Cryogenics Operations Monday 20 September Thursday 23 September 2010 TRIUMF. Programme

Similar documents
INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE

Packaging of Cryogenic Components

Cryogenics for Large Accelerators

THE CRYOGENIC SYSTEM OF TESLA

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

CEBAF Overview June 4, 2010

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension

Cryogenic Operations at SLAC

Philippe Lebrun & Laurent Tavian, CERN

Operation Status of KEK Accelerator Cryogenic Systems

Tests of the Spoke Cavity RF Source and Cryomodules in Uppsala

To produce more powerful and high-efficiency particle accelerator, efforts have

FREIA Facility for Research Instrumentation and Accelerator Development Infrastructure and Control Architecture

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS

Technology Transfer at CERN

LARGE SCALE TESTING OF SRF CAVITIES AND MODULES

Cryogenics, Cryomodule & Superconductivity for Accelerator Programme in Asia

ESS RF Development at Uppsala University. Roger Ruber for the FREIA team Uppsala University

S. Ghosh On behalf of Linac, IFR, Cryogenics, RF and beam transport group members. Inter University Accelerator Centre New Delhi India

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction

Big Science Business Forum Preliminary Programme

ASSEMBLY PREPARATIONS FOR THE INTERNATIONAL ERL CRYOMODULE AT DARESBURY LABORATORY

Superconducting RF System. Heung-Sik Kang

Amit Roy Director, IUAC

Fermilab Muon Campus g-2 Cryogenic Distribution Remote Control System

SRF Cavities A HIGHLY PRIZED TECHNOLOGY FOR ACCELERATORS. An Energetic Kick. Having a Worldwide Impact

Who is Meyer Tool.! What US Manufacturing does for the economy.! Why support of basic science is important.!

SUPERCONDUCTING RESONATORS DEVELOPMENT FOR THE FRIB AND ReA LINACS AT MSU: RECENT ACHIEVEMENTS AND FUTURE GOALS

Fermilab Muon Campus g-2 Cryogenic Distribution Remote Control System

SLHiPP-2, Catania, Italy. A cryogenic system for the MYRRHA linac. Nicolas Chevalier, Tomas Junquera

Status of Projects using TESLA Cavities. Mike Dykes, ASTeC, Head of RF.

OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW*

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh

PROJECT X: A MULTI-MW PROTON SOURCE AT FERMILAB *

Status and Future Perspective of the HIE-ISOLDE Project

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team

APAC 2007, Raja Ramanna Centre for Advanced Technology(RRCAT), Indore, India LHC STATUS. Lyndon Evans, CERN, Geneva, Switzerland

ReA3 Marc Doleans (On behalf of the ReA3 team)

Re-commissioning the Recycler Storage Ring at Fermilab

SRF Advances for ATLAS and Other β<1 Applications

Present and future beams for SHE research at GSI W. Barth, GSI - Darmstadt

2 nd and Final Announcement

e-linac project overview

DESIGN STATUS OF THE SRF LINAC SYSTEMS FOR THE FACILITY FOR RARE ISOTOPE BEAMS*

A New Cryogenic Test Facility for Large and Heavy Superconducting Magnets

Superconducting RF Cavities Development at Argonne National Laboratory

Motivation: ERL based e linac for LHeC

(fb) Nevent/year for 50fb -1. s (GeV) ~ ~ qq q=t. ZZ cos <0.8 W + W tt 175GeV 500,00 5,000. Zh 120GeV. 230GeV. HA 400GeV 220GeV 410GeV

CURRENT INDUSTRIAL SRF CAPABILITIES AND FUTURE PLANS

KEYWORDS: ATLAS heavy ion linac, cryomodule, superconducting rf cavity.

DEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT

CRYOGENICS OPERATIONS 2008

FRIB Project Overview Big Ten & Friends Conference

Recent Progress in the Superconducting RF Program at TRIUMF/ISAC

Status of the ESS Accelerator Workpackage

Current Industrial SRF Capabilities and Future Plans

1. PUBLISHABLE SUMMARY

The ATLAS Toroid Magnet

QUARTER WAVE COAXIAL LINE CAVITY FOR NEW DELHI LINAC BOOSTER*

Residual Resistivity Ratio (RRR) Measurements of LHC Superconducting NbTi Cable Strands

200 MHz 350 MHz 750 MHz Linac2 RFQ2 202 MHz 0.5 MeV /m Weight : 1000 kg/m Ext. diameter : 45 cm

Frequency Tuning and RF Systems for the ATLAS Energy Upgrade. Gary P. Zinkann

SUPERCONDUCTING RF DEVELOPMENT FOR FRIB AT MSU*

LHC: CONSTRUCTION AND COMMISSIONING STATUS

HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK

CRYOGENIC CURRENT COMPARATOR FOR STORAGE RINGS AND ACCELERATORS

Status of berlinpro and BESSY II Installation of SSA. Helmholtz-Zentrum Berlin for materials and energy (HZB)

THE PROTOTYPE FUNDAMENTAL POWER COUPLER FOR THE SPALLATION NEUTRON SOURCE SUPERCONDUCTING CAVITIES: DESIGN AND INITIAL TEST RESULTS*

DEVELOPMENTS OF HORIZONTAL HIGH PRESSURE RINSING FOR SUPERKEKB SRF CAVITIES

French industry capacity and interest in Large Research Infrastructure PIGES association

H. Weise, Deutsches Elektronen-Synchrotron, Hamburg, Germany for the XFEL Group

Niowave s Growth and the Role of STTR in its Development

Acceleration of High-Intensity Protons in the J-PARC Synchrotrons. KEK/J-PARC M. Yoshii

Beam Loss Monitoring (BLM) System for ESS

Physical Design of Superconducting Magnet for ADS Injection I

IFJ PAN contribution to international projects

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute

SUPERCONDUCTING RF IN STORAGE-RING-BASED LIGHT SOURCES

Superconducting Cavity Fabrication for ILC in Japan

AIDA-2020 Advanced European Infrastructures for Detectors at Accelerators. Milestone Report

Cryogenic Infrastructure for Testing of LHC Series Superconducting Magnets

Alignment of the 12 GeV CEBAF Accelerator

STATUS OF THE SUPERCONDUCTING CYCLOTRON PROJECT AT VECC

The Current Cyclotron Development Activities at CIAE. Current acyclotron

CERN PS, SL & ST Divisions

DESIGN AND BEAM DYNAMICS STUDIES OF A MULTI-ION LINAC INJECTOR FOR THE JLEIC ION COMPLEX

R.Bachimanchi, IPAC, May 2015, Richmond, VA

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint

ERLP Status. Mike Dykes

A few results [2,3] obtained with the individual cavities inside their horizontal cryostats are summarized in Table I and a typical Q o

Giovanni Anelli Head of Knowledge Transfer Group CERN. CERN 2014

High Voltage Instrumentation Cables for the ITER Superconducting Magnet Systems

THE U. S. RIA PROJECT SRF LINAC*

LCLS-II SRF Linac Multi-lab partnership to build CW FEL based on SRF at SLAC. Marc Ross 13 January 2014

Summary of Industrialization

3 General layout of the XFEL Facility

Beam Loss monitoring R&D. Arden Warner Fermilab MPS2014 Workshop March 5-6, 2014

Transcription:

Cryogenics Operations 2010 Monday 20 September 2010 - Thursday 23 September 2010 TRIUMF Programme Cryogenics Operations 2010 / Programme Thursday 23 September 2010

