INSTALLATION PROCEDURE FOR TENSION CONTROL BOLTS

Similar documents
Instruction Manual for installing

Instruction Manual for installing

ENGLISH (Original instructions) INSTRUCTION MANUAL. Shear Wrench 6922NB DOUBLE INSULATION. IMPORTANT: Read Before Using.

Type XTSR71 Sizes

SteelConstruction.info The free encyclopedia for UK steel construction information

Structural Bolting. Notice the Grade 5 has a much smaller head configuration and a shorter shank then the grade A325 structural bolt.

ELECTRIC TOOL CORPORATION

CIRRUS AIRPLANE MAINTENANCE MANUAL

ERECTION & CONSTRUCTION

REPAIR INSTRUCTIONS. Cat. No Cat. No MILWAUKEE ELECTRIC TOOL CORPORATION. SDS Max Demolition Hammer. SDS Max Rotary Hammer

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING CUT-OFF MACHINE

Contents. Grade 2, 5, 8 Hex Bolts 4. Heavy Hex Head Structural Bolts 6. A325 and A490 Tension Control Bolts (TC) 13. Nuts 22.

1. Turn off or disconnect power to unit (machine). 2. Push IN the release bar on the quick change base plate. Locking latch will pivot downward.

STRINGING MACHINE OWNER'S MANUAL. Copyright 1998 GAMMA Sports - All Rights Reserved

REP Design LLC. 193 Winding Ridge Rd, Southington, CT INSTALLATION INSTRUCTIONS:

USER MANUAL Nord-Lock X-series washers

HEICO FASTENING SYSTEMS. Simple Fast Reliable HEICO-TEC TENSION NUT

Tapping Screw (W/Flange) 46 Cord Armor 47 Tube (D) 48 Cord. 45 Cord Clip. Tapping Screw (W/Flange) 10 Gear Cover Ass'y. 12 Socket (B) Ass'y

Quick Set Dovetail Jig

Procedure for Wrench Calibration and Snug Tightening

ClampStar Safe-T-Link Tether Installation Instructions for Deadends

Fluid Sealing Association

Impact Wrench MODEL 6905B MODEL 6906

Water Line and Water Line Assembly Gasket

Tuf-Lite and Tuf-Lite II Fans 4000 Series Hub

SPECIFICATION FOR HIGH STRENGTH STRUCTURAL BOLTS

Procedure for Testing Direct Tension Indicators (DTI) Assemblies

ODOT ITB Group 4 Item 33 Qty. 1


Tuf-Lite and Tuf-Lite II Fans 4000 Series Hub

Tightening of Structural Joints

Maintenance Information

7. Operating instructions: EFL 300

Joint Preparation prior to Tensioning: General:

Cam Handle Service Guide

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extension Sections. Reliable Connections

STEINBERGER TRANSTREM (TYPE 2) TECHNICAL DOCUMENT

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

USER MANUAL MODEL MZ-100 BOLT TENSION CALIBRATOR

Hilti HIT-1 / HIT-1 CE Adhesive Anchor System

STEEL CONSTRUCTION FASTENERS STEEL CONSTRUCTION FASTENERS

Snap Tabs, Chin Strap, Swing Catch, Sealed Pull Pins Stainless Steel. Contents

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Tuf-Lite II Fans 3000H Series Hub

ELECRAFT Application Note

HARDINGE Installation booklet For: Dead-Length Collet Adaptation Chucks Stationary Collet

Astro-Physics Inc. 400QMD Lubrication/Maintenance Guide

Tuf-Lite II Fans 3000HC Series Hub

504P Operator s Booklet

Chin Strap, Sealed Pull Pins and Swing Catch for Fiberglass Helmets. Contents

Hatchback Wing Riser Kit

Technical description

TorqueMaster Replacement Spring

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

4-8 HSF 250 Patriot. Line Stop Fitting Installation Instructions. Installation Instructions and Best Practices continued on back

Replacing the build plate clamps

Tuf-Lite III Fans 3000K Series Hub

6o ft (18.3 m) Southwest Windpower, Inc West Route 66 Flagstaff, Arizona USA Phone: Fax:

B B B

Impact Wrench MODEL TW1000. WARNING: For your personal safety, READ and UNDERSTAND before using. SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE.

