Installation Guidelines

Similar documents
2.9 WINDOW & DOOR BUCKS

Section 7. Pouring Concrete. Section 7: Pouring Concrete

NAILSTRIP WALL APPLICATIONS CONSTRUCTION MANUAL. Foam-Control CONTROL, NOT COMPROMISE.

Chapter 1. Beam and Sill Plates

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

How to Use the Jahn Forming System

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

Unit 9. Wall and Ceiling Framing

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

Chapter 17 - Porch Trim

E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Chapter 23. Garage Construction

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Eagle clad double-hung window installation instructions

Integrity Polygon and Round Top Installation and Finishing Instructions

R-SHIELD WEATHER RESISTIVE BARRIERS CONSTRUCTION MANUAL. Foam-Control

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Non-Reinforced Joining Guide (Horizontal/Vertical)

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

COMPACT DECK. Compact Deck SOUTHERN FOREST PRODUCTS ASSOCIATION SOUTHEASTERN LUMBER MANUFACTURERS ASSOCIATION

Tools required by installer: Materials required by installer:

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

Flanged Dowel Box. Load Transfer System INDUSTRIAL SLAB ON GROUND

Shapes Siding. Perfection Shingles. Chalk Line

Steel Reinforced Joining Guide (Horizontal / Vertical)

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

WAL-MART SUPERCENTER # ; Milwaukie, OR: SPECIFICATIONS. Revisions to Specification Fence

Chapter 7 - Porch Framing

COMPOSITE SIDING INSTALLATION GUIDE

Installation Guide for Andersen Architectural Clad Inswing Entry and Patio Doors

SERIES 5001 SLIDING GLASS DOOR PATIO DOORS INSTALLATION GUIDE

Core Curriculum Carpentry 1 Carpentry 2 Carpentry 3

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

SECTION CARPENTRY

Oxford Stalls Installation Instructions

Copyright 2008 Robert Conroy

COMPACT DECK. Compact Deck Project Plan #850 Sheet 1 of Riverside Dr., Suite 212 Metairie, LA SouthernPine.com SouthernPineDecks.

MULTISLIDE DOORS INSTALLATION GUIDE & SITE PREPARATION

Features & Benefits: For Use with OSI QUAD Window & Door System. Recommended For:

Flashing Materials. Rough Opening Preparation

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

ARCHITECTURAL SHAPES CONTROL, NOT COMPROMISE.

Best Barns. 10' x 12' the Elm R. Assembly Book. revised September 29, 2016

Steel Strong-Wall Shearwall Installations

HR175 Sash Replacement Kit Installation Instructions

T he Double-Hung Replacement System replaces the sash and balance system of an older double-hung window. The

Sliding Glass Door Assembly and Installation Guide

CFDTT-01. Control Joint Study (General)

GENERAL INSTALLATION GUIDELINES

Keystone Garage Assembly Manual

Strands & Standards CARPENTRY 2

INSTALLATION INSTRUCTIONS FOR TEUTONIC ENTRANCE DOOR RECOMMENDATIONS FOR COMMON INSTALLATION OF ENTRANCE DOORS.

FOR PROFESSIONAL GARAGE DOOR INSTALLERS

A. Rough carpentry includes but is not limited to the following:

Carpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10%

Build a Full Height Wall

Best Barns. 10' x 16' the Elm R. Assembly Book. revised September 29, 2016

Installation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

Construction Manual. 1. Delivery Day

GIRTS ON BACK OF BUILDING

LuxCore Installation Instructions

Extra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS

STACKING MULTI-SLIDE DOOR SYSTEM

RECOMMENDED INSTALLATION PROCEDURE LEVEL 3

Flushglaze For Framed Openings and Horizontal Panels. Window System Installation Guide

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

Please read and understand all instructions before beginning. These instructions cover impact and non-impact aluminum French Door 650/750.

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

SERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Step 2 - Measure and install joist hangers every 16". See Figure "B" above. Fill every hole in each

Windows Installed into Walls with Polyiso and Wood Framing. Installation Instructions Standard Method Revised 10/24/2016

Chapter 6 - Walls & Stairs

Installation Guidelines

Series 7600 Installation Instructions Aluminum Multi-Slide Door (Pocketing)

12x12 Shed Plans and Building Guide

WoodWORKS Channeled Plank

GENERAL INSTALLATION GUIDELINES

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.

Please read and understand all instructions before beginning. These instructions cover the non-impact aluminum sliding glass door.

