Deck Mount Installation with Bench

Similar documents
The Festival Assembly Instructions

User Instructions Multiline Otter Scoreboard Caddy Assembly

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

Mount to the Wall INSTALLATION MANUAL

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

This instruction manual is an in-depth look and explanation of how to assemble and install the Murphy Bed properly and efficiently.

Table of Contents. Chapter 1 Pool Site Preparation Checklist...1 AutoGuard Preparation Checklist...2 Recommended Tools Checklist...

Kwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

TRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS

TOOLS REQUIRED Metal Wood Wood and Metal Screws. #16 Drill #12-24 Tap. 1/8 Drill

INSTALLATION INSTRUCTIONS FOR HAND OPERATED MODELS: 170, 171-R, 171-N, 172, 260

PO BOX 130 CLEAR LAKE, MN

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Motorized or Crank Operated Fortress Zipper Track Shade with Housing and Side Track Installation Instructions

PowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

For additional assistance call

A59 APD & A86 CPD 5'X 16' SW ALUMINUM PORTA-DOCK

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE

IDR assembly instructions:

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

ABM International, Inc. Navigator Assembly Manual

PORTA-DOCK, INC. AP17 APD DS 4 X 16 T12 AW17 CPD DS 4 X 16 T12

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

Track Rack. * Track Racks are not lockable

Horizontal Cable Systems

Clearview Railing System Installation Instructions

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

PowerLock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

MOTORIZED STANDARD SHADE WITH CABLES Installation Instructions

TABLE OF CONTENTS REQUIRED TOOLS

Classic Roll Tarp. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.

Parts list continues on Page 2 HOUSE PARTS PACKED IN HOUSE BOX PARTS IN SMALL PLASTIC BAG (HARDWARE) POST PARTS PACKED IN THIS BOX (LARGE PLASTIC BAG)

RAMPAGE P R O D U C T S. INSTALLATION INSTRUCTIONS BRONCO ZIPPER FASTRACK TOP PART #984xx BRONCO TOOLS REQUIRED

Assembly Instructions for 12x16 Floating Dock

Chapter 1. Beam and Sill Plates

Assembly Instructions

Real Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions

Playground Assembly Instructions

Installation Instructions - Model V4JSD 1

END FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"

MAG-CONV Basic, 48, 48R & Midline Front Mount

STEP 1 : DESTROYER FRONT BUMPER INSTALL GATHER YOUR TOOLS AND LAY OUT YOUR PARTS... *shorty bumper to show hardware* Tools Required:

Real Life Ninja Starter Pack 1 Assembly Instructions

ESA-200 Fixed Sidelite

ESA-100 Fixed Sidelite/Non Breakout

INSTALLING YOUR NEW SPRING LIFT ARM KIT

Double Beam Freestanding Pergola Installation Guide

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

SUT-1000CLC ASSEMBLY REQUIREMENTS

Ford Pick Up Rear leaf Spring Kit Installation Instructions

Step 1: The larger tower box contains the tower machine, a set of Silver 100 Lid Keys, and a set of Black 002 Coin Box Keys

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

BY ALIEN TECHNOLOGIES CORP

Kai Installation Instructions

ClearSpan PolyMax Windbreak Wall

Low/High Tunnel Greenhouse Plans

TM12 ASSEMBLY INSTRUCTIONS

MAKO TM CASH DISPENSER

ALL SEASON PATIO COVER

Thank you for purchasing out product! *Please read these instructions and follow them step by step. *

HAPPY CHICKEN TRACTOR

S48-L12-SC AND G48-L12-GC STEEL PORTA-DOCK S82 SC 6 X 12 PLATFORM AND G82 GC 6 X 12 PLATFORM

Horizontal Cable Systems

Assembly Instructions

Lumber Smith. Assembly Manual. If you are having problems assembling the saw and need assistance, please contact us at:

INSTALLATION OF THE TRACK FOR THE STRAIGHT SIDE STEEL LADDER

Melamine Plastic Laminate. Toilet Partition Installation Manual

In the box: Figure 1: Instructions, 1-channel, 2 retainers, 2 adjustable tubes, 1 chrome ring, and hardware. Channel

Baby Grande or Grande Crank Shade with Cables and Housing Installation Instructions

Gared Pro-S Portable Backstop

ICU TRACKLESS SLIDING DOOR

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

PLAYLAND 72 SPIRAL SLIDE 3.5 Posts, 3.5 Posts / 48 Grid and 5 Posts

INSTALLATION INSTRUCTIONS

BLADE N BULLET BLIND Cabela s Item Number:

12x12 Pavilion. Assembly Manual

Free Standing Frame and Canopy

Grade 8 Enriched Math Catapult Project 2012 Step by Step Instructions to building a catapult

11 6 Round Building Assembly Instructions

Equilibrium Credenza

Continuous Handrail Kit Installation Instructions

How to Install Custom Real Wood and Faux Wood Blinds

RTI TECHNOLOGIES, INC.

