Evorail Guardrail has Evolved

Similar documents
Ridgeguard Standard O&M Manual

Single and Double Gates Operation & Maintenance Manual

Installation Instructions - Model V4JSD 1

ATLANTIS RAIL Contact Information

Freestanding Guardrail System. Operation & Maintenance Manual

BEST PRACTICE GUIDE. Socket Bases. Working with Concrete Slabs

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

CURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START

Single and Double Gates Operation & Maintenance Manual

SecuAnch Roof Anchor System

Track Rack. * Track Racks are not lockable

Single and Double Gates Operation & Maintenance Manual

Single and Double Gates Operation & Maintenance Manual

Installation Instructions for. Before You Begin TOOLS REQUIRED

Kee Gate Operation & Maintenance Manual

Installation Guide Simplicity Alfresco. V1.9 Lu070318

DUTCH GABLE FREESTANDING CARPORT

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT

Installation Instructions for. Handrail Component System

Stratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE

ASSEMBLY GUIDE. Mia Narrow Bookcase

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase

Installation Guide Contemporary Alfresco V1.3 LU

Single and Double Gates Operation & Maintenance Manual

Bollards, Column Guards, Corner Guards, Wheel Stops, Speed Humps & Fixings. Lockinex. ea i, ea u i

Aluminium Walkways. For Standing Seam Roofing Systems

INTRODUCTION Tools Required Laminate Washroom Products... 4 DUCT PANELS Fixing the Frame: Fixing the Shadow Panels...

Clopay Models 835/837 Sliding Door System Installation Guide

Not including the type of fabric used (clear pvc or shade mesh), there are three main types of side screen.

Qwik-Fence Installation Instructions

ROOFSAFE ANCHOR & CABLE

ULTRA SPACE SAVER SQUARED Installation Instructions

W L. Standard Sizes: 2.125m underside of gutters m total height m roof m roof m roof.

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

ULTRA SPACE SAVER Installation Instructions

Edgerail Aluminum Bridge Railing System Specification & Installation Instructions

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SINCE 1922 P UBLICATION N O

TONNEAU INSTALLATION INSTRUCTION

Free-standing Barrial Installation of free-standing Barrial

Gardman Lean-to Greenhouse Assembly Instructions

Swerve Rack CUSTOM RACKS AVAILABLE

Junglenastix. Instruction Manual. Technical Support: Riaan Prinsloo Do-It-Yourself Jungle Gym Kits

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

Good Neighbour INSTALLATION GUIDE GOOD NEIGHBOUR FENCING BEFORE YOU START TOOLS AND HARDWARE REQUIRED

FRAMELESS GLASS FENCING DIY GUIDE

ALL SEASON PATIO COVER

STRATCO GABLE HOMESHED STRATCO GABLE HOMESHEDS STUBBIE INSTALLATION GUIDE

Tools Required Page 1. KIT CONTENTS: Smoking Shelter Page 1-2 Smoking Shelter Optional Extras Page 3

2013 Feeney (2/14) # B. Aluminum Railing Systems

Greenhouse Assembly Instructions

Safety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set

TOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER.

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

C70 Window Roller Repair Taken from: Heres the problem:

FIXED MOUNTING SHUTTERS INSTALLATION

GOOD NEIGHBOUR FENCING INSTALLATION GUIDE GOOD NEIGHBOUR FENCING BEFORE YOU START TOOLS AND HARDWARE REQUIRED

HOOP RACK HEAVY DUTY Setbacks WALL 36" WALL 42" 36" STREET 59" STREET Dero

INSTALLATION GUIDE DUOFUSE SLAT WALL SYSTEM

Downtown Rack. Custom logo option available

southpaw enterprises, inc.

Installation Instructions for Solar Snow Pad (SSP-T-3)

PINEHAVEN SHEDS Assembly Instructions FOR LEAN-TO SHEDS

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS

Document: Installation Overview Guide No: 017a Description: Omega Canopy, Lean-To Style, Post-Supported, Glass-Clear Plate Polycarbonate Roof Panels

Vinyl Gazebo Instructions

M4 Foot Operated Underpinner Instruction Manual

BIKE FILE (301)

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

WireCrafters, LLC. General Information

DOCK WEDGE - STANDARD

ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA North Las Vegas, NV 89030

CONSTRUCTION GUIDE 27ft Wide and 30ft Wide SHEEP HOUSE

Vertical Offset Base and Safety Rail System Installation Instructions

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

10x10 Trellis Pergola

TELESCOPIC GATE MANUFACTURING AND INSTALLATION MANUAL.

