Mach 1 High Performance Plug Valve. Installation Operation Maintenance Instructions

Similar documents
G4, G4ZHF and G4R. Installation, Operation and Maintenance. Non-Lubricated Plug Valves for Chemical Service. Bulletin V-240g

USER INSTRUCTIONS. Durco BTV/BUV 2000 Butterfly Valves. Installation Operation Maintenance. Experience In Motion FCD DVENIM A4 (06/15)

Installation Instructions

USER INSTRUCTIONS. Limitorque TM SR Series. Installation Operation Maintenance. Experience In Motion FCD LMENIM AQ 11/14

Repair Instructions ISC. Experience In Motion. ISC1PX Single Pusher Seal

Installation Instructions

Installation Instructions

Repair Instructions. Durametallic PSS III. Experience In Motion. Split Seal

Installation Instructions

W-K-M Model MA-1 DynaCentric Butterfly Valve

VALVTECHNOLOGIES, INC. INSTALLATION, OPERATIONS & MAINTENANCE MANUAL STEAM CHOKE VALVES

OTECO INC. MODEL ,000 PSI 4-1/16 PORT DM GATE VALVE MAINTENANCE MANUAL

Reliance SG800 Series Steel Water Gage Valves

Installation, Maintenance and Operating Instructions

Fisher 667 Diaphragm Actuators Size 80 and 100

Repair Instructions ISC2. Experience In Motion. Dual metal bellows seal

The Ultimate Critical Service Triple Offset Valve INSTALLATION, OPERATION & MAINTENANCE MANUAL

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extension Sections. Reliable Connections

The Ultimate Critical Service Triple Offset Valve INSTALLATION, OPERATION & MAINTENANCE MANUAL

General Four-Way Operation, Maintenance & Service Manual

PO STYLE AIR CLUTCH INSTALLATION AND MAINTENANCE MANUAL

AFB (AIR FAN BEARING) INSTALLATION GUIDE

Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe

Fisher 1052 Size 20 Diaphragm Rotary Actuator with H Mounting Adaptation

TYPE 3740XL EXTRA LARGE WET RUNNING CARTRIDGE SPLIT SEAL

Reliance SG777 Series Steel Water Gage Valves

YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS

Fisher 667 Diaphragm Actuator Sizes 30/30i 76/76i and 87

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extention Sections. Reliable Connections

Emission-Pak Assemblies

CV Control Valves Installation and Operation Manual

TYPE 3740/3740D WET/DRY RUNNING CARTRIDGE SPLIT SEAL

Fisher 657 Diaphragm Actuators Size 80 and 100

No September, Char-Lynn. Power Steering. Repair Information. 20 Series Steering Control Unit 001

25000 Series Lo-T TM Butterfly Control Valve Instructions

BETTIS SERVICE INSTRUCTIONS FOR MODELS G01 THROUGH G10 SERIES HYDRAULIC SPRING RETURN ACTUATORS WITH M11 HYDRAULIC OVERRIDE

1904, 1904Pg, 1904PgSB, and 1906SB High Capacity Ratchet Knockout Drivers

Series 4000 Model B 3-Piece Ball Valves with ISO Bonnet

GUIDELINES FOR HINGED AND BOLTED MANWAY ASSEMBLY

The MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. The main is drilled out under pressure.

H4670/42192 Submersible Trash Pump

H8508 Impact Wrench SERVICE MANUAL. Model (Serial Code FWN) Model (Serial Code FWP)

The MUELLER method of making a main to service connection using the MUELLER E-5 Small Drilling Machine. Hand or power. kpa/34.

TYPE 3710 CARTRIDGE SPLIT SEAL

GH BETTIS SERVICE INSTRUCTIONS DISASSEMBLY & REASSEMBLY FOR MODEL F10207 DOUBLE ACTING HYDRAULIC ACTUATOR

Type XTSR71 Sizes

Flow Solutions Division. ISC1BX Single Rotating Bellows Seal ISC. Repair Instructions

BETTIS SERVICE INSTRUCTIONS FOR MODELS G01 THROUGH G13 SERIES HYDRAULIC ACTUATORS WITH POWER MODULE TIE BAR CONSTRUCTION

USER INSTRUCTIONS. Limitorque PT Series Worm Gear Operator. Installation Operation Maintenance. Experience In Motion

Repair Instructions ISC2. Experience In Motion. Dual pusher seal

COBRA SERIES CONVERTER

Series 4000 Model B 3-Piece Ball Valves with ISO Bonnet

G01 through G10 Series Hydraulic Actuators Double-Acting with M11 Hydraulic Override Disassembly and Reassembly

Introduction... 2 Scope of Manual... 2 Description... 2 Specifications Installation... 2 Actuator Mounting... 3 Loading Connection...

