ORP-F1 Regular: Basic / J-Connection / M-Connection

Similar documents
ORP-R1 Mini/Regular: Basic / J-Connection / M-Connection

NRS Installation Manual

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

Installation Instructions

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT

ASSEMBLY INSTRUCTIONS

CSS Central Mount System

Owner's Manual & Assembly Instructions

DUTCH GABLE FREESTANDING CARPORT

Hip Roof Canopy Instructions

Installation Guidelines

English/French 06/04

Balustrade Systems / Installation Instructions

Installation Instructions (For Dealer or Contractor)

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

Football Goal Posts MODEL SERIES: FGP400 and FGP600 series

GrowSpan Estate Pro I Greenhouse

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS

Model No. EP84-A, EP84AR-A, P84L

Universal flat-panel mount

Moo-Tel Small Animal Hut

S H E D A S S E M B L Y I N S T R U C T I O N S

ClearSpan Attached-Style Awning

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

PMT-L31 (for Low Ceilings) PMT-H35 (for High Ceilings)

Sunset Swings By Health in Motion, LLC

8' x 22' Cash Hut INSTALLATION INSTRUCTIONS

Clopay Models 835/837 Sliding Door System Installation Guide

Wall mounting bracket

SB-WM-ART1-M-BL. Weatherproof Universal Single-Arm Articulating Mount for Medium Displays INSTALLATION MANUAL

Titan Series Awning Assembly and Installation Instructions

Greenhouse Assembly Instructions

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

UNIVERSAL INSTALLATION INSTRUCTIONS FOR CARPORTS

Installation Guidelines

Dura-Lock Roof System

MOUNTING INSTRUCTIONS CONCRETE PURLIN BRACKET

ClearSpan PolyMax Windbreak Wall

Panel Guard Installation For Adhesive Attachment

ALUMINUM FOOTBALL GOALS INSTRUCTIONS WARNING WARNING Upright. Upright. Flag. Flag. Offset Pole.

ShorePort PWC Lift Instructions " x 138" Sandstone ShorePort " x 138" White ShorePort " x 138" Tan ShorePort

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

Installation Guide Simplicity 16. V2.9 Lu171117


TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS

Fitting Instructions

ASSEMBLY INSTRUCTIONS FOR "GA" MODULAR BUILDINGS ALL MODELS

GroundControl. Follow instructions contained in this manual. Incorrect installation could result in serious injury or damage to property.

FORD MOUNT INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 "HERITAGE" F-150/250LD 2WD, 97-04, 04 "HERITAGE" 4WD WD EXPEDITION/ WD EXPEDITION PART

TURBOTWISTER ASSEMBLY AND INSTALLATION INSTRUCTIONS

7 X 10 X 6 SHELTER 7 X 16 X 6 SHELTER 12 X 10 X 6 SHELTER 12 X 16 X 6 SHELTER

S H E D A S S E M B L Y I N S T R U C T I O N S

Install Instructions. NewAge Steel Welded Tall Locker

Installation Instructions

Installation Instructions

General Array Layout Sketch

High End Residential In-Ground Basketball System Owners Manual

LAWN AND GARDEN GREENHOUSE

LAWN AND GARDEN GREENHOUSE

4 INSTALLATION Requirements on Installation Securing Space Before installing the Panaboard, be sure to secure space shown in section 2.6.

Otter Pro XT Cottage Installation and Set-Up Instructions

Universal flat-panel mount

Installation Guide Simplicity Alfresco. V1.9 Lu070318

ELEGANCE SHOWER DOOR/ENCLOSURE INSTALLATION INSTRUCTIONS. Style A Style B Style C Style D

ClearSpan Grab Bag Canopy

2010 KIDS CENTER #6 K-06

PMT-L11 (for Low Ceilings) PMT-H15 (for High Ceilings)

DOCK WEDGE - STANDARD

LCD DISPLAY MOUNT

Foot Rail. Nissan Navara_Frontier D23 DC START HERE! READ ME FIRST

Be sure any accessory used will fit with the soft upper doors before installing. Not all accessories will be compatible.

SHOREMASTER CANOPY TABLE OF CONTENTS

INTRODUCTION. EqunioxRoof.com. Pro Tip

ET-PKL100S. Installation Instructions. Ceiling Mount Bracket (for Low Ceilings) Model No.