H20 Beam for Elevated Slabs Application Guide

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

Lockinex. Key Clamps -Steel. Key Clamps -Steel. Key Clamps - Steel. ea i, ea u i. ea i, ea u i. Castings to BS 2789(ISO 1083) & BS 6681 (ISO 5922)

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

RAPID-EPS SAFETY INSTRUCTIONS AND INSTALLATION GUIDE. American Standard OSHA

WHY YOU SHOULD USE TUFFLOOR. components

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces User s Manual

INSTALLATION GUIDE. Outback. Flat Attached BEFORE YOU START ADDITIONAL MATERIALS TOOLS REQUIRED. VERAnDAHS PATIOS CARPORTS

Carousels - Overlapping Slat

ASSEMBLY INSTRUCTIONS

Assembly Instructions

Call (770) STEP 6: Caulk bolt hole within the bracket for protection from the elements.

INSTRUCTIONS FOR ASSEMBLY 2355mm x 3125mm Workshop

Fixings & Fastenings. Bright Zinc Plated, Galvanised & Stainless Steel. Lockinex. ea i, ea u i

CEILING-MOUNTED MONORAIL ANCHOR TRACK SYSTEM Assembly and Operation Instruction Manual

INSTALLATION INSTRUCTIONS

PORTA-FAB Cleanroom Wall Systems

General Prisoner Transport Install Instructions PT-2-INST

BY ALIEN TECHNOLOGIES CORP

Transcription:

Evorail Guardrail has Evolved

Introduction o About Evorail o Legislation & Hierarchy of Fall Protection o Evorail The Systems Evorail Standard Evorail Radius Evorail Collapsible Evorail Top Fixed Evorail Parapet o Evorail extra components o Installation procedures

About Evorail Evorail freestanding system Evorail has its very own aesthetically pleasing unique design which makes it the preferred system of choice in fall protection Evorail system provides a permanent edge protection without the need to mechanically fix though the roofing membrane or roof structure, and provides full protection where access is required for public use, maintenance or emergency purposes. The strength, stability and safety of Evorail is derived from our researched cantilever principal, which has engineered the need to drill and puncture the roof membrane out of the installation process. This avoids noise disturbance during installation and potential penetrative water damaged. Evorail is Robust All of the systems fixings are grade A2 stainless steel, its extra smooth galvanized finish (EN ISO 1461) and eco friendly re-cycled weights give Evorail a minimum lifespan of at least 25yrs as a maintenance free system. Evorail is Modular The system consists of galvanized pre-assembled uprights, 2.5mt rails and our slide on weight. The 2.5mt hand and knee rails are connected with the Evorail Eazy clamp upright, which is fast, straightforward and easily adjustable to provide that perfect level finish. With no requirement for drilling, the system is easily mounted on whatever platform is required.

More about Evorail Evorail is Versatile The system has been specifically designed to fit all shapes and sizes of flat roofs, even circular designs. The system can also cope with level changes, roof falls and difficult designs, such as ductwork passing over the roof edge and cable trays/plant mounted at the roof edge. Evorail s added features Evorail is manufactured with its unique rubber moulded foot and sleek designed weight. The rubber foot and weight are produced from re-cycled material, making them Eco-friendly. The weight has Pre-moulded handles on the sides, enabling; Easy to carry Easy to assemble the weight to the system Also, the foot and weight are colour co-ordinated, to create a more aesthetically pleasing system. Membrane Protection The rubber weights & foot are already membrane friendly; it is advisable for ultimate protection to add an additional piece of roof membrane under the foot and weight. This is not supplied with Evorail but is available as an optional extra if required.

Legislation & Hierarchy of Fall EN 13374:2004 Protection All freestanding guardrails should be tested and designed to Temporary Edge Protection EN 13374. The Legislative Requirements: o o o o o o An edge protection system shall comprise at least a principal and an intermediate guardrail or intermediate protection, and it shall be possible to attached a toe board. The inclination of edge protection system class A shall not deviate from the vertical by more than 15 degrees. If an intermediate guardrail is provided, any gap shall be so dimensioned that a sphere of 470mm diameter will not pass through the protection. The distance between the uppermost part of the edge protection and the working surface shall be at least 1.0m measured perpendicular to the working surface. A load test of 0.30kN is applied horizontal from the rail and should not deflect more than 55mm. A load test of 1.25kN is applied vertically from the top rail and should not tip / fall over.

