Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Similar documents
Tools required by installer: Materials required by installer:

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.

STACKING MULTI-SLIDE DOOR SYSTEM

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Flashing Materials. Rough Opening Preparation

Eagle clad double-hung window installation instructions

Integrity Polygon and Round Top Installation and Finishing Instructions

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

POCKETING MULTI-SLIDE DOOR SYSTEM

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Sun Windows General Information New Construction Hinged Door Installation Instructions

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Sun Windows General Information New Construction Sliding Door Installation Instructions H F

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

INSTALLATION INSTRUCTIONS FOR TEUTONIC ENTRANCE DOOR RECOMMENDATIONS FOR COMMON INSTALLATION OF ENTRANCE DOORS.

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GLOSSARY ROUGH OPENINGS

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

Installation of Fiberglass Windows

All Window Installation Instruction

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS

VISTALUXE CASEMENT, AWNING, & PICTURE WINDOW

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032)

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

INSTALLATION INSTRUCTIONS FOR FORGENT SLIDING PATIO DOORS RECOMMENDATIONS FOR COMMON INSTALLATION OF SLIDING PATIO DOORS.

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023)

NEW CONSTRUCTION, REPLACEMENT AND FLUSH FIN REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS

(773) INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) IMPORTANT INFORMATION & GL OSSARY ROUGH OPENINGS

window installation Guide wood FRaMinG New Construction

Installation Guide for Andersen Architectural Clad Awning Windows

WOOD OUT SWING AWNING, CASEMENT, & HOPPER WINDOW

DOOR INSTALLATION GUIDE WOOD FRAMING New Construction

Installation Recommendations for Finless Frame Doors

Vinyl Windows Manufactured by VPI Quality Windows

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

INSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING

Sliding Glass Door Assembly and Installation Guide

INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG

INSTALLATION INSTRUCTIONS for Wood Bay or Bow Windows with Nailing Fin or Exterior Trim (JII032) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

Installation Guide for Andersen Architectural Clad Inswing Entry and Patio Doors

Norwood Windows Permaglass Fiberglass Products Installation Instruction

How To Install Windows: Nail-Fin Application

Installation Guide for Andersen Architectural Clad Hinged Windows

Vinyl Windows and Doors Manufactured by VPI Quality Windows

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

Curtain Wall Installation Guide

Installation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Installation Guide for E-Series/Eagle Ascent 2 or 4 Panel Gliding (Sliding) Patio Doors

INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

Installation Guide for Architectural Wood Hinged Windows

INSTALLATION INSTRUCTIONS for Vinyl Projecting Windows with Integral Nailing Fin (JII023) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

NEW CONSTRUCTION PATIO DOOR INSTALLATION INSTRUCTIONS (WITH NAILING FLANGE)

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD CASEMENT & AWNING WINDOW VENTANA DE DOS HOJAS CON REVESTIMIENTO

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

8/7/ HP SWING DOOR INSTALLATION INSTRUCTIONS

Vinyl Windows and Doors

ULTRA WINDOW & DOOR EXPANDERS AND RECEIVERS INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS DOUBLE-HUNG WINDOW WITH FINS

Installation Guide. for Andersen 400 Series Tilt-Wash Picture Windows with Stormwatch Protection (High-Performance Impact Resistant Glass)

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nail Fin (JII025) IMPORTANT INFORMATION AND GLOSSARY ROUGH OPENINGS

Vinyl Windows and Doors

INSTALLATION INSTRUCTION FOR CLAD BOW WINDOWS WITHOUT HEAD AND SEAT BOARD

Vinyl Windows and Doors

UNIT 5: EXTERIOR DOORS AND WINDOWS

Installation Instructions for Wood/Clad Wood Windows with Exterior Trim or Nail Fin (JII024)

Installation Guide for Andersen 400 Series Tilt-Wash Transom Windows with Stormwatch Protection (PG Upgrade) Manufactured After 2006