Installation Guide for Andersen Architectural Clad Awning Windows

8x8 Shed Plans and Building Guide

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

INSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN

Transom Joining. for Andersen Elliptical Windows over Perma-Shield Gliding Patio Door

Best Barns USA. Regency Deluxe. 8' x 12' Assembly Book. revised February 15, 2017

Heavy Wall Applied Stop Tube Frame and Door Installation

Installation Instructions

Installation Instructions

Transcription:

Insulated Concrete Form Installation Guidelines Steps for installing the Diamond Snap-Form (DSF) Insulated Concrete Form (ICF). The Diamond Snap-Form ICF System consists of Foam- Control EPS with Perform Guard and Diamond Snap-Ties. Diamond Snap-Form ICF system offers a flexible, cost effective way to build a permanent insulated concrete wall. Contractors with basic construction skill level can build Diamond Snap-Form ICF by following these steps and using the details in the Diamond Snap-Form ICF Construction Manual. Study the Diamond Snap-Form ICF Construction Manual. Become familiar with the site. Site work must be level. For below grade work, cut area wide enough to accommodate work activities; overcutting 3 or greater works best. Footings should be level, square, and properly engineered to support the Diamond Snap-Form ICF wall and meet local building codes. On the footing, snap a chalk line to mark outside toeplate guide line. Install toe-plate outboard of chalk line using doubleheaded nails or Tapcon screws so you can remove plating later. Repeat for all exterior walls. Footings: Footings should be level; when they are not, simply shim first course with strips of Foam-Control EPS. Footing step-downs should ideally be built in 1 increments. If odd dimensions are necessary, saw cut Foam- Control EPS to size and notch with tie cuts and assemble as usual. Corners: Factory cut corner pieces allow for exact placement of Diamond Snap-Form ties and start the form building process; 90 o and 45 o corners are standard. Custom angles and radius corners are readily available. Using factory cut corners, begin building the Diamond Snap-Form ICF wall at a corner. 1

As you build the first course, start at the corners of each wall segment and work to the middle of the wall. Field cut Foam-Control EPS to fit; use a common hand saw or keyhole saw. Since the Diamond Snap-Form ICF System is designed to use stacked vertical joints, the Foam-Control EPS pieces remain a constant length for the height of the wall. Place horizontal rebar as required by local codes in the appropriate Diamond Snap-Tie rebar cradles. A helpful technique to support vertical rebar is to insert them in appropriate Diamond Snap-Tie courses. As you build corners, use a key hole saw to notch factory long corners, top and bottom, in locations shown in photo. Cut Diamond Snap-Form half and full Snap-Ties so the web can reach into the wall cavity. Set Diamond Snap-Form cut ties in notches. Notch the succeeding factory long corners, top and bottom, as in above photo. Set the factory long corner into the cut Diamond Snap-Ties. This will keep the factory corners at a level elevation as you build succeeding courses of the Diamond Snap-Form ICF wall and will provide a solid tie face connection for claddings or finishes attached to the Diamond Snap-Form ICF wall. 2

Continue building the Diamond Snap-Form ICF wall by installing Diamond Snap-Ties into the factory notches of the Foam-Control EPS planks. The installation of the Foam-Control EPS planks goes easily and quickly. Remember to install rebar in the appropriate courses of the Diamond Snap-Form ICF wall as you build upward. At each corner having a long factory corner piece, place a vertical corner brace, cleating it to the toe-plate. Note: Refer to the Diamond Snap-Form ICF Construction Manual for bracing details for corners and T-corner intersections. Install diagonal kickers to plumb vertical corner brace. 3

Fasten kickers securely to the vertical corner brace top and bottom. It is further recommended that additional kickers be installed to the vertical corner brace at its midpoint prior to pouring concrete. Install interior toe plate onto the footer tightly against the interior side of the Diamond Snap-Form ICF wall using double headed nails or Tapcon screws so you can remove plating later. Repeat for all interior walls. Openings. If the Diamond Snap-Form ICF wall has openings such as windows and doors, place appropiate blocking and bracing to create openings; use treated lumber if blocking is to be permanent. Note: Pre-formed vinyl bucks can also be used. Follow vinyl buck manufacturers installation guidelines. As you build the Diamond Snap-Form ICF wall, trim the Foam-Control EPS planks to fit flush at blocking of openings. Use spaced blocking at the sill of the opening so concrete can be poured directly into the Diamond Snap-Form ICF wall area below the sill opening. 4

