The following instructions will guide you through the installation of your new vinyl railing.

Similar documents
The following instructions will guide you through the installation of your new vinyl railing stair kit.

Installing the Nantucket (100 Series), Manhattan (200 Series), and Charleston (300 Series) Code-Approved Rail Systems

Installation Instructions for. Before You Begin TOOLS REQUIRED

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

INSTALLATION INSTRUCTIONS GUIDE

DekPro Prestige Aluminum Rail System Level Railing Installation Instructions

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

Double Beam Freestanding Pergola Installation Guide

PREPARATION & TOOL CHECKLIST

Tools Needed. 8 per column: stainless steel or hot-dipped galvanized bolts. Mallet

Fortress Al HOME posts must always be secured to the deck framing. Fortress Al HOME posts should never be attached to only the deck boards.

ATLANTIS RAIL Contact Information

PREPARATION & TOOL CHECK LIST

VINYL PERGOLA. Structural. Recommended Tools. What's Included. SuperiorPlasticProducts.com. SuperiorPlasticProducts.com

Dura-Lock Roof System

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

Continuous Handrail Kit Installation Instructions

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

Independent Containment System (ICS)

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

TREX POST MOUNT DECKING AND CONCRETE

PVC Composite Railing & Stair Kit

TREX TRANSCEND RAILING

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

Chapter 1. Beam and Sill Plates

Bumper Sign INSTALLATION INSTRUCTIONS

Installation Instructions for. Handrail Component System

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Figure 1. RAILING INSTALLATION The following instructions describe the installation of three types of railing sections: Line, Stair, and Angled

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

10x10 Trellis Pergola

RAILING R A IL ING 51

Assembly Aid. One of the packages contains the required bolts, washers and nuts for final assembly

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

Pergola Installation Instructions

Downtown Rack. Custom logo option available

Fortress Al Posts must always be secured to the deck framing. Fortress Al Posts should never be attached to only the deck boards.

42" Hybrid Composite Railing Installation Guide. v

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

TREX SELECT RAILING. Installation Instructions PARTS

TREX PERGOLA INSTALLATION INSTRUCTIONS

Installation Instructions

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS

Aluminum Railing Installation. Glass Railing Spindle Railings Intimacy Railings and Panels

Installing AZEK Evolutions Rail

Stair Parts Installation. Tricks

10x10 Trellis Pergola

INS TA L L AT I O N IN S T R U C T I O N S F O R BEF O R E YO U BE G I N TOOLS REQUIRED

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

10 Octagon Cedar Gazebo Assembly Instructions

COMPOSITE RAILING INSTALLATION

Straight Stringer Installation Instructions

Transform Cable Rail MUST be installed on 4" x 4" wooden posts sleeved with Transform post sleeves to support cable tension!

Swerve Rack CUSTOM RACKS AVAILABLE

TREX SELECT RAILING Installation Instructions

installation care & maintenance instructions moistureshield.com limited lifetime warranty

Locker Pedestal Installation Instructions

Vinyl Gazebo Instructions

Assembly Instructions for 12x16 Floating Dock

The Vienna Trellis. Tools You Will Need. General Information

DeckRail A Product of DeckRite LLC 3912 East Progress North Little Rock, AR Phone: (501) Fax: (501)

CountryAccents Pergola Assembly Instructions

V nyl Gazebo truct c it Assembly Instr ons

ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA North Las Vegas, NV 89030

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Deck Mount Installation with Bench

Harmony 1/4 Glass Railing Installation Instructions - Deck Application

SunTrackerTwo Preparation

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12

The Festival Assembly Instructions

Step 2 - Measure and install joist hangers every 16". See Figure "B" above. Fill every hole in each

PAT installation of a Sun Dome over a in-ground

Call (770) STEP 6: Caulk bolt hole within the bracket for protection from the elements.

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

Curved Baluster Railing Systems

Installation Guidelines

Pergola Installation Guide

Before You Begin IMPORTANT. Always wear safety glasses when cutting and drilling railing or decking products.

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

A Step-by-Step How To Guide

Assembly Instructions

Installing Cable Railings

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

Installation Guide (888)

340 & 350 SERIES BATH ENCLOSURES

ASSEMBLY INSTRUCTIONS FOR SOFTOP SHADE COVER

Tape Measure Carpenter s Square Touch-up Paint Chalk Line. Blue 242. Template

10 x 10 Flat Top Two Tone Pergola

Installation Instructions for Fortress Pure View Railing Panels with Universal (UB) Brackets and Iron Posts

6 1/2 x 6 1/2 Wood Grain Flat Top Pergola

TrendWall Floor-To-Ceiling Panels Installation Instruction

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

PORCH-LOC INSTALLATION INSTRUCTIONS

Tools & Materials Needed

6 1/2 x 6 1/2 Wood Grain Flat Top Pergola

WOOD POST FD POST. Installation Guide FD POST MOUNT STAIR / ANGLE RAILING LAG STAIR / ANGLE RAILING STUD CABLE RAILING FITTINGS