Repair of Rotac Actuators

Swivel Hoist Ring RIGGING ACCESSORIES. Color coded to distinguish between UNC (Red) and Metric (Silver) thread types.

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher

MATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.

PRODUCT SERVICE MANUAL FOR CIG Mechanical Seal Triple Pumps

MUELLER GAS. DH-5/EH-5 Drilling. Reliable Connections. DH-5 Drilling Machine General Information 2. EH-5 Drilling Machine General Information 3

Airflex Product Line PDC Installation, Operation and Maintenance of PDC Assemblies

DRIVE COMPONENTS REMOVAL. 9. FXCW/C: see Figure Remove bolt (9), sprocket retainer (8), and thrust washer (7). NOTE PRIMARY DRIVE LOCKING TOOL

TYPE 5610 & 5610Q SINGLE O-RING CARTRIDGE SEAL

No November, Char-Lynn. Hydraulic Motor. Repair Information. R Series General Purpose Geroler Motor

REPAIR INSTRUCTIONS. Cat. No Cat. No MILWAUKEE ELECTRIC TOOL CORPORATION. SDS Max Demolition Hammer. SDS Max Rotary Hammer

Model: SCD430 SCD640. Installation & Operation Guide P/N SCD640-95

4.4 PUMP MAINTENANCE MODELS: DB, DC, DF, DG, DJ, DL

NTTC Tank Truck Week Awareness Gaskets/Fasteners/Flanges

MUELLER E-5TM. and D-5TM. Drilling Machines. Reliable Connections. E-5 General Information 2. D-5 General Information 3. Operating Instructions 4-5

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16

OPERATION AND MAINTENANCE INSTRUCTIONS AVK UNDERGROUND FIRE HYDRANT

INSTRUCTIONS FOR AIRFLEX 36WCBEP/36WCSEP WEAR PLATE REPLACEMENT USING GASKET SEALING TAPE

Swivel Hoist Ring Page 142

3 Emergency Breakaway Coupling

4.2 - PUMP MAINTENANCE MODELS: AC, AS, WC, WS

YONGJIA NSV VALVE CO.,LTD. GATE, GLOBE & CHECK VALVES ASSEMBLY & MAINTENANCE PROCEDURES

Engineering Data Single Reduction Parts List Item # Description Basic Single Reduction Unit 1. Gear Housing 2. Pipe Plug 3. Vent Plug 4. Splash Guard

COYOTE ENTERPRISES, INC. RIMLOC BLAST WHEEL MAINTENANCE & ASSEMBLY MANUAL

Repair Manual MK40A-MK45A-MK50A MK55A-MK60A-MK65A. Ref Rev.C General Pump is a Member of The Interpump Group

MUELLER. CL-12 Drilling. Machine. Reliable Connections. Maintenance 2. General Specifications 3-4. Drilling Equipment 4

SYGEF Standard SYGEF Plus PVDF Flanges

NAVSEA STANDARD ITEM

4-8 HSF 250 Patriot. Line Stop Fitting Installation Instructions. Installation Instructions and Best Practices continued on back

1/2 2 (DN 15 50) Standard Bore Series /2 1-1/2 (DN 15 40) Full Bore Series 9000 Flanged Ball Valves with ISO Bonnet

SECTION BASIC MATERIALS AND METHODS

JARVIS. Model Brisket Scissor EQUIPMENT... TABLE OF

KEEP YOUR RESOURCE MOVING.

