Universal Shelving System Walmart Installation Manual

Similar documents
Installation Manual Porter Road, Sarasota FL fax

M o d u l a r Design

#916 CLASSIC 16 GUN CABINET ASSEMBLY INSTRUCTIONS

INSTALLATION GUIDE Locker With Top Shelf Transit Low Roof & Nissan NV Low Roof ( Aluminum )

Storage Cabinets 9000 Series Assembly Instructions

INSTALLATION GUIDE N5-DS48-4

INSTALLATION OF THE TRACK FOR THE STRAIGHT SIDE STEEL LADDER

User Instructions Multiline Otter Scoreboard Caddy Assembly

ASSEMBLY INSTRUCTIONS MANUAL

HILGARD Part Number Spectrum Lane ~ Missoula MT ~

INSTALLATION GUIDE FTX FLOOR Ford Transit ( 148" Extended Wheelbase )

STEP 1 STEP 2 LEVELER KIT OPTION MOBILE CASTER KIT OPTION

Independent Containment System (ICS)

SHELTON THERMOSTATIC SHOWER PANEL

WK9 WORKTOP KIT Assembly Guide

SECURITY DOORS - 2', 3', 4'

LPR System Installation instructions

INSTALLATION INSTRUCTIONS - NSF WALK-IN COOLER/FREEZER Wall-Mounted Shelving System - No Blocking

Assembly and installation help

Setup. The Faraday Cage is available in two types of configurations. Cage for mounting to a full perimeter enclosure on series tables.

DOE 2017 APPROVED & REGISTERED. Installation Manual _Rev1

CAELI THERMOSTATIC SHOWER PANEL

Assembly Instructions

2 ADULTS REQUIRED FOR ASSEMBLING

RBP-1215B-RX DODGE RAM QUAD CAB RX3

Whalen Furniture Mfg. Factory No. 5 Page # 1

4 BAY Low Profile WALL MOUNT CABINET

K9 KIT INSTALLATION INSTRUCTIONS CROWN VIC KK-K9-F7-K

Installation Instructions

(2) 25mm x 20mm x 5mm Adhesive Backed Foam Pads. 100mm x 50mm x 1.0mm Adhesive Backed Foam. (2) Spacer Plates. Passenger/Right Side Frame Mounting

SpeedCell Installation Instructions

ASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL

INSTRUCTIONS FOR: 2 DOOR WALL CABINET. MODEL No: AP02WC

SpeedCell Installation Instructions

INSTALLATION MANUAL. All Recessed Wall-Mount Modules Front-Loading, Rear-Loading, Parcel-Only, Collection Box, Trash/Recycling Bin

K9 KIT INSTALLATION INSTRUCTIONS CROWN VIC with Fire Suppression System Model KK-K9-F7-K-FS

INSTALLATION INSTRUCTIONS

Worktop INDEX eight Capacity Unpacking

Standard Shelving Installation Instructions

ADULT ASSEMBLY REQUIRED

K.D. LOCKER ASSEMBLY INSTRUCTIONS

XHD Bull Bar w/ Dual Row LED Light Bar (10-17 Jeep JK)

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Installation Instructions

TOOLS REQUIRED FOR ASSEMBLY. Rubber Mallet or Plastic Tip Hammer PARTS REQUIRED FOR ASSEMBLY OF SINGLE ENTRY STARTER.

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

K.D. DEFIANT II LOCKER ASSEMBLY INSTRUCTIONS

Melamine Plastic Laminate. Toilet Partition Installation Manual

Elliptical Unpacking and Installation Instructions

INSTALLATION INSTRUCTIONS

Installation Manual for Metal Emperor Lockers

ALUMINUM POLE VAULT STANDARDS SPECIFICATIONS

WireCrafters, LLC. General Information

Shelf Converter Drawer System

TYGER GUARD. Parts List BEFORE INSTALLATION WARNING TG-GD6C /5

PORTA~TRACE. GAGNE, INC. 41 Commercial Dr. Johnson City, New York Phone: Fax: ASSEMBLY INSTRUCTIONS

BLEACHER ASSEMBLY INSTRUCTIONS

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

Assembled Ez2 Positioning/Operating Instructions

Install Instructions. NewAge Steel Welded Tall Locker

High Density Sports Storage

ADULT ASSEMBLY REQUIRED DUE TO THE PRESENCE OF SMALL PARTS, SHARP POINTS, SHARP EDGES

A. Top Unit 1 Pc. For assembly see instructions in carton:

INSTALLATION GUIDE. C20-FTL STRAIGHT PARTITION Transit Partition ( Perforated Window, No Access, Steel )

Therma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit)

