NOT TO COPY -- NO DISSEMINATE WITHOUT WRITTEN AGREEMENT. Presentation JB AG JCN JR 1

Similar documents
Offshore Drilling Rigs

Deep Water Definitions

Subsea Well Engineering

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

An Introduction to Oil & Gas Drilling and Well Operations

Geoprober Drilling Moving from Ideas To Reality (Status August, 2005)

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton

Module No. # 01 Lecture No. # 3 Safety in design and operations. (Refer Slide Time: 00:10)

Marginal Project Development

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

Send your directly to

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement.

SUBSEA 101. Find more Subsea 101 case studies online

Marathon Drilling Indonesia

Macondo Blowout Lessons Learned for Prevention and Mitigation

SAFER, SMARTER, GREENER

Ultra deep water and ultra deep drilling technologies for 21 st Century Mohole. Engineering Development Advisory Committee J-DESC, JAPAN

BT-4000 LIGHT WORKOVER UNIT

A marginal field (re-)development using several alternative methodologies 1

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

Heidrun Inverted Gas Lift System

Dry trees for cost effective solution with the Wellhead Barge: WHB

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and

Managed Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International

Well Abandonment Services. Plug into a New Approach

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions

Mærsk Deliverer. Ultra deepwater drilling and development. semi-submersible

Transitions in Natural Gas Systems, including Transportation

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine

Getting to Grips with Deepwater Handling Operations

Refining the DP Watch Circle

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0

SWS Ultra deepwater drillship

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.

Deepwater well design, construction & drilling operations

AADE Houston Chapter. Group. 26 January 2011

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

RPSEA PROJECT STATUS REPORT FEB 2011

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing

HELIX ENERGY SOLUTIONS

Industry Response - Post Macondo

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

Working for the future POSGRIP Technology

TMR4225 MARINE OPERATIONS. SPRING 2004 Introduction

Drilling Courses Overview Pressure control and drilling equipment course offering

Learn more at

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells

/chesssubseaengineering. Deepwater Mux Subsea BOP Control System & Marine Riser System. Oseghale Lucas Okohue Bsc.Msc.CPMP.

TMR4225 MARINE OPERATIONS. SPRING 2005 Introduction

Land wellhead systems & offshore surface wellhead systems

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012

Impact of Input Parameters on Wellhead Fatigue, and Alternative Solutions for Life Extension

Well Abandonment & Field Decommissioning. Product Catalogue Destini Oil Service 1

On the Development of the Blowout Preventer PRA Model

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc.

Subsea Intervention: Is It Worth It? Drummond Lawson

Chapter 02. Casing and Tubing

AADE 01-NC-HO-02. Copyright 2001 AADE National Drilling Technical Conference

OBSERVATORY SERVICING AND MAINTENANCE

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response

Floating Systems. Capability & Experience

4 Briefing. Responsible investor

Single / Dual Barrier HP Drilling Risers

Table of Contents. Gregg S. Perkin, P.E. Engineering Partners International August 26, 2011 EXPERT REPORT MACONDO

Development. JOGMEC Techno Forum November 2014 Japan Drilling Co., Ltd. Drilling Technology Department Masahiro Nakamura

2016 Employee Product Education Courses

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

@balance Deepwater. MPD services

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018

Efficiency of Time Comparing With Modular Rigs for Work-Over Operation

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

Investor Relations Presentation April 30, 2013

Intervention/Decommissioning

Efficiency of Time Comparing with Modular Rigs for Workover Operation

Sinking of the Deepwater Horizon. 11 perish and 115 survive

Oil & Gas T T S O I L & G A S.

(12) United States Patent (10) Patent No.: US 6,640,900 B2

Advanced Well Completion Design

Cameron MBO Multi-Bowl Wellhead System

OTC seems to be able to afford to fix the problems associated with downtime due to an incomplete design.