Diamond Snap-Form half ties are used to terminate and support opening boundary. Screw through all wood blocking at one foot centers using a screw length that protrudes into the Diamond Snap-Form ICF wall cavity at a minimum of 6. Place Diamond Snap-Form half ties to cap the Foam-Control EPS wall and to provide 12 on center attachment points for cladding or finishing materials. Complete the installation of Diamond Snap-Form ties and Foam-Control EPS planks. Inspect the Diamond Snap-Form ICF wall for any damage that may have occurred during installation. Repair and/or replace damaged items. Wall Bracing. In preparation for pouring concrete, build and install OSHA approved walkway frames where required. These frames provide a means to plumb the Diamond Snap-Form ICF wall and safely support workers when pouring concrete. Installing OSHA approved bracing and walkways is the sole responsibility of the installer. 5

Attach strong-back board with screws to the Diamond Snap-Form half ties at the top boundary of the outside Diamond Snap-Form ICF wall. Attach kickers at a maximum of 6 on center for walls up to 8 in height, a maximum of 4 for walls up to 12 in height. Use a string line to ensure straightness of all Diamond Snap-Form ICF walls. While holding the Diamond Snap-Form ICF wall top to the string line, fasten wall kickers securely to the ground to prevent any potential movement of the Diamond Snap- Form ICF wall during the concrete pour. Prior to the concrete pour, place adequate reinforcement blocking and/or bracing into the blocked openings in the Diamond Snap-Form ICF wall. 6

As a final check, inspect the Diamond Snap-Form ICF wall components again, as well as checking the entire bracing system making sure that all components and materials are secure and functional. The Diamond Snap-Form ICF braced wall is now ready for the concrete pour. Concrete. Standard concrete mix designs can be used with Diamond Snap-Form ICF system (always check with local codes): - 3/4 aggregate size is commonly used - 5 slump recommended, 6 maximum - 3,000 to 4,000 psi strength typical, as specified by designer and/or local codes. - Place concrete at a controlled rate. When pouring concrete, maximum 4 lifts should be used. For taller walls, multiple passes around the walls are needed. The Diamond Snap-Form ICF requires no mechanical vibration. The use of 5 slump concrete with 3/4 aggregate, along with the natural vibration that takes place in the form system during concrete placement is adequate. The Diamond Snap-Form ICF system allows for concrete consolidation when installed per Diamond Snap-Form ICF instructions. When using a boom pump truck, do not let the concrete fall from the full height of the boom into the Diamond Snap-Form ICF. For best results, a double S hose end is recommended to control the concrete flow into the Diamond Snap-Form ICF wall. 7

The top of the wall is screeded, troweled smooth, and anchor bolts are set. Once the concrete is sufficiently cured, bracing can be removed and construction can continue. Bracing is not wasted - save lumber and reuse for further building on the site, or use for the next Diamond Snap-Form ICF project. Finishing the System. The exterior should be damp-proofed or water-proofed using cutback asphalts, self-adhering sheet membranes, or high-quality acrylic coatings recommended by the coating manufacturer for use with ICF s. Do not use products which are highly solvent-extended. For above-grade application, common building claddings can be used. Install according to manufacturer recommendations over the Diamond Snap-Form ICF system. For electrical outlets/switches, hot knife or router-cut Foam-Control EPS, set boxes using concrete fasteners, and install wire per local code, and foam all components securely in place. Use only coarse-thread screws for attachment to Diamond Snap-Form ties. On a weather exposed side, use noncorrosive screws. Disclaimer: Details, illustrations, pictures and guidelines provided herein give basic information and illustrate examples of Diamond Snap-Form ICF System installation. The basic information provided herein is not intended to cover every potential use and application of the Diamond Snap-Form ICF System. It is the responsibility of the installer to become familiar with his specific application and determine if the Diamond Snap-Form ICF System is suitable. By commencing work, the installer accepts full responsibility for the proper and safe installation of the Diamond Snap-Form ICF System at his job site. Furthermore, it is the sole responsibility of the installer to meet all federal and local regulatory requirements for job site safety for himself, his workers and any others on the job site while in the execution of all phases of the Diamond Snap- Form ICF System installation. Construction must be done in compliance with local building codes. Insulated Concrete Form For further information about Diamond Snap-Form ICFs call 800-766-3626 or 406-388-7223 Email contact@diamondsnapform.com visit www.diamondsnapform.com 8 Diamond Snap-Form is manufactured by Big Sky Insulations, Inc. Copyright 2011 Big Sky Insulations, Inc. All rights reserved. Printed in USA. Foam-Control and Perform Guard are registered trademarks of AFM Corporation, Lakeville, MN. Diamond Snap-Form is a trademark of BKH LP. Diamond Snap-Form-02-02/11