P-8 8Programs. Chuck Dabundo. Rob Elliott. June 8, Boeing Vice President, P-8 Program Manager. Boeing BCA P-8 Program Manager MEDIA TOUR

Similar documents
UNCLASSIFIED INTRODUCTION TO THE THEME: AIRBORNE ANTI-SUBMARINE WARFARE

COMPANY RESTRICTED NOT EXPORT CONTROLLED NOT CLASSIFIED Your Name Document number Issue X FIGHTING THE BATTLE. Thomas Kloos, Björn Bengtsson

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 5 R-1 Line #102

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

ARCHIVED REPORT. Marine Technology - Archived 7/2005

Unmanned Maritime Vehicle (UMV) Test & Evaluation Conference

CHAPTER 12 NAVAL AIRCREWMEN (AW) NAVPERS H CH-63

Communications Program Office (PMW/A 170)

Ultra Electronics Integrated Sonar Suite

Cost Effective Control of your Coastal Waters

Treasury and Trade Solutions Citi Commercial Cards. A History of Achievement. A Future of Innovation. May 19-21, 2014

Active Towed Array Sonar Outstanding Over-The-Horizon Surveillance

BUILDING SITUATIONAL AWARENESS

Test & Evaluation (T&E)/Science & Technology (S&T) Program

The C2/C4ISR Systems Market

Lesson 17: Science and Technology in the Acquisition Process

Advanced Simulation Displays. High-Performance Displays for the Most Demanding Training Applications

The Army s Future Tactical UAS Technology Demonstrator Program

Building the S&T Foundation for Agile Solutions

Expanded Use of the Probability of Raid Annihilation (P RA ) Testbed

Engineered Resilient Systems NDIA Systems Engineering Conference October 29, 2014

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: NAVSTAR Global Positioning System User Equipment Space

for these roles in an attempt to further reduce costs for the operators.

The RCAF S&T program and the All Domain

Customer Showcase > Defense and Intelligence

Use of Communications EW in a Network Centric Warfare Environment

Ship Signatures Department (Code 70) Paul Luehr, Acting Department Head

Mission Solution 300

UAV CRAFT CRAFT CUSTOMIZABLE SIMULATOR

NAVY SATELLITE COMMUNICATIONS

NAVAL AVIATION Carrier Borne AEW&C

CHAPTER 12 NAVAL AIRCREWMEN (AW) NAVPERS G CH-62

The New DoD Systems Acquisition Process

Science and Technology for Naval Warfare,

Networked Targeting Technology

MILITARY RADAR TRENDS AND ANALYSIS REPORT

Technology Roadmapping. Lesson 3

The Swedish Armed Forces Sensor Study

COI Annual Update: Guidance April 2017

Enterprise Control Systems Ltd. systems

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/SHIP CONCEPT ADVANCED DESIGN

ISU Symposium The Public Face of Space Strasbourg, France February A quiet and sustainable success story.

LEADING THE WAY FROM SEA TO LAND SURVEILLANCE RADAR SOLUTIONS

Sikorsky S-70i BLACK HAWK Training

DoD Research and Engineering

AN/ALE-55 Fiber-Optic Towed Decoy ELECTRONIC SYSTEMS

CRAFT UAV CRAFT CUSTOMIZABLE SIMULATOR

SYSTEMS ENGINEERING MANAGEMENT IN DOD ACQUISITION

The LVCx Framework. The LVCx Framework An Advanced Framework for Live, Virtual and Constructive Experimentation

STAINLESS STEEL STAINLESS STEEL MANUFACTURING STAINLESS STEEL TRADING BRIGHT BARS WIRES PRECISION COMPONENTS

CHAPTER 20 CRYPTOLOGIC TECHNICIAN (CT) NAVPERS I CH-65

Innovative Weapon Technology Solutions for the Current & Future Fight

CHAPTER 12 NAVAL AIRCREWMEN (AW) NAVPERS G CH-62

SECURITY AND DEFENSE FLIGHT SIMULATION. Simulation systems delivered in twelve countries. indracompany.com

International Cospas-Sarsat Programme : From operations to MEOSAR prospects

Copyright 2016 Raytheon Company. All rights reserved. Customer Success Is Our Mission is a registered trademark of Raytheon Company.