Table of contents Monday 20 September 2010 3 Welcome Reception and Registration 3 Tuesday 21 September 2010 4 Registration 4 Welcome 4 Cryogenic Developments and Technologies 1 5 Coffee Break 6 Cryogenic Developments and Technologies 2 6 Lunch Break 7 Cryogenic Developments and Technologies 3 7 Coffee Break 8 Cryogenic Developments and Technologies 4 8 Wednesday 22 September 2010 9 Cryogenic System Operation and Maintenance 1 9 Coffee Break 10 Cryogenic System Operation and Maintenance 2 10 Lunch Break 11 Cryogenics Operations Committee Meeting 11 Cryogenic System Operation and Maintenance 3 11 Refreshment Pick-up 11 Bus tour of Vancouver finishing at Granville Island 11 Conference Banquet 11 Thursday 23 September 2010 12 Cryogenic Project Management and Safety 1 12 Coffee Break 13 Cryogenic Project Management and Safety 2 13 Lunch Break 14 Closing Remarks 14 TRIUMF Tour 14 Coffee Break 14 Page 2

Monday 20 September 2010 Monday 20 September 2010 Welcome Reception and Registration - TRIUMF Hot Spot Cafe and Lobby (18:00-20:00) Page 3

Tuesday 21 September 2010 Tuesday 21 September 2010 Registration - TRIUMF Boardroom (08:00-09:00) Welcome - TRIUMF Auditorium (09:00-09:40) TRIUMF Introduction, Workshop Goals, Logistics - Conveners: Dr. Comyn, Martin (TRIUMF) 09:00 TRIUMF Director's Welcome (00h15') Speaker: LOCKYER, Nigel 09:15 Workshop Goals (00h15') Speaker: WEISEND, John 09:30 Workshop Logistics (00h10') Speaker: COMYN, Martin Page 4

Tuesday 21 September 2010 Cryogenic Developments and Technologies 1 - TRIUMF Auditorium (09:40-10:20) Progress updates from research centres - Conveners: Weisend, John (FRIB Michigan State University) 09:40 From Commissioning and Consolidation to Routine Operation of the CERN Test Facilities and Detector Cryogenic Systems (00h40') Speaker: BARTH, Klaus The past two years at CERN were dominated by the start-up of the LHC and the associated detectors. The presentation will summarize this first period of continuous operation of the cryogenics for LHC detectors, point out the main operation issues and describe the corresponding maintenance and consolidation measures. The cryogenic operation activities during this period for the non-lhc related detectors and test facilities at CERN will be briefly summarized. Page 5

Tuesday 21 September 2010 Coffee Break - TRIUMF Auditorium (10:20-10:50) Cryogenic Developments and Technologies 2 - TRIUMF Auditorium (10:50-12:50) Progress updates from research centres - Conveners: Weisend, John (FRIB Michigan State University) 10:50 The Cryogenic Magnet Test Facility for FAIR (00h40') Speaker: SCHROEDER, Claus For testing fast-pulsed supreconducting model and pre-series magnets for FAIR (Facility for Antiproton and Ion Research), a cryogenic magnet test facility was built up at GSI and is now running for more than 3 years. The facility was operated successfully during testing four complete magnets and several design elements. The last two magnets tested were dipole prototypes for the planned SIS100 accelerator. A recent change in the request of the operation parameters towards more intensive cycle modes made it necessary to adjust the design of these magnets. According to the new design of the dipole, in future the test facility must be able to provide at least double the operating current up to 22 ka. Also the four times lower hydraulic resistance of this high current dipole requires an adjustment of the cryogenic supply system for optimal cooling and effective tuning of the higher mass flow rates of the forced two phase helium flow. In order to operate the new dipoles, to improve the facility itself and to run its two benches more independently, an upgrade of the existing system took place in the beginning of 2010. Design and functionality of the facility and its upgrade will be described. 11:30 Current State and Perspectives for Helium Cryogenics at TRIUMF (00h40') Speaker: KOVESHNIKOV, Alexey The helium cryogenics capabilities at TRIUMF have been increased more than tenfold over the past decade. There are four helium refrigerators presently operational at TRIUMF. Two of them are used for cooling the ISAC Superconducting linear accelerator (SC-linac), Phase-I and Phase-II. The third one is for the vacuum cryopumping of the 500 MeV cyclotron. The fourth is used for the superconducting detector magnet of the muon experimental facility. There are plans to add two more helium refrigerators within the next 5 year, subject to funding availability: one for 2 K operations of the e-linear accelerator (e-linac), and another one to support the proposed Ultra Cold Neutron (UCN) experimental facility, and to re-liquefy helium used by various experiments on site. The details and the status of all helium refrigerators are discussed. 12:10 Recent Cryogenics Activity and Plans at Fermilab (00h40') Speaker: PETERSON, Thomas Fermilab's Tevatron is still running, and proposals are being reviewed for extending Tevatron operations for three more years than the currently planned 2011 end, to a 2014 turn-off of the accelerator. Nevertheless, preparations for future physics programs at Fermilab are underway including a new set of accelerators for high intensity neutrino physics and other experiments. Project X, which includes a 3 GeV CW H-minus linac operating at 2 K, is a main component of this program. Associated with Fermilab's superconducting rf efforts are several new 2 K test facilities, some of which are in operation now, and the procurement of a new 2 K cryogenic plant for a test linac beam line. I will provide a brief summary of recent cryogenics activity and plans at Fermilab. Page 6