OPERATION AND MAINTENANCE FOR MODEL MRV050A REVERSIBLE

HDL(M)6 Nut/Screw Assembly

ONE-LOK Series SLC/SLCE Pipe Restraint for AWWA C909 PVC Pipe

Fluid Sealing Association

4" (DN 100) 5RET Tank Car Fire-Tite Bottom Unloading Valves. Installation, Maintenance and Operating Instructions

MAINTENANCE CLEANING. MECHANICAL SEAL REPLACEMENT Refer to figures 1 and 2. SHIM ADJUSTMENT

NAVSEA STANDARD ITEM T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

Thomas Disc Couplings Installation and Maintenance Series 71 Sizes (Page 1 of 11) DANGER!

Page 1. SureMotion Quick-Start Guide: LARSACC_QS 1st Edition - Revision A 03/15/16. Standard Steel Bolt/Screw Torque Specifications

Service Instructions Part Number: E, Rev. C Release: August G01 through G10 Spring-Return Pneumatic Actuators with M11 Hydraulic Override

Service Instructions E Rev. C August G01 through G10 Double-Acting Pneumatic Actuators with M11 Hydraulic Override

Fig Remove chain cover plate bolts. Fig Remove hammer member. Fig Loosen set screws at base of 12-tooth sprocket.

Transcription:

User Instructions Mach 1 High Performance Plug Valve FCD DVENIM0300-01 03/13 Installation Operation Maintenance Instructions Quality System Certificate 1

TABLE OF CONTENTS SECTION TITLE PAGE I INSTALLATION... 2 II OPERATING/MAINTENANCE INSTRUCTIONS FOR MACH 1... 3 III VALVE DISASSEMBLY - MACH 1 RECOMMENDED PRECAUTIONARY MEASURES... 4 DISASSEMBLY STEPS... 4 IV PRESSURE CONTAINING FASTENERS... 5 V A. VALVE ASSEMBLY 1"-6" MACH 1 WITH PORT SEALS... 6 B. VALVE ASSEMBLY 1"-6" MACH 1 WITH SLEEVE... 9 VI ASSEMBLY SPECIFICATIONS - FIRESEAL VALVES 1"-6" MACH 1... 10 STOP! DANGER: indicates that death, severe personal injury and/or substantial property damage will occur if proper precautions are not taken. WARNING: indicates that death, severe personal injury and/or substantial property damage can occur if proper precautions are not taken. CAUTION: indicates that minor personal injury and/or property damage can occur if proper precautions are not taken. NOTE: indicates and provides additional technical information, which may not be very obvious even to qualified personnel. Compliance with other, not particularly emphasised notes, with regard to transport, assembly, operation and maintenance and with regard to technical documentation (e.g. in the operating instruction, product documentation or on the product itself) is essential, in order to avoid faults, which in themselves might directly or indirectly cause severe personal injury or property damage. SECTION I INSTALLATION INSTRUCTIONS - FLANGED Mach 1, Class 150, 300 and 600 FLANGED: Installation of Flowserve flanged valves is best accomplished by locating valves in pipeline flanges, assuring all corrosion and foreign materials are removed from pipe flanges and then center gaskets with the valve flanges. Fasteners or taper pins should be used to align holes and locate gaskets. Fasteners should be tightened to the corresponding valve and fastener size. TABLE I Temperature Limitations PFA Type Tefzel VMPE Material Description R Seat (full, no insert) S Seat (full, insert) P Seat (partial, insert) Max Service Temperature 400 F (204 C) 525 F (274 C) 525 F (274 C) 300 F (149 C) 200 F (93 C) 2