Additional Compliance Toe Board Requirements: o o o o The upper edge of the toe board shall be at least 150mm above the working surface. The toe board should be designed to avoid gaps between it and the working surface, preferably on a flat working surface. If there any gaps, a sphere with a diameter of 20mm shall not be able to pass through. The general application for toe boards are; To protect from falling tools of maintenance personnel. Parapet is less than 100mm, therefore creating the gap between the knee rail and the working surface greater than 470mm. NOTE for other situations, for example where the working surface is not flat, any gaps should be maintained as close as practical to 20mm.

Legislative Hierarchy The hierarchy for managing and selecting equipment for working at height is as follows. Duty holders must ensure that: o o o Where possible to avoid working at height. When working at height, work equipment is provided to avoid the risk of any fall. Where the risk of a fall cannot be avoided, use work equipment or other measures to minimise the distance and consequences of a fall should one occur. When working at height, the duty holders must ensure when selecting the correct equipment. o o o To use the most suitable equipment Give guardrails priority over personal protection such as harnesses and lanyards. Take account of the working conditions and the risks to the safety of all those at the place where the work equipment is to be used.

Evorail standard is the most popular system sold from the Evorail range. Even though classed as the standard system, it is for from a standard product. With it s 10 degree incline and its aesthetically pleasing design it is in a league above the other standard systems on the UK and international market Evorail standard can be purchased in; Galvanized Aluminium 304 & 316 Stainless Steel Component / Product code Long upright ERSLU Short upright ERSSU 2.5mtr rail ERAIL Rubber weight - ERRUW

Evorail Radius is the flagship of the Evorail family. It is a sleek and streamline system with a 925mm curved radius upright, the impact from floor level on any building is minimal at worst, enhancing at best. The Radius system can also be adapted into a 3 rail system for additional protection. Evorail radius can be purchased in; Galvanized Aluminium 304 & 316 Stainless Steel. Components / Product codes Long upright ERRLU Short upright ERRSU 2.5m rail ERAIL Rubber weight - ERRUW

Evorail collapsible has been specifically designed to cater for Listed Buildings. The system solves the visual issue of freestanding guardrail. When not in use, it neatly folds down and cannot been seen from floor level. When maintenance teams need to erect the system for protection, it is easily folded back into the upright position. Practical in design and easy to handle in modular 10mtr runs, bolted together with standard wing nuts. Evorail collapsible can be purchased in; Components / Product codes Galvanized Long upright ERCLU Aluminium Short upright ERCSU 2.5m rail ERAIL Rubber weight - ERRUW

Evorail Top Fixed is the most versatile system in the Evorail family. With our in house design team and full fabrication workshop, we manufacture the different base plates to suit the following applications; Standing seam Composite & Built up Concrete Brick Timber We can also adapt the system to a single rail system where the parapet is higher than 500mm from the roof level. Evorail Top Fixed can be purchased in; Galvanized Aluminium Stainless Steel Component / Product codes Top fixed upright ERTFU 2.5m rail ERAIL Rubber weight - ERRUW

Evorail Parapet is a unique system which has been developed by our in-house design engineers with their years of experience. It can be used to address a variety of applications:- too much plant or ducting on the roof to allow adequate space for freestanding guardrail. standing seam, composite and built up roof. to avoid the weight or loadings on the roof. while re-roofing the roof. Evorail Parapet can be purchased in; Galvanised Component / Product codes- Parapet upright ERPU 2.5m rail ERAIL Rubber weight - ERRUW

A freestanding end is used when the system finishes and there is no option to secure the rails to a permanent fixture. A second weight is required to ensure the extra stability demanded at the end a run. A freestanding end consists of; the D end an additional weight double weight connection bar Freestanding ends are available in; Galvanized Aluminium Stainless Steel D ends are utilized to suit all of the Evorail systems. Components / Product codes D end ERDEN Connection bar ERWCB Rubber weight - ERRUW