SENTINEL SERIES 110 SINGLE HUNG WINDOWS

Transom Joining. for Andersen Elliptical Windows over Perma-Shield Gliding Patio Door

Assembled Patio Door Installation Guide 2-Panel Patio Door with Non-Welded Frame

InStallatIon InStruCtIonS for vinyl 2-lIte PatIo door assembled

Pocket Door Installation Instructions

Vinyl Windows and Doors

STERLING DOUBLE HUNG & STUDIO WINDOWS

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

Installation Instructions for E-Series 2 or 4-Panel Gliding and French Gliding Patio Doors

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

INSTALLATION INSTRUCTION SINGLE PANEL, SINGLE PANEL WITH SIDELIGHT COMBINATION AND 20 MINUTE FIRE RATED WOOD FRAME ENTRY DOOR

INSTALLATION GUIDELINES: X25 SERIES using perimeter installation fin

Installation Guide for Andersen 200 Series Tilt-Wash Picture, Transom and Circle Top Windows

SERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS

Window Frame Installation Instructions For Nail-on and Block Frames

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

TARGA 7200 HORIZONTAL ROLLER INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

Vinyl Windows and Doors Manufactured by Pella Corporation

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

MULTISLIDE DOORS INSTALLATION GUIDE & SITE PREPARATION

Aluminum Clad Wood Window Field Mulling and Stacking Instructions

HERITAGE CASEMENT BOW & BAY WINDOW

Wood Hinged Patio Door Installation Instructions

GENERAL INSTALLATION GUIDELINES

Transcription:

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit. Installer: Read these instructions completely before starting any installation. Failure to install and maintain our product according to these instructions will void any warranty, written or implied. These instructions are consistent with ASTM 2112 Standard Practice for Installation of Exterior Windows, Doors and Skylights into common wall constructions. Contact your architect or construction professional for installation into other building designs or constructions methods. The installer is responsible for consulting the contractor, structural engineer, architect, or consumer, for proper installation according to local codes and/or ordinances. Warning: Proper eye and hearing protection must always be worn when installing, removing or performing adjustments to Quaker window and door products. Use power tools properly! To avoid personal injury, always follow manufacturers instructions for safe operation of power tools. If broken, glass can fragment causing injury. All Quaker products are available with safety glass. In many areas, local building codes require safety glass in certain locations and/or applications. Unless Quaker s stipulations dictate safety glass or safety glass is specifically ordered, Quaker windows are not provided with safety glass. Before installing, Quaker recommends consulting local building codes for more definitive information. Caution: Lead based paint may be present in older homes, and the removal of windows may cause this paint to be disturbed. In order to minimize exposure to lead based paint dust, please consult www.epa.gov/lead. Care must be taken to properly recycle or dispose of old materials. Any recyclable materials should be separated from non recyclable or hazardous materials. Please consult with local or state authorities regarding proper disposal of nonrecyclable or hazardous materials. Some codes require the use of pressure treated lumber to line rough openings. Corrosion resistant materials, such as stainless steel or hot dip galvanized steel, must be used for fasteners and anchors having direct contact with pressure treated lumber. Important: Quaker reserves the right to change the information contained in these guidelines without notice. Maintain a minimum of ¼ between the exterior window frame and any trim, siding or masonry to allow for expansion. Window nailing flanges and drip caps (integral or applied) do not take the place of window flashing. All windows and doors must be properly flashed and sealed around the perimeter. Use of Quaker products in barrier EIFS systems (synthetic stucco) is not recommended. To do so will void all warranties (written or implied) and Quaker Window Products Co., Inc. will not be held responsible for any claims or damages resulting from water infiltration. Do not drill through window sill to install alarm wires. If using muriatic acid or brick wash cleaning solutions, please follow the manufacturer s instructions found on the product label or on the manufacturer s website. Handling and Storage: Do not store units outside, or in a hot environment. When carrying window, always keep it in a vertical position. Do not carry flat, doing so could result in damage to the unit. Stack units as straight as possible to avoid bowing. Do not lay flat! 06/20/2017_V1.1 1