340 & 350 SERIES DELUXE FRAMELESS BYPASS

PORCH RAIL INSTALLATION INSTRUCTIONS. Level Rail... 2 Stair Rail... 8 Care & Maintenance, Finishing... 15

12X20 Breeze Pergola Assembly Manual Outdoor Living Today

Transcription:

Installation Guide St. James Vinyl T-Rail Tools Required Protective eye glasses 3/8 x 3 Concrete Anchors/Fasteners (for Tape measure concrete installations) Variable speed drill/screwdriver Philips Driver and #2 Square Driver Rotary hammer or hammer drill and Wrench and 3/4 deep socket masonry percussion bit recommended by Level (min 24 ) and small torpedo level concrete anchors purchased. (for concrete installations) Miter Saw Snap Line Drill bits 3/32, 1/8, 3/16, 3/8, 1/2", and Quick Clamp 1/4 masonry (Christy s ) PVC Glue The following instructions will guide you through the installation of your new vinyl railing. This installation guide is a recommendation for meeting most code requirements. Always check your local building codes before starting a project and for determining the acceptable installation practices of your area. Please read assembly instructions completely before beginning construction. Always wear protective goggles & gloves when installing a vinyl railing system. Remember to register your Limited Lifetime Warranty at www.lyftym.com/warranty-registration Installation Steps Layout Railing and Position Posts The Vinyl Railing Systems are designed for posts sets from 48 (4 feet) to 120 (10 feet) between posts. The vinyl rail and aluminum inserts (when required) can be trimmed to shorter lengths using a miter saw. When trimming of the rails is necessary, equal amounts should be cut from both ends of the rails in order to maintain equal spacing from the outer picket and the adjacent posts. Determine ahead of time if the post will be anchored to the top of the deck substructure, bolted to the inside of the deck joists, or anchored to concrete. It is best to do a sketch of the general layout in order to plan for post locations and any adjustments to rail lengths. Check measurements for accuracy prior to beginning the project. Determine locations of all line and corner posts. These need to be located inside the joist as shown in the drawing below. Measure each side of the deck so that line posts are spaced as evenly as possible between the corner posts. Remember that the outside dimensions of the vinyl posts are 4, unlike wood, which could be 3 1/2 to 3 5/8. Also check the structural members below the deck to be sure there is no interference with the mounting brackets. If necessary, adjust the post locations. (Designing your railing so the wood posts are against a floor joist will simplify installations.) After determining the location of the posts, install the corner posts first. -1-

Install Posts Vinyl railing posts can be installed using the following methods: Post Tower (Concrete and Wooden Decks) The surface mount tower system is designed for 4 x 4 vinyl posts in railing applications where the posts need to be mounted to a hard surface such as concrete, or this tower system can be used on wood decks when the substructure is modified as detailed at the end of this section. When installed as detailed below, vinyl posts using the post tower can meet post requirements for 36 and 42 high rail systems in one and two family residential applications. Vinyl railing can also be used in all other 42 high railing applications. Posts on Concrete 1) Lay out your post positions according to your railing design. You can use a chalk snap line to mark the railing line and centers of the post locations. Make sure to mark all post positions at least 5 from the edge of the concrete to reduce the chances of cracking the concrete when drilling holes for the concrete anchors. 2) Using the leveling plate as a template, mark the locations on the four mounting holes to be drilled. Drill four holes into the concrete using a 1/4 diameter masonry drill bit. The hole must be drilled to a minimum depth of 3 1/2. Clean out the holes of all dust and debris. 3) Install the four leveling screws into the post mount member. Place the leveling plate on the concrete surface and align over the four holes. Place the post mount member on top of the leveling plate and align the four holes. Adjust the leveling screws to ensure the post mount is level. 4) Install the four concrete bolts with washers as shown by applying downward pressure while turning in a clockwise direction. Continue to tighten the bolts until the heads are firmly seated. (Do not over tighten.) 5) Install the two guide blocks onto the post mount member. They should be positioned so that the screws from the railing brackets will screw into the guide blocks. Once the proper heights are established, drill a 3/16 diameter hole through the guide block and the post mount member. Install the supplied guide block screws to hold the guide blocks in place. 6) Slide your posts over the tower and install the railing sections. (Note: If using a post trim, slide the trim piece over the post tower, then slide the post over the tower and into the trim piece) (Note: If using post trims cut the plastic tabs at the 90 degree bend and slide the trim pieces over the posts) -2-