SWIMMER: Hybrid AUV/ROV concept. Alain FIDANI Innovative Projects and R&D Manager Oil&Gas Division CYBERNETIX SA, France

3 WELL CONSTRUCTION. 3.1 Strategy

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists

Hans J Lindland FMC Kongsberg Subsea Innovative Technologies, Creative Solutions

Fundamentals of Drilling Course Outline. (1)Basics of Rotary Drilling Rotary Operations/Coring

Subsea Capability Profile

Industry & Govt Changes Post Macondo. Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

ECDM System. November, Security Classification: Restricted - Status: Draft

Subsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management

PETROLEUM ENGINEERING

Transcription:

Presentation JB AG JCN JR 1

Presentation JB AG JCN JR 2

SUMMARY - INTRODUCTION - ENVIRONMENTAL DATA ACQUISITION & RIG BEHAVIOUR - RIG DRILLING EQUIPMENT - surface equipment - Subsea equipment - R O V - RIG STATION KEEPING & RIG MOVING - RIG MOVING - WELLHEADS & CHRISTMAS TREES - DRILL STEM TEST (DST) - RIG & DRILLING COSTS Presentation JB AG JCN JR 3

RIG TYPES Land rig Barge Platform rig Tender rig Jack-Up Semi-sub. moored Semi-sub. DP mode Drillship DP-mode Presentation JB AG JCN JR 4

RIG TYPES Onshore/Land rigs Wheel/truck mounted Standard/conventional rig Type Drilling depth range (ft) Light 4000-8000 ft Medium 8000-12000 ft Heavy 12000-16000 ft Ultra heavy 18000-25000 ft Offshore / bottom supported Barges: 8 to 25 ft WD Special artic Posted Submersible: 30 to 150 ft WD Jack-Up: 100 up to 500 ft WD Mat supported / Independent leg Platform Rig Self-contained (compact rig) Tender supported (tender rigs) Offshore / floaters Semi-submersible Conventional moored (up to 7650 ft WD) Dynamic positioning system (5000 to 12 000 ft WD) Drillships Conventional moored Dynamic positioning system (5000 to 12 000 ft WD) Presentation JB AG JCN JR 5

Semi-submersible... some references Rig floor Main Sea Level Air gap Drilling riser Sea bed or mud line Subsea BOP Subsea Wellhead The Well Presentation JB AG JCN JR 6

Semi-submersible Leiv-Eiriksson (in drilling conditions) Presentation JB AG JCN JR 7

SEMI SUBMERSIBLE Aker Spitsbergen The new Aker H-6e is the world's biggest and most advanced drilling semi. It has features that make it particularly well suited for drilling under extreme conditions. Presentation JB AG JCN JR 8

SUMMARY - INTRODUCTION - ENVIRONMENTAL DATA ACQUISITION & RIG BEHAVIOUR - RIG DRILLING EQUIPMENT - surface equipment - Subsea equipment - R O V - RIG STATION KEEPING & RIG MOVING - RIG MOVING - WELLHEADS & CHRISTMAS TREES - DRILL STEM TEST (DST) - RIG & DRILLING COSTS Presentation JB AG JCN JR 10

Environmental constraints Impact on drilling Water depth, Marine currents, Low Temperature. T U B E P R O L O N G A T E U R ( R I S E R ) 1. Well architecture, drilling units costs, 2. Drilling riser technology and management Hydrates, Soil Unstability Low formation fracture pressures B A L I S E A C C O U S T I Q U E R A C C O R D D E M E S U R E S B L O C O B T U R A T E U R D E P U I T S J O I N T F L E X I B L E T E T E D E P U I T S P L A Q U E D E B A S E T U B E C O N D U C T E U R 3. Safety: hydrates control BOP reliability 4. Drilling Fluids : hydrates control, «Mud Weight Window «5. Drilling geo-hazards: shallow water flows slope unstability Presentation JB AG JCN JR 11

OFFSHORE ENVIRONMENT WITH. -- Action of winds, -- Action of waves, Drilling floating unit (semi-submersible) Telescopic joint Drilling riser -- Action of currents and, Kill & choke lines Guide Guide lines lines -- impact of water depth, -- impact of seabed (formation) wellhead TGB & PGB Subsea BOP s Subsea wellhead Presentation JB AG JCN JR 12

MODU (SS, DS) motions in offshore environment. Presentation JB AG JCN JR 13

FLOATING UNITS (SS, DS) BEHAVIOUR vs. OCEANO ENVIRONMENT - IMPACT OF WATER DEPTH === > ON MOORING - IMPACT OF WIND - IMPACT OF SEA CONDITIONS === > ON FLOATER MOTION (waves, swell) - IMPACT OF CURRENTS === > ON DRAG FORCES ON RISERS === > ON FLOATER MOTION - IMPACT OF SOIL DATA === > DESIGN OF MOORING GEARS - IMPACT OF SEABED OBSTRUCTIONS === > CONVENT. MOORING? DYPO.? Presentation JB AG JCN JR 14

