GRID PANEL SYSTEM Installation Instructions

Similar documents
VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

I n s t a l l a t i o n I n s t r u c t i o n s S E N T I N E L S E R I E S 1 50 SLIDING GLASS DOORS

Wall Panel Systems, Inc.

Façade INSTALLATION INSTRUCTIONS 03/2014-V1

If you discover that material is missing or defective, contact our customer service department immediately:

Siding Systems NOVIKSTONETM FS FIELDSTONE INSTALLATION GUIDE

Please read these instructions thoroughly prior to beginning the Acrovyn Z-Clip Wall Panel installation!

ULTRA WINDOW & DOOR EXPANDERS AND RECEIVERS INSTALLATION INSTRUCTIONS

Installation Manual 0318

9 X 9 REMOVABLE TYPE ALUMINUM WINDOW BARS INSTALLATION INSTRUCTIONS Import Note : 9 X 9 Spacing Removable Type Installation is covered in this

Siding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Insolroll Clutch Operated Shades Installation Instructions Installation Instructions

40mm Thermoclick. Type II Class 1 Clear Satin Anodize - 201R1 (Mid Grade Commercial)

Installation Manual for Metal Emperor Lockers

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

SERIES 5001 SLIDING GLASS DOOR PATIO DOORS INSTALLATION GUIDE

Setup. The Faraday Cage is available in two types of configurations. Cage for mounting to a full perimeter enclosure on series tables.

Installation Instructions Door Surrounds

PORTA-FAB Cleanroom Wall Systems

Trim (Aluminum Substrate)

western window systems westernwindowsystems.com installation instructions non-pocket 2-1/4 panels

Vinyl Windows Manufactured by VPI Quality Windows

TrendWall Floor-To-Ceiling Panels Installation Instruction

C-Series & S-Series Classic Frame with Transom (Single or Pair)

Installation Manual. Solid Plastic Toilet Partitions. IN CANADA & AREAS OTHER THAN U.S.A.: IN THE U.S.A.:

TARGA 7200 HORIZONTAL ROLLER INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

SINGLE TRACK BYPASS (patent pending) barn door hardware

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

Vinyl Sliding Glass Door Assembly Instructions

WoodWORKS Channeled Plank

GSP REMOVABLE PANEL INSTALLATION GUIDE

Installing Continuous Light Trap

Siding Systems NOVIKSHAKE TM HR HALF-ROUND INSTALLATION GUIDE

9 X 12 REMOVABLE TYPE ALUMINUM WINDOW BARS INSTALLATION INSTRUCTIONS Import Note : 9 X 12 Spacing Removable Type Installation is covered in this

WoodTrac Direct Mount Ceiling System

Desk/Wall-Mount Rack

Sliding Glass Door Assembly and Installation Guide

METALWORKS Concealed. Installation Instructions

LF Series Assembly Instructions

Display Shelving Installation Instructions

Installation Recommendations for Finless Frame Doors

PRE-ENGINEERED HORSE STALL SYSTEMS SDFD SLIDING DOOR c/w FOLD-DOWN GRILL. & Assembly. Installation Instructions

IMPULSE G2/PULSE STATIC BRIDGE & RETURN MODULE. Drill. Desk Connecting. Outside by fastening the supplied wood screws from the HK-67 kit through the

Wall Panel Installation Instructions

Oxford Stalls Installation Instructions

Tufftec Solid Plastic Lockers

How To Install Windows: Nail-Fin Application

METALWORKS TARTAN PANELS General Installation Instructions

WOODWORKS Walls. Installation Instructions WALL

TARGA 7300 CASEMENT INSTALLATION INSTRUCTIONS NOTE: Read instructions completely before attempting any installation.

SURFACE CLIP MOUNT. 1 Insert lens into channel, measure, and cut to length. Remove lens cover from channel. surface. Attach lens cover and end caps

METALWORKS Linear (Interior & Exterior Applications)

All Window Installation Instruction

Installation Instructions Palladium Square Edge Panels

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

SYSTEM 42 SCREEN CASSETTE WITH 30mm SIDE RAIL

METALWORKS Linear (Interior & Exterior Applications)

WOODWORKS Access Hook-on System

1200 SERIES 2 PANEL DOOR rev.1 DETAILED INSTALLATION INTRUCTIONS

6 Foot/ 1800mm Aisle Width Net-Contain Aisle Containment for N-Type and S-Type Cabinets

C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available.

Assembly Instructions

Worktop INDEX eight Capacity Unpacking

Extra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions

D. Product Certificates: Signed by manufacturers of casework certifying that products furnished comply with requirements.

