How to build a Javelin Skiff

Similar documents
Building Instructions ARTEMIS Sailing Canoe Day Six Version 1.0 Brian Pearson & Dr. Axel Schmid Day Six. Align and Glue Planks

Repairing Sheet-Molded Compound (SMC) With Epoxy

Above are the offsets for the plywood panels.

Making your Rudder Cassette

Bateau.com PH18 CNC kit notes 1/5

Chapter # 002 : Creating Threaded Metal Anchoring Points in Fiberglass Foam Structures

Jabiru Aircraft. Fit Ailerons

Building a Scarab 350 Trimaran

07 - Landing Gear. Landing Gear. February EGF Page 7-1

10. Wing prep and subassembly

REVISION LIST CHAPTER 25: AFT WINDOWS. The following list of revisions will allow you to update the Legacy construction manual chapter listed above.

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

Pre-Paint>Fuselage>Empennage>Fit elevator. Objectives of this task: Materials required: Prepare the horizontal stabiliser and the elevator

12. Wings, Flaps, Ailerons and Struts

COMPOSITES LAB MANUAL

1. Initial Precautions 2. Technical Precautions and Suggestions 3. General Information and Cure Stages 4. Understanding and Controlling Cure Time

Hatch Installation For Pygmy Solo and Double Kayaks

3Insert the second rod no. 4

Cowper From Steve Wolverton on the T&TTT forum, Feb 2005 For Reference Only Do not use to build a trailer. Check on Teardrop and Tiny Travel Trailers

#70 grit sand Putty knives, sized as needed #1 fine gray sand Corner tools Milestone acrylic liquid

CAUTIONS / INSTRUCTIONS

*Before starting, please read entire manual *Changes can be made in order for this manual to work for you. 3 x 6 I-Beam

TAPE & GLUE PROCESS Version: Jun. 2011

This Manual Covers The Construction Of A Hood Scoop Plug From The Drawing Board. Through Construction. To Final Fitting.

Steps and Resources for Composite Construction Mark Westlake

3Position the hull of the ship as

Building instructions ARTEMIS Sailing Canoe Day Five Version 1.0 Brian Pearson & Dr. Axel Schmid Day Five. Assembly of Planks and Frames

Step by Step Wing Bagging

FireFighter.21 Building Instructions

5If the protruding part is. 6Place 1 as is shown in the. 7Place what was assembled

Wall Installations. Chapter 16 Wall Installations 16. 1

PITTS S2S CONSTRUCTION

Photo Essay How to Build an. Alaskan. Grand Banks Dory. Plans for this boat may be found at:

The following pages replace pages 7 thru 14 in the current printing of BUILDING THE PT ELEVEN. (As of December 2012.)This is a modified method for

Building small wooden boats in Myanmar

Building Instructions ARTEMIS Sailing Canoe Workshop and Tools Version 1.0 Brian Pearson / Dr. Axel Schmid Two Sawhorses. Workshop and Tools

MUDGUN Drywall Finishing System

PROJECT PLAN MODERN COFFEE TABLE

A Skin-on-Frame Pram. Designed by Dana Munkelt. Drawings by Andrew Walters. Duckworks Boatbuilder's Supply duckworksbbs.com

Timberflex & Flexboard Technical Guide

Installation Instructions

8 x 10 Sandwich Panel

Use these notes in conjunction with the plans and the plan's building notes.

Glass Cloth (supplied pre cut) Fibre Flock

Fitting Fiberglass arches to MK 1 Escort

Sawn Baluster Sizing and Installation Guide

SE5a Instrument Board part 2 - rev 1.1

PoorBoy Skiff. A 10-11ft 6in skiff for outboard motoring By Steven Lewis

Deck Repair Grady White Runabout

SPUNKY ASSEMBLY MANUAL

Tools and Tips: ( 1 )

Redwood strips are tacked to the templates, and edge-glued. Drive brads through into the templates before putting on fiberglass doth.