Tuf-Lite II Fans 3000H Series Hub

Timber fasteners for structural use

Thorvie Instructions Always wear eye protection and do not wear loose clothing when operating machinery. FOR AV- 41 ICE AUGER MACHINE

Tuf-Lite II Fans H Hi Temp 3000HT Series Hub

COMPACT. Assembly Instructions

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

DRIVE COMPONENTS REMOVAL. 9. FXCW/C: see Figure Remove bolt (9), sprocket retainer (8), and thrust washer (7). NOTE PRIMARY DRIVE LOCKING TOOL

MUELLER. Improved, Centurion Series, Modern Improved, and 107. Fire Hydrants. Inserting Extention Sections. Reliable Connections

Quolis 5000 Light INSTALLATION AND OPERATION INSTRUCTIONS. Model AL-820 IMPORTANT

The object of these Operating Instructions is to assist you in the correct safe and economical use of the TORSIOMAX torque screwdriver.

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING DISC GRINDER

Tube Facing Tool.

Model: SCD430 SCD640. Installation & Operation Guide P/N SCD640-95

Thomas Disc Couplings Installation and Maintenance Series 71 Sizes (Page 1 of 11) DANGER!

WSG 8-115; 8-125; P; WSG ; WSG P; WSG PS; WSG P; WSG 15-70Inox

SERVICE PARTS LIST. M18 FUEL SAWZALL Reciprocating Saw F56A BULLETIN NO CATALOG NO

MSR/MSB Mechanical Setting Tool

12mm (Max) 6mm (Max) 82mm (Max) 12mm (Max) 6mm (Max)

It is highly recommended that you use a thread lock compound such as Loctite brand on all threads to keep them from vibrating loose.

OPERATOR S MANUAL DRILLING MACHINE WITH ELECTROMAGNETIC BASE

YALE FIGURE 500 & 500R CLOSURE OPERATION AND MAINTENANCE INSTRUCTIONS

OPERATING INSTRUCTIONS 5-AXIS CLAMPING SYSTEM + ACCESSORIES

Tuf-Lite III Fans K Hi Temp 3000KHT Series Hub

SecuAnch Roof Anchor System

Pneumatic Clamp Carrier. Installation & Operation Manual

Impact Wrench WR 22SA HANDLING INSTRUCTIONS. Read through carefully and understand these instructions before use.

LEG CURL IP-S1315 INSTALLATION INSTRUCTIONS

High Strength Weathering Steel Structural Bolting Assemblies PC 8.8 Hex. Cooper & Turner Ltd. Worldclass products for a.

AUTOMATIC ADVANCE MANUAL

Thomas Disc Couplings Installation and Maintenance Type 54 RDG Sizes (Page 1 of 6)

Instruction Manual 3 BLADE CLASSIC. Scan the QR code with a mobile device to view the installation video.

8" BENCH SHEAR INSTRUCTIONS. Item #20198

Index. Introduction. Arrow & ARP Care

Page 1. SureMotion Quick-Start Guide: LACPACC_QS 1st Edition - Revision A 03/15/16

Removing and Replacing the Y-truck

Tuf-Lite III Fans 5000K Series Hub

Nibbler MODEL JN1601. WARNING: For your personal safety, READ and UNDERSTAND before using. SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE.

SECTION METAL FABRICATIONS

Aluminum Frame Type Instruction Manual

Tuf-Lite III Fans 5000K Series Hub

Transcription:

INSTALLATION PROCEDURE FOR TENSION CONTROL BOLTS

Introduction This booklet is for steel erectors and inspectors and should be referred to as a guide when making structural bolted connections. Tension Control Bolts (TCBs) are HRC (High Resistance Calibrated) high strength structural bolting assemblies for preloading and conform to EN 14399-1. TCBs provide an easily installed and inspected method of bolting. The TCB concept is a simple and uncomplicated system that completely removes the responsibility of attaining the correct preload in a given connection away from the erector and there is no requirement for the use of k factors with HRD (1d) nuts. The 110 or 220 volt electric non-impact shear wrench is light in weight and quiet to use. Under the Construction Product Regulations (CPR) all preloaded bolting assemblies should conform to EN 14399-1 or have a relevant European Technical Approval (ETA) in force. All class 10.9/10 TCB products are CE marked with the appropriate Declaration of Performance (DoP) available to download from our website. Technical advice is always available and if required, on-site training can be provided. Installation videos are available online via the links below:- Installation of TCBs in a steel joint. https://www.youtube.com/watch?v=lngadyjtiwk The concept of Fail-to-Safe https://www.youtube.com/watch?v=hjtrzrfn3e0 Tension Control Bolts Ltd TCB House, Clywedog Road South, Wrexham Industrial Estate, Wrexham, LL13 9XS United Kingdom Telephone: +44 (0)1978 661122 Fax: +44 (0)1978 661177 Email: info@tcbolts.com Web site: www.tcbolts.com Certificate No. FS86045 LRQ 4006595 Supplier number 094882