HQ Precision-Glide Track Upgrade 2 Extension Kit for HQ Studio Frame Part# QF09750

WARNING: Prior to installation, turn the power off to the vending machine and unplug it from its power source. Also, make sure to level the machine.

Budget Robotics Octabot Assembly Instructions

Assembly Instructions

Metroboard Pulley Replacement Procedure

Dura-Lock Roof System

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

Spring Loaded SCREEN-PRO. All Season Roll-Up Doors IN-JAMB MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST

Chevy Tahoe Utility Vehicle

Continuum Frame Assembly Instructions

Shop Style Miter Saw Stand Kit

The following instructions will guide you through the installation of your new vinyl railing.

P a r k c o n s o l e s i n k a s s e m b l y i n s t r u c t i o n s

NOTE: Top section pole (Q) is packed INSIDE bottom section pole (S)

ED1300/1300F SERIES CONCEALED VERTICAL ROD DEVICE INSTALLATION INSTRUCTIONS

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Transcription:

Deck Mount Installation with Bench 1. Mark track with square. 2. Cut tracks with saw. 3. Drill ¼ hole (if needed.) 4. Countersink track. 5. Countersink all track 6. File all track ends. ends.

7. Lay out tracks and do diagonal. 8. Check Track Space (both ends.) 9. Position shims under track. 10. Using ¼ hammer drill bit, 11. Install 2 ½ screw with 12. Drill pulley end of track and drill shim end of track. anchor at shimmed end. add 1 ¾ screws and anchors.

13. Tap end pulley to make mark 14. Drill Hole to counter sink for 15. String out track to in deck. for pulley nut. ensure it is straight. 16. Next Drill the splice 17. Set screws in splice first then 18. Leave screw head up ½ (both sides.) continue drilling the rest of to have room for the rope the track (both sides.) (shown later.)

19. Using 5/32 drill bit, drill 20. Attach drum to end-casting 21. ON MOTOR SIDE measure track and guide. (both sides.) supplied ½ bolts. (both sides.) center of bolt to end of track. 22. ON OPPOSITE SIDE 23. Find the Center between the measure 12 from center of bolt two tracks mark deck. Using to end of track. center line on drum align the mark on drum with line on deck.

24. On opposite end drill ¼ 25. Set screws and anchors 26. ON MOTOR END Un-fasten hammer drill (4 holes.) and tighten down with bolts (9/16 socket.) drill. 27. After removing coupler, lift out 28. Double check distance 29. Set screws and anchors using the end casting and remove shaft from pulley bolt to track long screw driver and hammer. and rope reel assembly. Then (12 ) Using hammer drill, Fasten down to deck. re-install end casting back into drill 6 holes. motor end housing.

30. Opposite Side Raise approximately 2 (depending on deck crown or fall) and level, tighten ½ nuts. 31. Motor Side Raise approximately 2 and level, check level on drum then tighten ½ nuts.

32. Re-install shaft and rope-reel into motor side housing. 33. Re-assemble motor coupling with 9/16 bolts and Washers. 34. From opposite end pulley to motor end pulley mark deck with chalk line. Drill two ¼ holes with hammer drill, 4 feet from each pulley and drive In anchors and screw in the eyelets as shown. Roll out cover behind drum, untangle ropes and lay on top of fabric. (both sides) Run ropes under drum and through hole in guides. -

35. Allow 3-4 feet of rope and snap rope into track. Pull ropes down to pulleys and feed rope through pulley as shown. Snap ropes in outside channel of tracks and pull entire length of track back to guide. On opposite end continue rope through pulley then through both eyelets. After both ropes are run, tighten all track screws starting at track splices. 36. Run motor side rope through pulleys as shown. 37. Pull ropes equally until cover hits guides, Pull Run opposite side rope through pulleys as shown. ropes tight to pre-stretch. With cover pulled even leave 6 feet extra and cut ropes.

