International Journal of Advance Engineering and Research Development

Similar documents
A Review of Adaptive Under Frequency Load Shedding Scheme on Islanded Distribution System Using MATLAB/SIMULINK

ESB National Grid Transmission Planning Criteria

ISLANDING DETECTION FOR DISTRIBUTED GENERATION SYSTEM USING VARIOUS METHODS

Coordination of overcurrent relay using Hybrid GA- NLP method

SCIENCE & TECHNOLOGY

Power System Protection Manual

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP

Chapter -3 ANALYSIS OF HVDC SYSTEM MODEL. Basically the HVDC transmission consists in the basic case of two

Anti-IslandingStrategyforaPVPowerPlant

Design and Construction of Synchronizing Check Relay

Islanding and Detection of Distributed Generation Islanding using Negative Sequence Component of Current

Introduce system protection relays like underfrequency relays, rate of change of frequency relays, reverse - power flow

EXCITATION SYSTEM MODELS OF GENERATORS OF BALTI AND EESTI POWER PLANTS

each time the Frequency is above 51Hz. Continuous operation is required

Time over/underfrequency relay with protection assemblies

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017

A New Approach Applied to Adaptive Centralized Load Shedding Scheme

Loss of Excitation protection of generator in R-X Scheme

Power System Stability. Course Notes PART-1

Transmission Line Protection for Symmetrical and Unsymmetrical Faults using Distance Relays

Micro grid Protection Using Digital Relays Mr.Karthik.P 1, Mrs.Belwin J. Brearley 2

TEAMS Competition 2014

Doãn Văn Đông, College of technology _ Danang University. 2. Local Techniques a. Passive Techniques

Instruction Manual. Description Calibration. Excitation Sensor and Reverse Power Relay

Islanding Detection Techniques for Distributed Energy Resources-Review

Reducing the Effects of Short Circuit Faults on Sensitive Loads in Distribution Systems

Power Transmission of AC-DC Supply in a Single Composite Conductor

DRTS-6. DRTS-6 has been designed to test: DRTS-6. Advanced Protection Relay Test Set and Measurement System

Single Line Diagram of Substations

Keywords: Transformer, differential protection, fuzzy rules, inrush current. 1. Conventional Protection Scheme For Power Transformer

Testing of Circuit Breaker and over Current Relay Implementation by Using MATLAB / SIMULINK

EH2741 Communication and Control in Electric Power Systems Lecture 2

Increasing Dynamic Stability of the Network Using Unified Power Flow Controller (UPFC)

Under-Frequency Load Shedding based on PMU Estimates of Frequency and ROCOF

International Journal of Advance Engineering and Research Development ANALYSIS OF INTERNAL AND EXTERNAL FAULT FOR STAR DELTA TRANSFORMER USING PSCAD

Transient stability improvement by using shunt FACT device (STATCOM) with Reference Voltage Compensation (RVC) control scheme

Arvind Pahade and Nitin Saxena Department of Electrical Engineering, Jabalpur Engineering College, Jabalpur, (MP), India

A NEW DIRECTIONAL OVER CURRENT RELAYING SCHEME FOR DISTRIBUTION FEEDERS IN THE PRESENCE OF DG

Massive Transient Stability Based Cascading Analysis and On-line Identification of Critical Cascades

Texas Reliability Entity Event Analysis. Event: May 8, 2011 Loss of Multiple Elements Category 1a Event

Analysis of Effect on Transient Stability of Interconnected Power System by Introduction of HVDC Link.

VOLTAGE STABILITY OF THE NORDIC TEST SYSTEM

Renewable Interconnection Standard & Experimental Tests. Yahia Baghzouz UNLV Las Vegas, NV, USA

ARC FLASH PPE GUIDELINES FOR INDUSTRIAL POWER SYSTEMS

Phase-phase/phase-neutral: 24/13.8 kv star, 13.8 kv delta, 12/6.9 kv star.