SECTION II OPERATING/MAINTENANCE INSTRUCTIONS FOR MACH 1 Maintenance requirements for Mach 1 valves may vary due to operating conditions of the process. Factors such as operating temperature, pressure, solids content, and frequency of cycling can influence valve performance and maintenance requirements. FIGURE II-1 Typical Assembly of Mach 1 Seal wear is compensated by adjusting appropriate parts. For Mach 1 valves, there are three possible leak paths: 1. Top Cap (bonnet) 2. Stem 3. Line (through) 16 Corresponding adjustments for each leak path are as follows. Note: Refer to Figure II-1 or Figure VI-1 for parts identification 15 14 1. Top Cap (bonnet) Leakage due to thermal or pressure cycling is eliminated by tightening the top cap fasteners (Part 10) in a criss-cross pattern to the torque values given in the tables. This adjustment is most effective when the valve is not pressurized. It is important that the top cap fasteners not be tightened excessively and that torque values applied be within industry standard for fasteners. 2. Stem Leakage due to wear of the diaphragm, and/or wear to the sleeve (primary seal) is eliminated by tightening the adjuster fasteners (Part 11) in 1/4 turn increments. The adjuster fasteners must be tightened evenly for maximum adjustment. The valve should be operated between adjustments to assure that the plug properly seats itself into the sleeve. If leakage persists after repeated adjustments, the sleeve and diaphragm will require replacement as covered in Section V and Section VI. 13 11 9 7 5 12 10 8 6 3. Line (through) Through leakage due to wear of the primary seal can be eliminated by tightening the adjuster fasteners (Part 11) in 1/4 turn increments. The fasteners must be tightened evenly for maximum adjustment. The valve should be operated during adjustments to prevent excessive operating torque. Should leakage persist after repeated adjustments, the port seals or sleeve will require replacement as covered in Section V and Section VI. 3 2 4 STOP! WARNING: To avoid personal injury and prevent damage to equipment, do not operate or repair this valve without observing the following procedures outlined in this manual. 1 3

SECTION III Valve Disassembly - Mach 1 RecommendED Precautionary Measures 1. Valves must be relieved of process fluid and pressure prior to disassembly. 2. Personnel performing disassembly must be suitably protected and alert for emission of hazardous process fluid. Disassembly Steps NOTE: Refer to Figure II-1 or VI-1 for parts identification. If an actuator or gearbox operates the valve, alignment marks should be noted to assure correct orientation when reassembled. This may best be accomplished by making matching marks on the plug stem and operator housing with no burrs made on the plug stem. 1. Remove the wrench (Part 16), if so equipped. Remove the stop collar retainer (Part 15), stop collar (Part 14) and locking stop (Part 12) after marking their orientation. 2. Gradually loosen adjuster fasteners (Part 11) - DO NOT REMOVE. 11. Inspect the valve port seals or sleeve for wear or damage, especially scratches near the top, bottom, and port areas. If wear or damage is excessive, the port seals/sleeve should be replaced. 12. Remove port seals or sleeve as follows: NOTE: Care must be taken not to damage the machined internal body bore. a. Lift port seals out of body bowl. b. To remove the sleeve, use a wooden dowel and pry the sleeve upward by engaging the dowel in the sleeve at the top of the port. A sharp blow may be necessary to dislodge the sleeve. Both sides of the sleeve may need to be pried upward for removal. (See Figure III-1) Apply force 3. WARNING: Do not loosen or remove top cap fasteners (Part 10) when removing an operator. Remove the operator by unfastening it from the STOP! bracket. 4. Turn plug (Part 4) in order to raise the plug to vent any material trapped in the valve (see note below). NOTE: If there is no upward movement of the plug, it will be necessary to devise a method of lifting the plug upward. This may require removal of the valve operator (Step 3). This operation should be undertaken noting the above precautionary measures. Methods of plug removal must include protective measures on plug stem and plug end. 5. Once the plug has lifted, the adjuster fasteners (Part 11) can be completely removed. 6. Gradually loosen but DO NOT REMOVE all of the top cap fasteners (Part 10). Turn the plug until it is loose from the port seal (Part 2) or sleeve (Part 3) and all pressure has been vented. (Again, it may be necessary to use a mechanical means to move the plug upwards.) Figure III-1 13. Thoroughly clean all valve parts with an acceptable cleaner. 14. Inspect parts for damage. Look for marred, scratched, or rough sealing surfaces on the valve plug or machined body bore. NOTE: Reinstallation of damaged or unclean parts will ruin any replacement seals installed into the valve. 7. Remove the top cap fasteners and top cap (Part 9) from the plug stem. Retain the tags for attachment during re-assembly. 8. Remove the plug (Part 4) from the body (Part 1). 9. Remove the grounding spring (Part 8) and thrust gland (Part 7). 10. Remove the metal diaphragm (Part 6) and the PFA diaphragm (Part 5) from the plug stem. 4