38. Keep ends from fraying on ropes, 39. After ropes are ran, install 1 screw 40. Use ½ drum screws to attach use tape or melt ends. as shown above (both sides.) ropes to rope reels or tie knot and use keyhole. 41. Feed cover into one side of track, 42. Position white triangle over the 2 holes in lead edge, Install two ½ drum screws pull other side tight and slide lead as shown. edge across entire length of the fabric.

43. Evenly distribute fabric across lead 44. Flip lead edge over and install 45. If applicable install 3 prong plug edge Feed fabric into track on other wheels using two ½ drum screws on end of power cord. side. per side. 46. Connect Power Cord and Low Voltage cord to back of motor. Wire Key switch according to the side see diagram to right Connect to power source.

47. Closing cover run extra rope 48. Attach fabric to drum using pre-drilled 49. Pull fabric tight and install on reels Close cover, stopping holes. Line edge of webbing to edge of second screw using drum cover 3 from Pulley end of tracks. end casting install first screw as shown screw (both sides.) above (both sides.) 50. Pull 2 of slack on 3 rd hole and attach fabric to drum (both sides.) Continue this pattern 51. Fabric attached to drum complete. until you run out of holes. *Note fabric should be tight in middle, no slack in middle of Drum*

52. Cut a slit 6 behind guide, slide in 53. operate cover to open position and stop wheels before guides. Flip lead edge magnet and push past guide one inch. over and insert magnet into natural opening in webbing and use a push rod to *May have to adjust magnets due to slide the magnet approximately 7-8 *May need to make adjustments to grab rails, slide, etc* this due to distance between water and mechanism* 54. Next Screw in sensor to guide making it flush to the bottom of the opening. Tighten down lock nut.

55. Position Opposite end bracket 56. Center motor end bracket next 57. Drill ¼ hammer drill in all 8 holes as shown (bolt should be in to handle measure 2 ½ from on both brackets. center of up right.) handle to upright. (depth should be 2 ½ deep) 58. Use ¼ mollys for back holes and 59. Tighten down front screws. 60. Tighten down 7/16 molly nut. track screws and anchors for front Check upright for 90 (may need holes. to shim bottom of brackets.)

61. Space out remaining brackets 62. Run a string between the two end 63. After all mollys and track screws are evenly between the two end brackets. Align remaining brackets installed, double check with L bracket brackets. on string and drill all holes. for level. Slide all L brackets in place. 64. Lay angle aluminum on top of brackets as shown (long sides facing out) Square up the ends, then measure 3 on opposite side from bracket to end of angle aluminum, repeat on motor side (9 inches on motor side) Next mark both angle aluminum pieces directly center of L bracket. Position holes ¾ away from vertical as shown above

65. Using ¼ drill bit, drill holes 66. Starting on the back of the L bracket using a 5/16 nut driver screw in self tap marked on the angle aluminum. screws provided (Aluminum should be 1/8 higher than top of bracket) Continue using self tap screws until the angle is secured to back of brackets. 67. Before installing front angle 68. Finish installing front aluminum 69. Starting at the center most brackets aluminum square up to back angle on front brackets making raise up to 15 and secure bracket aluminum angle as shown. sure it is level from front to back. using self tap screws (2 per bracket)

70. Lay front pieces of vinyl (face down) on top of bench frame, match up like numbers on sections. Slide sections together use ½ drum screws to assemble sections. (2 per section) Use pre-drilled holes. 71. After all sections are assembled rotate entire section so the opening in the vinyl is facing down. (needs to be spaced equally over the tracks.) Push vinyl to the underside of the aluminum. Then using ¼ drill bit, drill through vinyl and aluminum angle. Drill 4-5 holes equally spaced. Use the 3 stainless bolts with washers and nuts attaching section to angle aluminum.

73. Repeat process on previous page to attach back sections together. Rotate back section and square end up to front section. As show to the right Drill and attach back section to aluminum angle. 72. Square up ends of vinyl. 74. Tighten up nuts using 7/16 wrench. 75. Slide on end vinyl pieces and attach to front and back sections using ½ 76. Next lay out top of bench and evenly drum screws as shown. (2 per side) 4 total. space over top of frame. Front to back.

77. Connect all top sections together 78. Looking up at underside of bench top, using 11/64 drill bit find a cross member and space evenly over bench frame and drill through aluminum at center of cross member (do not drill into cross as shown. member) using 1 wood screw attach lid to bench frame. Drill 2 holes per lid section, diagonal from each other. 79. Optional key switch installation- using ½ drill, drill through motor end of bench and through J-box. Pull low voltage wires and sensor wires into j-box and wire as shown in the diagram. Using ½ drum screws mount key switch onto end of bench.