MESO X1 TBAR SEMI-RECESSED

Similar documents
General Installation Instructions

SAVE THESE INSTALLATION INSTRUCTIONS

Pleated Shades with Corded Top Down / Bottom Up Option

HO4 Surface Mount Installation Instructions Overview

BLUEMOTION UXP, CDP, SD

LINESSE LINEAR LUMINAIRE 3 CEILING MOUNT CM2420

EOS LED Surface Mounted Luminaire

LIGHT FIXTURES MUST BE COMPLETELY INSTALLED PRIOR TO CEILING CONSTRUCTION

HP-2 / HP-4 Wall Wash Recessed T-Bar Installation Instructions Overview

MaxLite Linear Strip ECO Series

HP-2 / HP-4 / HP-6 Ceiling to Wall Inside Corner Installation Instructions Overview

INSTALLATION INSTRUCTIONS TOOLS YOU WILL NEED GETTING STARTED

IMPORTANT: WILL NOT FIT COUNTRYMAN MODELS

INDIVIDUAL MOUNTING: T-Bar

Optima 450 LED Edge-Lit Single-Sided Light Box. Installation Instructions INSTALLATION INSTRUCTIONS. Figure 1. Tools you ll need

LCD LIFT Flat Panel Display System Installation Manual. Table of Contents

HP-2 / HP-4 Wall Wash Recessed Spackle & Visible Flange Installation Instructions Overview

+ - 1a. 1b. c. 1d. 1e. Runway Suspended / Surface Cont. Run Installation. 2.0mm DIL DIL Revision - M 23/11/2018 Page 1

General Installation Instructions LED

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

LINESSE LINEAR LUMINAIRE 3 RECESSED CV2424

Transition Range Installation, Care & Adjustment Instructions

INSTALLATION: D1-NOTCH DRYWALL TRIM FLANGE

RAIL 4 INSTALLATION INSTRUCTIONS. RM4DOD Recessed GENERAL SAFETY INSTRUCTIONS: NOTE:

Lightplane 3.5 Recessed

Installation And Care Instructions. Vertical Honeycomb Shades

Assembly Instructions

J-BOX. 3-O or 4-0 MUD RING J-BOX BRACKET BAR CABLE GRIPPER/ CANOPY MOUNTING STUD 8-32 BRACKET BAR SCREWS CANOPY STRAIN RELIEF POWER CORD CANOPY

Installation Instructions For TruLine 1.6A 24VDC

ADVANTUS CV1100 SERIES OV1100 SERIES OG1000 SERIES

Two Panel Frameless Bypass Door

CONTINUOUS CORD LOOP SYSTEM

New Roman Shades WARNING. Installation Operation Care. Retractable Cord Lifting System

- 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS. Factory pre-installed mud flange TOOLS REQUIRED: Phillips screwdriver, 5/16 nut driver.

INSTALLATION AND CARE INSTRUCTIONS

Basic Assembly For Conventional Series 9000 Structural Panels

SERIES: CONFIGURATION: MOUNTING PACKAGE: 1200 Door-Door Frameless, sliding door

Cellular SlumberShade

HP-2 Recessed Wall Wash Flush Diffuser Tech Zone 4" Starter/Independent Installation Instructions

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

HONEYCOMB & PLEATED Standard Shades Top Down Bottom Up

Inde-Pendants Family. 32L Ring Plaster Trim, Grid and Drywall Ceiling Types. Document No Installation instructions for 32L-Rxx-P

Joiner Kit Joiner bracket (x1) Biscuit aligners (x2) Trim Flange

SeriesTWO RGB Fluorescent Fixtures. Installation and Instruction Manual

INSTALLATION AND CARE INSTRUCTIONS

Product must be installed as shown using the screws and brackets provided. Use of incorrect hardware could result in damage to the product.

Luxe Linen Honeycomb Shades

Installation Instructions for TruLine 1.6A 24VDC. Section One: Basic Configuration Options

ALWAYS TURN FIXTURE OFF/DISCONNECT POWER AND ALLOW TO COOL BEFORE PERFORMING ANY MAINTENANCE, INCLUDING RELAMPING AND CLEANING!

EOS Direct/Indirect LED Pendant Luminaire

*** All chrome surfaces should be cleaned using a clean damp cloth. *** No abrasive cleaning agents or materials should be used.