FLOATING UNITS BEHAVIOUR and LIMITS OF OPERATION Typical criteria for the selection of a floater vs. location assessment : Refer should be made to amplitude of the motions expressed by RAO curves (Response Amplitude Operator) in meter or in deg. / meter of wave for a given period. For example - the floater must stay in position under 5-yrs storm condition - the floater can operate under 1-yr storm condition. Presentation JB AG JCN JR 15

DW floaters: Relative heave motion response vs. Wave period Source: TOTAL Offshore Reference Book Presentation JB AG JCN JR 16

SUMMARY - INTRODUCTION - ENVIRONMENTAL DATA ACQUISITION & RIG BEHAVIOUR - RIG DRILLING EQUIPMENT - surface equipment - Subsea equipment - R O V - RIG STATION KEEPING & RIG MOVING - RIG MOVING - WELLHEADS & CHRISTMAS TREES - DRILL STEM TEST (DST) - RIG & DRILLING COSTS Presentation JB AG JCN JR 17

SPECIFIC RIG EQUIPMENT FOR FLOATERS Surface equipment Presentation JB AG JCN JR 18

DRILLING STRING -- HEAVE COMPENSATOR Heave compensator will allow to keep constant the weight on drilling bit (WOB). When the floater is heaving up -/- down, the heave compensator cylinders extend -/- retract to compensate the vertical motion (heave). Heave compensator will be also used - for easy/smooth BOP reconnection on wellhead, - to keep constant tension on DST string, etc Presentation JB AG JCN JR 20

Heave motion compensator... to keep on drilling Riser tensionners... to keep the riser under constant tension Slip joint... to accomodate heave motion and for mud return conduit Presentation JB AG JCN JR 21

Drill String Compensator Drill String Riser tensioner Slip Joint Riser Tensioners Riser Presentation JB AG JCN JR 22

CONV. TENSIONING DEVICE SPLIT TENSION RING Source / illustrations: Cameron Drilling Products Presentation JB AG JCN JR 23

Riser tensioning equipment Tension : 16*100 kips <=> 7500 riser 15 ppg in GOM conditions Presentation JB AG JCN JR 24

. In the moon pool Telescoping joint (inner barrel) Riser tensioning lines Telescoping joint (main part with suspension ring) Presentation JB AG JCN JR 25

SPECIFIC RIG EQUIPMENT FOR FLOATERS Subsea equipment Presentation JB AG JCN JR 26

ROLE OF A DRILLING RISER - ROLE OF THE TELESCOPIC JOINT A drilling riser connects the top of the BOP-stack to the drilling unit - mechanical role: to run or retrieve the BOP stack, to guide the drillstring, the casings, the logging tols in the well, to support BOP-hydraulic control lines, ckoke & kill lines, booster line, command lines (multiplex lines). - hydraulic role: to bring the drilling fluids up to surface; therefore, its participates to the hydraulic pressure balance of the well. The drilling riser is kept under constant tension by means of riser tensioners. A telescopic joint ( top part of the riser) will allow vertical (heave) motions and provides a conduit for mud return. Presentation JB AG JCN JR 27

OFFSHORE DRILLING WITH FLOATERS (SS or DS) DW RISER JOINT ELEMENT 75 BUOYED RISER JOINT A TYPICAL RISER JOINT - 75 ft long (approx. 22m) - weight in air: 22 t ( with flotation modules) - OD: 45 to 50 in (with flotation modules) - Inside volume: 200 l per m Source / illustrations: Part from Cameron Drilling Products Presentation JB AG JCN JR 28

DRILLING RISER and OPERATIONAL LIMITS Operational limits: refer to tensionners capacity vs. water depth, mud weights, refer to riser equipment/components: for example, for the ball joint. 0 to 2 : drilling will continue; between 2 and 5 : stop drilling, riser still connected; between 5 and the maxi. for this equipment: riser must be disconnected. Presentation JB AG JCN JR 30

RIG DRILLING EQUIPMENT SUBSEA ARRANGEMENT: Riser, A typical riser element - 75 ft long, - 21 OD x 7/8 wall - 2 x 4 ½ ID choke and kill lines - 1 x 4 ID booster line - + hydraulic lines BOP stack Drilling wellhead Source / illustrations: Cameron Drilling Products Presentation JB AG JCN JR 31