Tripanel Marine Technical Bulletin

Installation Guide. Welcome to the Pro Box Installation Guide

Tools and Tips: ( 1 )

SZD-10 bis CZAPLA ASSEMBLY MANUAL IN PICTURES

Kam Aero 43% Extra 300.

COMPOSITES LAB MANUAL

Building Tips This model can be built using the following types of adhesives:

Installing your new Bevella Top. L Shaped Countertop with Joints No Finished Ends (Fits Between Four Walls)

Installation Instructions Recommended Tools

Arched. Building an. Passageway. Although my company specializes in high-end jobs

Hudson Dresser [1] Hudson Dresser Published on Ana White ( Submitted by dan-k [2] on Fri, :43 [1]

SURFACE CASTING METHOD: For Molds & Core Boxes. Presented by: Hapco Inc.

Restoring the Bouyancy Tanks on 6878

Storing, Handling, and Cleaning dekō Markerboards Storing Markerboards. Handling. Cleaning

Building an Unfeathered Paddle with a Wood Shaft and Carbon Fiber Blades

1982 Hydrostream Viking Restoration

This article was written by Phill Brander (AUS), who has built many timber catamarans including a Paper Tiger.

Grade 11 Woods Lift Lid Coffee Table. Based on Under the big Top from Popular Mechanics Website

Get the benefits of oil with the ease of latex

Tape Measure Metal Clippers Screw Bit Set With Extensions

Photo Essay: How to Build a. Seneca. Pacific Power Dory. Plans for this boat may be found at:

FLITZEBOGEN-2 Assembly instructions

Nanton Grain Mill Assembly

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

Building the Wee Lassie Canoe. A Michigan Woodworkers Guild Presentation by Bob Mills

Contents. Study Plans. 2 Introduction. 4 List of Materials. 5 Glue, Resin and Fixings. 6 Tools. 7 Construction Sequence

Piper Cherokee /3 scale. Construction Manual

Procedure on construction of each of the following subsystems:

Installation Instructions Palladium 3D Hi Impact Wall System, Partial Height with Color Matched Caulk Joints

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ

M. R. Mittleman, Constructor Member, Long Island Woodworkers

C-180 Builder s Manual

PRO CYC PRO CYC, INC. SYSTEM SUPER 3EZ

Optima 450 LED Edge-Lit Single-Sided Light Box. Installation Instructions INSTALLATION INSTRUCTIONS. Figure 1. Tools you ll need

woodworkersjournal.com MATERIAL LIST

TANDY WALKER'S A 2nd CLASS BOMBER 10 to 20. FW:10 Class A Bomber LG. FW:11 Class A Bomber Pylon Primary Sructure

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS

Cold curing adhesive K-X280

Photo Essay Building a. Key Largo. Carolina Dory. Plans for this boat may be found at:

Tools Required: Steps to completion:

Loose Lay Luxury Vinyl Plank

BUILDING A STORM DOOR

LUNAR EXPRESS. Little

A H M 531 The Civil Engineering Center

Masking: Each mirrored sheet is well protected by a durable paint backing and

Your Best Finish! Darrell Krasoski and Charles Samaha Article originally prepared for the SeaWind Express

4. Bevel the LE face of HS1-HS11 to match the horizontal stab leading edge sweep angle.

Quality Marine Equipment Since Antifouling Paint For Metal Under The Waterline ROLLER. Application Instructions.

Transcription:

How to build a Javelin Skiff This is not your grandfather s plywood boat! The Javelin involves a high-tech type construction, called composite. The hull can be constructed with foam or plywood; these materials are used as a core sandwiched between two layers of fiberglass with epoxy resin. This type of construction is different than conventional boat building. But don t let this scare you. Many people have built the Javelin, and have never built a boat before. As long as you put enough determination and patience this will be rewarded with the final result, a high performance sailboat capable of speeds in excess of 20 knots. Weight is one of the most important factors, impacting on the boat performance. The goal is to build a light boat but also strong, to be capable of withstand high stress forces. This article describes the construction process using plywood. It is important to select the best materials for this project to get the best results. Materials The plywood used is Okoume marine plywood, and it complies to BS 1088 standard. There is another grade of plywood below Marine bonded, which complies to BS6566. That sometimes is also used, but care is needed in selecting the best sheets due to voids between the plies. The plywood thickness is 3mm with the exception of the false floor where it is recommended to use plywood at least 4mm thick, or if you prefer you may use 4mm through out. For this project you will need a total of eight (8) sheets of plywood. The fiberglass used is 4oz S, and biaxial fiberglass tape 4 wide for the joints. A better material to use would be carbon fiber tape, which is much stronger that fiberglass. The Mold The Javelin hull is built around a male mold. The first phase of the construction process is to build the mold. The mold is made with transversal formers erected on a building bench, accurately aligned, and braced to prevent movement. The stringers, or battens, are attached to the formers creating the hull shape. More stringers run over the outside of the formers better. The formers can be made of plywood at least 1 2 thick, or particle board at least 1 thick. The stringers can be 1/2 thick, and 15 long, cut from 2 x4 studs. *Very important* Before you transcribe the measurements into the formers, you have to take in consideration the thickness of the hull, plus the thickness of the stringers. For example, if you use 4mm plywood, plus 2mm for the thickness of the fiberglass, plus 126mm for the thickness of the stringers, you have to discount 132mm on both sides, and bottom of the former measurements. Notching the formers to accommodate the stringers it s not a good option, because you won t be able to re-adjust the stringers once they are in place. When transcribing the measurements to the formers, remember to add the height of the formers in relation to the reference plane. Always remember as a rule, measure twice cut once. After the formers have been traced, verify the measurements before cutting. Mark the formers F6 to F1/2, and mount them securely on the building bench. Make sure the forms are correctly placed according with the drawing. Then attach the stringers to the formers. Cover the stringers with brown packaging plastic tape, to prevent the panels to be glued to the stringers, specially in the areas where the panels join each other. After the mold is finished, verify the accuracy in your measurements, to assure that no mistakes were made. Remember the boat that you are building is as good as the mold you built. Attaching the panels to the mold. The second phase of the project is the construction of the hull shell. Place a sheet of plywood against the area, and mark the shape of the panel, leaving some excess to be trimmed after the panel is installed. The hull is made of joint panels of plywood, since a single sheet is not long enough for the entire length of the hull. The panel joints are made after the panels are attached to the mold. One process of attaching plywood panels to the mold is by drilling small holes, and using thin plastic coated electrical wire to tie the panels to the stringers, and in some locations you may have to use sheet-rock screws in order to bring the panel into the proper shape. Start by attaching the side panels. Once the side panels are attached, trim them to the proper dimensions. The building bench is constructed with two 2 x4 x16 studs, plus some additional wood for the cross-members and legs. The bench has to be sturdy and leveled. The bench height is very important to provide the best working conditions. One of the most challenging parts of the project is the bow area. The bottom panels for the bow require that you leave quite a bit of extra margin for adjustment, due to the twist that the panels are subjected to in this area. The plywood has to be forced into place in this area, and you may have to use C clamps, sheet-rock screws, to bring the plywood into the right shape. Bring the plywood slowly into shape, otherwise it will crack.2