INSTALLATION INSTRUCTIONS for Wood/Clad Wood Windows without Exterior Trim or Nailing Fin (JII025) ImpOrTaNT INFOrmaTION & GlOssary.

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

SIDING-MASTER VINYL SIDING ATTACHMENT & ALIGNMENT SYSTEM & OVERHANG ATTACHMENT & ALIGNMENT SYSTEM INSTALLATION INSTRUCTIONS

Video Wall Installation Instructions 2W X 3H, 3W X 3H

Vinyl Windows and Doors Manufactured by VPI Quality Windows

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

Installation Manual for Metal Toilet Partitions Standard Series

Half Round 180 Displacement Diffuser

INOVO 2-LITE SLIDING PATIO DOOR

Versatrim Side-Snap Frame

System 3000 specifications

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

Pocket Door Installation Instructions

metalworks Plank Assembly and Installation Instructions 2.1 Read this entire document before proceeding with installation.

Installation Instructions Edge Storage System

Installation Manual SOLID CORE SIDING

METAMORPHOSIS INSTALLATION GUIDE

Assembly and Installation Guide

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February

Installation Manual MODEL NE-42

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

FOR PROFESSIONAL GARAGE DOOR INSTALLERS

RECREATIONAL VEHICLE DOOR INSTALLATION INSTRUCTIONS

Vinyl Windows and Doors

Vertical Slider Section Detail

Gambrel Barn Construction Manual 8x8 through 16x24 Units

Shetland Stalls Installation Instructions

Versatility at Work. Installation Instructions

DW HORIZONTAL INSTALLATION

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Track Rack. * Track Racks are not lockable

ATLANTIS RAIL Contact Information

INSTALLATION INSTRUCTIONS

ELEPHANT DOOR SYSTEMS SERIES E1200

Transcription:

Ceiling Top Edge Trim Shim GRID PANEL SYSTEM Installation Instructions Installation is simple & fast using Ambienta Grid Horizontal Reveal Option for Horizontal Reveals & Edge Trim to be punched with slotted holes for adjusting into place after mounting. AG375 Clip Bottom Edge Trim Base Variety of options for the appearance of the reveal between the panel Metal Stud

GRID PANEL SYSTEM Installation Instructions DISCLAIMER These instructions are based on feedback from customers and our own test installations. Ambienta Global does not give explicit structural recommendations, offers no warranty and suggests you consult with a structural engineer for your specific installation conditions. Important Note on Relative Humidity and Expansion / Contraction: s expand and contract based upon changes between the humidity of the panel material and the surrounding environment. The installation needs to be made after the building HVAC systems are operational and balanced. Wide changes in the room humidity after the installation can result in panel movement that distorts the appearance or damages the installed system. Install the bottom perimeter trim. It is critically important that you install the perimeter pieces level and plumb, as these pieces will be the basis for the remainder of the installation. The perimeter should be installed in long continuous lengths, being sure to secure the perimeter at the wall studs. We recommend #8 x 1.75" Pan Head Sheet Metal screws for installing to metal studs. 1. Installed the bottom edge trim and vertical edge trim to form the bottom and side perimeter of the panel installation. NOTE: These profiles must be shimmed plumb and flush before moving to the next step! Next, install the side perimeters, whether you are using corners or edge trim. You will have to cope these pieces at the intersection of the bottom edge trim and the side perimeter trim to allow for a continuous reveal. This is accomplished by notching a space in bottom edge trim and in the vertical edge trim.

To cope the piece, you will make two cuts to notch the bottom edge trim. The first cut will be a partial cut approximately 1.875 from the end as illustrated in image 2. The second cut will just above the bottom edge, joining to the first cut to create a notch as illustrated in image 3. 2. Make a cut along the bottom edge trim that is the length of the vertical trim to which it is marrying 4. Join the bottom edge trim to the vertical trim at the notch 3. Make a vertical cut on the bottom edge trim to complete the notch where the vertical trim will intersect The second cut will be a cut from, the top of the bottom edge trim to complete the notch. 5. Plan View of Drawing Notched Piece