Evorail can be supplied with Toe boards as an option. They are fitted when the system has been erected incorporating a specially designed foot. The installation is simple procedure using 4no M8 bolts to fix the toe board to the foot. Toe boards can be supplied in Galvanised and Aluminium. Toe boards are available for the following systems: Evorail Standard Galvanized Evorail Radius Galvanised Evorail Standard Aluminium Evorail Radius Aluminium Component / Product codes Galvanized Toe board ERTBG Aluminium Toe board - ERTBA

A sweeping bend is the required component to accommodate design layouts with 90 corners. Available in; Galvanized Aluminium Stainless steel Component / Product code Sweeping bend - ERSWB

Wall brackets are the means to secure and connect the rail to a permanent fixture. Available in; Galvanized Component / Product code Wall bracket - ERWBK

A Multi-bend is the component which required to accommodate design layouts with corners other than 90 Can also be used to overcome changes in roof levels. Available in; Galvanized only Component / Product code Multi-bends - ERMUB

The T piece is used in conjunction with the double weight connector bar. And can be used to enable a variety of solutions on complicated roof layouts. Available in; Galvanized only Component / Product code T piece - ERTPI

Swinging gate allows you to safely gain access through the Evorail systems, and to secure them behind you. Available in; Galvanized Aluminium Stainless steel Component / Product code Swinging gate - ERSWG

Tools required for Evorail Standard, Radius & Collapsible Tools required to install Evorail (not supplied) 5mm allen key 8mm allen key Hacksaw or electrical cutting machine Battery drill Suitable drill bit to fix wall bracket (6mm masonry or 5mm steel bit) 13mm ratchet & spanner Marker pen Spirit level

Planning your layout There are generally 2 ways of delivering the components onto the roof: Manually Crane or hoist Once all the components are on the roof, you can start planning the layout and the erection of Evorail. Ensure the roof area where the system is to be installed is clear from debris including any gravel or stones. If installing on a Membrane roof, it s recommended to use additional membrane pads under the foot and rubber weight. This gives extra protection to the roof membrane. Before you start to layout the system, plan your starting point. If there s a fixed end or freestanding end that is generally the best place to start, and work from left to right. If the layout connects back to itself i.e. a square. Start at one of the corners with a long upright, approximately 1m in from the corner. When your starting point has been decided, begin to layout the 2.5mt rails on the roof where the system is going to be erected, when all are laid out begin to place the uprights at the joints of the rails. The uprights should be laid out alternately, long upright short upright - long upright and so on. Usually starting with the long upright first.

Layout Continued... All rails and uprights should now be in position, next place the rubber weights with the long uprights. The weights should be spaced every 5mtrs, if there are any freestanding ends two (2) weights should be placed at this point. All sweeping bends should be placed at the appropriate corners. Now all the system is laid out and ready to be erected. Go to your starting point. Place the long upright in position and slide the knee rail into the upright. Secondly slide the top rail into the upright. Holding the rails horizontal, slide over the short upright, placing the rails in at the same time. tighten up the M8 fixings with your 5mm allen key. You now have the first 2.5m section in place. Take the rubber weight and slide on to the end of the long upright, there is a grub screw in the top of the weight. Ensure this is tightened, do not over tighten. The 2.5m run is light enough should require to re-adjust the position. It s advised at this stage to double check everything is correct with the alignment. Take the next rail and slide into the short upright knee rail socket, take the other rail and insert the top rail. A long upright then slides over the rails, tighten the bolts and place weight on the end of long upright. Continue this procedure until the run ends or you come to a corner.

Installation Continued... A CORNER When you come to a corner, place the 2no rails in the upright pointing towards the edge of the roof. Place your next upright adjacent to the rails in the position / line it will be in on the return from the corner. Place the sweeping bend on the upright and rails and mark on your cut lines accordingly to the sweeping bend. (approximately 100mm into the bend will suffice). Take both rails out and find a safe and suitable place to cut the rails. It is advisable to mark up your cut rails to avoid them getting mixed up. Once cut and marked, place the rails back into the upright. Slide the sweeping bend over the rails with bolts on the bend pointing towards the roof and tighten 2no bolts. The off cut from the top rail needs to slide in the bottom sweeping bend, and the off cut from the knee rail needs to slide into the top sweeping bend. This keeps the rails in line when you come to connect the upright. ( if the rails are not in line on the return of the corner, the rails have most likely been mixed up). Slide on the next upright and carry on the procedures as before.