Breathable Wall Light Traps & Blackout Fan & Shutter Kits

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

30 wide track Adjustable Tire Rack

INSTALLATION GUIDE. C20-FTM STRAIGHT PARTITION Transit Partition ( Perforated Window, No Access, Steel )

TP4463. ASSeMBly INSTruCTIONS FLAT PANEL TV MOUNTING SYSTEM OPTION 1 OPTION 2 OPTION 3

INSTALLATION GUIDE. C30-NL STRAIGHT PARTITION Nissan NV ( Swing Door, Steel )

Installation Instructions

Bollard CartMagnet Standard Open Unit INSTALLATION INSTRUCTIONS

Performance 2.0 Series

Installation Guide 406TH

Installation Instructions

Side DuraRac Installation Instructions

INSTALLATION INSTRUCTIONS

Assembly Instructions. Important!

EUROLINE CLASSIC SOLID SURFACE Installation Instructions


MobileTrak5 Installation Instructions

Thanks for shopping with Improvements! Deluxe 10 Closet Organizer (12 deep) Item #461609

Colonial Classic Bar

INSTALLATION GUIDE. C20-NH STRAIGHT PARTITION Nissan NV ( Perforated Window, No Access, Steel )


INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE

EUROLINE CLASSIC PHENOLIC / EVERGREEN. Installation Instructions. Installation Instructions.

Parts Included: Tools Required: Canvas Office Landscape Interiors Off Module 90 Connector Kit Installation and Disassembly for Recycling Instructions

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

PRINCESS SINGLE BED WITH TRUNDLE

Contour Hanger ASSEMBLY INSTRUCTIONS

Contractors Rack Assembly and Installation Instructions

Industrial Hanger ASSEMBLY INSTRUCTIONS

Qwik-Fence Installation Instructions

Tuscany 32" x 79" Open Bookcase

FOLDING DOOR INSTRUCTIONS

INSTALLATION GUIDE. C30-NH STRAIGHT PARTITION Nissan NV ( Swing Door, Steel )

Parts list. Model:10400

Assembly Instructions. Important!

Transcription:

Universal Shelving System Walmart Installation Manual Patent Pending FREE STANDING SELF SUPPORTING GRAVITY FLOW Does not attach to cooler walls or door frames Certified Destin Global, Inc. PO Box 50033 Sarasota, FL 34232 941.727.0097 Office 941.961.4511 Cell http://destinglobal.com Made in the USA DGICS@DestinGlobal.com DGA1313 1/12

Table of Contents Section 1: Getting Started (Parts and Mapping work site) Section 2: Upright Box Assembly Section 3: Shelving Installation and Upright Box Positioning (level shelving, center alignment behind glass doors) Parts and Tooling Part Number Destin Parts Descriptions D30X43SW 30 X 43 DEEP SHELF D30X43PW 30 X 43 MILK STOP PERIMETER GUARD D30X43DW 43 LANE DIVIDER D30X36SW 30 X 36 DEEP SHELF D30X36PW 30 X 36 MILK STOP PERIMETER GUARD D30X36DW 36 LANE DIVIDER DXBARW CROSS BAR SUPPORT BRACKET D84URW UPRIGHT POST ASSEMBLY with LEVELER D30PTMW PRICE TAG MOLDING, PTM DBOLTS2 7/16-20 X 2 1/4 BOLTS DNUTS 7/16 NYLON LOCKING NUT Tools Required: 7/16 socket and a 7/16 wrench 3/4 open-end wrench Tape measure Cordless drill with a socket adapter Torpedo level Contact Information: Customer Service: 800.377.1090 24 Hr Emergency: 941.961.4511 941.727.0097 DGICS@DestinGlobal.com DGA1313 2/12

Section 1: Getting started 1. Identify and confirm the packing list with components received. 2. Map your cooler layout by counting the number of doors, for each individual line-up A line-up may include 1 or more sets of glass door frames. 3. Locate the Upright Posts, Cross Bar Support Brackets, Bolts & Locking Nuts. 4. Assemble all Upright Boxes with Crossbars provided. Notes: A line-up is where no mullions or spacing exists between glass door frames Notes: STYLELINE/Commercial Door, each glass door frame has flanges. Therefore, each frame must be installed as an independent line-up. Upright Box Assembly Parts Upright Box Assembly (Figure 1) (Figure 2) Example: 13 door line-up requires: 15 Uprights and 32 Crossbars Note: Line-ups with odd number of cooler doors of 13 or more will need a 3 Upright Box added to adjust center alignment with the glass doors. Locate double light fixture closest to the center of the line-up. Position the 3 Upright Box assembly side by side to the single Upright Box closest to the center double light fixture. 13 Door Example: Position a Upright Box behind door 7 and the 3 Upright Box behind doors 8 & 9. 3 Upright Box assembly: 3 UR posts secured to 8 Cross Bars. 941.727.0097 DGICS@DestinGlobal.com DGA1313 3/12