You then will attach AG375-2'' clips facing down on the bottom of the panel and facing up on the top of the panel. Generally, we recommend the spacing to be no more than 12-15'' on center and no less than two clips in each row. The Ambienta Clips will be installed so that the edges are flush with the panel edges. For the appropriate hardware / screws to attach the Clips to each panel, recommends a #8 x ¾'' Pan Head Coarse Thread Screws for ¾ MDF panels and #8 x 7/16'' Type F Pan Head Screws for 3/8 '' phenolic panels. Ambienta recommends using pre-drilled holes and a drill stop when working with phenolic panels as the screw must be at least 1/16'' from penetrating the panel. 6. Drawing of The Two Pieces Coped Together With the bottom and side perimeter installed, you should now design a layout for your panels so that the panels on the left and right ends are an equal width and the panels on the top and bottom are an equal height. To prepare the panels for installation, you will cut the panels to size and cut a.090 x.375 kerf where necessary to accept the spline for the vertical reveal. 8. Install AG375-2 Clips facing down on the bottom and facing up on the top 7. Drawing of splined panel 9. The AG375-2 Clips should face up on the top of the back-side of the panel and be flush with the top

Install the panels one row at a time working your way from the lower left hand panel across. The Ambienta Clip on the bottom of the back side of the panel fits over the bottom edge trim as you work across. The vertical reveals will spline into the side of the panel and should be cut to the height of the panel. 11. Engage the horizontal reveal with the Ambienta Z Clips and screw into place Each additional row will install in the same manner as the bottom row. The Ambienta AG375-2 Z Clips are installed facing down on the bottom of the panel and engage with the horizontal reveal and the clips on the top of the panel engage with the reveal on top (See illustration 12.) Continue to install clips in this manner until you reach the top row. 12. Install top panels by hooking the Ambienta AG375-2 clip at the bottom of the panel If you run into an issue fitting the last panel in the second row from the top, you can remove the back of the kerf in the panel to install it. The panel will still be securely fastened on Ambienta Z Clips. 10. First installed panel in the lower left hand side The horizontal reveal engages with the Ambienta Clips installed on the back of the panel in the same manner. You will need to cope the horizontal reveal to the Edge Trim with the same process described in Step 1. 12. Remove the back half of the kerf on the final panel to avoid interference with the vertical reveal

Alternative Zero Lift Off Installation with 3M Dual Lock An alternative to have a zero lift off, removable installation is to incorporate the use of 3M Dual Lock. A zero lift off means that the panel and the trim do not need to be raised above their final height to engage the system, allowing the wall panels to be installed flush to the ceiling. The system is entirely removable, where you can remove the panels for access panel needs or repair work. The panels are installed securely by being mechanically supported in shear by an Ambienta Clip from the bottom and being held in place in a tensile direction by the 3M Dual Lock. For phenolic panels, the surface should be cleaned with a 50/50 isopropyl alcohol solution and primed with the appropriate 3M primer. Next tilt the panel installing the Ambienta Clips on the bottom of the rear side of the panel first and then applying pressure directly over the attachment point of the 3M Dual Lock. You will physically feel the Dual Lock engage and it requires a strong pressure to engage correctly. You may need to use a rubber hammer or a roller to engage the Dual Lock. To use the Ambienta system with 3M Dual Lock you will need to order 1" x 2" pieces and.75" x 2" pieces from Ambienta. To prepare the panel for installation, you will mount the Ambienta AG375-2" Clips facing down along the bottom of the rear side of the panel to be mounted. These will be installed such that the bottom edge is flush with the panel. On the top edge of the back of the panel, (2).75 x 2 strips of 3M Dual Lock will be installed horizontally 1 in from each side of the panel and flush with the top of the panel. If you panel is wider than 2 ½ feet, you may want to consider additional attachment points in the center. Next tilt the panel installing the Ambienta Clips on the bottom of the rear side of the panel first and then applying pressure directly over the attachment point of the 3M Dual Lock. You will physically feel the Dual Lock engage and it requires a strong pressure to engage correctly. You may need to use a rubber hammer or a roller to engage the Dual Lock. Ceiling Top Edge Trim 3M Dual Lock SJ3550 17. Rear side of a panel with 3M Dual Lock strips installed on top and AG375-2 Clips installed on bottom. AG375 Clip Horizontal Reveal Shim Metal Stud 18. 3M Dual Lock being installed in the recess of the EPS- ET075-N 19. Install top panels by hooking the Ambienta AG375-2 clip at the bottom of the panel

Ceiling Top Edge Trim 3M Dual Lock SJ3550 20. Apply pressure directly over the 3M Dual Lock. You should feel a snap when it engages. Horizontal Reveal Shim AG375 Clip Bottom Edge Trim Base 21. Continue installing top panels by hooking the bottom and utilizing 3M Dual Lock at the top If installed correctly, the panel will be very difficult to remove with bare hands. Removing the panel will be best accomplished using a tool to begin to separate the 3M Dual Lock and give a access point to separate the Dual Lock. Metal Stud 22. Sectional view of the wall panels installed with 3M Dual Lock