Installation Continued... FREESTANDING END There are 3 items which complete a freestanding end. A D end will be supplied to slide into the long upright on the finishing side. The D end is 500mm long and can be cut down if required. Tighten bolts up to secure D end Two (2) weights are required with a freestanding end, there will be a double weight connecting bar supplied which fixes on the end of the long upright by a T piece. One (1) weight slides onto the end of each side of the bar. Tighten grub screw in weights. WALL FIXED END When the rails can be fixed into a wall, a wall bracket will be supplied. There are four(4) fixing holes in the bracket, use suitable fixing for the 6mm hole. Into brick or concrete we advise M8 x 50 s JAB fixings or 6mm threaded bar resin fixed. Into cladding we advise pop rivets or tek screws to be used. Use a spirit level to ensure the fixed rails remain horizontal The last upright can end on a short or long upright when using the wall brackets, do not exceed the 2.5mtr span.

Installation Continued... ON COMPLETION When the Evorail system is erected. The system can be adjusted to accommodate modest rise and falls in the roof alignment. If levelling is required, unscrew the bottom bolt on the top section of the upright and adjust accordingly. Re-tighten the bolt once level Walk round checking the system is level and in line and double checking all the bolts and fixing are tight and secure.

Installation Continued... TOE BOARDS Toe boards will be supplied to fix straight onto the foot of the system. Toe boards should only be used after Evorail has been erected. The hole centres of the toe board line up with the holes in the foot when the uprights are correctly positioned and butt up to the 2.5 mtr rails. Slots are manufactured into the toe board to allow for any slight dimension variation. M8 bolts are supplied with toe boards four (4) per toe board. Internal corner a hacksaw will be required to notch out the channel section of the toe board, this will allow the toe board to fold and continue around the corner. External corner a hacksaw will be required to cut the toe board in two (2) pieces to the correct measurement. A connection plate will be supplied and you will require a drill to re-drill the toe board.

Tools required for Evorail Top Fixed Tools you will need to install Evorail Top Fixed. 5mm allen key 8mm allen key Hacksaw or electrical cutting machine Battery drill Suitable drill bit to fix wall bracket (6mm masonry or 5mm steel bit) 13mm ratchet & spanner Marker pen Appropriate spanners, drill bits and fixings dependant on the individual roof application.

Planning your layout There will be 2 ways of accessing the components onto the roof: Manually Crane or hoist Once all the components are on the roof, you can start planning the layout and the erection of Evorail. Ensure the roof area of where the system is being installed is clear from debris and is free from any gravel or stones. Before you start to layout the system, plan your starting point. If there s a fixed end or D end that s probably the best place to start, and work from left to right. If the layout connects back to itself i.e. a square. Start at one of the corners with a long upright approximately 1m in from the corner. When your starting point has been decided, begin to layout the 2.5mt rails on the roof where the system is going to be erected, when all laid out begin to place the uprights at the joints of the rails. All sweeping bends should be placed at the appropriate corners.

Continued... Now all the system is laid out and ready to be erected. Go to your starting point and place the Top Fixed upright in position and fix appropriately to roof application, and slide the knee rail into the upright. Then slide the top rail into the upright, holding the rails horizontal slide over the next top fixed upright placing the rails in at the same time. tighten up the M8 fixings with your 5mm allen key, you now have the first 2.5m section in place. Check that all is well and the 2no uprights are in the correct position. It s advised at this stage to double check everything is correct. Take the next rail and slide into the uprights knee rail socket, take the other rail and insert the top rail. An upright then slides over the rails, and fix upright as previous and tighten M8 bolts. Continue this procedure until the run ends or you come to a corner. A CORNER When you come to a corner, place the 2no rails in the upright towards the edge of the roof. Place your next upright adjacent to the rails in the position / line it will be in on the return to the corner. Place the sweeping bend on the upright and rails and mark on your cut lines accordingly to the sweeping bend. (approximately 100mm into the bend will be suffice). Take both rails out and find a suitable place to cut the rails. It s advisable to mark up your cut rails to avoid them getting mixed up. Once cut and marked, place the rails back into the upright. Slide the sweeping bend over the rails with bolts on the bend pointing towards the roof and tighten 2no bolts. Use the 2no off cuts to slide in the return of the sweeping bend. Slide the next upright onto the off cuts and continue fixing the uprights and rails as previous.