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

CARPORT INSTALLATION INSTRUCTIONS FOR 4 1/2 ON CENTER FRAMES

Assembly instructions. 6x4. Model GH1354A. 6x6. Model GH1357A. 6x8. Model GH1360A. 6x10. Walk-in Greenhouse. Model GH1363A

ASSEMBLY INSTRUCTIONS FOR MODEL GW86-A

How-To-build guide carport

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

Portable System Owners Manual Customer Service Center N53 W24700 South Corporate Circle Sussex, WI U.S.A.

INSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

Balustrade System Installation - Cambridge & Huntington

Downtown Rack. Custom logo option available

Curium 19H Installation Instructions & Parts List

Assembly Instructions

SunTrackerTwo Preparation

MPA-9000 Universal Ceiling Projector Mount Kit

GREENHOUSE 6'x8' ASSEMBLY INSTRUCTIONS. (Internal Dimensions) Overall Dimensions (Approx.) L 193 W 200 H cms 97.5" L 76" W 78.

Frameless Hinged Door Enclosure. These instructions must be left with the user. Installation Guide W2-B

FAIRFAX ROUGHING-IN K-12151T=673. UNIT: mm K-12153T K-12156T K-12151T=610 K-12157T K-12161T T01-A -1- INSTALLATION INSTRUCTIONS

SB-WM-ART2-L-BL SB-WM-ART2-XL-BL

GLOSSARY OF TERMS SECTION 8

General Guidelines:

ELPMB27. Short Throw Projector Wall Mount Installation Manual xxx(fr) xxx(de) xxx(it) xxx(es) xxx(pt) xxx(zhs)

Barn Door & Hardware Installation Guide

Installation and Assembly: In-wall Mount for 32" to 71" Flat Panel Displays

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16

Transcription:

D636 ORP-F Regular: Basic / J-Connection / M-Connection Construction Manual Thank you for purchasing our product. The indication symbols in this construction manual are for you to construct the product safely and properly and also to protect the owner etc. from damage. Be sure to understand the meaning of each indication symbol and act in accordance with this manual (its instructions). In this construction manual, the following symbols are used. Warning * Tip Mishandling may lead to minor or moderate injury on the part of the user, or to property damage. Matters you should take particular care with during the construction process. If not followed, construction will fail or failure may occur after the product is constructed. Matters to be noted related to the contents of construction instructions (each instruction). Conditions where limitations apply to construction instructions. Helpful tips complementing construction instructions. * Observe the following items to prevent personal injury or property damage due to damage or collapse of the product. <Before Construction> Warning Constructing the product may be dangerous. Be sure to have a professional contractor construct the product. This product is a simplified carport. Do not carelessly modify or rebuild the product in order to convert it into storage space, playing space or residential space. Do not construct the product in a place where snowfall (fresh snow) of more than 0 cm may happen. Place the product where snow will not slide off the roof of the house directly onto the product. Do not construct the product on a cliff, a roof or in any other place with strong winds. Do not construct the product in a place where waste heat from a hot-water heater or a heating apparatus will build up inside the product. Toxicosis may occur due to exhaust. If constructing the product on a slope, ensure sufficient embedding depth on the lower side. If constructing products of different sizes simultaneously in the same place, be sure not to mix components of each product in order to preserve the original performance. Be sure to read this construction manual before construction for proper construction and assembly. Be sure to construct the product by following this construction manual. Check if all the required components and parts are prepared by referring to the package details. Make sure that the product is constructed where waste heat from a hot-water heater or a heating apparatus will not contact the product. Coating deterioration / exfoliation may occur due to exhaust. Check if the product properly fits the size of the construction place. --