SECTION IV PRESSURE CONTAINING FASTENERS Material Selection Selecting the proper fastener material is the ultimate responsibility of the customer because the supplier does not typically know in what service the valves will be used or what elements may be present in the environment. Flowserve normally supplies B7 (carbon steel) for ductile cast iron and carbon steel valves. For stainless steel and high alloy valves, B8, Class 2B (stainless steel) fasteners are supplied as standard. All fasteners used must have a minimum yield strength of 65,000 PSI, a minimum elongation of 25% and be compatible with the process fluid. Determining compatibility to the process fluid goes beyond a material being resistant to general corrosion because the more important consideration is a material s resistance to stress corrosion cracking. Depending on the service, it may make sense to use B7 fasteners on high alloy valves. One such service would be marine environments because of stainless steel s susceptibility to stress corrosion cracking in chloride environments. Another key aspect of fasteners is frequent visual inspection. Because of the common practice of using steel fasteners rather than stainless steel to avoid chloride stress corrosion cracking, visual inspection is recommended to monitor the general corrosion of these fasteners. If jacketing or insulation is used on a valve, it must be periodically removed TABLE I CAP SCREWS - STUDS HHCS - Finished Heavy Hex Head Cap Screw HCS - Finished Hex Head Cap Screw STUD - Stud Dimensions per ASME B18.2.1 * These options should be limited to glass ISO valves. ** CL 600 valves are limited to these alloys. for visual inspection of the fasteners. If you wish assistance in determining the proper fasteners to use, please refer to the attached chart. Design & Type Flowserve s valve design standards adopt ASME B18.2.1 (1996, Addenda 1999) as the standard for fastener type and design. This national standards requires that finished hex head cap screws be used when the head of the fastener is turned. A finished hex head cap screw and a heavy hex cap screw have a bearing surface under the head to minimize frictional resistance during tightening. They also comply to qualified body diameters and fully formed head dimensions. Cookeville Valve Operation s policy is to use finished hex head and heavy hex head cap screws for all pressure retaining fasteners. This includes top caps, packing adjusters, plug adjusters, bottom caps, body halves or other pressure retaining components. Compliance is made with ANSI B18.2.2 (1987, reaffirmed 1993), Square and Hex Nuts, when studs and heavy hex nuts are required. Additional information on these items may be obtained from the Flowserve Corporation, Cookeville Valve Operation, Cookeville, Tennessee. Alloy identification stamp required on each piece. Certification required. Alloy Specification (40 KSI Minimum Yield Strength, 12% Minimum Elongation) B9 - Stainless Steel per ASTM A193, Class 2B, Grade B8 (AISI type 304) B16 - ** Stainless Steel per ASTM A193, 100% hardness tested B7 - ** Chromium - Molybdenum Alloy Steel per ASTM A193, Grade B7 B7M - Chromium - Molybdenum Alloy Steel per ASTM A193, Grade B7M, 100% hardness tested B7MT - Chromium - Molybdenum Alloy Steel per ASTM A193, Grade B7M, 100% hardness tested, PTFE coated, Dupont SP11C, Type B - Color blue or green B8M - 316 Stainless Steel per ASTM A193, Grade B8M, Class 1, 40 KSI Min. Yield Strength, 12% Min. El. B8C2-304 Stainless Steel per ASTM A193, Grade B8, Class 2 C20 - * Carpenter C20, CB-3 (UNS NO8020), ASTM B473, 40 KSI Min. Yield Strength, 12% Min. El HC - * Hastelloy C276 (UNS N10276), ASTM B574 I625 - * Inconel 625 (UNS N006625), ASTM B446 I825 - * Incoloy 825 (UNS N08825), ASTM B425, 40 KSI Min. Yield Strength, 12% Min. El. IN - * Inconel 600 (UNS N0660), ASTM B166, 40 KSI Min. Yield Strength, 12% Min. El. M - * Monel (UNS N04400), ASTM B164, Class A or B, 40 KSI Min. Yield Strength, 12% Min. El. HB - Hastelloy B (UNS 10665), ASTM B335 I718 - ** Incoloy 718, AMS 5595B MKH - * Monel K-500, Cold drawn and aged hardened, QQN-286 and ASTM F468 L7 - ** Chromium-Molybdenum Alloy Steel per ASTM A320, Grade L7 L7M - Chromium-Molybdenum Alloy Steel per ASTM A320, Grade L7M, 100% hardness tested L7T - ** Chromium-Molybdenum Alloy Steel per ASTM A320, Grade L7, Teflon coated, Dupont SP11C, Type B - Color blue or green L7MT - Chromium-Molybdenum Alloy Steel per ASTM A320, Grade L7M, 100% hardness tested, Teflon coated, Dupont SP11C, Type B - Color blue or green N-200 - * Nickel per ASTM B160 (UNS N0220), 40 KSI Min. Yield Strength, 12% Min. El. B7YC - ** Chromium-Molybdenum Alloy Steel per A193, Grade B7, Yellow Zinc Dichromate Plated 5