Coalition C2 Interoperability Challenges. Peter Gorm Larsen

Argo. 1,000m: drift approx. 9 days. Total cycle time: 10 days. Float transmits data to users via satellite. Descent to depth: 6 hours

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

Naval Combat Systems Engineering Course

Test & Evaluation Strategy for Technology Development Phase

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

Frame through-beam sensors

Innovation in the Aerospace & Defence Industry - A European Perspective

Electronic Warfare Training in the Pacific Northwest

The Role of the Communities of Interest (COIs) March 25, Dr. John Stubstad Director, Space & Sensor Systems, OASD (Research & Engineering)

System of Systems Integration Technology & Experimentation (SoSITE)

Technology Insertion: A Way Ahead

ABB Oy, KPM. Sakeusmittaukset paperikoneen massanvalmistuksessa

Engineering excellence through life SIMULATION AND TRAINING. Immersive, high-fidelity, 3D software solutions

Lockheed Martin. An Overview of Partnering with Small Businesses

Enterprise Control Systems Ltd. systems

Rutter High Resolution Radar Solutions

Future Technology Drivers and Creating Innovative Technology Cooperation

CHAPTER 20 CRYPTOLOGIC TECHNICIAN (CT) NAVPERS C CH-72

Economic Outlook for 2016

Jerome Tzau TARDEC System Engineering Group. UNCLASSIFIED: Distribution Statement A. Approved for public release. 14 th Annual NDIA SE Conf Oct 2011

ILA Berlin Air Show 2016

SAAB RESEARCH, COOPERATION AND GLOBALIZATION

SOLVE DEEPEST LEVEL FLUID CHALLENGES. at their

2012 PRODUCT INFORMATION SHEET. EagleEye 350 Multi-Role, Special Missions Aerial Surveillance Platform

NILE PMO. IDLS October 2005 Sydney, Australia

CISCO ONS /100-GHZ INTERLEAVER/DE-INTERLEAVER FOR THE CISCO ONS MULTISERVICE TRANSPORT PLATFORM

DoD Research and Engineering Enterprise

HELISIM SIMULATION CREATE. SET. HOVER

The Role of CREATE TM -AV in Realization of the Digital Thread

Other Transactions (OTs) for Prototypes and the Information Warfare Research Project (IWRP) Consortium OT

SUBJECT: Army Directive (Acquisition Reform Initiative #3: Improving the Integration and Synchronization of Science and Technology)

OFFensive Swarm-Enabled Tactics (OFFSET)

S540 Power Semiconductor Test System Datasheet

Michael Gaydar Deputy Director Air Platforms, Systems Engineering

SAAB SEA POWER CAPABILITIES FOR MALAYSIA AND APAC LIMA Robert Hewson Vice President Head of Communications, Saab Asia Pacific

Model-based Systems Engineering Mission Formulation and Implementation

Future UAS Software Procurement

GROUP OF SENIOR OFFICIALS ON GLOBAL RESEARCH INFRASTRUCTURES

Welcome to the IFR Press Conference 30 August 2012, Taipei

Information Warfare Research Project

Radar Systems.