Tuesday 21 September 2010 Lunch Break - TRIUMF Hot Spot Cafe and Conference Room (12:50-14:00) Cryogenic Developments and Technologies 3 - TRIUMF Auditorium (14:00-15:20) Progress updates from research centres - Conveners: Mr. Koveshnikov, Alexey (TRIUMF) 14:00 Present Status of the Cryogenic System for Chamber A at the NASA Johnson Space Center (00h40') Speaker: SIDI-YEKHLEF, Ahmed NASA Johnson Space Center (JSC) in Houston, TX is currently upgrading its refrigeration system to meet the new requirements for testing the James Web Space Telescope in the environmental control chamber A (40' dia x 100' high) in building 32. The new system consists of a liquid nitrogen thermo siphon system and a 12.5 kw at 20 K helium refrigeration system. These two sub-systems are designed to meet the various operating modes which include fast (or controlled) cool down, warm up and bake out of the chamber, and the required stability at the 20 K load. The cryogenic group at Thomas Jefferson Lab (JLab) is consulting to NASA for the design, procurement and integration of the new system. This paper will present the progress to date and describe the overall improvements to the system in efficiency, operability and reliability. 14:40 Review of NSCL Operations and Expansion (00h40') Speaker: JONES, Shelly The National Superconducting Cyclotron Laboratory (NSCL) is a NSF-supported facility, with additional support from Michigan State University for conducting research in nuclear and accelerator science. NSCL is in the process of adding a reacceleration capability for experiments requiring rare isotope beams at low energy (6 MeV/u): ReA3. The ReA3 expansion introduces new operational requirements for the present system. NSCL's superconducting devices are either batch-filled or continuous-flow systems that are not very sensitive to changes in return pressure. The superconducting rf cavities are very dependent on constant vessel pressure. In addition, there is a rapid change in load as the cavities are turned on or off. Therefore, to better serve the SRF requirements, a new 900 W plant is being procured from Linde. The expansion includes new transfer lines. Two of the three cryomodules are installed and the remaining one is expected early in 2011. There is additional demand on the plant from testing of SRF cavities at 2 K required for the Facility for Rare Isotope Beams. We review the recent operations and planned expansion. Page 7