These instructions are for installing Quaker s aluminum flange fin sub sill & receptor system into a wood or concrete/masonry wall. The rough opening must be lined with a 1 ½ thick wood buck. Contact your Quaker window and door supplier for more information on installing units in other wall conditions. Please visit our website at www.quakerwindows.com or call at 1 800 347 0438 for additional literature and information. Tools required by installer: Safety Glasses Hearing protection Utility knife Rubber mallet Caulk Gun Level Tape measure Stapler Metal cutting saw Materials required by installer: Backer Rod ¼ to ½ diameter closed cell foam Insulation Fiberglass or similar strips Minimally expanding low pressure polyurethane window and door spray foam. (Must be compliant with AAMA 812 04) Shims Made of cedar or synthetic material Screws Screw size may vary per wall/framing needs. Fasteners must be corrosion resistant and compatible with materials contacted and or penetrated. Silicone Sealant 100% silicone ASTM C920 compliant Neutral cure (modified oxime) only Some sub states made need to be primed before sealed. Consult the sealant supplier. Flashing Self adhesive flexible flashing that complies with ASTM D779 Drill / screwdriver Step 1: Inspect unit and sub sill / receptor before installation A. Match up the sub sill and receptor with the correct window unit and opening. Sub sill & receptor will be labeled to match sales order & line number of the window unit. B. Remove all shipping packaging material (blocks, pads, protectors, stretch wrap) and dispose/recycle properly. C. Inspect unit for any damage or defects, and make sure the unit operates properly. D. Verify that the window unit is the correct size and configuration. E. Contact the nearest Quaker distributor if there is a problem. Provide the sales order number on the warranty sticker (see http://quakerwindows.com/wp content/uploads/2013/04/warranty sticker locations01 30 2015.pdf for sticker locations). 06/20/2017_V1.1 2

Step 2: Prepare rough opening A. The material/lumber quality and fasteners must be structurally adequate for design load requirements. B. Measure and verify the size of the rough opening. The rough opening should be a minimum ½ (but not to exceed 1 ) wider and taller than your flanged sub sill/receptor unit. C. Verify the rough opening is flat, plumb, level, and square. (Fig. 1) Take diagonal measurements to check for square. The sill plate beneath the unit must be level for proper unit operation. D. Cut the weather resistant barrier (WRB) in a I pattern. (Fig. 2) Fold back the WRB sides and sill toward the interior and staple into place. (Fig. 3) E. Cut the top corners of the WRB at 135 and 9 long. (Fig. 2) Fold flap up and temporarily tape in place. (Fig. 4) When installing into a wall with exterior rigid foam insulation panels, place solid blocking material behind the nail fin to provide proper support when fastening the unit. Fig. 1 Fig. 2 Fig. 3 Fig. 4 06/20/2017_V1.1 3

Step 3: Sill Flashing A. Flashing must meet ASTM D779 performance requirements. Use flashing that is 6 minimum in width When using WRB and OSB substrates, or with applications under 45 F, spray an application adhesive (available at you Quaker dealer) around the perimeter of the window before applying flashing. Different applications require different spray adhesives so please check with your dealer for the proper type. B. Measure the width of rough opening and cut a length of flashing that is 12 wider than the rough opening. This will allow you to run the flashing 6 up each side. (Fig. 5) C. Apply sill flashing to exterior side first allowing for a minimum of 3 of flashing to be below the sill, and a minimum of 6 up each side. (Fig. 5) D. Flashing tape must cover the entire sill plate. If needed, apply an additional flashing piece over the first one (start from the exterior and work toward the interior). Maintain a minimum 1 overlap. Step 4: Flange Sub sill/receptor system assembly (if parts have been factory cut skipped to step E) A. Measure the sill opening and square cut the sub sill ½ less than opening to allow for level & shimming. B. Cut the head the same as the sub sill, but miter cut both ends at 45 degrees. C. The jamb will be handed left and right and notched at the factory to fit the sub sill. Measure the opening height and miter cut at 45 degrees the head side of jambs 1 1/16 less than opening to allow for leveling & shimming. Note: when cutting all material use caution not to cut weather strip to short. D. Using the screw slots as a guide, cross drill the head end of the mitered receptor jamb with an 11/64 drill for corner assembly screws. (Fig. 6) E. Assemble all four parts together with supplied screws using a total of 8 screws. (Fig. 7 & 8) Fig. 5 Fig. 6 Fig. 7 06/20/2017_V1.1 4 Fig. 8