SECTION IV TABLE II NUTS HN - Finished Heavy Hex Nut XN - Finished Hex Nut HXN - Regular Heavy Hex Nut Dimension per ANSI B18.2.2 Alloy identification stamp is required on each piece. Certification required. 8-304 Stainless Steel per ASTM A194, Grade 8 8M - 316 Stainless Steel per ASTM A194, Grade 8M 2H - ASTM A194, Grade 2H 2HM - ASTM A194, Grade 2HM 7M - ASTM A194, Grade 7M, 100% hardness tested 7MT - ASTM A194, Grade 7M, 100% hardness tested, PTFE coated, Dupont SP11C, Type B - Color blue or green M - Monel (UNS N04400), ASTM B164, Class A or B, QQN-281, Class B HB - Hastelloy B (UNS 10665), ASTM B335 HC - Hastelloy C276 (UNS N10276), ASTM B574 I625 - Inconel 625 (UNS N06625), ASTM B446 I718 - Incoloy 718, AMS 5596B I825 Incoloy 825 (UNS N08825), ASTM B425 L7 - Chromium-Molybdenum Alloy Steel per ASTM A194, Grade 7 L7M - Chromium-Molybdenum Alloy Steel per ASTM A194, Grade 7M, 235 BHN Max, ASTM A320, Section 9 MKH - Monel K-500, Cold drawn and aged hardened, QQN-286 and ASTM F467 8F - 303 Stainless Steel per ASTM A194, Grade 8F 2HYC - ASTM A194, Grade 2H, Yellow Zinc Dichromate Plated SECTION V A. VALVE ASSEMBLY 1"-6" MACH 1 WITH PORT SEALS NOTE: Part number reference is shown in Figure II-1, page 3. 1. Mount body (Part 1) on arbor press or table vise holding one flange. 2. Place port seals (Part 2) in position in body. Align port seal ports with body ports. (See Figure V-A1) FIGURE V-A1 3. Place the plug (Part 4) into the port seals in the closed position. 4. Push the plug (still in the closed position) downward, using the arbor press or other suitable means, until the top of the plug taper is 1/16" above the top port seal surface. Allow the plug to remain in this position for the time listed in Table V-A-I, Port Seal Sizing Times. TABLE V-A-I PORT SEAL SIZING TIMES Valve sizes 1" - 3" 4" - 6" Time (min) 5 8 5. Remove the plug. 6. Assemble the PFA diaphragm (Part 5) over the plug stem (Part 4) with the aid of a diaphragm guide, Part series BY77543A (Figure V-A2). The plug stem and diaphragm guide should be checked for nicks before installing the diaphragm. Nicks on these surfaces could result in scratches on the lip of the diaphragm and must be removed by polishing. 6