Tuesday 21 September 2010 Coffee Break - TRIUMF Auditorium (15:20-15:50) Cryogenic Developments and Technologies 4 - TRIUMF Auditorium (15:50-17:10) Progress updates from research centres - Conveners: Mr. Yosifov, Dimo (TRIUMF) 15:50 The FRIB Cryogenic System: A First Look (00h40') Speaker: WEISEND, John The Facility for Rare Isotope Beams (FRIB) is a DOE funded nuclear science facility currently under design at Michigan State University. The heart of FRIB is a heavy ion linac capable of accelerating nuclei up to 200 MeV/nucleon for Uranium. This is accomplished via superconducting rf cavities operating at both 4 K and 2 K. Cryogenic cooling will be accomplished by a centrally located Helium Refrigeration System (HRS) connected to the cryomodules via cryogenic distribution lines. This talk will describe the top level design and sizing of the cryogenic system and describe the next steps in creating this system. 16:30 The Status of the Cryogenic System at SSRF (00h40') Speaker: XU, Jieping The Shanghai Synchrotron Radiation Facility (SSRF) cryogenic system is designed for cooling three SRF cavities with cooling capacity of 650 W at 4.5 K. A safety margin of 1.5 is used to estimate the heat load from the SRF cavities and the heat loss from the transfer lines. The helium refrigerator made by AIR LIQUIDE passed the acceptance test in April 2008. A high performance multi-channel transfer line was developed and installed by SSRF in July 2008. The system has successfully operated since September 2008. The main operation parameters are given in the paper. The experiences from system building to operating are described. Page 8

Wednesday 22 September 2010 Wednesday 22 September 2010 Cryogenic System Operation and Maintenance 1 - TRIUMF Auditorium (09:00-10:20) General operation and maintenance issues - Conveners: Dr. Bylinski, Yuri (TRIUMF) 09:00 From First Cool-Down in 2007 to the 18 Month Continuous Campaign in 2010-2011, 4 Years of Commissioning and Operation for the LHC Cryogenic Systems (00h40') Speaker: FERLIN, Gerard The cryogenic system of the Large Hadron Collider (LHC) has been put in production mode since 2007. The first part of the presentation will show the evolution of the operation from the "expected mode" foreseen during the construction phase to the "consolidated mode" used since the end of 2009. The second part of the presentation will highlight the main problems encountered during this period and will explain improvements done for their resolution. We will finally present a brief introduction to our real-time process control simulator used for operator training. 09:40 Operational Experience with a Helium Plant and Distribution System at BESSY II (00h40') Speaker: PFLUECKHAHN, Dirk The Helmholtz-Zentrum Berlin (HZB) operates the synchrotron radiation source BESSY II, producing ultrabright photon beams ranging from terahertz to hard X-rays. Since 2003 a LINDE TCF 50 helium plant provides 4.2 K liquid helium for several SC magnets, refrigeration power for a SRF Landau Cavity and 1.8 K helium for the HoBiCaT Superconducting Cavity Test Facility. The 24/7 operation of the plant requires a high availability and reliability of all components. Maintenance, failure analysis as well as optimization of the process and the helium distribution led to energy savings and reliability improvements of the liquid helium supply. The interconnection of the LINDE TCF50 with a LINDE L700 installed in 2009 for the future Berlin Energy Recovery Linac Project (BERLinPro) demanded major changes of piping, installations and of the control system, but since then it provides a redundancy and a very flexible operation. Page 9