5. Even line-ups of less than 12 cooler doors: 2, 4, 6, 8 & 10 doors will require utilizing a 3 Upright Box assembly to complete the installation. NOTE: 3 Upright Box is the assembly of 3 Uprights secured w/8 Cross Bars as illustrated below. Even line-ups of 12 or more cooler doors, an additional Upright Box will be needed. Locate the most center of line-up where there are 2 frames w/double lights. Position 2 nd Upright Box, side by side where the 2 door frames are joined. This will insure shelving center alignment with the cooler doors. Very, Very Important: Center Boxes behind cooler doors with the Upright Boxes 10 from cooler wall. Open channel side of Upright Boxes must face cooler doors. The 43 bottom shelves must be 4 from cooler wall utilizing the 3 rd hook when shelf is installed 941.727.0097 DGICS@DestinGlobal.com DGA1313 4/12

Section 2: Upright Box Assembly 1. Assemble the Upright Boxes as shown in graphic Note: Assemble all upright boxes first with the open channel of the Upright Post and Cross Bar front, facing the cooler door. 941.727.0097 DGICS@DestinGlobal.com DGA1313 5/12

Section 3: Positioning and Shelf installation 1. Place all Upright Box assemblies into position (every other door for odd door line-ups or according to cooler door layout plan). The Upright Box assembly must be aligned behind the glass doors and centered where Uprights are not visible through the glass doors from the customer s perspective. Important: Upright boxes need to be positioned 10 from cooler wall. 2. Install all bottom 43 shelves and perimeter guards utilizing the 3 rd hook from the front of shelf, 4 from cooler wall. Next install all top shelving, 36 perimeter guards first & 36 shelves next. For 36 shelves and perimeter guards, utilize the 2 nd hook from front of the 36 shelving. Note: Always check shelving alignment from the store view looking into cooler through the doors. Adjust all levelers as needed to level shelving system. 941.727.0097 DGICS@DestinGlobal.com DGA1313 6/12

Section 3: Continued 3. Milk / Product Stops, Install and align all bottom 43 Perimeter Guard (Product Stops) utilizing the 3 rd hook from the front of the Perimeter Guard (Product Stops). Next install all top 36 Perimeter Guard (Product Stops) utilizing the 2 nd hook from front of the Perimeter Guard (Product Stops). 4. Lane dividers are added by inserting the front single peg and back double pegs into the holes located on the Perimeter Guard (Product Stops). Note: Insert the lane divider front single peg into the receiver hole in the front of the perimeter guard. Press the back of 2-prong divider into the back receiver of perimeter guard. Follow UP Check List: PART 1 At the completion of the Destin Global shelving system installation, use the following check list as a guide to insure that all components are installed correctly and the shelving is safe and ready for use. From outside of cooler (store view), visually check shelving alignment insuring shelving is centered with glass doors. Visually scan all top shelves for alignment, shelves should be even and level Adjust Upright Post levelers as needed. Verify shelving is centered to glass doors. Review your cooler layout plan and visually check that all hardware has been installed correctly (Upright and Cross Bar Assemblies, Nuts and Bolts secured). Verify Uprights for proper placement with cooler layout plan to make sure that they are positioned and installed correctly. Important: Verify Uprights and bottom shelving are set back with exact measurements as follows: Upright posts MUST BE 10 from cooler wall. Bottom 43 shelves MUST BE 4 from cooler wall. Cleanup all packing material and dispose of properly in the dumpster. 941.727.0097 DGICS@DestinGlobal.com DGA1313 7/12

Cooler Doors and Shelving, EVEN number layout Even Line-ups with 2, 4, 6, 8, 10 Doors: Line-ups with an even number of less than 12 cooler doors will require a 3 Upright Box Build. NOTE: The assembly of 3 Upright posts secured w/8 Cross Bars. This is a 3 UR Box assembly. Illustrated below Even Line-ups with 12 or more: Line-ups with an even number of 12 or more cooler doors, an additional Upright Box will be needed. Locate the most center of line-up where there are 2 frames and double lights. Position 2 Upright Boxes side by side. The best way to start the 12 or more door line-up would be to find the most center of the line-up where 2 door frames meet. Place 2 Upright boxes together, to the right and to the left side of where the frames are joined. This will insure shelving center alignment with the cooler doors. Note: A line-up is where no mullions or spacing exists between glass door frames. Example: 12 door line-up will require 14 Uprights and 28 Crossbars Cooler Doors and Shelving, ODD number layout Odd Door Line-Ups of 11 or less cooler doors: An Upright Box is positioned at every other door. Odd Door Line-Ups with 13 or more: An Upright box gets placed at every other door. One assembly will consist of a 3 Upright Box and is used to adjust center alignment with the glass doors. First, locate where 2 frames meet w/double lights closest to the center of the line-up. Position the 3 Upright Box side by side to the single Upright Box located at the double light fixture. See illustration below, door 7, 8 and 9. Example: 13 door line-up requires: 15 Uprights and 32 Crossbars 941.727.0097 DGICS@DestinGlobal.com DGA1313 8/12

