Assembly Instructions

Similar documents
INSTALLATION OF THE TRACK FOR THE STRAIGHT SIDE STEEL LADDER

Locker Pedestal Installation Instructions

ASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

Constable Oak Extension Dining Table

Top Mount Ultra Modern Hanger

WOOD GRAIN 6 SHELF BOOKCASE

ROCKWELL 4-IN-1 DOOR. Two Panel Door. Half X Door. Z Combination Door. Double X Door

WAREHOUSE HANGER INSTALLATION INSTRUCTIONS R H INS T A L L A TIO N INS T R U C TIO N S

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S ROD IRON SCROLL HANGER R H

COACT MEDIA UNIT ASSEMBLY WITH X9 OPEN SHELF STORAGE OPTION PART # INSTALLATION INSTRUCTIONS

INS T A L L A TIO N INS T R U C TIO N S HORSESHOE W/ BAR HANGER

INSTALLATION INSTRUCTIONS INS T A L L A TIO N INS T R U C TIO N S THE MAVERICK HANGER R H

Heavy-Duty Bypass Track System

LOFT DOOR HANGER BARN DOORS & HARDWARE. Hardware Installation Instructions. Page

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

Storage Cabinets 9000 Series Assembly Instructions

Box Track INSTALLATION INSTRUCTIONS

Mounting a BalanceBox 400 to a brick wall

Triple Bypass System

Therma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit)

Mirage 9x9, 8x8 and 7.5 Mirage Gazebo Assembly Instructions

LAWN AND GARDEN GREENHOUSE

Setup. The Faraday Cage is available in two types of configurations. Cage for mounting to a full perimeter enclosure on series tables.

SINGLE TRACK BYPASS (patent pending) barn door hardware

#916 CLASSIC 16 GUN CABINET ASSEMBLY INSTRUCTIONS

Mount to the Wall INSTALLATION MANUAL

IDR assembly instructions:

CABINETRY Assembly Instructions

Vigilant Cigar Humidor Vault. Assembly Instructions

IMPULSE G2/PULSE STATIC BRIDGE & RETURN MODULE. Drill. Desk Connecting. Outside by fastening the supplied wood screws from the HK-67 kit through the

Track Rack. * Track Racks are not lockable

TABLE OF CONTENTS REQUIRED TOOLS

TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF

CHICKEN COOP & CHICKEN RUN. Tools required for assembly (not included)

Real Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions

Straight Stringer Installation Instructions

a.k.a. casegoods instructions

User Instructions Multiline Otter Scoreboard Caddy Assembly

WILDING WALLBEDS INSTALLATION INSTRUCTIONS Bed with storage headboard

Boat Lift Canopy Frame Assembly Instructions

Vertical Offset Base and Safety Rail System Installation Instructions

Spoked GARRICK HANGER

MONKEY BARS OVERHEAD RACK INSTALLATION

Heavy Duty I-Beam Trolley

LAWN AND GARDEN GREENHOUSE

Baby Grande with Crank, Housing, and Side Rails Installation Instructions

Assembly and Installation Guide

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

Qwik-Fence Installation Instructions

Deck Mount Installation with Bench

M10 x 75mm Sockethead Cap Screws. 5mm Fender Washer (12) Included - (8) Required. #10 x 2.5" PH Wood Screws. (30) Included - (24) Required

Stag Hanger ASSEMBLY INSTRUCTIONS

Frameless Fixed Panel Slider

POP PLUS / SPIDER SET-UP INSTRUCTIONS

Desk/Wall-Mount Rack

Assembly and installation help

Parts List (Continued) 18 each: #8 x 0.625" Truss Head Phillips Screw 20 each: #8 x 1.75" Flat Head Phillips Screw 4 each: #8 x 1.25" Flat Head Philli

INSTRUCTIONS High Tech II Unit Assembly

Shetland Stalls Installation Instructions

Playground Assembly Instructions

END FRAMES. End frames built using pressure treated 2x4 (1 1/2" x 3 1/2") 36" 34" 7/16" pilot hole. 5 1/2" x 1/2" lag bolt 8" wheel 23"

Greenhouse Assembly Instructions

FLATFROG MULTITOUCH 3200

L182 - Installation Sheet Modular Wine Rack ( Wall Mount )

Base Cabinet. Assembly Guide. Give Us A Call at ext 2. Or You Can Watch The Assembly Videos Here

Clopay Models 835/837 Sliding Door System Installation Guide

INSTALLATION INSTRUCTIONS VENETIAN 84" SLIDING SHOWER DOOR SYSTEM (180º INSTALLATION)

WINDLOAD POST WayneMark 8000, 8100 INSTALLATION INSTRUCTIONS

Germ City Storage Box Inventory

INSTALLATION INSTRUCTIONS

Renaissance Pavilion. Assembly Manual

P a r k c o n s o l e s i n k a s s e m b l y i n s t r u c t i o n s

ASSEMBLY GUIDE. Mia Narrow Bookcase

Version 2016_1.1 VICTORIAN ASSEMBLY INSTRUCTIONS. Victorian Vi-23, 34, 36

WILDING WALLBEDS INSTALLATION INSTRUCTIONS Bed with storage headboard

Parveneer Positive Pressure Fire Rated Frames Double rabbet with T stop for 20 minutes

Installation Instructions - Model V4JSD 1

Assembled Ez2 Positioning/Operating Instructions

Contour Hanger ASSEMBLY INSTRUCTIONS

Industrial Hanger ASSEMBLY INSTRUCTIONS

Joiner Kit For Models N388, C450, E402B, E411T, E415H, E440T, E442B, E521T and E522B

MAKO TM CASH DISPENSER

INSTRUCTION MANUAL MANUAL DE INSTRUCCIONES

TOOLS REQUIRED

Commercial Wine & Liquor Display. Double Displays

PIVOT BUFFET HARDWARE TOOLS REQUIRED COMPONENTS. 8 - cams 8 - cam screws bolts 44 - flat washers shelf pins.