Wednesday 22 September 2010 Coffee Break - TRIUMF Auditorium (10:20-10:50) Cryogenic System Operation and Maintenance 2 - TRIUMF Auditorium (10:50-12:50) General operation and maintenance issues - Conveners: Ms. Jones, Shelly (NSCL) 10:50 Improved Helium Refrigeration Plant Reliability at Jefferson Laboratory (00h40') Speaker: WRIGHT, Mathew As a utility in support of many of the current and future particle accelerators, helium cryogenic plants are required to provide a high level of reliability. Beginning in 1988, Jefferson Laboratory has maintained continuous operation of its major cryogenic plants for durations up to 5 years at a time. These plants have included a wide variation of capacity from 750 W at 4.2 K to 4.6 kw at 2.1 K. An outline of the operational changes and methods used to increase system reliability over the past several years from an early 75% to 99%+ will be presented. 11:30 Cryogenic System for J-PARC Neutrino Superconducting Beam Line - Design, Performance Test and Operation (00h40') Speaker: MAKIDA, Yasuhiro A helium cryogenic system has been constructed to circulate 300 g/s of Supercritical Helium (SHe) at 4.5 K through a series of superconducting magnets for a neutrino beam line at J-PARC. The conceptual cryogenic system design, considering the cooling characteristics of the magnets, was defined in 2005. The engineering design was subsequently carried out by Taiyo Nippon Sanso Corp. The main elements are a screw compressor with a capacity of 160 g/s at 1.4 MPa, a refrigerator with a capacity of 1.5 kw at 4.5 K and a centrifugal SHe pump with a flow rate of 300 g/s. After system integration in 2008, performance tests were successfully carried out. The magnets were pre-cooled from the ambient temperature for eight days and were kept below 4.8 K by circulating pumped SHe. The measured heat leakage at the magnets during these tests, including SHe transfer lines, was 210 W. Since the maximum beam loss predicted is 150 W, the cooling capacity of the cryogenic system is large enough to manage beam operations expected in the future. The cryogenic system has been run after the performance test almost continuously. At this conference, (1) how the specifications of the cryogenic system were decided, (2) operational methods, especially power saving mode, and (3) the impurity check system will be presented. 12:10 ISAC-II Cryogenic Operations (00h40') Speaker: KISHI, David This presentation will cover the overall operations of the cryogenic system for the ISAC-II Superconducting LINAC. This system comprises two Linde TCF50 helium refrigeration systems, vacuum jacketed helium distribution and cold return piping, warm helium return piping, liquid nitrogen distribution system, eight cryomodules housing the accelerator cavities, and controls interface with our EPICS controls system. There are also secondary transfer lines and helium return piping to support superconducting rf tests in the cleanroom. Day to day operations, maintenance and challenges will be discussed. Page 10

Wednesday 22 September 2010 Lunch Break - TRIUMF Hot Spot Cafe and Auditorium (12:50-14:00) Cryogenics Operations Committee Meeting - TRIUMF Boardroom (13:00-14:00) Cryogenic System Operation and Maintenance 3 - TRIUMF Auditorium (14:00-15:20) Refrigerant loss and leak prevention / Cryogen contamination problems - Conveners: Dr. Sidi-Yekhlef, Ahmed (Thomas Jefferson Lab) 14:00 Cryogenic Challenges at the Superconducting Electron Accelerator S-DALINAC (00h40') Speaker: EICHHORN, Ralf During the last two years, the operation of the superconducting electron accelerator S-DALINAC was strongly affected by two cryogenic malfunctions: one was related to the cold mass, where gaskets to seal the helium bath against the beam vacuum developed random-like cold leaks. As the source of the cold leaks was finally located and proper operation successfully resumed, the cryo-plant is still under investigation. We will report on the details of cold mass leakage and the methods to locate the malfunction. As a basis for discussion, an overview of the strange cryo-plant behaviour will be given. The measures taken so far will be reported, the last of which was an acetone rinsing applied this summer which hopefully will lead to a decent cool-down within the next weeks. 14:40 ALICE - 5 Years of 2 K Operations (00h40') Speaker: GOULDEN, Andrew The ALICE 2 K Superconducting RF accelerating modules at STFC Daresbury Laboratory, Warrington, UK are cooled and maintained by Linde cryogenic refrigeration equipment. The system comprises principally a modified TCF50 liquefier, ambient temperature 2 K pumping system and integrated controls. This presentation will describe the operational highs and lows experienced over the last 5 years, focusing on issues such as contamination, gas losses, equipment failures and resultant lessons learned. Refreshment Pick-up - TRIUMF Auditorium (15:20-15:30) Bus tour of Vancouver finishing at Granville Island - TRIUMF Auditorium (15:30-18:30) Conference Banquet - Bridges Restaurant (18:30-22:00) Page 11