Posts on Wood 1) Lay out your post positions according to your railing design. You can use a chalk snap line to mark the railing line and centers of the post locations. Make sure to mark the post center line position at least 3 1/4 from the edge of the rim joist. The top plate must be a minimum of 3/4 from the rim joist so the bolts will clear the rim joist on the underside of the deck. Install a piece of 2 x 8 treated lumber between the joists, under the deck boards where the tower is to be installed. Attach this reinforcement board to the rim joist and stringers. (Three screws should be used on each end.) Thickness of the deck board and reinforcement board underneath should be a minimum of 3 inches actual thickness. 2) Using the leveling plate as a template, mark the locations of the four mounting holes to be drilled. Drill four holes through the decking and blocking using a 3/8 diameter drill bit. 3) Install the four leveling screws into the post mount member. Place the leveling plate on the wood deck surface and align over the four drilled holes. Place the post mount member on top of the leveling plate and align the four holes. Adjust the leveling screws to ensure the post mount member is level. 4) Install the four mounting bolts with washers as shown. On the underside, place the back plate over the exposed mounting bolts. (Use the centered holes for in-line applications and the offset holes for corner applications.) Secure the back plate by using the supplied mounting nuts and washers. 5) Install the two guide blocks onto the post mount member. They should be positioned so that the screws from the railing brackets will screw into the guide blocks. Once the proper heights are established, drill a 3/16 diameter hole through the guide block and the post mount member. Install the supplied guide block screws to hold the guide blocks in place. 6) Slide your posts over the tower and install the railing sections. (Note: If using a post trim, slide the trim piece over the post tower, then slide the post over the tower and into the trim piece.) (Note: It may be necessary to cut the plastic tabs at the 90 degree bend when sliding the trim pieces over the posts) Sleeving a Wood 4 x 4 Post The vinyl post can be used to sleeve 4 x 4 wooden posts. When installed as detailed below, vinyl posts used as a sleeve can meet post requirements for 36 high and 42 high rail systems in one and two family dwelling residential applications. Note: The instructions reflect how the wood posts were installed during testing to ensure the post attachment and substructure would meet the same load requirements as the railing system. Check with your local code official for other acceptable attachment methods. -3-

1) Designing your deck so the post spacing will end up with a stringer at each post will simplify installation. Lay out your post positions according to your railing design. 2) Temporarily attach the wood post in place. For corner post applications and where the post is against a stringer, add an additional stringer on the opposite side of the post. For line post applications, where the post doesn t butt up against a stringer, add a stringer on each side of the post. If the stringers run across the deck, a cross stringer may be placed 24 inches from the rim joist. The additional stringer(s) attached to the post is then attached to the cross stringer. For all of the applications, add a cross member between the two stringers thus creating a structural box around the post. (Four screws should be used on each end when creating the structural box.) 3) Drill two 1/2 holes through the rim joist, wood post, and back cross member 1 1/2 from the top and bottom of the rim joist. Drill one 1/2 hole through the wood post and the stringers on each side. This hole will be perpendicular to the two holes already drilled and should be in the middle of the stringers and post. For ACQ lumber, all bolts, washers, and nuts must be galvanized. The bolts through the rim joist have a 1/2 washer, then a 3/4 washer, which is against the wood. Insert bolts and place a 3/4 washer, 1/2 washer and nut on the bolt. The bolt through the stringers and post only has a 1/2 washer on each side. Tighten all bolts. 4) Slide your vinyl posts over the wood posts and install the railing sections. (Note: If using a post trim, slide the trim piece over the wood post, then slide the vinyl post over the wood post and into the trim piece) (Note: It may be necessary to cut the plastic tabs at the 90 degree bend when sliding the trim pieces over the posts) -4-

VINYL T-RAIL INSTALLATION Always check your local building codes before starting a project. Please read assembly instructions completely before beginning construction. Always wear protective goggles & gloves when installing a vinyl railing system. Vinyl T-Rail Components 3. 6. 4.. 1. 5. 9. 7. 1. 4 x 4 Vinyl Post (Sold Separately) 2. 4 x 4 Post Trim (Sold Separately) 3. 4 x 4 Post Cap (Sold Separately) 4. 3 1/2 x 3 1/2 Vinyl T-Rail 5. 2 x 3 1/2 Aluminum H-Channel Insert (Required in all top rails and in bottom rails of lengths exceeding 8 ) 6. 3 1/2 x 3 1/2 T-Rail Bracket Kit 7. 1 3/8 x 1 3/8 Vinyl Picket (Spindles also available) 8. 2 x 3 1/2 Vinyl Rail 9. 2 x 3 1/2 Standard Rail Bracket Kit 10. Adjustable Foot Block Kit 2. 8. -5-

