SECTION SLATE SHINGLES. 1.1 SUMMARY A. Section Includes: 1. Slate shingles over underlayment nailed to roof sheathing.

Similar documents
SECTION WOOD SHINGLES

Slate Shingle Specifications

B. Related Sections: The following Sections contain requirements that relate to this Section:

1.04 QUALITY ASSURANCE

eco-shake INSTALLATION INSTRUCTION

AIA Specification. Section Slate Shingles PART 1 GENERAL

PROJECT INSTRUCTIONS Roofing

1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights

A P P L I C A T I O N I N S T R U C T I O N S

ROOFING City of Grand Rapids Building Safety Division

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

DIRECTIONS FOR APPLICATION

DIRECTIONS FOR APPLICATION

Inspire Aledora Slate Application Guidelines

DIRECTIONS FOR APPLICATION

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION

4. Metal roof jacks at penetrations and attachments

Turada Hardwood Shingles and Shakes Installation instructions

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

RED DIAMOND SHINGLES Roof Installation Introduction:

Installation Guide. Cedar Shake. Distributed by: BEST MATERIALS LLC, Phoenx AZ

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

SECTION ASPHALT SHINGLES

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD

ROOFING APPLICATION STANDARD (RAS) No. 130

The City of Winnipeg SHINGLE ROOF REPLACEMENT Section Replacement of Shingle Roof - Louis Riel Library Page 1 of 5 Bid Opp. No.

RESIDENTIAL ROOFS ADDENDUM NUMBER ONE. August 28, 2017

SECTION ASPHALT SHINGLES

SECTION ASPHALT SHINGLES

PREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

ENDUREED VIVA SERIES Specifications

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25

C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l. and Carriage House STEEP. Slope Application. (over 21/12)

Ekoroof LiteTile Dimensions

10 Steps to Performing a Roof Inspection Class. Ben Gromicko InterNACHI nachi.org/class

Asphalt Shingle Installation at Roof Edges, Intersections and Valleys

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: IKO INDUSTRIES LIMITED

HERITAGE LAMINATED ASPHALT SHINGLES Tuscaloosa, AL

Wood shakes and wood shingles

SECTION SHEET METAL FLASHING AND TRIM

Brava Old World Slate Installation Guide

Cambridge English Application Instructions

Grand Manor Carriage House and Centennial Slate 16 YOUR OBJECTIVE: To learn the correct method of installing each of these roofing products.

ESR-1129 Reissued June 1, 2011 This report is subject to renewal in two years.

b) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the

The new steep-slope manual

Installation Guide. Titan Old World Slate REV Titan Manufacturing Phone: (407) Fax: (866)

Timberline and Sovereign Expanded Fastener Placement Area

Slate Shingle Specifications

APRON FLASHING NOTES: SHEET METAL APRON FLASHING WITH HEMMED EDGE RAGGLE SEALANT UNDERLAYMENT TURNED UP WALL

SECTION SHEET METAL FLASHING AND TRIM

ENGINEERED SLATE 2018 INSTALLATION GUIDE

LAMINATED SHINGLES CERTAINTEED SHINGLE APPLICATOR S MANUAL SUPPLEMENT

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Laminated Shingles. Landmark Series and Landmark TL. CertainTeed Shingle Applicator s Manual

GlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing

Capstone Application Instructions

SmartVent Eave Edge Installation Instructions

installation guide Villa

StormMaster Shake GENERAL INSTRUCTIONS For Spanish Instructions Click Here (Para las Instrucciones Españolas Haga Clic Aquí)

STORMMASTER SHAKE GENERAL INSTRUCTIONS

Application instructions

Multi-Width Shake. Widths: 9", 8", 7", 6", 4" Length: 22" Thickness at butt: 5/8" Single-Width Shake. Widths: 9" Length: 22" Thickness at butt: 5/8"

ONDUVILLA. The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S

1 Roof Substrate (Deck) OWENS CORNING BERKSHIRE SHINGLES INSTALLATION INSTRUCTIONS

A201 3 PROPOSED SOUTH ELEVATION SCALE: PROPOSED EAST ELEVATION SCALE: EXISTING EAST ELEVATION EXISTING SOUTH ELEVATION WEST WORKSHOP

OWENS CORNING LAMINATE SHINGLES INSTALLATION INSTRUCTIONS

Steel Shingle Installation Guide

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

Tapersawn Shake Installation Instructions

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

BARRELL VAULT BATTENLESS

6 STEP INSTALLATION GUIDE BY DCI

Shapes Siding. Perfection Shingles. Chalk Line

Application Guidelines - Slate General Information

ASPHALT T E C H N O L O G I E S

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1

ICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013.