Quality Assurance TCB preloaded bolting assemblies are manufactured and supplied in accordance with EN 14399-1 and CE marked in accordance with the CPR. Bolts and HRD nuts are manufactured in accordance with EN 14399-10 with washers manufactured in accordance with EN 14399-6. Assemblies are (usually) supplied unassembled as extended bolting assembly lots. Bolts and nuts have an embossed 3 digit heat code added during production to identify lot numbers plus bolts also have their nominal length stamped on the head. Inspection Certificates TCB assemblies are tested in accordance with EN 14399-2 and certified in accordance with EN 14399-1. The relevant DoP can be downloaded via the QR code found on packaging labels. Storage TCB bolting assemblies shall be stored in a clean and dry condition. Shear Wrenches Shear wrenches are non-impacting, lightweight, low noise tools available in various models all of which meet Directive 2006/42/CE on machinery. Please note - Shear Wrenches are dumb tools and require no calibration Shear Wrench 110 volt 220 volt Model number GM161EZ GM162EZ GM221EZ GM222EZ GH241EZ GH242EZ GV301EZ GV302EZ GMC221EZ GMC222EZ GHC241EZ GHC242EZ GVC301EZ GVC302EZ SSGM221EZ SSGM222EZ SSGV271EZ SSGV272EZ GX361EZ GX362EZ Serial number Tools marked with unique number Directives Machinery Directive 2006/42/EC EMC Directive 2004/108/EC RoHS Directive 2011/65/EU

Installation procedure connections with few TCBs 1. As per Fig 1 insert the bolt into the connection and place the washer, bevelled side outermost, onto the bolt followed by the nut. Nut markings should be outermost to ensure Quality Assurance is visible. If two washers are being used, ensure the washer under the bolt head is placed bevelled side facing the bolt head. Nut markings Bolt head markings Fig 1. Washer with bevelled edge 2. The non-impacting electric shear wrench has two sockets which operate in opposing directions; engage the inner socket over the bolt spline and the outer socket over the nut (Fig 2). Ensure that both inner and outer sockets are fully engaged before proceeding. Fig 2.

3. Press the power switch. The outer socket rotates clockwise and tightens the nut whilst the inner socket holds the bolt spline (only one socket can move at any one time). When the correct preload is reached the outer socket stops rotating, the inner socket counter rotates and shears the spline off (Fig 3) Fig 3. 4. Stop the wrench and pull the outer socket off the nut. The spline is retained in the inner socket. The wrench has a second trigger to eject the spline safely (Fig 4). Ensure that the wrench motor has come to rest prior to engaging the next bolt. Fig 4.

Installation procedure multi-bolt, multi-ply connections Before commencement of preloading, the connected components shall be fitted together (as previously detailed in section 1) and the bolting assemblies shall be brought to a snug tight condition. This tightening process shall be carried out from bolt to bolt of the group starting from the most rigid part of the connection and moving progressively towards the least rigid part (contact to non-contact surfaces). In order to ensure that the preload in fully installed bolting assemblies meets the specified minimum preload requirement, the installation process consists of two tightening stages. The first stage applies a bedding torque to the bolts to ensure a firm contact between components. This pretensioning (or snug tightening) can be accomplished by: i. Using the shear wrench but only snug tightening assemblies and UnotU shearing off the splines. When using this method the operator will notice a distinct change in the sound/tone of the wrench motor. This indicates that pre-tensioning has commenced as the bedding load is being applied. If pretensioning has occurred, then when the power trigger is disengaged the wrench gearing will backtrack and reverse allowing the tool to be easily removed from that particular bolt. This whole process can also be felt by the operator. or ii. Using a standard nut runner/impact wrench with a deep socket to pull all surfaces into contact without involving the bolt spline. NOTE If mating surfaces are significantly distorted or misaligned then slave bolts should be used. TCBs can be used as slave bolts but they must be clearly marked and then replaced prior to final completion of the joint. The second tightening stage can only be achieved using a shear wrench. When the spline end of the bolt shears off at the break neck, full preload has been induced. If the bolting assembly cannot be installed using shear wrenches, tightening shall be carried out in a conventional manner by either; i. Using the torque method with the aid of the k-class K2 information (K2 values are provided upon request) or ii. Using a direct tension indicator.