Continued... D end A D end will be supplied to slide into the long upright on the finishing side. The D end is 500mm long and can be cut down if required. Tighten bolts up to secure D end Wall fixed end When the rails can be fixed into a wall, a wall bracket will be supplied. There are 4no fixing holes in the bracket, use suitable fixing for the 6mm hole. Into brick or concrete we advise M8 x 50 s JAB fixings of 6mm threaded bar resin fixed. Into cladding we advise pop rivets or tek screws to be used. The system can end on a short or long upright when using the wall brackets, don t exceed the 2.5mtr span.

Continued ON COMPLETION When the Evorail system is erected. The system can be adjusted to accommodate rise and falls of the roof. If levelling is required, unscrew the bottom bolt on the top section of the upright and adjust accordingly. Re-tighten the bolt once level Walk round checking the system is level and in line and double checking all the bolts and fixing are tight and secure.

Tools required for Evorail Parapet Tools you will need to install Evorail Top Fixed. 5mm allen key 8mm allen key Hacksaw or electrical cutting machine Battery drill Suitable drill bit to fix wall bracket (6mm masonry or 5mm steel bit) 13mm ratchet & spanner Marker pen 24mm ratchet & spanner

Planning your layout There will be 2 ways of accessing the components onto the roof: Manually Crane or hoist Once all the components are on the roof, you can start planning the layout and the erection of Evorail. Ensure the roof area of where the system is being installed is clear from debris and is free from any gravel or stones. Before you start to layout the system, plan your starting point. If there s a fixed end or D end that s probably the best place to start, and work from left to right. If the layout connects back to itself i.e. a square. Start at one of the corners with a long upright approximately 1m in from the corner. When your starting point has been decided, begin to layout the 2.5mt rails on the roof where the system is going to be erected, when all laid out begin to place the uprights at the joints of the rails. All sweeping bends should be placed at the appropriate corners.

Continued... Now all the system is laid out and ready to be erected. Go to your starting point and place the Parapet upright over the parapet and start to clamp up the nut on the end of the treaded bar with a 24mm socket and ratchet. When tight and secure slide the knee rail into the upright. Then slide the top rail into the upright, holding the rails horizontal slide over the next parapet upright placing the rails in at the same time. Tighten up the M8 fixings with your 5mm allen key, you now have the first 2.5m section in place. Check that all is well and the two (2) uprights are in the correct position. It s advised at this stage to double check everything is correct. Take the next rail and slide into the uprights knee rail socket, take the other rail and insert the top rail. The parapet upright then slides over the rails, clamp the upright to the parapet as previous. And tighten M8 bolts with 5mm allen key. Continue this procedure until the run ends or you come to a corner. A CORNER When you come to a corner, place the two(2) rails in the upright towards the edge of the roof. Place your next upright adjacent to the rails in the position / line it will be in on the return to the corner. Place the sweeping bend on the upright and rails and mark on your cut lines accordingly to the sweeping bend. (approximately 100mm into the bend will be suffice). Take both rails out and find a safe and suitable place to cut the rails. It s advisable to mark up your cut rails to avoid them getting mixed up. Once cut and marked, place the rails back into the upright. Slide the sweeping bend over the rails with bolts on the bend pointing towards the roof and tighten two (2) bolts. Use the two (2) off cuts to slide in the return of the sweeping bend. Slide the next upright onto the off cuts and continue fixing the uprights and rails as previous.

Continued... D end A D end will be supplied to slide into the long upright on the finishing side. The D end is 500mm long and can be cut down if required. Tighten bolts up to secure D end Wall fixed end When the rails can be fixed into a wall, a wall bracket will be supplied. There are four (4) fixing holes in the bracket, use suitable fixing for the 6mm hole. Into brick or concrete we advise M8 x 50 s JAB fixings of 6mm threaded bar resin fixed. Into cladding we advise pop rivets or tek screws to be used. The system can end on a short or long upright when using the wall brackets, don t exceed the 2.5mtr span.

Continued... ON COMPLETION When the Evorail system is erected. The system can be adjusted to accommodate rise and falls of the roof. If levelling is required, unscrew the bottom bolt on the top section of the upright and adjust accordingly. Re-tighten the bolt once level Walk round checking the system is level and in line and double checking all the bolts and fixing are tight and secure.

Evorail