<About Foundation Construction> Warning For cold places where the subsoil may be frozen, build the foundations deeper than the frost line. Otherwise, strength degradation may occur. Be sure to lay crushed stones on the foundations and make water draining holes ( 6) at the base of the pillars and foundations for water drainage inside the pillars. Otherwise the water inside the pillars may freeze and expand, causing damage to the pillars. Do not apply sand containing salt (sea sand) or chlorine-based strongly alkaline concrete admixtures (anti-freezing agents, curing accelerators, accelerators, etc.) to mortar or concrete. Otherwise, metal such as aluminum may be corroded. If required, use chlorine-free or non-alkaline admixtures. If substances such as mortar or concrete have adhered to the product surface, quickly wipe them away. Otherwise the product appearance may be affected with stains or blotches. <Warnings During Construction> If a water pipe is mounted to the pillar labeled "Warnings for Use", it will hide the label and the warnings will not be provided properly. Direct the indication label to the side where no water pipe is mounted. If aluminum products contact metal other than zinc or stainless steel, implement insulation. Do not modify the product or make holes other than on the specified points. Seal the specified points in order to prevent water leakage. If using silicone sealant, use our specified dealcoholized sealant in order to avoid failure such as cracks in polycarbonate boards. In order to prevent product strength degradation or injury, use the specified number of our genuine bolts and screws and make sure that there is no looseness after fixing them at the following recommended torque. * 4 Screws:.5 N m ± 0.5 N m (5 ± 5 kgf cm) * 5 Screws: 3.0 N m ± 0.5 N m (30 ± 5 kgf cm) Warning Sealant Manufacturer Shin-Etsu Chemical Co., Ltd. Momentive Performance Materials Japan LLC Toray / Dow Corning Corporation * M8 Bolts: 0.0 N m ± 0.5 N m (00 ± 5 kgf cm) Product and Number Sealant 7 TOSSEAL 380 SE960 Work safely during construction. * Wear working clothes properly (safety helmets, safety belts and protective equipment for eyes, hands and feet). * Keep the workplace tidy and ensure safety. Ensuring safety for high place work, preventing collapse, keeping enough illuminance with lighting, etc. are especially important. * Check the functions of equipment, tools, protective equipment, etc. before using them. * Consider each work and process while proceeding with construction. Work which requires a license, skill training or special education must only be done by a qualified person. * Workers should confirm one another's safety. Be sure to check the health of each worker and maintain health management. * If an accident should happen, immediately provide first aid and prioritize rescue over anything else. Remove stains on the product surface. If the product surface is damaged by mistake, repair it with repairing coating. <After Construction> Warning Retighten the bolts and nuts. However, the lock bolts must be retightened before curing. Give the installation manual to the owner. --

INDEX Package Details... 4 Part s... 6 Construction Method for Basic Type... 7 Items to Check... 7 Checking Foundation Dimensions... 8 Preparation for Pillar Construction... 8 3 Constructing Pillars and Beams... 9 4 Processing Components... 0 5 Mounting s / Rear Frames... 6 Mounting s... 7 Mounting Side Frames... 3 8 Mounting Roof Rafters... 4 9 Mounting PC Roof Panels... 5 0 Mounting Side Frame Covers / Roof Rafter Covers... 5 Mounting Water Pipes... 6 Construction Method for J-Connection... 7 Items to Check... 7 Processing Components... 8 Mounting Components... 9 Construction Method for M-Connection... Drawing... Marking Foundation Position... Constructing M-Connection Beam Connecting Fittings... Mounting Connection Ridgepoles... 3 3 Mounting M-Connection Edge Caps... 4 4 Mounting MY-Connection Covers... 4 Indication Symbols Independent Foundations For Construction with Independent Foundations For Construction with Concrete Concrete Slabs on Grade Slabs on Grade Pillar Moving For Construction by Moving Pillar Position M-Connection For Constructing M-Connection J-Connection For Constructing "J-Connection" Wind Resistance For Wind Resistant Construction Optional Optional Product Point Construction Process Marking Foundation Position 3 4 Preparation for Pillar Construction Mounting Brackets and Beams Mounting Covers and Caps 5 6 7 8 Mounting Rear Frames / s / s Mounting Caps Mounting Side Frames Checking Diagonals Mounting Roof Rafters Mounting PC Roof Panels Mounting Side Frame 9 0 Covers / Roof Rafter Covers Mounting Water Pipes -3-

.. Package Details * Check if all the required components and parts are provided by referring to the package details. [] Pillar Set Required Quantity [] Beam Set Required Quantity Included Included Pillar Beam [3] Bracket Set Required Quantity Included Bracket [4] Length Set Required Quantity [5] Width Set (Roof Rafter) Required Quantity W4 / 7 W30 W4 / L50 W7 / L50 W30 / L50 Rear Frame Roof Rafter 6 6 6 Roof Rafter Cover 6 6 6 3 4 Side Frame Water Pipe 40 x L3500 Side Frame Cover [6] Connection Component Set Required Quantity W4 / 7 W30 [7] Connection Width Set (Roof Rafter) Required Quantity W4 W7 W30 Rear Frame Sleeve Roof Rafter 7 7 7 Sleeve Roof Rafter Cover 7 7 7 Sleeve 3 4 [8] Reinforcement Set (Optional) Required Quantity [6-] 4 x 3 Pan Head Self Drilling Screw 44 5 Reinforcement for Wind Resistant Reinforcement (L = 500) [8-] 5 x 3 Pan Head Self Drilling Screw 8 [9] PC Roof Panel Set Required Quantity Included 3 Included 4 Included PC Roof Panel 3 4-4-

