Diameter Outlet Structure Weir Length Outlet Structure Weir Elevation By signing this form, the registered professional indicated below certifies that they, or a designee, were present during the required measurements associated with the SMP listed above, and that, to the best of their knowledge, information, and belief, these measurements are in general accordance with the Approved PCSMP. Please note that the measurements listed above must be reflected on the project s Record Drawing(s). The Project s Construction Certification Package, which must be submitted with the Record Drawing(s), must include digital copies of all SMP Construction Certification Forms (one per SMP) and digital copies of the material receipts and photographs required on these forms. Registered Professional Signature Date Name (Print) Company License Type & Number

Media Filter (Page 1 of 2) Project Name: PWD Tracking Number: SMP Label (on plans): 1. Contact the project s assigned PWD Inspector at least three (3) days prior to the start of construction of any SMP, including installation of any water quality device. SMP installation must be observed by the PWD Inspector. 2. Provide the PWD Inspector with an estimated schedule for the placement of any of the following: geotextile, stone, filter media, underdrain piping, etc. 3. Provide the following information about the SMP: Required Documents Receipt # Copies of receipts for the containment structure for the media filter Copies of receipts for filter media Copies of receipts for underdrain Copies of receipts for stone Required Reports and Certifications Receipt # Report demonstrating that stone was washed per AASHTO T-11 Standards (< 0.5% wash loss) Photo(s) of the containment structure for the media filter (include internal views) Photo(s) of weir plate installation (if applicable) Photo(s) of stone installation, including underdrain placement Photo(s) of filter media installation

Media Filter (Page 2 of 2) Required Measurement Photo # Measurement Filter Media Footprint Filter Media Depth Stone Depth Underdrain Invert Inflow Pipe Invert Outflow Pipe Invert Weir Elevation Weir Length Rated Pollutant Removal Efficiency (TSS) Number of Cartridges (if applicable) By signing this form, the registered professional indicated below certifies that they, or a designee, verified the manufacturer s specifications listed for the SMP listed above, and that, to the best of their knowledge, information, and belief, these specifications are in general accordance with the Approved PCSMP. Please note that the specifications listed above must be reflected on the project s Record Drawing(s). The Project s Construction Certification Package, which must be submitted with the Record Drawing(s), must include digital copies of all SMP Construction Certification Forms (one per SMP) and digital copies of the material receipts and photographs required on these forms. Registered Professional Signature Date Name (Print) Company License Type & Number

Sumped/Trapped Structures (i.e. Inlets, Sumped Manholes, Outlet Structures, etc.) (Page 1 of 2) Project Name: PWD Tracking Number: 1. Contact the project s assigned PWD Inspector at least three (3) days prior to the start of construction of any SMP, including excavation of SMPs. SMP installation must be observed by the PWD Inspector. 2. Provide the PWD Inspector with an estimated schedule for the planned installation of the inlet, so that the Inspector can visit while structures inside the inlet are visible. 3. Provide the following information about the SMP: Required Documents Receipt # Copies of receipts for precast concrete inlets/drains Copies of receipts for inlet/drain grates Copies of receipts for hoods/traps Copies of receipts for installed precast structures Photos showing sumps and traps (if required per plans) installed correctly Photos showing sump depth (with tape measure as size reference) Photos showing traps installed correctly (including grouting)

Sumped/Trapped Structures (i.e. Inlets, Sumped Manholes, Outlet Structures, etc.) (Page 2 of 2) Component (Plan Label) Inlets Listed Individually Sump Installed (Yes/No) Hood/Trap Installed (Yes/No) Trench Drains Listed Individually Yard/Area Drains Listed Individually Manholes Listed Individually Outlet Control Structures Listed Individually By signing this form, the registered professional indicated below certifies that they, or a designee, were present during the installation of the required components listed above, and that, to the best of their knowledge, information, and belief, these components are in general accordance with the Approved PCSMP. Please note that the information listed above must be reflected on the project s Record Drawing(s). The Project s Construction Certification Package, which must be submitted with the Record Drawing(s), must include digital copies of all SMP Construction Certification Forms (one per SMP) and digital copies of the material receipts and photographs required on these forms. Registered Professional Signature Date Name (Print) Company License Type & Number

Level Spreader (Page 1 of 2) Project Name: PWD Tracking Number: SMP Label (on plans): 1. Contact the project s assigned PWD Inspector at least three (3) days prior to the start of construction of any SMP, including excavation of SMPs and soil testing if applicable. SMP installation must be observed by the PWD Inspector. 2. Provide the PWD Inspector with an estimated schedule for the placement of any of the following: geotextile, stone, storage media, piping, soil, etc. 3. Provide the following information about the SMP: Required Documents Receipt # Copies of receipts for stone (clean washed stone, if required) Copies of receipts for geotextile Copies of receipts for distribution pipes used in level spreader (if applicable) Copies of receipts for vegetation/seeding, if required Photos showing depth of excavation bottom to inflow pipe invert and excavation bottom to overflow lip (with tape measure as size reference) Photos showing placement of geotextile within the excavation (if applicable) Photos showing the placement of clean washed stone and perforated piping (if applicable) Photos showing the placement of turf reinforcement matting or geotextile fabric downstream of level spreader Photos showing the area downstream of the level spreader prestabilized without vegetation Photos showing the area downstream of the level spreader stabilized with vegetation

Level Spreader (Page 2 of 2) Required Measurement Photo # Measurement Level Spreader Surface Area (Length and Width) Level Spreader Depth/Height Stone Depth Distribution Pipe Invert Level Discharge Elevation Level Discharge Width By signing this form, the registered professional indicated below certifies that they, or a designee, were present during the required measurements associated with the SMP listed above, and that, to the best of their knowledge, information, and belief, these measurements are in general accordance with the Approved PCSMP. Please note that the measurements listed above must be reflected on the project s Record Drawing(s). The Project s Construction Certification Package, which must be submitted with the Record Drawing(s), must include digital copies of all SMP Construction Certification Forms (one per SMP) and digital copies of the material receipts and photographs required on these forms. Registered Professional Signature Date Name (Print) Company License Type & Number

Low Flow Devices (Page 1 of 1) Project Name: PWD Tracking Number: SMP Label (on plans): 1. Contact the project s assigned PWD Inspector at least three (3) days prior to the start of construction of any SMP, including installation of any water quality device. SMP installation must be observed by the PWD Inspector. 2. Provide the following information about the SMP: Required Documents Receipt # Copies of receipts for the containment structure for the Water Quality Device Copies of receipts for proprietary device, including model number Photo(s) of the containment structure for the proprietary device (include internal views) Photo(s) of installed proprietary device Required Specification Photo # Specification Rated Water Quality Flow Rate (cfs) Maximum Flow Rate with Positive Overflow (cfs) By signing this form, the registered professional indicated below certifies that they, or a designee, verified the manufacturer s specifications for the SMP listed above, and that, to the best of their knowledge, information, and belief, these specifications are in general accordance with the Approved PCSMP. Please note that the specifications listed above must be reflected on the project s Record Drawing(s). The Project s Construction Certification Package, which must be submitted with the Record Drawing(s), must include digital copies of all SMP Construction Certification Forms (one per SMP) and digital copies of the material receipts and photographs required on these forms. Registered Professional Signature Date Name (Print) Company License Type & Number