Positioning and Shelf installation EXCEPTION: CD/STYLELINE glass door frames have flanges. Therefore, each frame is an independent line-up. Place all Upright Box assemblies into position every other door for odd door line-ups and according to cooler door layout plan for even door line-ups. The Upright Box assembly must be aligned behind the glass doors and centered where Uprights are not visible through the glass doors from the store view, the customer s perspective. Very, Very Important: Center Boxes behind cooler doors with the Upright Boxes 10 from cooler wall. Open channel side of Upright Boxes must face cooler doors. The bottom 43 shelves must be 4 from cooler wall when shelf is inserted utilizing the 3 rd hook from the front of interior cooler/freezer wall. Install ALL 43 bottom shelves and perimeter guards utilizing the 3 rd hook from the front of shelf and 4 from interior cooler wall. Next, install all top 36 perimeter guards first & top 36 shelves second. Install ALL 36 perimeter guards and shelves utilizing the 2 nd hook from front of shelf. Note: Always check shelving alignment from the store view looking into cooler through the doors. Adjust all levelers as needed to level shelving system. 941.727.0097 DGICS@DestinGlobal.com DGA1313 9/12

Pre-Installation Verify number of pallets shipped were received; verify packing list counts with skid component counts. Verify cooler is ready for installation: doors installed, electrical work completed. Tools: drill, 7/16 socket wrench, 3/4 open-end wrench, tape measure, level. Installation Check List Verify shelving containers are off trailers and staged close to Walk-In cooler or Walk-In freezer. Count the number of doors in each individual line-up. Refer to the Destin Global Installation Manual to see how many Upright Post Boxes to assemble. Note: some line-ups will require a single Upright Post or Double Upright Post Box added for center alignment of shelving to glass doors. Locate and unpack the Upright Posts, Cross Bar Supports, Bolts and Nuts. Note: Place Upright open side of channel facing same direction. Insure levelers are at the bottom of assembly. Build Upright Boxes: All Upright & Crossbar channel need to be assembled in the same direction. Upright open channel facing front. Crossbar flat surface faces front and flat surface on top. Upright Boxes must be square. Place Upright Post Boxes at every other door for odd line-ups. Note: Line-ups of 13 or more will need a 3 Upright Box placed in the most center position of line-up, where 2 frames meet and with double lights. Even door line-ups of 12 or more will need an additional Upright Box installed at the most center of line-up. Upright Post Boxes must be 10 from cooler wall and centered to glass door. The Upright Post Boxes are free standing and do not attach to the cooler walls. Install all bottom 43 shelves (3 rd hook from the front of shelf into Upright Posts). Install all top 36 shelves (2 nd hook from the front of shelf into Upright Posts). Visually scan all top shelves for horizontal alignment, shelves should be even & level. Adjust using Upright Post levelers using the 3/4 open-end wrench. Leveling is crucial particularly when floor drain is located directly behind shelving line-up. Use the Upright post levelers to insure the shelving is installed level. Review your cooler layout plan and visually check that all hardware has been installed correctly and securely tightened. (Cross Bars, Upright Boxes, Nuts and Bolts secured) Verify proper placement of the Uprights & Upright Boxes with cooler layout plan to make sure that they are positioned and installed correctly. Verify shelving is centered and aligned behind cooler doors Important: Verify Upright Posts and bottom shelving are set back with exact measurements as follows: Upright Posts MUST BE 10 from cooler wall. Bottom 43 shelves utilizing 3 rd peg from the front MUST BE 4 from interior cooler/freezer wall Clean-up all skids & packing material and dispose of properly in the recycle or dumpster containers 941.727.0097 DGICS@DestinGlobal.com DGA1313 10/12

Positioning, Shelf and Perimeter Guard Installation 941.727.0097 DGICS@DestinGlobal.com DGA1313 11/12

941.727.0097 DGICS@DestinGlobal.com DGA1313 12/12