[0] Parts Set Required Quantity [0] Parts Set (Continued) Required Quantity W4 / 7 W30 W4 / 7 W30 Drain Elbow Cap 3 Each for Right and Left 4 Each for Right and Left 9 Elbow ( 40) Pillar Cap Rainwater Pipe Holder 3 3 Pillar-Beam Cover Rainwater Pipe Attachment Beam Cap Rainwater Pipe Packing 8 x 00 Anchor Stick Rainwater Pipe Hole Cover Cap Hole Hiding Sticker 0 0 4 Panel Cushion 4 3 [0-] M8 x 0 Hex Bolt PW (with loosening prevention) [0-] 4 x 3 Pan Head Self Drilling Screw 4 3 4 3 Rear Frame Corner Cap [Part Number] L: 68740A, R: 6874A Each Each for Right for Right and Left and Left [0-3] 5 x Self-Tapping Truss Head Screw Class 3 Installation Manual <UD7> Construction Manual <D60> - - 8 8 Adhesive Corner Cap [Part Number] L: 68738A, R: 68739A Each Each for Right for Right and Left and Left [] PC Roof Panel Holder Set Required Quantity Standard Type 706 Pitch L L9 L50 PC Roof Panel Holder 3 4 7 PC Roof Panel Holder Spacer 4 4 4 [-] 5 x 3 Pan Head Self Drilling Screw 7 7 6 Construction Manual <D64> - [] MY-Connection Ridgepole Set Required Quantity [3] M-Connection Parts Set Required Quantity M/Y-Connection Ridgepole MY-Connection Cover for F M-Connection Connecting Fixing Fitting for F [3-] 4 x 3 Pan Head Self Drilling Screw 4-5-

[4] M-Connection Parts Set Required Quantity [4] M-Connection Parts Set (Continued) Required Quantity M-Connection Metal Fitting Spacer 8 M-Connection Beam Connecting Fitting for F 4 M-Connection Fixing Fitting for F 4 Beam Spacer 8 M-Connection Edge Cap for F [4-] M8 x 80 Hex Bolt [4-] Hex Self-Lock Nut for M8 [4-3] Plain Washer for M8 [4-4] 4 x 3 Pan Head Self Drilling Screw [4-5] 4 x 0 Self-Tapping Truss Head Class 8 8 6 4 4 Part s Corner Cap R [Part Number] 68739A Rear Frame Corner Cap R [Part Number] 6874A 5 x Self-Tapping Truss Head Screw Class 3 Roof Rafter Cover 5 x Self-Tapping Truss Head Screw Class 3 5 x Self-Tapping Truss Head Screw Class 3 Roof Rafter Beam Cap PC Roof Panel PC Roof Panel Receiver Rear Frame 5 x Self-Tapping Truss Head Screw Class 3 Side Frame Side Frame Cover 5 x Self-Tapping Truss Head Screw Class 3 Rear Frame Corner Cap L [Part Number] 68740A Panel Cushion M8 x 0 Hex Bolt PW (with loosening prevention) Cap 5 x Self-Tapping Truss Head Screw Class 3 Pillar-Beam Cover Beam Corner Cap L [Part Number] 68738A Anchor Stick Pillar Cap Bracket Pillar M8 x 0 Hex Bolt PW (with loosening prevention) -6-

94 Construction of Basic Type Pillar Moving Items to Check Drawing Warning For [Pillar Moving], move the pillar within ±00 mm of the pillar core-to-core distance dimensions. Be sure to lay crushed stones so that the water inside the pillars can be drained. J-Connection For Mounting Detachable Supports Also refer to " Detachable Support Mounting Manual <D605>". Tip P.7 P. M-Connection This symbol indicates the [Pillar Moving] range. For the foundation dimensions of [J-Connection] and [M-Connection], refer to page 8 and relevant pages. [For Long Pillars] Add 300 to the height dimension. W 508 706 [Roof Rafter Core-to-Core] 00 00 00 00 H H W G.L. 90 G.L. 550 894 064 900 [Pillar Core-to-Core] 064 Width W4 W7 W30 W 393 69 99 W 58 58 58 H 49 70 9 H 043 064 085 Marking Foundations () Determine the embedding position for pillars and then dig foundation holes. P.8 [About Foundation Dimensions] Refer to "Page 8" for foundation dimensions. W DL Carport Main Unit Outer Line DW 064 900 064 508-7-