Railing Layout Remember to check local building codes for rail height requirements in your area. The vinyl railing systems are designed to meet requirements for 36 and 42 high rail systems in one and two family dwelling residential applications. Vinyl railing can also be used in all other 42 high railing applications. This is dependent on the post installation methods detailed in the preceding post installation instructions section. The 2 x 3 1/2 and 3 1/2 x 3 1/2" rails run in between the posts and are installed with brackets. The bottom of the railing section is designed to be 2 1/2 above the surface. Kits are available with 1 3/8 x 1 3/8 pickets or spindles. Replace with drawing from Duane Rail Installation 1) Cut Rails to Length. Measure distance between posts and subtract 3/8 to allow room for the brackets (3/16 each end). Mark the rails to the calculated length using a square. Important: Make sure that there is equal spacing between the picket hole and end of rail to maintain uniform picket spacing. Do not leave an open picket insert hole at the bracket. Trim both ends of the rails. 2) Install Post Trim. Be sure you install the post trim over the posts before you start attaching the stair sections to the posts. (Note: You may need to notch the post trim if bottom rail is less than 2 1/2 from the deck surface.) -6-

3) Install Foot Block and Drill Weep Holes. Center and screw the adjustable foot block onto the bottom of the bottom rail. Take the 2 x 3 1/2 rail and drill four 1/4 drain holes on the underside of the bottom rail. One adjustable foot block kit is required on all railing sections. Drain Holes Adjustable Foot Foot Block Block Insert 4) Install Bottom Rail. When required, slide the aluminum insert into the 2 x 3 1/2 rail such that the beveled legs of the H are up towards the side with the picket holes. Trim the insert to match the length of the rail. Slide trim pieces onto the bottom rail facing the finished trim towards the center of the rail. After making certain that the aluminum insert is positioned with the beveled legs facing the hole, slide the 2 x 3 1/2 brackets at both ends the bottom rail. Lower bottom rail (the rail with your drain holes) into position between posts and set onto the foot block. Make sure the holes for the pickets are facing up. Ensure the rail is level and the brackets are centered on the post through the six outside holes with a 1/8 drill bit and attach bracket to post using six of #12 x 1 1/4 screws provided. Drill two (one on each side) #8 x 3/4 screws provided, through the sides of the bottom rail (Predrill with a 3/32 drill). These two side screws go through the vinyl bottom rail and through the aluminum insert on lengths exceeding 8 into the vinyl bracket. This will provide the mechanical attachment of the rail to the bracket. Snap trim in place. Repeat for the other bracket. Beveled Legs Foot Block -7-

5) Install Top Brackets. Insert one picket or spindle in the far left hole and another picket or spindle in the far right hole. Insert the aluminum insert into the T-Rail such that the shorter legs of the insert are facing the hole. Feed the top T- Rail onto the pickets or spindles. Slide a T-Rail bracket under the end of each rail such that the bracket is butted up to the T portion of the rail. Make sure the rail is centered on the post and level and then mark the post under the brackets. Remove the top rail and set aside. Line the bottom of the black bracket with the line that you just marked. Center the bracket on the post and pre-drill the post through the bottom two outside holes and the inner two holes in the center with 1/8 bit. Secure the bracket in place using two #12 x 1 1/4 screws provided in the bottom two holes and the #12 x 1" countersunk screws provided in the center holes. Repeat with the other top bracket. T-Rail Brackets 6) Install Top Rail. Slide the aluminum insert into the 3 1/2 x 3 1/2 T-rail such that the beveled legs of the H are down towards the side with the picket holes. Trim the insert to match the length of the rail. Slide trim pieces onto the top rail facing the finished trim towards the center of the rail. Insert the remaining pickets or spindles in to the bottom rail. Starting at one end of the rail begin feeding the rail down onto the pickets or spindles. Once the top of the rail has been seated onto all the pickets and the rail is level, drive two (one on each side) #8 x 3/4 screws provided, through the bottom side hole (Pre-drill with a 3/32 drill). These side screws go through the vinyl and insert. This will provide the mechanical attachment of the rail to the bracket. Snap trim in place. Repeat for the other bracket. -8-

7) Install Post Cap. Place a 1 x 1/4 wide bead of glue on inside of cap along the center of all four sides. Slide cap onto top of post. The glue will smear as the cap is slid on the post and a permanent bond will take effect after a few minutes. Be careful not to drip glue on the outside of a post or cap or it will cause a scar. Cleaning If cleaning becomes necessary, use a mild detergent or household cleaner. If stains or scuff marks appear, use a fiberglass cleaner/glaze or #0000 steel wool and Simple Green. The surface can be sanded, and a fine sand paper (such as 200 grit) should be used, followed by 400 or 600 grit to polish and restore it to its original finish. Important It is the responsibility of the contractor to meet or exceed all code and safety requirements, and to obtain all required building permits. These instructions are only a guide, and may not address every circumstance. The deck and railing installer should determine and implement appropriate installation techniques for each situation. Manufacturer shall not be held liable for improper or unsafe installations. -9-