Application instructions

Ash Brook Golf Course Scotch Plains, New Jersey

SECTION HERITAGE SERIES LAMINATED FIBERGLASS ASPHALT SHINGLES

Laminate Shingle Installation Instructions

3-Tab Shingle Installation Instructions

The proposal includes the replacement of the roof on the entire house (historic massing and later additions) and detached garage.

Barrel Vault Counter Batten and Batten

Re-Roofing Policy SPECIAL REQUIREMENTS AND NOTES

INSTALLATION GUIDE LEARN MORE AT DECRA.COM

TECHNICAL BULLETIN NEW ICC ES EVALUATION REPORT

IRONSTONE SLATE & FLASHING SPECIFICATIONS IRONSTONE SLATE

Table of Contents. Roof to Head Wall w/ Side Flashing DECRA Shake XD Roof Overview Roof Penetration - Pipes & Vents...

BARDOLINE INSTALLATION INSTRUCTIONS

Installation Instructions

SLATE & SHINGLE INSTALLATION

OHearneAssociates.com

Transcription:

SECTION 07 31 26 SLATE SHINGLES SPEC WRITER NOTES: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Slate shingles over underlayment nailed to roof sheathing. 1.2 RELATED REQUIREMENTS SPEC WRITER NOTE: Update and retain references only when specified elsewhere in this section. A. Counterflashing and Flashing of Roof Projections: Section 07 60 00, FLASHING AND SHEET METAL. B. Roof Hatches (Scuttles) and Roof Vents: Section 07 71 00, ROOF SPECIALTIES. C. Slate Color: Section 09 06 00, SCHEDULE FOR FINISHES. 1.3 APPLICABLE PUBLICATIONS A. Comply with references to extent specified in this section. B. ASTM International (ASTM): 1. C406/C406M-15 - Roofing Slate. 2. D226/D226M-09 - Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing. 3. D1970/D1970M-15a - Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection. 4. D4586/D4586M-07(2012)e1 - Asphalt Roof Cement, Asbestos-Free. 5. F1667-15 - Driven Fasteners: Nails, Spikes, and Staples. 1.4 PREINSTALLATION MEETINGS A. Conduct preinstallation meeting // at project site // minimum 30 days before beginning Work of this section. 1. Required Participants: a. Contracting Officer's Representative. SPEC WRITER NOTE: Edit participant list to ensure entities influencing outcome attend. 07 31 26-1

b. // Architect/Engineer. // c. Contractor. d. Installer. e. // Manufacturer's field representative. // f. Other installers responsible for adjacent and intersecting work, including flashing and sheet metal // and skylights //. SPEC WRITER NOTE: Edit meeting agenda to incorporate project specific topics. 2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting. a. Installation schedule. b. Installation sequence. c. Preparatory work. d. Protection before, during, and after installation. e. Installation. f. Terminations. g. Transitions and connections to other work. h. Other items affecting successful completion. 3. Document and distribute meeting minutes to participants to record decisions affecting installation. 1.5 SUBMITTALS A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. B. Manufacturer's Literature and Data: 1. Description of each product. 2. Installation instructions. C. Samples: 1. Shingles: Full sized, each type and color. Submit quantity required to show full color and texture range. D. Qualifications: Substantiate qualifications comply with specifications. 1. Installer // with project experience list //. 1.6 QUALITY ASSURANCE A. Installer Qualifications: 1. Regularly installs specified products. 2. Installed specified products with satisfactory service on five similar installations. 07 31 26-2

a. // Project Experience List: Provide contact names and addresses for completed projects. // 1.7 DELIVERY A. Deliver products in manufacturer's original sealed packaging. B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, production run number, and manufacture date. C. Before installation, return or dispose of products within distorted, damaged, or opened packaging. 1.8 STORAGE AND HANDLING A. Protect products from damage during handling and construction operations. 1.9 WARRANTY SPEC WRITER NOTE: Always retain construction warranty. FAR includes Contractor's one year labor and material warranty. A. Construction Warranty: FAR clause 52.246-21, "Warranty of Construction." PART 2 - PRODUCTS 2.1 PRODUCTS - GENERAL A. Basis of Design: Section 09 06 00, SCHEDULE FOR FINISHES. B. Provide each product from one manufacturer. 2.2 SLATE SHINGLES A. Slate Shingles: ASTM C406/C406M, Grade S1, unfading color, with no ribbons. 1. Nail Holes: 2 per shingle, pre-punched or predrilled. 2. // Match existing slate in color, size, exposure and texture. // SPEC WRITER NOTE: When slate is not required to match existing slate, specify architectural characteristics, including size, thickness, face texture, color or color range. If the roof is specified or noted as "graduated" specify size and thickness ranges. 3. Thickness: // 5 mm (3/16 inch) // 6 mm (1/4 inch) // 10 mm (3/8 inch) //. 07 31 26-3