Checking Foundation Dimensions Independent Foundations J-Connection M-Connection [J-Connection] Also refer to the foundation dimensions on this page. [M-Connection] Independent Foundations Work required for [Construction with Independent Foundations]. () Check the foundation hole dimensions. Size (Width) W4 W7 W30 DW 700 700 800 DL 600 600 700 DW Rear Frame Side 300 (* ) DL Side 550 Tip (*) is thedimension between the pillar core and the foundation edge on the rear side of the foundation. Concrete Slabs on Grade Concrete Slabs on Grade Work required for [Construction with Concrete Slabs on Grade]. () Check the foundation hole dimensions. Size (Width) DW DL W4 W7 W30 350 350 370 300 300 370 50 DL Rear Frame Side DW 50 Side 50 00 550 The edge distance between the top of the foundation and the concrete slabs on grade must be 00 mm or more. Foundation Concrete Crushed Stones 00 or More Pillar G.L. 00 or More Rebar Lay rebar. Concrete Slabs on Grade Preparation for Pillar Construction () Insert an anchor stick to the pillar. () Make a 6 water drain hole near the G.L. of the pillar (aboveground). Pillar [When Constructing Pillars] Construct the pillar so that the "Warnings for Use"label will not be hidden by the water pipe. Check if the pillar is vertical. Warning The pillar may be damaged if there is no water drain hole. 5 Level 6 Water Drain Hole G.L. Anchor Stick -8-

3 Constructing Pillars and Beams Mounting Brackets and Pillar-Beam Covers () Insert a bracket to the pillar and mount it with [0-]. () Insert a beam to the bracket and mount it with [0-]. Bracket Do not "loosen or tighten" bolts after the loosening prevention agent has cured. Bolts may become easy to loosen. (Cures in about 4 hours after tightening. ) Bracket [0-] M8 x 0 Hex Bolt PW (with loosening prevention) Beam Pillar [0-] M8 x 0 Hex Bolt PW (with loosening prevention) Mounting Beams and Caps () Put a pillar cap on the pillar. () Fit a pillar-beam cover into the notch on the pillar. (3) Mount the pillar-beam cover to the pillar cap with [0-3]. (4) Seal the beam cap and then put it on the beam. M-Connection P. For [M-Connection], also refer to page prior to work. Pillar Cap Hook Rotate Pillar Cap Press them together Spread Pillar-Beam Cover Beam Pillar-Beam Cover Pillar [0-3] 5 x Self-Tapping Truss Head Screw Class 3 Tip During this step, pillar caps or pillar-beam covers are slightly unsteady. Pillar Cap Beam Pillar Beam Cap -9-

4 Processing Components P.8 Refer to page 8 for processing J-connection components. For Pillar Moving (processing components to be mounted on moved pillars or beams) Pillar Moving Work required for [Pillar Moving]. () Process holes on the component. () Cover the existing holes with hole hiding stickers. Pillar Moving Distance Pillar moving distance must be within 00 mm. [Rear Frame] Existing Hole Additional 5.5 Hole Processing Rear Frame Pillar Moving Distance Hole Hiding Stickers 36 5.5 Processed Hole Pillar Moving Distance [] 5.5 Additionally Processed Hole Existing Hole Pillar Moving Distance Hole Hiding Stickers 36 5.5 Processed Hole Pillar Moving Distance [] 5.5 Additionally Processed Hole Existing Hole Pillar Moving Distance Hole Hiding Stickers Pillar Moving Distance 36 5.5 Processed Hole For Mounting Reinforcement Optional Wind Resistance Work required for [Wind Resistance]. 5.5 Hole 00 () Process 5.5 holes on the side of the roof purlin. (8 points) () Process 4.5 additional holes on the side of the roof purlin reinforcement. (3) Insert the roof purlin reinforcement into the roof purlin and mount it with [8-]. 400 0 560.5 5.5 Processed Hole (8 Points) V-Groove Reinforcement [8-] 5 x 3 Pan Head Self Drilling Screw 400 0 560.5 00 0 Reinforcement 0 4.5 Processed Hole V-Groove 4.5 Processed Hole 0.6 80 Total Length of Reinforcement: 500-0- 80 Total Length of Reinforcement: 500