Unit 2. Single Line Diagram of Substations

Combination of Adaptive and Intelligent Load Shedding Techniques for Distribution Network

O V E R V I E W O F T H E

Modle 6 : Preventive, Emergency and Restorative Control. Lecture 29 : Emergency Control : An example. Objectives. A simple 2 machine example

ADVANCED VECTOR SHIFT ALGORITHM FOR ISLANDING DETECTION

Improving the Transient and Dynamic stability of the Network by Unified Power Flow Controller (UPFC)

International Journal of Advance Engineering and Research Development

Transmission Line Protection Objective. General knowledge and familiarity with transmission protection schemes

UPGRADING SUBSTATION RELAYS TO DIGITAL RECLOSERS AND THEIR COORDINATION WITH SECTIONALIZERS

Unit Protection Differential Relays

DG TRANSFER CONNECTION SCHEME IN ACTIVE DISTRIBUTION NETWORKS

FRIENDS Devices and their Coordination

ISSN: Page 298

3 Phase Induction Motor Protection using Numerical Relay

INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES. Technical Requirements for Grid-Tied DERs

Overcurrent and Overload Protection of AC Machines and Power Transformers

A Real-Time Regulator, Turbine and Alternator Test Bench for Ensuring Generators Under Test Contribute to Whole System Stability

A Pyrotechnic Fault Current Limiter Model for Transient Calculations in Industrial Power Systems

Smart Grid Where We Are Today?

PSV3St _ Phase-Sequence Voltage Protection Stage1 (PSV3St1) Stage2 (PSV3St2)

Voltage Relays. Ensuring Reliable Protection for Electrical Systems against Voltage Faults. ISO 9001:2008 Certified.

Protection of Microgrids Using Differential Relays

Central Hudson Gas & Electric Corporation. Transmission Planning Guidelines

Ultra Hight Voltge Transmission line Faults Identified and Analysis by using MATLAB Simulink

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 4: (June 10, 2013) Page 1 of 75

Voltage Control and Power System Stability Enhancement using UPFC

A CONTROL TECHNIQUE FOR INSTANT MITIGATION OF VOLTAGE SAG/SWELL BY DYNAMIC VOLTAGE RESTORER

NVESTIGATIONS OF RECENT BLACK-

Transmission System Phase Backup Protection

Optimal sizing of battery energy storage system in microgrid system considering load shedding scheme

Transmission Protection Overview

MODEL 421 Over/Under Motor Load Monitor

DESIGN ANALYSIS AND REALIZATION OF MICROCONTROLLER BASED OVER CURRENT RELAY WITH IDMT CHARACTERISTICS: A PROTEUS SIMULATION

How to maximize reliability using an alternative distribution system for critical loads

System Operating Limit Definition and Exceedance Clarification

Power System Reliability and Transfer Capability Improvement by VSC- HVDC (HVDC Light )

Electrical Protection System Design and Operation

3 Circuit Theory. 3.2 Balanced Gain Stage (BGS) Input to the amplifier is balanced. The shield is isolated

The Coupling of Voltage and Frequecncy Response in Splitting Island and Its Effects on Load-shedding Relays *

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

PRC Generator Relay Loadability. Guidelines and Technical Basis Draft 5: (August 2, 2013) Page 1 of 76

[Nayak, 3(2): February, 2014] ISSN: Impact Factor: 1.852

An Ellipse Technique Based Relay For Extra High Voltage Transmission Lines Protection

Design of Low Cost Embedded Power Plant Relay Testing Unit

Appendix S: PROTECTION ALTERNATIVES FOR VARIOUS GENERATOR CONFIGURATIONS

EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM

A COMPARATIVE STUDY: FAULT DETECTION METHOD ON OVERHEAD TRANSMISSION LINE

Development of Dynamic Test Cases in OPAL-RT Real-time Power System Simulator

Power Plant and Transmission System Protection Coordination Fundamentals

I. INTRODUCTION IJSRST Volume 3 Issue 2 Print ISSN: Online ISSN: X

Rajasthan Technical University, Kota

Study on the Improvement of the Special Protection Scheme (SPS) in the Korean power system

E N G I N E E R I N G M A N U A L

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation

International Journal of Advance Engineering and Research Development. Short-circuit analysis of Industrial plant

Transcription:

Scientific Journal of Impact Factor (SJIF): 3.134 International Journal of Advance Engineering and Research Development Volume 2,Issue 12,December -2015 E-ISSN (O): 2348-4470 P-ISSN (P): 2348-6406 Detection of Frequency Deviation and Under/Over Frequency Protection by Load Shedding Using MATLAB/SIMULINK Ravi Patel 1, Dr. Vijay Makwana 2 Electrical Department, GCET, V.V. Nagar, Gujarat, India Abstract -This paper represents measurement of frequency, design steps for digital frequency relays, effectiveness of under/over frequency relays as well as tripping requirements of frequency relays. Matlab/simulink is user friendly software and is useful to simulate normal and faulty conditions of the electrical power system. In recent days, most of electromechanical relays are replaced by the digital relays because of their high speed, compact size, high accuracy and variable settings. In this paper, performance of digital under/over frequency relays are tested on 132 kv power system network, that contains synchronous generator with distribution generation on MATLAB/SIMULINK. Key words - stability, over/under frequency, digital relays, load shedding, distributed generation I. INTRODUCTION The major problems of electrical power system network are because of power system instability. Frequency, angle and voltage instability are three fundamental instability problems [1]. Power system protection and stability coordination are big challenges for researchers [2]. Certain faults like over load, transmission line tripping contingency and reversal power cause instability problems [4]. Few types of relays such as over/under frequency, over current, over voltage, earth fault, reverse power relays are used to protect typical portion of a power system. If the overloading condition persists for a long duration then a part of power system may face a problem of instability as well as the generator and their prime mover may begin to slow down. Mismatch between the load and generation can cause the frequency deviation. Which may ultimately leads to loss of power. If the frequency deviation is in excess then the entire power system may face very serious trouble which may be responsible for start the condition of cascade tripping [6]. To save the power system against such serious problems, under frequency relays are used. When there is mismatch between the load and generation, the power system frequency varies within a wide range depending upon the level of mismatch. The frequency relay operates depending upon its setting and level of mismatch. After a set time, transmit trip signal to the circuit breaker to start load shedding. This is helpful to bring back power system parameters under safe limit. Now a days, most of the electromechanical and solid state relays are being replaced by digital relays. Digital relays can able to perform different functions such as, protection, measurement and control simultaneously. Wide range controlling and high sensitivity are also specific advantages of the digital frequency relay [7]. Simulation tools like MATLAB, PSCAD, MIPOWER, ETAP assist researchers for more easily grasped actual operation of power system. matlab provide power system analysis toolbox, which does not have protection relays module. In this paper, the design of a digital frequency relay is built on MATLAB/SIMULINK. II. DETECTION OF FREQUENCY Frequency relays are used to protect the power system against variations in frequency. In any condition of power system, power frequency should remain stable. For maintaining stability, first step is measure or detect frequency variations. A signal frequency measuring technique proposed by C. Buque at el. [3] is used in this paper for measuring frequency. This is based on counting the number of zero level crossing with unit time interval. This numbers indicate the frequency of a given signal. As shown in the fig.1 voltage signal from the potential transformer is send to the zero crossing detection block. Time delay is applied to output of zero crossing detection block and give the signal to integrator circuit. Integrator integrate the signal and send the signal to the sample and hold circuit if signal exceeds the threshold value. Sample and hold circuit hold the signal till the next zero crossing. Output of the sample and hold circuit is multiplied by integer 2.inverse of this value gives the signal frequency. Figure 1. Frequency measurement @IJAERD-2015, All rights Reserved 140

This frequency is compared with the nominal system frequency (50 or 60 Hz) to find the actual frequency deviation of the power system. III. MODELING OF OVER/UNDER FREQUENCY RELAYS Digital frequency relay constructed with two blocks 1) Frequency measuring block (FMB) 2) Frequency detection block (FDB) as shown in figure. Frequency detection block is also classified in to two element delay element and hold element Figure 2. Block of digital frequency relay As shown in Fig. 2, Frequency measuring block calculate the system frequency from signal of potential transformer. Frequency measuring block transmit measured frequency to delay element of the frequency detection block. Detection block transmit the signal to circuit breaker based on under and over frequency limit. A. Frequency measuring block:- Frequency measuring block used voltage signal of the system from PT for measure the frequency. X 1 is first zero crossing and X 2 is the second zero crossing of the voltage signal as shown in figure. X is the total time of one complete cycle. To calculate X, zero crossing difference between X 1 and X 2 (X 2 -X 1 ) is multiplied by factor 2. Inverse of this value gives the frequency of the signal as shown in below equation and fig. 3. X = 2 (X 2 X 1 ) frequency = 1 = time period 1 2 (X 2 X 1 ) Figure 3. Frequency measurements of input signal @IJAERD-2015, All rights Reserved 141