Vertical Honeycomb Shades

assembly guide Sliding Track Assembly Guidance Manual & Technical Data Sheets Issue ML/02 SEPTEMBER 2007

Please read these instructions before use and keep for future reference

INSTALLATION AND CARE INSTRUCTIONS

Installation Instructions Standalone or continuous run configurations - 2 JOINER ALIGNERS - 2 JOINING BRACKETS - 4 HEX BOLTS

Horizontal Shadings. Installation & Operating Instructions

SURFACE CLIP MOUNT. 1 Insert lens into channel, measure, and cut to length. Remove lens cover from channel. surface. Attach lens cover and end caps

QWALL 5.2 (2 Back Panels)

PRODUCT INFORMATION MANUAL SECTION: 9F-1 DUETTE ULTRAGLIDE LIFTING SYSTEM DUETTE SIGNATURE ULTRAGLIDE LIFTING SYSTEM

A524 ASSEMBLY & INSTALLATION INSTRUCTIONS BELLADONNA PENDANT CASTLETON, VERMONT USA SYNCHRONICITYLIGHTING.COM Rev A 1 OF 7

!When using electrical equipment, basic safety precautions should always be followed, including the following: AIR FOIL CLUSTER CP5371

Deluxe Exterior Solar Shades

Vanity Cabinets and Mirrors Installation and User Guide

INSTALLATION INSTRUCTIONS

Installation Operation Care

Basic Spring Motor Roller Shades

Titan - Double Skin Steel Partitioning. Installation Pack

Maintenance and other important non-personal injury and non-material damage instructions or statements that should be observed.

Cellular Shades SLUMBERSHADE. with energy saving blackout sidetracks. Installation & Care Instructions

Solar & Roller Shades

WARNINGS & SAFETY INFORMATION: PLEASE READ CAREFULLY AND KEEP A COPY ON THE PROPERTY FOR FUTURE REFERENCE!

Inde-Pendants Family. 32L Surface Mount Cylinder with Ring Plaster Trim, Grid and Drywall Ceiling Types. Document No

Sable Frame Series. Fixed Frame Projection Screen. Featuring CineGrey 3D Ambient Light Rejecting Material. User s Guide

ASSEMBLY INSTRUCTIONS

5 ACCESS PANEL INSTALLATION SPACER *SLIDE TO LOCATION OF FASTENER DURING INSTALLATION OF EACH FASTENER

Ambient Light Rejecting Fixed Frame Screen. (3.9 width frame) User s Guide

ZAPF PANEL SYSTEM ASSEMBLY INSTRUCTIONS. It is recommended that the components be installed in the sequence of this assembly manual.

SHOWERGLIDE 600B, 690B, 692B, SERIES

Glass cleaning hp scanjet 4500c/5550c scanner

M MODULAR PARTS T01-A INSTALLATION INSTRUCTIONS MIRRORED CABINET SIMPLIFIED LEFT OPENING DOOR K-15512T-NL RIGHT OPENING DOOR K-15512T-NR

STEP BY STEP INSTALLATION INSTRUCTIONS. Honeycomb Shades. Stationary Arch

MIL-STD B (SH) UPDATE

QWALL 4 ACRYLIC SHOWER WALL INSTALLATION INSTRUCTIONS

M MODULAR PARTS T01-A INSTALLATION INSTRUCTIONS MIRRORED CABINET W/DEFOGGER K-15512T , 2011 Copyright Kohler China Ltd.

WHISPER Cellular EasyRise Shades. Installation Operation Care

Premium Light Filtering Sheer Shade

pottery barn kids MADISON CABINET HUTCH

1/4 FRAMELESS SLIDING DOOR FOR TUB OR SHOWER

Step-by-Step Installation Instructions for

PRODUCT DESCRIPTION Camille Gents Wardrobe H183 x W96.5 x D52cm

INFUSIONS and METALWORKS Wings Accent and Acoustical Clouds

Healthcare LED TROFFER FLANGE (HSTLED Family)

INFINITE RANGE - CENTRE FOLDING DOOR

Installation, Operation and Care Instructions. Continuous Cord Loop Operating System

Figure A. Figure B. Figure C. Figure D

Installation Instructions for Zip Suspension Downlight with Remote Power and 4" Square or Round Canopy

STEP BY STEP INSTALLATION INSTRUCTIONS. Honeycomb Shades. Top Down Operable Arch

Installation Instructions

Acrylic Claw Foot Tub

Transcription:

MESO X1 TBAR SEMI-RECESSED 93t-inst PAGE 1 OF 2 1 2 A IMPORTANT Do not remove packaging around fixture until after fixture is installed. The packaging protects and in some cases supports the fixture during installation. NOTE Installation of this fixture requires two people. 3 B 1. Attach t-bar clip to t-bar grid at desired mounting location. Attach #12 gauge steel guy wire to substructure above and secure to t-bar clip. One (1) clip is required for every 4 of fixture run. 2. Insert aligner plate A midway into each end of channel extrusion. Aligner plate is midway in channel extrusion when holes line up with end of channel. 3. Remove cover B from fixture. Lift fixture by ballast channel and raise up to ceiling. Snap t-bar clips around joiner aligners and secure clip to extrusion with #8 screw (supplied). Note: T-Bar not shown for clarity 3a 3b 4. For 8 fixture, secure t-bar clip in middle using #8 screws. 5. Remove wire access cover from ballast cover. Connect branch circuit wiring to fixture through wires. Attach ground wire to extrusion. Replace wire access cover. 6. Replace cover B that was removed in step 3. / CONTINUED ON NEXT PAGE 4 5 6 B make power connection inside IMPORTANT Fixture will not hang level unless T-bar ceiling is also level. ATTENTION: INSTALL IN ACCORDANCE TO ALL NATIONAL AND LOCAL ELECTRICAL AND BUILDING CODES. Filename: 93a_t01 Rev.: A

7a MESO X1 TBAR SEMI-RECESSED 7b 93t-inst PAGE 2 OF 2 7. Slide endcap onto joiner aligner already installed in channel. Secure with #8 screw (supplied.) Continuous Row Applications Only 8. To join ceiling channel extrusions together, it will be necessary to remove the sheetmetal covers and pull the wires back out of the way. 9. Slide second channel extrusion into aligner plate and secure with screw. Wire connections can now be made and top covers replaced. 10. Join fixtures together using supplied bracket and screws. 10 11. Snap molded cover into place between each pair of fixtures. 12. Snap molded endcap onto end of fixture. 13. For fixture with ballast installed, cut a full-length 1.75 strip from the ceiling tile at proper location to clear ballast. Re-install the two halves of the tile around the fixture. 14. Install any remaining ceiling tiles. 15. Remove protective packaging from around fixture. 11 12 13 14, 15 Filename: 93a_t01 Rev.: A

MESO X1 SURFACE MOUNT 93s-inst PAGE 2 OF 3 1 48" 1/8", typical bracket stud must face end of channel IMPORTANT Do not remove packaging around fixture until after fixture is installed. The packaging protects and in some cases supports the fixture during installation. STARTER FIXTURE JOINER FIXTURE NOTE Installation of this fixture requires two people. 3 1. Attach ceiling brackets to ceiling at desired mounting location. Ensure bracket studs are facing ends of channel. Refer to first page for bracket and power feed locations. 2. For power feed through ceiling channel, prepare channel by removing rectangular knockout. Remove cover from ceiling channel where power will be fed through. Other covers do not need to be removed. 3 3. Lift fixture by ceiling channel and raise up to ceiling. If applicable, feed power cable through channel. Snap channel onto ceiling brackets. Thread supplied locknuts onto bracket stud at each end of channel and tighten (locknut not required for center brackets on 8 fixture). 4. For adjoining fixtures, raise joiner fixture to ceiling and clip end of joiner channel into starter ceiling channel. Secure opposite end of joiner to ceiling bracket with locknut. / CONTINUED ON NEXT PAGE 4 ATTENTION: INSTALL IN ACCORDANCE TO ALL NATIONAL AND LOCAL ELECTRICAL AND BUILDING CODES. Filename: 93a_s01b Rev.: 0

5 MESO X1 SURFACE MOUNT 93s-inst PAGE 3 OF 3 5. Join fixtures together using supplied bracket and screws. 6. Snap molded cover into place between each pair of fixtures. 7. Snap molded endcap onto end of fixture. 8. Install ceiling channel endcaps as shown. 9. Remove protective packaging from around fixture. 6 Power feed 10a. For power feed through ceiling channel, secure shielded cable to cover plate (included in power kit) and attach to channel with supplied screws. Make appropriate power connections and replace cover that was removed in Step 2 above. 10b. For power feed through endcap, remove endcap cover and connect shielded cable or conduit through knockout hole. Make appropriate power connections and replace cover 7 8 10a 10b Filename: 93a_s01b Rev.: 0