For Wind Resistant Construction (processing holes for additional reinforcement screws) Wind Resistance Work required for [Wind Resistance]. () Process the component. [] [Beam] [] 8 5.5 Processed Hole Process holes in all roof purlins. [For Moving Pillars Inside] Process holes only on the moved side. 8 5.5 Processed Hole [For W30] Process 4.5 pilot holes also in the bracket. 4.5 Processed Hole ( Part) 4.5 Processed Hole ( Part) Bracket 4.5 Processed Hole 8 MEMO --

5 Mounting s / Rear Frames J-Connection P.0 For [J-Connection], also refer to page 0 prior to work. PC Roof Panel Receiver Rear Frame () Mount a rear frame to the bracket with [0-3]. () Affix a panel cushion to the roof purlin. (3) Mount the roof purlin to the beam with [0-3]. Move the PC roof panel receiver to the position shown in the figure below. Center [0-3] 5 x Self-Tapping Truss Head Screw Class 3 Between Notches Panel Cushion Affix the panel cushion to the position shown in the figure below. Panel Cushion Between Holes Between Holes [0-3] 5 x Self-Tapping Truss Head Screw Class 3 Work required for [Wind Resistance]. Wind Resistance Center Direct the fin on the roof purlin to the front frame side. Rear Frame Side Beam Side Fin Additionally fix to the roof purlin and beam with [-]. [-] 5 x 3 Pan Head Self Drilling Screw 6 Mounting s J-Connection P.0 For [J-Connection], also refer to page 0 prior to work. () Mount the front frame to the beam with [0-3]. [0-3] 5 x Self-Tapping Truss Head Screw Class 3 Work required for [Wind Resistance]. Wind Resistance Additionally fix to the roof purlin and beam with [-]. [-] 5 x 3 Pan Head Self Drilling Screw Beam --

7 Mounting Side Frames Processing Caps M-Connection Work required for [M-Connection]. () Process corner caps. 9 Corner Cap Cut 5 Mounting Caps () Seal a front frame corner cap and rear frame corner cap. () Put the front frame corner cap on the front frame. (3) Put the rear frame corner cap on the side frame. Corner Cap View A Insertion Surface Side Frame Insertion Surface Cap B View Rear Frame Side Side Frame View B Insertion Surface Side Frame Insertion Surface Rear Frame Corner Cap -3-

3 Mounting Side Frames () Temporarily fix a side frame to the front frame corner cap with [0-3]. () Insert the side frame to the rear frame and mount it with [0-3]. (3) Mount the side frame to the roof purlin and rear frame with [0-3]. (4) Seal the joint of the notch on the rear frame edge and the side frame. (5) Even out the diagonal dimensions around the roof frames. [After Mounting Side Frames] Check diagonal dimensions. Front Frame Roof Purlin [0-3] 5 x Self-Tapping Truss Head Screw Class 3 Side Frame Rear Frame Rear Frame Mount components so that screws do not float or tilt. Screw Float Screw Tilt No Screw Float / Tilt 8 Mounting Roof Rafters () Seal the notch on the rear frame. () Mount the roof rafter to the front frame / rear frame / roof purlin with [0-3]. Roof Rafter [0-3] 5 x Self-Tapping Truss Head Screw Class 3 Rear Frame If the sealant on the rear frame notch has spilled onto the inner side of the roof, wipe it up. Rear Frame Roof Purlin Rear Frame Mount components so that screws do not float or tilt. Screw Float Screw Tilt No Screw Float / Tilt -4-

9 Mounting PC Roof Panels () Insert PC roof panels into the front frame cover and PC roof panel receiver into the rear frame. Be sure to check the front and back of the PC roof panels and detach their protective sheets before mounting them. Protective Sheet PC Roof Panel Tip The embedded length of the roof rafter must be the same on the right and left. Embedded Embedded PC Roof Panel Cover PC Roof Panel PC Roof Panel Side Frame Rear Frame Press the PC roof panel against the PC roof panel receiver when mounting. PC Roof Panel PC Roof Panel Receiver 0 Mounting Side Frame Covers / Roof Rafter Covers () Mount the roof rafter / side frame cover to the roof rafter and side frame with [0-3]. () Seal the roof rafter cover / side frame cover. Mount components so that screws do not float or tilt. Screw Float For Mounting PC Roof Panel Holders Also refer to "PC Roof Panel Holder Mounting Manual <D64>". Screw Tilt No Screw Float / Tilt [After Mounting] Check that the roof rafter and the roof rafter cover are properly engaged. [When Mounting] Mount from the front frame side. Mount while pressing against the front frame. Cover [0-3] 5 x Self-Tapping Truss Head Screw Class 3 Roof Rafter Cover Side Frame Rear Frame PC Roof Panel Side Frame Cover -5-