Figure 4. Logic implementation for frequency measurement using MATLB/SIMULINK As shown in fig.4, hit crossing block detect the zero crossing of the voltage signal and give the signal at every zero crossing. Output of hit crossing is applied to the if block. If the condition is satisfied, then if block send ramp signal to the output. Variable X stored time duration of ramp signal. Transport delay is applied to variable X. Result is stored in variable Y and next zero crossing time is calculated. Subtraction of variable Y from X gives half time period. Sample and hold circuit block hold the result of subtraction up to the second zero crossing. Output of sample and hold block is multiplied by factor 0.5. After performing this process, frequency of voltage signal is derived. B. Frequency detection block:- Frequency detection block detect the over and under frequency condition of the system. Generic frequency relay computational model as shown in the figure. The input signal Vs is the voltage waveform which is derived from the potential transformer. Frequency measuring unit calculate the frequency Fx of the voltage signal. The calculated voltage signal frequency Fx is compared with the over/under frequency relay setting. If signal frequency smaller than the under frequency setting α 2 or larger than the over frequency setting α 1 then relay transmit the operational signal to circuit breaker. Figure 5(a). Under frequency detection block Figure 5(b). Over frequency detection block Logic diagram of under/over frequency detection is shown in the fig 5(a,b). In the first step, frequency measuring block measure the frequency of the voltage waveform and compared with the threshold under frequency limit(48.5hz) and over frequency limit (51.5Hz). If over frequency (Fx greater than Fu as shown in fig. 5(b)) or under frequency (Fx less than Fu as shown in fig 5(a)) condition occurs, 1 will be transmit to the integrator and integrator start integration. The relay will send the trip signal after delay (here 0.4s) to the circuit breaker if the integrator output exceeds threshold value. Frequency detection block have been divided in to two part 1) delay element and 2) hold element. @IJAERD-2015, All rights Reserved 142

1. Delay element:- Relay send a false signal to the circuit breaker in the temporary or transient fault condition. So, the main reason of implement delay block is to stop the relay from transmitting a false tripping signal to the circuit breaker. The frequency measuring block output is sent to an action block (switch or switch4). In the normal condition output of action block is 0 and in the faulty condition output of the block is 1. This value is integrated by the integrator block. The output signal of the integrator is compared with threshold. Threshold value is set same as required delay time. In normal condition output of the delay element is 1 otherwise 0. Figure 6. Logic diagram of delay element 2. Hold element:- Relay sent trip signal to circuit breaker when permanent fault occurs. If For a few second stable condition is occurs after the permanent fault then relay again send signal to close the circuit breaker. This maloperation is prevented by using hold element in the detection block. So, hold element is used to keep the relay in stable state after the relay transmit trip signal to circuit breaker. Figure 7. Logic diagram of hold element Output of delay is convert (0 to 1 or 1 to 0) and transmitted to the integrator block. Output of the integral exceeds 0 value then hold block output is change from 1 to 0.The integrator output exceeds the threshold of 0 it will never come back to that value because integrator can t reset in the hold element. 3. Complete circuit:- Delay element and hold element is connected as shown in the fig. 8. output of hold element is applied to the nor gate and then send to the circuit breaker. @IJAERD-2015, All rights Reserved 143

Figure 8. Diagram with hold and delay element of under/over frequency detection block To stop the false tripping during transient, switch block is feet between hold element and delay element as shown in fig. 8. IV. POWER SYSTEM MODEL The single line diagram of power system model is shown in the figure. The system shown in fig. 9 is tested under various conditions such as normal operation and load variations. Here, utility load is fed by the main grid whereas local load is fed by the distribution generation (as shown in the fig. 9). Variable load changes as per the change of demand. Voltage signal is derived from the potential transformer connected at the bus 2. This voltage signal is sent to the frequency measuring block of digital frequency relay. Output of the digital relay frequency detection block is sent to the circuit breaker of the variable load. If under frequency problem occurs, then variable load is shed by opening the circuit breaker 2. Frequency relay is effectively implemented in islanded mode for the protection of distribution generation as shown in fig. 9. Frequency relay also has ability to detect the islanding condition of this system. Figure 9. Single line diagram of the power system V. MATLAB MODEL OF POWER SYSTEM As shown in fig. 10, 150MVA, 132KV synchronous machine is used for testing the designed relay. 10 MVA,132 KV distribution source is fed the system. Frequency relay is set at 51.5 HZ over frequency limit and 48.5 HZ for under frequency limit. Under frequency problem is occurs, frequency relay sent the trip signal to the circuit breaker and variable load is isolate from the system when the frequency goes below 48.5HZ. After the predetermine load shedding frequency will be restored. @IJAERD-2015, All rights Reserved 144