4. Length: // 400 mm (16 inches) // 450 mm (18 inches) // 500 mm (20 inches) //. 5. Width: // 150 mm (6 inches) // 175 mm (7 inches) // 200 mm (8 inches) // 225 mm (9 inches) // 250 mm (10 inches) // 275 mm (11 inches) // 300 mm (12 inches) // 350 mm (14 inches) //. 6. Exposure: // 300 mm (12 inches) // 350 mm (14 inches) // 400 mm (16 inches) // 450 mm (18 inches) //. 7. Texture: // Smooth // Medium // Natural Cleft //. SPEC WRITER NOTE: Select 50 mm (2 inch) minimum head lap for roof slopes greater than or equal to 20/12. Select 75 mm (3 inch) minimum head lap for roof slopes 8/12 to 20/12. Select 100 mm (4 inch) minimum head lap for roof slopes 4/12 to 8/12. 8. Head Lap: // 50 mm (2 inches) // 75 mm (3 inches) // 100 mm 2.3 ROOFING NAILS (4 inches) // minimum. A. Roofing Nails: 1. Nails for Slate Shingles: ASTM F1667, Type 1, Style 23 copper slating nails, 25 mm (1 inch) longer than thickness of slate. 2. Nails for Felt: ASTM F1667, Type I, Style 20, galvanized steel, smooth shanks. 2.4 ROOFING UNDERLAYMENT A. Organic Felt: ASTM D226/D226M, Type II, No. 30. B. Self-Adhering Modified Bituminous Underlayment: ASTM D1970/D1970M. 2.5 METAL FLASHING A. Provide metal roof flashings, including apron flashings, step flashings, valley flashings, drip edges, and vent pipe flashings specified in Section 07 60 00, FLASHING AND SHEET METAL. 1. Metal: Copper. a. Valleys: 1 mm (20 oz., 0.039 inches). b. Other Locations: 0.55 mm (16 oz., 0.022 inches). 07 31 26-4

2.6 RIDGE VENTS SPEC WRITER NOTE: Retain article below if ridge vents are required. Ensure drawings detail slate fastening. A. Ridge Vents: Manufacturer's standard ridge vent intended for long-term use under slate shingles. 1. Provide ridge vents with internal filters, internal baffles, or external baffles, for weather protection. 2. Free Area: Minimum 25400 square mm net free area per meter length (12 square inches per foot). SPEC WRITER NOTE: Retain article below if snow guards are required. 2.7 SNOW GUARDS A. Snow Guards: Individual copper snow guards, designed not to penetrate slate shingles. 2.8 ACCESSORIES A. Asphalt Roof Cement: ASTM D4586/D4586M. PART 3 - EXECUTION 3.1 PREPARATION SPEC WRITER NOTE: This specification is for slate secured to wood or plywood roof deck. If slate is secured to another material, edit specification accordingly. A. Examine and verify substrate suitability for roofing installation. 1. Verify roof substrates are sound, within manufacturer's tolerances, and free from defects which would interfere with roofing installation. 2. Verify roof accessories, vent pipes and other projections through roof are in place and roof flashing is installed, or ready for installation, before installing shingles. B. Protect existing construction and completed work from damage. 3.2 INSTALLATION - GENERAL A. Install products according to manufacturer's instructions. 1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration. 07 31 26-5