MESO X1 TBAR REMOTE BALLAST 93r-inst PAGE 1 OF 2 IMPORTANT - Do not remove packaging around fixture until after fixture is installed. The packaging supports and protects the fixture during installation. - Two people will be required to install this product. Installation will begin with "STARTER" fixture, either 4' or 8' long. "JOINER" fixtures can then be added to form longer rows. 2.50" holes will need to be cut/drilled in ceiling tile for fixture mounting components. First two holes must be drilled 45.50" apart, all other holes must be drilled 48.00" apart. 45.50" 48.00" 48.00" 48.00" 48.00" DRILL 2.50" HOLE IN CEILING TILE 8' STARTER 8' JOINER 45.50" 48.00" 48.00" 48.00" 4' JOINER 48.00" DRILL 2.50" HOLE IN CEILING TILE 4' STARTER 8' JOINER 8' JOINER 1 2 Mark ceiling tiles at required hole locations. Holes must be in a perfectly straight line or fixtures will not hang straight. Drill 2.50" diameter hole in ceiling tiles. Re-install tiles if they were removed for drilling. Install support channel, aircraft cable bracket, and tie-off plate through each tile hole. Aircraft cable bracket can be installed in two positions, make sure slots are properly oriented for aircraft cables. Secure with two #8 screws (provided). bracket may need to be turned 90 for aircraft cables (depends on fixture orientation) tie-off plate aircraft cable bracket support channel BOTTOM VIEW 3 Secure support channel to T-bar with self-drilling screw through T. 4 Feed fixture aircraft cables through plastic canopies, then raise fixture up to ceiling level. Insert crimped cable ends through aircraft cable bracket and slide each cable into curved slot. Secure canopies with plug (non-power mount), or bushing (power mount). On power mounts, push fixture power cord through bushing. plug bushing fixture power cord NON-POWER MOUNT POWER MOUNT Filename: 93a_r01 Rev.: 0

5 MESO X1 REMOTE BALLAST CONTINOUS ROW APPLICATIONS ONLY Join fixtures together with metal joiner bracket and secure together with four #8 x 1/4" screws (provided). Snap molded cover into place. 93r-inst PAGE 2 OF 2 6 Install endcaps by pushing onto fixture end. 7 POWER FEED LOCATIONS Remove ballast box cover. Secure ballast box to tie-off plate and support channel with #8 x 3/8" screws (provided). Feed fixture power cord into ballast box and make appropriate connections. Attach power cord ground terminal to hole on side of ballast box. Connect branch circuit power feed into ballast box and re-install cover. 8 Attach guy-wires from structure to tie-off plate. ATTENTION: INSTALL IN ACCORDANCE TO ALL LOCAL AND NATIONAL BUILDING CODES. Filename: 93a_r01 Rev.: 0

Meso X1 CARE AND CLEANING 930-ov01 Congratulations on choosing Ledalite Meso X 1. Here are a few suggestions for keeping your system in top shape The undersides of the acrylic side panels and spine have a microscopic surface pattern that is highly sensitive to finger marks. Handle by ends only When handling, wear cotton gloves and handle the fixtures by the ends only. If finger marks do get on the acrylic surfaces, remove them immediately as the volatile oils in the finger marks will degrade the materials. (See cleaning instructions below) Periodic dusting inside the top of the luminaire is important to maintain light output. Use a feather duster or soft, lint-free cloth. From time to time a more thorough cleaning is required to remove any build-up of dust and airborn grease. (See cleaning instructions below) MesoOptics surfaces. Avoid finger marking. Follow cleaning instructions below. Lamp replacement is easy. Access is from above the fixture. T5 HO High Output lamps are required. NOTE: Lamps contain mercury: please dispose of them in accordance with applicable disposal laws. See www.lamprecycle.org CLEANING INSTRUCTIONS 1. Using a solution of warm water and a mild, lemon liquid detergent (such as Sunlight) and a soft damp cloth, wipe along the length of the fixture, going with the microscopic grain of the MesoOptics material. This will remove any dust or dirt that has collected and will help avoid streaking. 2. Rinse out cloth and repeat. 3. Using a different clean, soft cloth, rinse with fresh warm water again wiping along the length of the fixture. Repeat rinse to remove all traces of detergent. 4. Take a dry cloth and wipe the surface along the length of the fixture until dry to avoid streaking. CAUTIONS! USE ONLY MILD, LEMON LIQUID DETERGENTS, SUCH AS SUNLIGHT. AVOID DETERGENTS WITH HAND SOFTENERS OR ANTI-BACTERIAL AGENTS. DO NOT USE WINDEX OR OTHER GLASS CLEANERS. DO NOT USE ACRYLIC CLEANING POLISHES. Note: Specifications and designs subject to change without notice. Phone: 604-888-6811 Fax: 604-888-2003 www.ledalite.com Filename: 93a_ov01.pub Rev: B