Mounting Water Pipes () Cut the water pipe. () Mount "Rainwater Pipe Packing" and "Rainwater Pipe Attachment" to the water drain hole on one side of the rear frame with [0-3]. (3) Mount "Rainwater Pipe Holder" to the pillar with [0-]. (4) Mount a "Drain Elbow", "Water Pipe" and "9 Elbow" with adhesive. (5) Mount "Rainwater Pipe Packing" and "Rainwater Pipe Hole Cover Cap" to the water drain hole on the other side of the rear frame with [0-3]. (6) Seal the screws inside the rear frame. Water Drain Hole Rainwater Pipe Packing Rear Frame Adhesive Adhesive Rainwater Pipe Attachment [0-3] 5 x Self-Tapping Truss Head Screw Class 3 Water Drain Hole Adhesive Drain Elbow Rainwater Pipe Packing Adhesive 63 9 Elbow Change the length according to the moved distance if the pillar has been moved. Rainwater Pipe Hole Cover Cap [0-3] 5 x Self-Tapping Truss Head Screw Class 3 Water Pipe [0-] 4 x 3 Pan Head Self Drilling Screw Adhesive Rainwater Pipe Holder 9 Elbow -6-

Construction Method for J-Connection J-Connection Work required for [J-Connection]. Items to Check Drawing Warning Tip Pillar Moving For [Pillar Moving], move the pillar within ±00 mm of the pillar core-to-core distance dimensions. This symbol indicates the [Pillar Moving] range. [For Long Pillars] Add 300 to the height dimension. 9970 W 706 (Roof Rafter Core-to-Core) 94 00 00 00 00 00 00 00 00 H H G.L. W 90 G.L. Width W4 W7 W30 W 393 69 99 W 58 58 58 H 49 70 9 H 043 064 085 064 900 04 900 064 (Pillar Core-to-Core) (Pillar Core-to-Core) Marking Foundations () Determine the embedding position for pillars and then dig foundation holes. P.8 [About Foundation Dimensions] Refer to page 8 for foundation dimensions "DW" and "DL". DW Carport Main Unit Outer Line W DL DL 550 DW 550 894 064 900 04 900 064 9970-7-

Processing Components Connection Part (Processing Holes for Mounting Connecting Sleeves) P.9 If mounting roof purlin reinforcement, also refer to page 9 and process the roof purlin. () Process holes on the connection side of the rear frame / front frame / roof purlin. [Rear Frame] 4.5 5 65 Connection Side 37. 0 4.5 5 65 65 5 37. Connection Part 37. 5 65 [] 4.5 5 65 Connection Side 3. 0 4.5 Connection Part 5 65 65 5 5 65 3. 3. [] 4.5 5 V-Groove Fin 5 65 65 Connection Side Tip 5.5 Process holes on the side with fin. 0 4.5 5.5 Connection Part 5 65 65 5 5.5-8-

For Mounting Reinforcement Optional and Work required for [Wind Resistance]. J-Connection Wind Resistance () Process the roof purlin, roof purlin reinforcement and roof purlin sleeves. 400 [] 0 560.5 00 Fin V-Groove [ Reinforcement] V-Groove 0 8-5.5 Hole Processing 4.5 Processed Hole 400 0 560.5 90 0 Connection Part 400 400 0 0 560.5 560.5 8-4.5 90 00 Hole Processing 0 0 80 500 500 80 80 500 500 80 [ Sleeve] V-Groove 4-4.5 Hole Processing Tip 0 5 5 0 On the roof purlin, process holes on the side with fin. 00 Mounting Components Mounting Reinforcement Optional Connection Side J-Connection and Wind Resistance Work required for [Wind Resistance]. () Insert the roof purlin reinforcement to the roof purlin and mount it with [8-]. 0 [8-] 5 x 3 Pan Head Self Drilling Screw 0 Reinforcement 0 Connection Side 0-9-

Mounting on Connection Part () Insert sleeves into one side of the front frame / roof purlin / rear frame and mount them with [6-]. () Seal the connection part. (3) Insert sleeves into the other side of the front frame / roof purlin / rear frame and mount them with [6-]. (4) Clear up the spilled sealant. Sleeve [When Connecting Rear Frame] Fix with screws after filling the processed holes on the rear frame with sealant. Front Frame Sleeve Sleeve Rear Frame Sleeve [6-] 4 x 3 Pan Head Self Drilling Screw Rear Frame Sleeve [6-] 4 x 3 Pan Head Self Drilling Screw Rear Frame Sleeve -0-