EXPERIENCE OF PARTICIPATION IN INTERNATIONAL SCIENTIFIC AND EDUCATIONAL SPACE PROJECTS BY THE EXAMPLE OF QB50 PROJECT

Transcription:

MEDIA TOUR P-8 8Programs Chuck Dabundo Boeing Vice President, P-8 Program Manager Rob Elliott Boeing BCA P-8 Program Manager June 8, 2011 Copyright 2011 Boeing. All rights reserved. 1

P-8A Poseidon The P-8A Poseidon is the U.S. Navy s longrange, persistent, maritime patrol aircraft that will provide superiority in both the open ocean and littoral environments. Copyright 2011 Boeing. All rights reserved. 2

Capabilities Next generation anti-submarine warfare (ASW) to counter subsurface threats Detect, locate, identify and track targets in the surface, subsurface and littoral battlespace; if required: deny, disrupt or destroy Conduct armed Intelligence, Surveillance and Reconnaissance (ISR) in maritime and littoral areas of operation Provide command, control and communications (C3) and serve as an interoperable C3 node Provide accurate stand-off targeting and strike support for naval, joint and multi-national operations Copyright 2011 Boeing. All rights reserved. 3

P-8A Maturity Common with B-737 Proven airframe Engine, APU Hydraulics Electrical, ECS Fire Protection Ice & Rain Protection Flight Systems Fuel Valving & Pumping Airframe Systems 41 Million Commercial Flight Hours To Date Systems Integration Completed - 24,000 hours of weapon system integration Full functionality in test aircraft OA event provided additional confidence in weapon systems maturity Mission Computer & Displays Radar Acoustics EO/IR Sonobuoy Rotary Launcher IFFI ESM EWSP Communications Systems Mission Systems COTS components Upgrade to P-3 APS-137 AAPS and P-3C ASU Upgrade to MX-20 on P-3, C-130, AFRL Italian Navy NH-90 UPX-40 on MH-60R, AWACS, CP140 Components from ICAP III and EA-18G Components in multiple military aircraft Components in multiple military aircraft No Uniquely Developed P-8A Mission Systems Summary P-8A aircraft and mission systems are mature and stable Meets or exceeds all key performance parameters (KPPs) Proven performance and reliability in civilian and military environments Milestone C complete LRIP-1 contract award High Fidelity WSIL Has Allowed for Significant Integration Effort to Occur On Track to Support 2013 IOC Copyright 2011 Boeing. All rights reserved. 4

State of the Art Capabilities Air Refuel Receptacle Stores Management System Acoustics INMARSAT Mission Set Anti-Submarine Warfare (ASW) EO/IR (MX-20HD) s Armed Intelligence, Surveillance and Reconnaissance (ISR) Anti-Surface Warfare (ASuW) Radar (APY-10) EWSP Sea control Targeting and strike support 5 Mission Stations CFM56-7B Engines ESM Command, control and communications Copyright 2011 Boeing. All rights reserved. 5

Platform Heritage Leverages production efficiencies and performance of the Boeing Next-Generation 737 5,756 orders for 133 diverse customers worldwide; 3,655 aircraft delivered d Proven track record Continuous innovation Industry-leading reliability and operating costs Copyright 2011 Boeing. All rights reserved. 6

In-Line Production Spirit AeroSystems P-8 fuselage Boeing (Renton Factory) Wings, empennage, aircraft assembly, engine installations Boeing (Boeing Field) Mission systems installation and checkout First in industry with in-line production process Copyright 2011 Boeing. All rights reserved. 7

Commercial Derivative Efficiencies Benefits of an established commercial production system Robust manpower/training certification program Industrial agility across supply chain Commercial support systems infrastructure Copyright 2011 Boeing. All rights reserved. 8

Performing to Plan T2 T5 T1 T3 T4 T6 2010 2011 New Production Facility Opens Static Testing Complete LRIP-1 Contract Award P-8I Final Assembly Copyright 2011 Boeing. All rights reserved. 9

Moving Into Production P-8A LRIP 1 P-8I Final assembly of first P-8A and P-8I production aircraft underway P-8A March 2011 P-8I May 2011 Copyright 2011 Boeing. All rights reserved. 10