3.3 METAL DRIP EDGE INSTALLATION A. At eaves and rakes, install copper drip edges specified in Section 07 60 00, FLASHING AND SHEET METAL. 1. Eaves: Install metal drip edge before underlayment. 2. Rakes: Install metal drip edge after underlayment. B. Secure metal drip edges with compatible nails spaced minimum 250 mm (10 inches) on center along inner edges. 3.4 FLASHING INSTALLATION A. Install copper flashings at intersections of roofs, adjoining walls, roof slope changes, under ridges, hips, and valleys, and at projections through deck such as chimneys and vent stacks. Install metal flashings to comply with requirements in Section 07 60 00, FLASHING AND SHEET METAL. B. Install step flashing at intersections with vertical surfaces. 1. Length: Length of shingle plus 50 mm (2 inches). 2. Vertical Leg Height: 200 mm (8 inches) minimum. 3. Horizontal Leg Width: 150 mm (6 inches) minimum. C. Valley Flashing: Shingle type, as shown and as specified in Section 07 60 00, FLASHING AND SHEET METAL. 1. Secure valley flashing according to shingle manufacturer's instructions. 2. Width: 300 mm (12 inches) minimum, both sides of valley. D. // Hip and // Ridge Flashing: Step flashing. 1. Length: Length of shingle plus 50 mm (2 inches). 2. Width: 13 mm (1/2 inch) less than shingle on both sides of hip or ridge. 3. Install step flashing as each course of slate shingles is installed. Extend upper edge of flashing 50 mm (2 inches) minimum above each course of shingles. Extend lower edge 13 mm (1/2 inch) above butt of shingle forming next course. 3.5 UNDERLAYMENT INSTALLATION A. Install self-adhering sheet underlayment, working from low point to high point. Lap sides 90 mm (3-1/2 inches) minimum, and lap ends 150 mm (6 inches) minimum. Install at the following locations: 1. Eaves and Rakes: From edge of eave and rake to 600 mm (24 inches) minimum beyond inside face of exterior wall. a. Lap underlayment over eave metal drip edge. 07 31 26-6

2. // Valleys, // Hips // and // Roof Slope Transitions: Centered over change in slope, and extended 450 mm (18 inches) minimum on both sides. 3. Ridges: Centered on ridge, and extended 900 mm (36 inches) minimum on both sides. // Do not cover ridge vent opening. // 4. Sidewalls and Projections through Roof: Extended 450 mm (18 inches) from projection, and extended up projection 100 mm (4 inches) minimum. 5. Roll underlayment to ensure adhesion to roof deck and metal flashings. B. Install two layers organic felt underlayment, shingled, on roof deck not covered by self-adhering sheet underlayment, with 100 mm (4 inches) minimum end laps, 50 mm (2 inches) minimum head laps, and 300 mm (12 inches) minimum ridge laps. Nail felt 125 mm (5 inches) on centers along laps. 3.6 ROOF ACCESSORY INSTALLATION A. Install // roof hatches (scuttles), // and roof vents, // specified in Section 07 71 00, ROOF SPECIALTIES before installing shingles. B. Lap underlayment and slate shingles over upslope base flanges of roof accessory flashings. C. Install underlayment and slate shingles over sideslope base flanges of roof accessory flashings. D. Install downslope base flanges of roof accessories over slate shingles. 3.7 SLATE SHINGLE INSTALLATION A. Install starter course of roof shingles with 50 mm (2 inch) overhang at eaves. Install first course over starter course. B. At rake, overhang roof edge 25 mm (1 inch). C. Install shingles with specified head lap. D. Fasten shingles using two nails per shingle, concealed by head lap. E. Valleys: // Open // Closed, to match existing //. 3.8 RIDGE VENT INSTALLATION A. Construct ridge vents. Fasten with roofing nails to penetrate through roof sheathing. 07 31 26-7

SPEC WRITER NOTE: Coordinate ridge vent location and extent with drawings. 1. Extent: Continuous along ridges extending to within <distance> of rakes. 3.9 // HIP AND // RIDGE SHINGLE INSTALLATION A. Fasten nailing strips to both sides of // hip and // ridge. B. Install step flashing at // hips and // ridges. 1. Begin ridge shingle installation at leeward end of ridge. // Cover ridge vents with step flashing and shingles. Do not cover ridge vent openings with ridge shingles. // 2. // Begin hip shingle installation at eave. // C. Install // hip and // ridge shingles in pairs, over step flashing. Butt shingles together, nail in place, then install the next course of flashing. D. Seal ridge joint with asphalt roof cement. SPEC WRITER NOTE: Retain article below if snow guards are required. 3.10 SNOW GUARD INSTALLATION A. Install snow guards in layout recommended by manufacturer. 1. Fasten snow guards with fasteners concealed by shingles. Do not penetrate shingles. 3.11 PROTECTION A. Protect slate shingles from construction operations. B. Repair damage. - - E N D - - 07 31 26-8