SECTION V Figure V-A2 11. Turn the top cap to the right side up position and place the top cap (with grounding spring in place) over the plug stem. Orient the top cap anti-rotation lugs with the antirotation lugs on the body (Figure V-A5). Figure V-A5 7. Place the metal diaphragm (Part 6) over the plug stem with the raised center section up. 8. Place the thrust gland (Part 7) over the plug stem. 9. Apply a thin film of lubricant to the plug and place the assembled plug (complete with PFA diaphragm, metal diaphragm and thrust gland), in the open position into the body. (Figure V-A3). Figure V-A3 10. Lay the top cap (Part 9) upside down (the bonnet gasket flange upward). Hold the grounding spring (Part 8) so the tabs on the spring ID point downward. Insert the grounding spring into the top cap and push the grounding spring to the bottom of the center cavity in the top cap. (Figure V-A4). Figure V-A4 12. Coat the top cap fastener threads (Part 10) with Loctite 242. Replace the tags removed in step 7 of Section III, Valve Disassembly. Install the top cap fasteners in the top cap. 13. Use an arbor press to push the top of the plug downward until the bottom of the plug port aligns with the bottom of the body port. 14. Maintain the top cap position relative to the body antirotation lugs (Figure V-A5), and using all top cap fasteners (Part 10), tighten evenly in a cross-cross method until the top cap bottoms on the body counterbore. (Figure V-A5). Tighten top cap fasteners to the value per valve size and pressure class as listed in Tables V-A-II, V-A-III and V-A-IV. 15. Remove the valve from the arbor press. Operate the plug several times. Torque will be high, but will reduce and the plug will turn freely. 16. Install adjuster fasteners (Part 11) (Figure V-A6) and hand tighten evenly to the values listed in Table V-A-V or until the bottom of the plug port is 1/16" to 1/8" above the bottom of the body port. Figure V-A6 7

SECTION V 17. Place the locking stop (Part 12) on the top cap as shown in Figure V-A7 and tighten the locking stop fasteners (Part 13) to a reasonable torque. Check their orientation based on the location marks made during disassembly (Section III, step 1). Figure V-A8 Figure V-A7 18. Place the stop collar (Part 14) and retainer (Part 15) on the plug stem as shown in Figure V-A8. The stop collar should point in the direction of the flow. Check the orientation based on the location marks made during disassembly (Section III, step 1). TABLE IV-A-II 19. The valve should turn clockwise to close. The valve is now ready for test and use. 20. LEAK TESTING: Anytime a valve has been modified in any manner, including fastener changes, it must be re-tested. Normal testing, using gas, should be at 80 PSI for Class 150 through Class 600. Refer to API or MSS for test procedures complying with these specifications. *Apply Loctite 242 to fastener threads, top cap only. TORQUE REQUIRED ON TOP CAP FASTENERS OF CLASS 150 MACH 1 VALVES Valve sizes 1" 1.5" 2" 3" 4" 6" Max. Torque (ft-lbs) 10 10 15 28 40 80 TABLE V-A-III *Apply Loctite 242 to fastener threads, top cap only. TORQUE REQUIRED ON TOP CAP FASTENERS OF CLASS 300 MACH 1 VALVES Valve sizes 1" 1.5" 2" 3" 4" 6" Max. Torque (ft-lbs) 12 12 22 35 62 115 TABLE V-A-IV *Apply Loctite 242 to fastener threads, top cap only. TORQUE REQUIRED ON TOP CAP FASTENERS OF CLASS 600 MACH 1 VALVES Valve sizes 1" 1.5" 2" 3" 4" 6" Max. Torque (ft-lbs) 14 20 35 45 42 70 TABLE V-A-V TORQUE ON PLUG ADJUSTER OF MACH 1 VALVES, 150#, 300# AND 600# Valve sizes 1" 1.5" 2" 3" 4" 6" Max. Torque (ft-lbs) 35 35 35 50 75 150 8

SECTION V B. VALVE ASSEMBLY 1"-6" MACH 1 WITH SLEEVE Figure V-B3 1. Mount body (Part 1) on arbor press or table vise holding one flange. 2. Place the sleeve (Part 3) into the bowl of the body. STOP! WARNING: Sleeve port must be aligned with body port. (See Figure V-B1) 6. Check that the top seal of the sleeve is seated into the body counterbore. (See Figure V-B4) Remove the top cap fasteners and top cap. Figure V-B1 Figure V-B4 3. Apply a thin film of lubricant on the plug (Part 4). 4. Place the plug in the closed position into the sleeve which is in the body. (See Figure V-B2) 7. Push the plug downward, while still in the closed position, until the top of the plug taper is 1/16" above the top of the sleeve surface. Allow the plug to remain in this position for the time listed in Table V-B-I. TABLE V-B-I SLEEVE SIZING TIMES Figure V-B2 5. Position the top cap (Part 9) over the plug with the antirotation lugs aligned with the body lugs, making sure the top cap is free to move downward (Figure V-B3). Using all top cap fasteners (Part 10), tighten evenly in a cross-cross method until the top cap bottoms on the body counterbore. Valve sizes 1" - 3" 4" - 6" Time (min) 5 8 8. Remove the plug. 9. Continue with assembly as in V-A, Valve Assembly of 1"-6" MACH 1 with port seals, starting at number 6, assembling diaphragms on plug stem. 9