Subsea BOP stack Hydril BOPs Weight : > 400 T in air Presentation JB AG JCN JR 32

BOP rams Shear rams Variable bore rams Source / Illustrations: Cameron Presentation JB AG JCN JR 33

BOP stack can be disconnected. -- either at the wellhead connector -- or at the LMRP connector At the wellhead connector: - for example, to repair the BOP at surface, but in this case the well HAS TO BE secured (cement plugs, packers, ). At the LMRP connector - in case the rig is drifting or an iceberg is approaching, but the drillstring has to be hanged-off on pipe rams first, or the DP have to be sheared in a process of an emergency procedure. Presentation JB AG JCN JR 34

Subsea BOP STACK LRMP (Lower Riser Marine Package) Kill line flexible Kill & choke connector Flex joint Choke line flexible Annular BOP Collet connector Control pod Control pod Annular BOP 4 x rams type BOP BOP Kill line valves Choke line valves Collet connector Well head Presentation JB AG JCN JR 35

Operating the BOP. -Through multiplex (electro-hydraulic) system = normal operation, Through EDS Emergency Disconnect System = emergency it shears DP & unlatches the LMRP, Through AMF Dead-man (Auto. Mode Function) it shears DP, closes the well but does not disconnect the LMRP. Battery will allow to power up to five functions Through ROV Panels - use of an ROV when normal operations is not available. Presentation JB AG JCN JR 36

Operating the BOP (contd.). - Through Automatic Disconnect System: automatically close the shear rams when the riser angle exceed a certain predetermined limit. Through Autoshear System: to automatically close the shear rams When there is an unplanned disconnect of the LMRP Through Acoustic System: system to activate a limited number of functions from the rig when no other communications are possible. If a BOP failure occurs then HC influx will be uncontrolled leading/meaning to/a blowout. Presentation JB AG JCN JR 37

SUMMARY - INTRODUCTION - ENVIRONMENTAL DATA ACQUISITION & RIG BEHAVIOUR - RIG DRILLING EQUIPMENT - surface equipment - Subsea equipment - R O V - RIG STATION KEEPING & RIG MOVING - RIG MOVING - WELLHEADS & CHRISTMAS TREES - DRILL STEM TEST (DST) - RIG & DRILLING COSTS Presentation JB AG JCN JR 38

SUBSEA OPERATIONS ASSISTED BY ROV Presentation JB AG JCN JR 39

ROV manipulators Source: TPA A.Quenelle Presentation JB AG JCN JR 40

OPERATED VEHICLE FAMILY. FOR IMR* OPERATIONS (* Inspection, Maintenance, Repair) Animation J5 E1 ROV video02_02 ROV.wmv One example of work performed with a ROV R O V ------ > A U V* ----- > SWIMMER** **( Subsea Work Inspection and Maintenance with Minimum Environment ROV) Concept invented by CYBERNETIX in 1997 * (Autonomous Underwater Vehicle) Presentation JB AG JCN JR 41

ROV --- AUV --- SWIMMER ROV: (Remote Operated Vehicle) for underwater works; widely used in support of offshore drilling activities; rental daily rate: (approx) 4000 $/d) - main system components: TMS (Tether Management System) + tether (= ombilical) + ROV (Remote Operated Vehicle). AUV : (Autonomous Underwater Vehicle) for survey works (video inspection, ) on pipelines SWIMMER : R&D development stage - for underwater surveys + works - main system components: docking station (to park AUV + ROV) + AUV (to support the ROV) + ROV linked to the AUV with a tether) Presentation JB AG JCN JR 42

SUMMARY - INTRODUCTION - ENVIRONMENTAL DATA ACQUISITION & RIG BEHAVIOUR - RIG DRILLING EQUIPMENT - surface equipment - Subsea equipment - R O V - RIG STATION KEEPING & RIG MOVING - RIG MOVING - WELLHEADS & CHRISTMAS TREES - DRILL STEM TEST (DST) - RIG & DRILLING COSTS Presentation JB AG JCN JR 44

RIGS ON LOCATION and STATION KEEPING When on location different system of station-keeping Reference point = the drilling wellhead --- > Inland barges are set on sea-bed bottom, --- > Jack-up are pinned on the sea bed (spud cans and legs), --- > Tenders are conventionally moored, --- > SS, DS are either: - conventionally moored (mooring lines, anchors) - operated in DP mode (thrusters, propellers) Presentation JB AG JCN JR 45