Construction of M-Connection Type Drawing M-Connection Work required for [M-Connection]. Pillar Moving Tip Warning For [Pillar Moving], move the pillar within ±00 mm of the pillar core-to-core distance dimensions. This symbol indicates the [Pillar Moving] range. [For Long Pillars] Add 300 to the height dimension. When constructing on a slope, construct the product by adjusting the embedding depth of the main unit on the higher side according to the height of the main unit on the lower side so that the pillars are vertical. Otherwise, water leakage may be caused by the water accumulated on the connected ridgepole. Lower Side Vertical Level Embedding Seal Position (G.L. Standard) Adjusting Embedding Depth Higher Side Vertical W 508 00 00 00 00 H3 H H G.L. G.L. 90 W [Pillar Core-to-Core] 900 [Pillar Core-to-Core] 064 064 Width W4-4 W4-7 W7-7 W7-30 W30-30 W 480 500 5399 5699 5999 W 4643 494 54 554 5839 H 5 5 73 73 94 H 043 043 064 064 085 H3 894 894 894 894 894 Marking Foundation Position () Determine the embedding position for pillars and then dig foundation holes. P.8 [About Foundation Dimensions] Refer to page 8 for foundation dimensions "DW" and "DL". DW W Carport Main Unit Outer Line DL For different sizes (widths), the foundation depth (DH) is as shown in the table below. Width W4 Side W7 Side W30 Side W4-7 550 57 - W7-30 - 550 57 DL DH DW 064 900 064 508 --

Constructing M-Connection Beam Connecting Fittings ()Remove the push buttons on the beam. ()Press the M-connection beam connecting fitting against the beam, mark the hole positions and then drill 9 through holes. (3)Mount the M-connection beam connecting fitting, M-connection metal fitting spacer, and beam spacer to the beam with [4-], [4-] and [4-3]. Tip [Mounting for Other than Connection Part] Refer to " Construction Method for Basic Type". When tightening bolts, be sure not to overtighten them, to avoid deforming the beam. Beam [4-] M8 x 80 Hex Bolt 9 Processed Through Hole [4-3] M8 Plain Washer M-Connection Metal Fitting Spacer Beam Spacer M-Connection Beam Connecting Fitting [4-] Hex Self-Lock Nut for M8 Push Button Beam [4-3] M8 Plain Washer Check that the distance between front frames is 5 mm. 5 Beam 37.5 66 Existing Hole 9 (Through) --

Mounting Connection Ridgepoles For Independent Construction P.3 Be sure to complete "Construction Method for Basic Type 7 Mounting Side Frames Processing Caps(page 3)". Tip Be sure to complete " Construction Method for Basic Type 8. Mounting Roof Rafters" before this process. () Place the MY-connection ridgepole between front frames, and then fix it with an M-connection fixing fitting for F and [4-4]. M-Connection Fixing Fitting for F Mount the M-connection fixing fitting for F to the position shown in the figure below. If a beam is at the fixing fitting mounting position, shift it before mounting. MY-Connection Ridgepole 00 Approx. 65 Approx. 65 00 M-Connection Fixing Fitting for F [4-4] 4 x 3 Pan Head Self Drilling Screw For Connecting Construction J-Connection Work required for [J-Connection]. J-Connection P.0 Also refer to page 0. () Connect the front frames with front frame sleeves. () Place the MY-connection ridgepole between front frames, and then fix it with an M-connection fixing fitting for F and [3-]. MY-Connection Ridgepole Tip Mounting for other than the connection part is the same as " For Independent Construction". For M-Connection Fixing Fitting for F Sleeve -3- M-Connection Connecting Fixing Fitting for F [3-] 4 x 3 Pan Head Self Drilling Screw

3 Mounting M-Connection Edge Caps () Seal the M-connection edge cap and MY-connection ridgepole. () Mount the M-connection edge cap to the MY-connection ridgepole with [4-5]. M/Y-Connection Ridgepole [4-5] 4 x 0 Self-Tapping Truss Head Screw Class M-Connection Edge Cap 4 Mounting MY-Connection Covers J-Connection Work required for [J-Connection]. () Mount the MY-connection cover for F to the MY-connection ridgepole with [3-]. () Seal the MY-connection cover. [3-] 4 x 3 Pan Head Self Drilling Screw MY-Connection Cover for F MY-Connection Ridgepole -4- Manual No. D636 XXX0554 05A_047