Thursday 23 September 2010 Thursday 23 September 2010 Cryogenic Project Management and Safety 1 - TRIUMF Auditorium (09:00-10:20) Project management and scheduling - Conveners: Laxdal, Robert (TRIUMF) 09:00 Management of Cryogen and Related Infrastructure at CERN (00h40') Speaker: DELIKARIS, Dimitri CERN, the European Organization for Nuclear Research, has placed several contracts for industrial type procurement of cryogens as liquid helium and liquid nitrogen in order to fulfill the present organization s requirements. Contracts for the supply of quantities up to 320 tons of liquid helium and up to 70,000 tons of liquid nitrogen over four years, are presently in force. Main users, coupled to dedicated cryogenic installations, are CERN s accelerators complex, physics experiments, test benches and facilities for research and development programs. With the installation, commissioning and now steady state operation of the LHC accelerator and its physics detectors, the procurement and use of related cryogens was adapted accordingly in order to fulfill the dramatic increase of inventory and delivery rates. In this presentation we discuss the liquid helium and liquid nitrogen procurement strategy, global turnover, distribution methods and safety standards. Information will be provided on the upgrade of the general infrastructure including storage capacity, on-site re-liquefaction and purification means, operational consumption and accidental losses with respect to the present total inventory. 09:40 Schedule and Cost Estimation Methods (00h40') Speaker: GOULDEN, Andrew STFC s ASTeC Department has a considerable portfolio of projects that involve collaborations with Universities, International Laboratories / Facilities, and Industry, as well as other STFC Departments. In recognition of the importance of these programmes and the need to continually develop project management skills, ASTeC is currently establishing a Departmental project support office located at Daresbury Laboratory. This presentation will consider the pros and cons of the various schedule and cost estimation methods currently available to project managers. Page 12

Thursday 23 September 2010 Coffee Break - TRIUMF Auditorium (10:20-10:50) Cryogenic Project Management and Safety 2 - TRIUMF Auditorium (10:50-12:50) Equipment procurement / Design strategy / Cryogenic Safety - Conveners: Mr. Peterson, Thomas (Fermilab) 10:50 Cryogenic Test Facility Improvements (00h40') Speaker: YUKSEK, Errol The Cryogenic Test Facility (CTF) is a 2 Kelvin helium liquefier which supports the cryogenic needs of Thomas Jefferson National Accelerator Facility's (TJNAF) Test Lab. In order to meet the Test Lab's projected cryogenic needs, an upgrade of the CTF is planned. This presentation will explain the present plant limitations and describe the changes planned to improve its capabilities and efficiency. The expected results of the upgrade are improved liquid helium utilization, a reduction in compressor power and maintenance requirement, and an increased liquid helium storage capacity. The commissioning of the upgraded plant is planned to take place in April 2011. 11:30 System Overview, Status and Schedule for CHL II at JLab (00h40') Speaker: DIXON, Kelly The doubling of the CEBAF beam energy for the 12 GeV upgrade requires a similar increase of capacity from the Central Helium Liquefier at Jefferson Lab. System performance parameters, equipment specifications, installation status, and a summary of procurement challenges are presented. 12:10 Open Discussion Session (00h40') Speaker: WEISEND, John Page 13

Thursday 23 September 2010 Lunch Break - TRIUMF Boardroom and Auditorium (12:50-14:00) Closing Remarks - TRIUMF Auditorium (14:00-14:30) Cryogenics Operations Workshop business - Conveners: Mr. Koveshnikov, Alexey (TRIUMF) 14:00 Cryogenics Operations Workshop Business and Closing Remarks (00h30') Speaker: WEISEND, John TRIUMF Tour - Site (14:30-16:30) Coffee Break - TRIUMF Auditorium (16:30-17:00) Page 14