Strata. urniture. Addison Instructions. Parts in the Arm Box: Parts in the Body Box: Watch our assembly videos at

Installation Instructions for. Before You Begin TOOLS REQUIRED

ASSEMBLY INSTRUCTIONS MANUAL

Panel & Shelf Identification


Closet System Installation Manual

Oxford Stalls Installation Instructions


Free Standing Frame and Canopy

S48-L12-SC AND G48-L12-GC STEEL PORTA-DOCK S82 SC 6 X 12 PLATFORM AND G82 GC 6 X 12 PLATFORM

TWIG Hanger ASSEMBLY INSTRUCTIONS

Assembly Instructions & General Overview

IMPULSE G2/PULSE STATIC BRIDGE & RETURN MODULE. Drill. Desk Connecting. Outside by fastening the supplied wood screws from the HK-67 kit through the

Transcription:

Selling Station Assembly Instructions View from above without top A B C D Rounded finished corners on A & D Square unfinished 3-sides on B & C

Selling Station Components (2) 2' x 6' Side s Have a channel running vertically down the middle (1) 2' x 6' Just flat, no channel (2) 2' x 2' Top Piece and Bottom Piece (1) Top Piece has square groove for header sign to set into. (1) Bottom Piece has small plastic feet to rise selling station off of floor (10) Inside Shelves Squared edges, only 1-finished side with black on them to face out. (9) Outside Shelves Rounded edges, finished on all four sides. (1) Custom Made to fit Roof Drain Display, pre-drilled hole to anchor drain to shelf. (18) (2) (40) (40) (1) (1) 12" Metal Bracket To be used on outside shelves 16" Metal Bracket To be used on outside shelves 16" Metal Bracket To be used on outside shelves Screws 2-1/2" screws for main assembly Screw 1/2" screw to tighten down Roof Drain Display Square Driver Bit #2 bit for drill bit driver

Step 1 Place 3 outside shelves down on the floor or a flat surface. (These are only being used to raise the display off of floor during assembly). Step 2 Lay one of the side panels down on top of the 3 shelves with the center groove facing up. Side Groove Step 3 Place piece into groove. 2' Side 2'

Step 4 Once in groove, flush the top and bottom edge of the with the side panel. Side Step 5 Attach Bottom to starting from the top edge down. End joints will fit flush into grooves. Step 6 Screw in all pre-drilled screws on bottom to center panel. Screw all vertical fasteners first. Then fasten all screws from Bottom to Side (horizontal screw holes along bottom in blue).

Step 7 Place Top Piece on in same manner as bottom but only place 1 screw in the bottom hole slightly loose. (In Step 10, this will allow the top edge to be pulled back a small amount to make it easier to place final Side top edge into groove on Top Piece). Top Only one screw for now Step 8 Place the last Side center groove onto the and then slide into the Bottom Piece and align groove down the center of the display (groove on inside will slide into place). Bottom Step 9 Attach 4 screws on Bottom Piece of display to the side panel that you just placed. Make sure that feet are visible on bottom. (Finalizing all screws on the Bottom from Step 6). Bottom

Step 10 Then pull Top Piece away (toward you) slightly allowing Side to slide down and into groove on Top Piece and. Make sure that square groove for signage is visible on top. 2 Top 1 Top Step 11 Fill remaining screws on Top Piece connecting to (red). Then fill remaining screws on Top Piece connecting Side (blue). Already done on Step 7 Bottom Step 12 Fasten screws all the way down the Side that is facing up in predrilled holes.

Step 13 Stand unit upright. Fasten screws on opposite Side connecting to. Top has groove for signage Lift Bottom has small plastic feet Step 14 Place 4 small shelving brackets (2 on each side) per shelf. Total of 10 shelves, 5 on each side. Make sure that all shelves are level. Start at the bottom of display by placing shelf on top of product to determine height. Step 15 Place 2 large shelving brackets (1 on each side) per shelf. Total of 10 shelves, 5 on each side. Make sure that all shelves are level. Start at the bottom of display by placing shelf on top of product to determine height. Drain display requires custom cut 16 shelf and bracket.

Step 16 There is a 1/8" hole pre-drilled into the roof drain and another hole in the top of the drain shelf. Place the small 1/2" screw into the pre-drilled area and screw down. Small chain connected will show the 3 additional finishes that are available. This will connect the drain to the shelf so that it does not walk out of the showroom without someone noticing. Step 17 View from top of the display Once header signage is connected, it will simply rest in groove There is groove that should be facing the ceiling on the top part of the display. Assemble the 4-sided header graphic by sliding each side into the plastic channels. Once all 4-sdes are connected, place on top of the display in the grove cut out. Groove is only there to set signage in and prevent from sliding off of the top of display and ensure signage is centered.