Figure 10. Implementation of frequency relay in power system on MATLAB/SIMULINK VI. SIMULATION RESULTS The relay is tested under three cases 1) Normal operation, 2) Under frequency operation and 3) Over frequency operation. In the normal case generation power is equal to the consumption power. So, there is no frequency deviation and frequency is within a limit. Generation power is less than the consumption power in under frequency case. If frequency goes below the relay setting, relay send trip signal to the circuit breaker. In the over frequency case generation is larger than consumption. Hence, frequency may go above the relay setting and ultimately relay will send trip signal to the breaker. A. Case 1 (Normal Operation):- During the normal operation, variable load is assumed to be 2 MVA. The frequency and relay status as per MATLAB simulation are shown in fig. 11. As shown in fig. 11, relay does not trip because frequency of the power system is under safe limit. Up to 0.2s, frequency varies because of starting transient but frequency still in the limit of the relay setting. So, frequency relay does not send trip signal to the circuit breaker. (a) @IJAERD-2015, All rights Reserved 145

(b) Figure 11. Performance of the relay a) Frequency b) status of trip signal B. Case 2 (Under frequency condition):- In this case, variable load is increased from 2 MVA to 30 MVA. Because of increase of load, the system frequency goes down (here 48.49HZ) below the under frequency limit of 48.5 Hz. Hence, the relay sends trip signal after the set time limit (here the limit is kept to 0.4s) to the circuit breaker as shown in fig. 12. Because of tripping of the variable load, frequency comes within a limit. In this way, the system frequency is restored to its safe limit (between 48.5 HZ and 51.5 HZ). (a) (b) Figure 12. Performance of the relay a) Frequency b) status of trip signal C. Case 3 (Over frequency condition):- If generation is more than load, over frequency condition occurs. If the frequency increases beyond the limit, relay sends trip signal to circuit breaker to disconnect appropriate source. The system is restored back to the safe limit because of disconnection of such source. Working of the over frequency relay is similar to under frequency relay. Only one @IJAERD-2015, All rights Reserved 146

difference between the function of over frequency relay and under frequency relay is that the over frequency relay operates when the system frequency goes above its set limit. VII. CONCLUSION This paper has presented detection of frequency, over/under frequency protection using digital frequency relay and load shedding for restore the frequency within a limit. By using the under frequency based load shedding relay, trip signal has been applied to a breaker if system frequency crosses a under frequency limit (48.5). Due to tripping of the breaker, load shedding has started (to isolate some load from the system) and frequency has returned back in the safe limit. This digital frequency relay has also been implemented in islanded mode. Frequency relay has also detected the islanding condition effectively. In this paper, under frequency protection with load shedding has been shown in the result section. VII. REFERENCES [1] P. Kundur, et al., Power system stability and control vol. 4: McGraw-hill New York, 1994. [2] M. M. Ama, et al., "Modeling and Simulation of Digital Frequency Relay for Generator Protection, 2012 IEEE International Conference on Power and Energy (PECon), 2-5 December 2012, Kota Kinabalu Sabah, Malaysia. [3] C.Buque, S.Chowdhury, S.P, Chowdhury, Modelling and Simulation of Adaptive Frequency Relaying for Distributed Generation, 9-12 Sept. 2013 IEEE conference at pointe aux piments. [4] Gunjan J. Shelke, Prof. Y. D. Shahakar, A Methodology for Power System Protection Using Digital Relay, IJARCSSE, volume 3, issue12, December 2013. [5] Jose C.M Vieira, et al, Dynamic Models Of Frequency And Voltage Based Relay For Distribution Generation Protection. Brazil. [6] Anderson Avenue, Load Shedding, Load Restoration And Generator Protection Using Solid-State And Electromechanical Underfrequency Relays. Ontario Canada. [7] B. A. oza, N. C. Nair, R. P. Mehta and Vijay H Makwana, power system protection and switchgear, McGraw-hill publication, 2010. @IJAERD-2015, All rights Reserved 147