Flight Test Progress Entered Test Program 4Q09 3Q10 3Q10 Significant Clean/stores GVT Acoustic subsystem testing Radar system testing Accomplishments Flutter Envelope expansion Fuel system verification Comm system testing ASW testing Stores release testing Copyright 2011 Boeing. All rights reserved. 11

Major Program Events June 2004 Systems Development and Demonstration contract award December 2004 High-speed wind tunnel tests November 2005 Preliminary Design Review June 2007 Critical Design Review Fourth quarter 2009 Flight test start August 2010 Milestone C approval First quarter 2011 Static testing complete First quarter 2011 LRIP-1 contract award 2012 IOT&E 2013 Initial Operational Capability 2015 Increment 2 fleet introduction Copyright 2011 Boeing. All rights reserved. 12

Comprehensive Support System Service Engineering Chief Mechanic Service Engineering Fleet Support Center Supply Support Leverage commercial commonality Synergy with P-8A Technical Publications Leverage Commercial and P-8A Operator / Maintenance Manuals Commercial Formats and Revision i Schedules PHS&T Commercial Best Practices Training Pilot Mission Operator Maintenance Computing Resources Access to Technical Data GHMS S/W Support System Manpower and Planning On-Site Field Service Rep. Manpower/Personnel Guidance Operational Support Plan Guidance Maintenance Planning Two level O & D Maintenance Scheduled Maintenance Plan Maintenance Planning Document Ground Support Equipment Commercial Commonality Facilities Copyright 2011 Boeing. All rights reserved. 13

Integrated P-8A Training System Pilot, Aircrew & Maintenance Training High fidelity training Maximize readiness training performed in ground-based training systems Realistic and repetitive Training system concurrency Training solution designed to maintain P-8A training device concurrency with aircraft by using P-8A flight and mission software Reduced P-8A total ownership costs Reduce flight hours and expendables by training in ground based training system 70% P-8A Simulator Based Training Continuum Copyright 2011 Boeing. All rights reserved. 14 153783-10.ppt TSS Hello Brief 14

P-8A Capability Roadmap NEXT PHASE OF CAPABILITY: Multi-static Active Coherent (MAC) Automatic Identification System (AIS) Aircraft Rapid Capability Insertion (ARCI) Tactical Operations Center updates High Altitude ASW FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 P-8 Integration AAS Future Series Modification (TBD) NR implementation, ASuW Weapon, A4 Arch Upgrade Development / Integration System Test Integrated Test MAC, AIS, ARCI, TOC, High Alt ASW Increment 1 IOT&E FOT&E FOT&E FOT&E P-8 Baseline P-8 Fleet Configuration Copyright 2011 Boeing. All rights reserved. 15

Long-Range Maritime Patrol International Market Sales potential for an additional 100 aircraft Norway Canada U.K. Germany Spain Portugal Italy Greece Korea Japan Saudi Arabia India Taiwan Thailand Brazil Chile Argentina South Africa Australia New Zealand Copyright 2011 Boeing. All rights reserved. 16

P-8I Boeing to provide 8 P-8I aircraft to Indian Navy Contract includes provisions for additional 4 aircraft Significant accomplishments: July 2010 - FDR completed Dec 2010-1 st aircraft build initiated May 2011 - Final assembly underway Copyright 2011 Boeing. All rights reserved. 17

P-8 Australia Australia signed MOU with U.S. Navy to collaborate in Increment 2 Joint Program Office established at NAS Pax River Currently in discussions for follow on development and product support Copyright 2011 Boeing. All rights reserved. 18

Facilitized for the Future A TOWER Portable Offices PCA PCA Test Support Static Test Fatigue Test ASAT 7 S & I ASAT 8 Barge LR Shipside Barge Final Assembly Barge Barge Clear Zone for AP Moves Stores Tool Room Copyright 2011 Boeing. All rights reserved. 19

The Team Copyright 2011 Boeing. All rights reserved. 20

MEDIA TOUR Copyright 2010 Boeing. All rights reserved. Author, Filename.ppt 21