Step 4: Flange Sub sill/receptor sealing A. Apply self leveling sealant to both corners inside where the sub sill and receptor come together covering all seams. (Fig. 9a &9b) B. Apply self leveling sealant to both corners inside where the jamb and head receptors come together covering all seams. (Fig. 10) C. Peel backing off the supplied corner gaskets and install over exterior side of flashing flange on the bottom two corners to cover gap between flanges. (Fig. 11) Apply sealant to cover any hole between gasket and frame. (Fig. 12) Sill self leveling sealant locations Fig. 9a Fig. 9b Fig. 10 Fig. 11 Fig. 12 06/20/2017_V1.1 5

Step 5: Flange Sub sill/receptor system Installation preparation A. Test fit the flashing flange system into the opening to ensure a proper fit that is plumb, level, and square. Check and mark points in sub sill anchor flange, jamb & head receptors for places to drill pilot holes for installation. B. Remove flashing flange system. C. Drill pilot holes in the interior sub sill anchor flange per shop drawings or anchorage calculations. Typically 3 from the ends and 12 on center. (Fig. 13) D. Drill pilot holes in the jamb and head receptor per shop drawings or anchorage calculations. Typically 3 from the corners and 12 on center. Keep all pilot holes on the interior side of flashing flange. (Fig. 14) Always follow the fastener/anchor manufacture s guidelines for proper edge distance, load capacity and installation techniques. Insulated cavity before installation. Fig. 13 Fig. 14 06/20/2017_V1.1 6

Step 6: Flange Sub sill/receptor system Installation A. Apply a ¼ diameter bead of 100% neutral cure silicone sealant along the interior side of the flashing flange. Bead must run continuously around both sides and across the head. (Fig. 15) Use a discontinuous bead at the sill to allow for any drainage. Alternate using a 6 long bead with 1 gaps. (Fig. 16) B. Center and set the flashing flange system into the rough opening. Pulling the system tight towards the interior making sure flashing flange is tight against the WRB. C. Temporarily screw the window into place using a screw through the pre drilled pilot holes on the sub sill anchor flange. Do not drive the screw in fully. (Fig. 17) Fig. 15 Fig. 16 Fig. 17 06/20/2017_V1.1 7

Step 6: Flange Sub sill/receptor system Installation (cont.) D. Square, plumb, and level the flange fin system into the opening shimming as needed at each fastener location. (Fig. 18) E. Apply sealant in installation holes or on screws. F. Fasten the flange fin system to framing with screws by others per shop drawings or anchorage calculations. (Fig. 19) Always follow the fastener/anchor manufacture s guidelines for proper edge distance, load capacity and installation techniques. Fig. 18 Fig. 19 06/20/2017_V1.1 8

Step 7: Exterior flashing A. Cut two pieces of flashing tape for jamb flashing extending 1 above flashing flange system head flange and 4 to 6 below bottom edge of sill flashing. Remove release paper and press tightly along sides of window frame. (Fig. 20) B. Cut a piece of flashing tape for the head flashing, which extends beyond outer edges of jamb flashings. Remove release paper and install completely covering mounting flange and adhering to exposed sheathing or framing members. (Fig. 21) C. Flip down upper flap of WRB so it lays flat across head flashing, then trim 1 2 above the window opening. (Fig. 22) D. Tape along all cuts in WRB and across head of the window with flashing tape and tape both angle cuts. (Fig. 23) Fig. 20 Fig. 21 Fig. 22 Fig. 23 06/20/2017_V1.1 9