SECTION VI ASSEMBLY SPECIFICATIONS - FIRESEAL VALVES 1"-6" MACH 1 NOTE: Part number reference is shown in Figure VI-1. 1. Normal procedures for field replacement of port seals or sleeves are to be followed. Refer to V-A, steps 1-5, and V-B, steps 1-8. 2. The fireseal top seal assembly differs from the standard Mach 1 top seal and is completed per the following instructions. 3. The PFA diaphragm (Part 19) is to be flared on a tapered bar just enough to slip over the plug stem (Fig. VI-2) Figure VI-2 FIGURE VI-1 TYPICAL ASSEMBLY OF FIRESEAL MACH 1 15 16 4. The PFA diaphragm is placed over the plug stem with the lip down using the diaphragm guide (Figure VI-3). The plug stem should be checked for nicks before installing the PFA diaphragm. Nicks on this surface could result in scratches on the lip of the diaphragm. 13 14 Figure VI-3 12 11 10 9 8 7 17 20 3 19 18 4 5. The metal diaphragm (Part 20) is placed over the plug stem just far enough to enlarge the ID to conform to the plug stem and then removed (Figure VI-4). Figure VI-4 2 1 10

SECTION VI 6. The metal diaphragm is removed from and replaced on the plug stem with the ID lip down. (Figure VI-5) Figure VI-7 Figure VI-5 7. The Grafoil packing ring (Part 17) is placed over the stem (Figure VI-6). 9. The entire assembly is turned over and the Grafoil gasket (Part 18) placed on the metal diaphragm (Figure VI-8). A small amount of rubber cement is placed on the Grafoil in several places to cause it to adhere to the metal diaphragm. Figure VI-8 Figure VI-6 8. The thrust gland (Part 7) is then assembled over the plug and driven into place using the thrust gland guide, part series BY90431 and arbor press. (Figure VI-7) 10. Continue to assemble the valve per Section V-A, beginning at step 6. 11

Flowserve Corporation Flow Control Division 1978 Foreman Drive Cookeville, Tennessee 38501 Phone: +931 432 4021 Fax: +931 432 3105 www.flowserve.com Flowserve Ahaus GmbH Von Braun Straße 19a D-48683 Ahaus Germany Phone: +49 2561 686-0 Fax: +49 2561 686-39 Flowserve Pte. Ltd. 12 Tuas Avenue 20 Republic of Singapore 638824 Phone: +65 862 3332 Fax: +65 862 2800 Your contact: FCD DVENIM0300-01 03/13 Printed in USA. Flowserve Corporation has established industry leadership in the design and manufacture of its products. When properly selected, this Flowserve product is designed to perform its intended function safely during its useful life. However, the purchaser or user of Flowserve products should be aware that Flowserve products might be used in numerous applications under a wide variety of industrial service conditions. Although Flowserve can (and often does) provide general guidelines, it cannot provide specific data and warnings for all possible applications. The purchaser/user must therefore assume the ultimate responsibility for the proper sizing and selection, installation, operation, and maintenance of Flowserve products. The purchaser/user should read and understand the Installation Operation Maintenance (IOM) instructions included with the product, and train its employees and contractors in the safe use of Flowserve products in connection with the specific application. While the information and specifications contained in this literature are believed to be accurate, they are supplied for informative purposes only and should not be considered certified or as a guarantee of satisfactory results by reliance thereon. Nothing contained herein is to be construed as a warranty or guarantee, express or implied, regarding any matter with respect to this product. Because Flowserve is continually improving and upgrading its product design, the specifications, dimensions and information contained herein are subject to change without notice. Should any question arise concerning these provisions, the purchaser/user should contact Flowserve Corporation at any one of its worldwide operations or offices. 2013 Flowserve Corporation, Irving, Texas, USA. Flowserve is a registered trademark of Flowserve Corporation. 12