Greenkote PM1 Greenkote is a metal surface treatment for the prevention of corrosion and the name simply relates to the process. Greenkote PM1 is a Thermo-Chemical Surface Modification (TCSM) process which gives better protection than electro-galvanizing and zinc flake coating and offers similar protection to hot dip galvanising. Bolting Assemblies coated with Greenkote are ready for installation and no additional treatments are necessary. T Washing T-washing or etching of bolting assemblies prior to installation MUST NOT BE DONE. Greenkote provides an excellent surface for paint adhesion (sample paint pull-off tests available upon request) Paint Faying surfaces along with surfaces under the bolt head and washer should be masked off and left unpainted. If bolting assemblies are installed with paint under the bolt head and/or washer, loss of preload in the bolting assembly could occur over time; this is known as paint creep and should be avoided. When a connection has been fully assembled with the bolts correctly installed (splines sheared off), a zinc rich primer can be used to protect the exposed bolt end until the painting contractors have access to the joint. Testing, certification and inspection Five bolt assemblies per extended lot are systematically tested in accordance with European standards. Axial loads are recorded onto the Certificates of Inspection for TCB assemblies being delivered to site / works. After the spline of the bolt has sheared, the assembly preload should be equal to or greater than those values as required by the specification (see table 1). Since the quality assurance and integrity of the bolted connection is determined by the bolting assembly itself, visual inspection of the bolt spline removal is sufficient.

EN 1090-2 8.5 Tightening of preloaded bolts 8.5.1 General Unless otherwise specified, nominal minimal preloading force F p, c shall be taken as: F p, c = 0.7 f ub. As where f ub is the ultimate strength of the bolt material and As is the stress area of the bolt as defined in EN1993-1-8 and specified in Table 1. This level of preload shall be used for all slip resistant preloaded connections and for all the other preloaded assemblies unless a lower level of preloaded is specified. Table 1 Values of Fp,c in kn Bolt diameter M12 M16 M20 M22 M24 M27 M30 M36 10.9 HRC 59 110 172 212 247 321 393 572 Fail Safe bolts It is important to understand the difference between tension control bolts and conventional preloaded bolts. As with any threaded fastener an occasional failure can occur. This is generally attributed to a problem during installation and can be the result of several factors including the following examples: Using a TCB as a slave bolt Alignment problems Foreign materials in the threads such as grit, mastic, oil etc Temperature Moisture

In all of these cases, the friction co-efficient of the TCB assembly reduces resulting in the dumb tool continuing to take the least line of resistance (rotate the outer socket). One of two things will happen. Either: i. Threads will strip in which case the spline will not be removed or ii. Threads will hold and the increased preload will break the bolt due to torsional overload. IN EITHER CASE THE OPERATOR WILL BE AWARE AND THE ASSEMBLY WILL ALWAYS FAIL-TO-SAFE These assemblies should be removed and replaced with new ones. If, on inspection it can be seen that the spline has sheared off, then one can be certain that the bolt is installed correctly. It is not possible to properly remove the spline during installation AND the bolt break afterwards without additional forces being applied, thus reinforcing the fail-to-safe properties of this type of bolting system. Example of thread stripping Example of torsional overload

Changing of sockets Loosen the 2 set screws on the side of the socket (keep screws safe) Remove the socket set Push central portion of inner socket with screwdriver or correct size bolt spline as below; the sockets will disassemble To reassemble, connect both inner and outer sockets; push the central portion of inner socket with a correctly sized bolt (with spline) to assemble both parts fully Place assembled socket over ejector rod and socket holder on the shear wrench When a gap remains between the outer socket and socket holder, simply insert a correctly sized bolt spline into the inner socket thus allowing the inner socket to drop and become correctly seated into the socket holder Retighten grub screws

Shear Wrench Maintenance Maintain the wrench in a state of cleanliness as with any other electrical tool Check electric cable and plug regularly replace if damaged to avoid electric shock Do not pick up or carry the shear wrench by the electric cable Clean sockets occasionally with a dry cloth to avoid build up of debris/dirt Change motors carbon brushes when necessary. The length of the brush needs to be more than 6mm. If shorter than this an insulation pin protrudes through the carbon, disabling further motor operations to protect the armature To maintain the shear wrench in good condition and service, return to TCB Ltd every 6 months or 30,000 bolt installations whichever is first. Publication No. 201116/C Copyright TCB Ltd 2016