ANCHORING PATTERN for a semi-submersible WD on location: 115m Chain length out: 1200m Presentation JB AG JCN JR 47

RIGS ON LOCATION and STATION KEEPING PERFORMANCES Reference point = the drilling wellhead BUT a DP mode will - facilitate re-entries (drilling bits, conductor pipe, ) - facilitate BOP or riser reconnection - safe access when sea-bed are occupied with pipe-lines, umbilicals, - facilitate leaving a location in case of emergency: blowout (surface gas), of typhoons, of iceberg drifting,. Presentation JB AG JCN JR 48

SUMMARY - INTRODUCTION - ENVIRONMENTAL DATA ACQUISITION - OPERATIONS - RIG BEHAVIOUR vs. ENVIRONMENTAL CONDITIONS - RIG DRILLING EQUIPMENT - HEAVE MOTION COMPENSATORS - DRILLING RISER - SUBSEA BOP - ROV - RIG STATION KEEPING - RIG MOVING - WELLHEADS & CHRISTMAS TREES - DRILL STEM TEST (DST) - RIG & DRILLING COSTS Presentation JB AG JCN JR 52

PLATFORM RIGS, MODU --- MOVING TO/OFF LOCATION For Platform rigs === > Platform cranes or crane-barges are used For Tender rigs === > Crane of the Tender rig are usually used For Jack-Up === > Cantilever are skidded over the wellhead platform === > Skid-off method over the wellhead platform For floaters and Jack-Up === > field move with tug(s) (floater without own propulsion) === > ocean tow (long distance) === > on heavy ship-lift carriers Presentation JB AG JCN JR 53

Conventional semi-submersible (deballasted conditions) In transit: dry tow Presentation JB AG JCN JR 54

SS «Polyarnaya Zvezda» Loading for dry tow In transit: self moving Presentation JB AG JCN JR 55

SUMMARY - INTRODUCTION - ENVIRONMENTAL DATA ACQUISITION & RIG BEHAVIOUR - RIG DRILLING EQUIPMENT - surface equipment - Subsea equipment - R O V - RIG STATION KEEPING & RIG MOVING - RIG MOVING - WELLHEADS & CHRISTMAS TREES - DRILL STEM TEST (DST) - RIG & DRILLING COSTS Presentation JB AG JCN JR 56

OFFSHORE DRILLING WITH FLOATERS A DRILLING WELLHEAD. WHAT FOR? Main functions - to suspend casing strings (typically 3 or 4), - to suspend a production tubing, - to seal the different annulus (at wellhead level) = safety barrier and, - to provide access to the different annulus, - to support the BOP ( while drilling ), - to support the X-mas tree (producing well). Location, The well head is located on ground level (onshore), at the wellbay level (drilling on platform) or at the seabed (offshore). Presentation JB AG JCN JR 57

TYPICAL SUBSEA HP WELLHEAD STACK-UP Souce / Illusreations: TOTAL Presentation JB AG JCN JR 58

TYPICAL SUBSEA HP WELLHEAD HOUSING A 18 ¾ wellhead housing Souce / Illusreations: TOTAL Presentation JB AG JCN JR 59

TYPICAL SUBSEA HP- WELLHEAD HP Housing Casing Hangers Seal Assemblies LP Housing Conductor Pipe 20 Casing 14 or 13-3/8 Casing 10-3/4 or 9-5/8 Casing 7.5/8 or 7 Casing Souce / Illusreations: Cameron Presentation JB AG JCN JR 60

P & A -- Subsea wellhead recovery Presentation JB AG JCN JR 61

Rig move on location Running WH Running BOP and riser Drilling msl Semi-sumersible Drillstring WD Drilling riser Sub sea BOP Sea bed Sub sea wellhead Presentation JB AG JCN JR 62