Step 8: T mull anchor plate installation A. Install the 8 anchor plate in the center of the mullion location at an angle sliding the leg into the notch in the sub sill, and then press the anchor plate down until it snaps into place. (Fig. 24) Fig. 24 Step 9: Window installation A. Apply a bead of sealant to the legs of the sub sill where the window will rest. (Fig. 25) B. Install the first window in opening and set the interior leg of the window onto the sub sill frame, then push the window head and jamb in against the head and jamb receptors. Measure to locate the window is the correct distant from the jamb receptor per shop drawings. Snap in temporary closer pieces to hold window into place. (Fig. 26) C. Place a level on the window sill to verify that the sill is level. Adjust the shims as needed to ensure a level condition. Fig. 26 Fig. 25 Measure the gap between window and receptor per shop drawings. 06/20/2017_V1.1 10

Step 10: T mull installation A. Measure between the exterior sub sill and head receptor legs and square cut the T mull head. Note: The T mull sill should be notched from the factory. (Fig. 27) B. Measure to located the spacing between the T mull and window matches the shop drawings. (Fig. 28) C. Install L angles in a bed of sealant with self tapping screws. (Fig. 29) Note: Make sure screw don t penetrate sub sill. D. Install the next windows following the same steps used in Step 9. Head view Square cut Sill view (factory notch) Fig. 27 Fig. 28 Fig. 29 06/20/2017_V1.1 11

Step 11: Window installation trim A. Apply the continuous sub sill wedge gasket into the interior side of the sub sill against the window. (Fig. 30) B. Measure opening and cut the head receptor closer clip. Trim weather strip to appropriate length using caution not to stretch material. C. Install clip using a rubber mallet to make sure the closer clip snaps into place. (Fig. 31) D. Measure between the sub sill and head receptor clip and cut the jamb receptor closer clips. Trim weather strip to appropriate length using caution not to stretch material. Install clip using a rubber mallet to make sure the closer clip snaps into place. E. Check the installed product to ensure that it operates properly and that the reveal is equal between the sash and frame. F. Install T mull base plate with weather strip. (Fig. 32) G. Snap T mull base plate cap over base plate to finish off mullion. (Fig. 33) Insulate cavity Fig. 30 Fig. 31 Fig. 32 Fig. 33 06/20/2017_V1.1 12

Step 12: Sealing the Exterior A. Warning: Maintain a minimum of ¼ between the window frame, trim, siding, or masonry. Failure to do so will forfeit all warranties (written or implied). B. After siding or wall exterior is complete, apply backer rod and sealant between the window frame and exterior finish material on all four sides of unit. Make sure to clean all surfaces before applying 100% neutral cure silicone sealant. Low expansive foam insulation Low expansive foam insulation Backer rod & sealant Sill cut view Backer rod & sealant Jamb cut view 06/20/2017_V1.1 13

Step 13: Complete the Interior A. Insulate between the window frame and the rough opening using loose fiberglass insulation or minimally expanding window and door spray foam insulation that is compliant with AAMA 812 04. Read and follow the manufacturers recommendations for application and use. B. Operate window unit to ensure proper operation. Sash will not operate correctly if window is out of square, overshimmed or over insulated. C. Allow foam to fully cure before installing interior trim. Care and Use An inspection of your windows should be made annually. Visit the Quaker website http://quakerwindows.com/wpcontent/uploads/2013/05/quaker Window Care Maintenance.pdf or contact your local independent Quaker distributor for information on the care and use of your product. Ask for the Window Care & Maintenance Guide. 06/20/2017_V1.1 14