One of the most challenging parts of the project is the bow area. The bottom panels for the bow require that you leave quite a bit of extra margin for adjustment, due to the twist that the panels are subjected to in this area. The plywood has to be forced into place in this area, and you may have to use C clamps, sheet-rock screws, to bring the plywood into the right shape. Bring the plywood slowly into shape, otherwise it will crack. To apply epoxy resin to large surfaces a foam roller provides good results, then on the final coat use a large plastic spatula. To clean epoxy resin use acetone, or alcohol, or other epoxycompatible water free solvents. Do not use other products that may contain contaminants, or leave oily residue The Joins Once all the panels are attached to the mold, it s time to make the joins. The joins require special attention to keep them to a minimum height, and at the same time they have to be strong. One misconception is to add more epoxy to make it stronger. This is far from the truth. By adding more epoxy, the weight increases and the joint becomes more susceptible to break. You should always remove the excess of epoxy. On the joins one should use biaxial tape. The fibers run at 45 degrees of each layer, providing better strength. Carbon tape is a better choice, but its cost is much higher. After applying the epoxy resin to the tape, you may cover it with kitchen wax paper to make the join smooth. Apply pressure using a flat surface object, to squeeze out the excess of resin. Leave the wax paper in place until the epoxy resin is cured. A few words about epoxy resin. Use only epoxy, other types of resin are not strong enough and they don t bond. Follow the manufacturer instructions to the letter. Use dispensers (pumps) for the epoxy/hardener mixture to be correct. The mixing proportions should be held as accurately as possible. Otherwise it will not cure properly and it will never provide the proper strength. If the epoxy and hardener stand for a long period of time (6 months or longer), stir or agitate each ingredient before use. Do not attempt to mix too much resin at a time. The best mixing containers are graduated and made of flexible polyethylene plastic. They are reusable, and the resin once cured will not stick to them. Make sure you stir the ingredients thoroughly, this is extremely important for the epoxy to cure properly. Avoid working in high humidity whenever possible; drastic changes in humidity can affect bonding strength. Ideal working temperatures range between 70oF and 85oF. However some manufacturers make special hardeners for lower temperatures. Surfaces must be clean and dry. These are two main factors affecting the success of the bonding. The picture below shows a great tool to apply epoxy resin in small surfaces, and hard to reach places. It can easily be done, by cutting a piece of a paint roller, and stapling it into a paint stick. After the resin is completely cured, remove any wax residue with acetone. When you need to apply layer of fiberglass on top of another, sand the layer underneath to provide better adhesion. Cut the fiberglass cloth of the size of each panel, over-lapping the joins slightly. Use a foam roller to apply the epoxy. Wet the surface with epoxy, then lay down the cloth, and make sure that there are no air pockets. Apply the epoxy resin in two coats, on the first coat the cloth threads are still visible after the resin is cured. Within a short time of the first coat being cured, apply the second coat. If you wait too long between coats you need to clean the entire surface with acetone, before applying the second coat. In general, epoxy resin is not self-leveling, due to its viscosity, so don t attempt to do this with a single coat of resin. This may cause an irregular surface with runs, and the use of excessive amounts of resin. At the end you will have a tremendous amount of work sanding it down. The second coat is applied with a plastic spatula. This requires a bit of practice, but once you acquire the skill you ll be able to spread the epoxy creating a smooth surface. Once again, don t use more epoxy than what you have to.

Once the hull outer shell has been fiber-glassed, it s time to remove the hull from the mold. You may use the building bench with the formers removed, to place the hull up righted. Place two stringers across the hull, side to side, for the hull to keep the right shape. The next step is to make the inside joins, using the same process used for the outside. For the inside joins, carbon tape is the ideal material to be used for its strength. Remember to place fiberglass at the bow. After the joins are done, fiberglass the inside of the hull. The frames The frames provide not only support for the false floor, but structural strength to the boat. Refer to the drawing on page 4 for the location of the frames. Note that the location different than the location of the formers. Mark each frame location on the inside of the hull, then place a string across and make several depth measurements, every 200mm, and note on a paper. Subtract 4mm from the depth, to compensate for the plywood strip to be placed on top. Then transfer the measurements to the plywood, and draw the line for the bottom of the frame, by connecting all the points with a flexible ruler or batten. The picture below shows the area near the center board box. The frames are fiber-glassed on both sides, and are T-shape. A strip of plywood, one inch wide, is fiber-glassed on top of the frame, to allow the false floor to have enough surface to attach to the frames. It s easier if all the frames are fiber-glassed outside. The stern frame should be doubled with two pieces of 4mm plywood. An additional block of hard-wood can be fiberglassed on the inside to provide a place to attach the rudder hardware.

Pictures of the boat finished