OFFSHORE WELL CONTRUCTION - TYPICAL SEQUENCE OF OPERATION: - Drilling 36 hole (no mud return in surface) - Run 30 CP (*) (Install temporary guide base for very soft formation only) - Drilling 26 hole. no mud return in surface or. with mud return for special application (use of pin-connector & riser) - Run 18 ¾ HP - wellhead housing with the permanent guide base attached - Run BOP and marine riser - Drill 17 ½ hole - Run 13 3/8 intermediate casing - Drill 12 ¼ hole - Run 9 5/8 intermediate casing - Drill 8 ½ hole - Run 7 production casing or liner - Well test (DST) - Well completion ( = run X-tree) or T&A or P&A ( * CP can be set by jetting process) Presentation JB AG JCN JR 64

SUMMARY - INTRODUCTION - ENVIRONMENTAL DATA ACQUISITION & RIG BEHAVIOUR - RIG DRILLING EQUIPMENT - surface equipment - Subsea equipment - R O V - RIG STATION KEEPING & RIG MOVING - RIG MOVING - WELLHEADS & CHRISTMAS TREES - DRILL STEM TEST (DST) - RIG & DRILLING COSTS Presentation JB AG JCN JR 72

DRILL STEM TEST (DST) PERFORMED FROM FLOATERS * * Semi-submersibles or drillships Source / illustrations: Cameron Subsea Systems Presentation JB AG JCN JR 73

Typical assembly (onshore) Surface testing wellhead Rig floor Safety valve Subsurface Safety Test Tree Typical assembly (offshore floating supports) Sea bed DST string (DP, tubing) Cased or Uncased hole Reverse circul. tool Test valve Pressure recorder Safety joint packer Perforated tail-pipe Pressure recorder casing Presentation JB AG JCN JR 74

SSTT Subsea Completion Test Tree * ( * TM Schlumberger) Provide wellbore access, dual barrier well control and fast acting means to shut-in a well and disconnect the test string at BOP level in the event of an emergency. Such SSTT devices support operations performed from anchored or Dypo floaters in water depths ranging from shallow to ultra deep. Such devices can have slickline, wireline, CT cutting capability Presentation JB AG JCN JR 75

SSTT POSITION IN BOP STACK Disconnection level Presentation JB AG JCN JR 76

SURFACE TEST EQUIPMENT LAYOUT (OFFSHORE SET UP) Source / illustration: IFP ENSPM Presentation JB AG JCN JR 77

WELL TESTING FROM A SEMI-SUBMERSIBLE Presentation JB AG JCN JR 78

SUMMARY - INTRODUCTION - ENVIRONMENTAL DATA ACQUISITION & RIG BEHAVIOUR - RIG DRILLING EQUIPMENT - surface equipment - Subsea equipment - R O V - RIG STATION KEEPING & RIG MOVING - RIG MOVING - WELLHEADS & CHRISTMAS TREES - DRILL STEM TEST (DST) - RIG & DRILLING COSTS Presentation JB AG JCN JR 79

Rig rental costs (approx.) Operational daily costs (approx.) Land rig 30 to 45 K$ / d 65 000 $/d Drilling barge 45 to 100 K$ / d 130 000 $/d Tender rig (conventional) 50 to 120 K$ / d 160 000 $/d Jack-Up (300 ft) 100 to 250 K$ / d 170 to 425 000 $/d Semi-submersible (5000 < WD < 7500 ft) 200 to 250 K$ / d 380 to 475 000 $/d Drillships (5000 < WD < 7500 ft) 300 + K$ / d 570 000 $/d ( 7500 < WD < 10 000 ft) + / - 700 K$ /d 1 200 000 $/d Figures vary with type of contract (short/long term), market conditions, geographical area... Presentation JB AG JCN JR 80

Slides were prepared for presentation and information to Students of Schools and Universities only. References Slides presented were prepared with illustrations from the following referenced documents: - API Standards and Recommended Practices, - Neal J. Adams, Drilling Engineering, PennWell Books, Tulsa, Oklahoma, 1985, - (Halliburton) - Petroleum Well Construction J Willey & Sons - Miscellaneous books from Chambre Syndicale de la Recherche et de la Production du Pétrole et du gaz naturel - IFP Drilling data handbook - Miscellaneous documentation from TOTAL Drilling Division - Halliburton Completion Services - Miscellaneous books from IFP - Leading Edge Advantage Ltd (Under Balance Drilling). - Miscellaneous documentation from web-sites: O&GJ, World Oil, SPE - Transocean, Saipem, Pride Drilling Contractors - Baker Hughes, Schlumberger, Weatherford, Wild Well Control Service Companies - Cameron, Hydril, Companies. Presentation JB AG JCN JR 83