Similar documents
Existing and proposed contours at 1-foot intervals. The fill and/or excavation quantities in cubic yards.

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

Washington County Road Engineering Plan Submittal/Review Checklist

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CITY OF REEDLEY NEW DEVELOPMENT PLAN REVIEW CHECK LIST

CITY OF SALEM DEPARTMENT OF PUBLIC WORKS ADMINISTRATIVE RULES CHAPTER 109 DIVISION 002 DRAFTING AND DRAWING STANDARDS

City of Massillon Site Plan Checklist

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

PLANNING AND DEVELOPMENT

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

List of Figures. List of Forms

3. DESIGN SPECIFICATIONS

Sewer Line Extension Permit Design Checklist

ACSA PLAN REVIEW CHECKLIST (Guideline Only) (4) Standard water and sewer general plan notes (attached).

SECTION 9.00 AS-BUILT DRAWING REQUIREMENTS SUB-INDEX

Porter County Plan Commission

CHAPTER 11. Plan Standards

Subdivision Application Checklist

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF MUSKEGO DRAFTING STANDARDS

Clarifications in italics added July 2018

SUBMITTAL REQUIREMENTS FOR USE PROCESS III OR PROCESS IV

Anne Arundel County Dept. of Inspections and Permits Water Sewer Plan Checklist

APPENDIX 4. Checklists. Township of King Design Criteria and Standard Detail Drawings

3. The PAC (Permit Application Center) will notify the design professional of plan review results.

PRELIMINARY PLAT CHECK LIST

Minimum Drawing & Electronic Submittal Requirements For Record Drawings /As-Builts

SANITARY SEWER SYSTEM ADMINISTRATIVE STANDARDS A.1 SANITARY SEWER SYSTEM PLAN SUBMITTAL PROCEDURES AND GENERAL REQUIREMENTS

SCHEDULE 10 ENGINEERING DRAWING SUBMISSION

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

Grease Interceptor Design Checklist

B17. Sewer Site Plans BULLETIN

Conceptual, Preliminary and Final Site Plan Review in Holladay City

Town of Westlake Construction Plans Review Checklist

DEVELOPMENT PLAN CHECKLIST

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

10010 RECORD DRAWING INFORMATION

Chapter 13 Plan Submittals

Essential Skills: Reading and Interpreting Maps and Plans

NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STORM DRAIN IMPROVEMENT PLAN REVIEW CHECKLIST

MAJOR GRADING PLAN CHECKLIST

Plan Preparation Checklist

City of Starkville Development Review Committee Infrastructure Drawings Submittal Checklist for Site Plan Applications

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CONCEPT REVIEW GUIDELINES

Minor Site Plan Application and Checklist Land Disturbing Activities

.1 Applicability: These criteria shall be applied as follows:

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

Project Name: County File No.: Checked by: For: Date:

SUBDIVISION APPLICATION FOR DRT SUBMITTAL PUBLIC WORKS DEPARTMENT

Council Policy Engineering Drawing Submission Requirements

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division SANITARY SEWER IMPROVEMENT PLAN REVIEW CHECKLIST

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

APPLICATION FOR SITE PREPARATION PERMIT

KC Water Rules and Regulations For Water Main Extensions and Relocations

Plan Submittal and Review Checklist

Grading, Erosion and Sediment Control (GESC) Checklist

B-PERMIT PLAN CHECK MANUAL

Construction Documents (CDs) Checklist

STATE UNIVERSITY CONSTRUCTION FUND

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

MINOR SITE PLAN APPLICATION COVER SHEET

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

Please type or print legibly using blue or black ink. Incomplete applications cannot be accepted. Project Information. Address or Location:

Application for Site Plan Review

SECTION SITE SURVEYS

Charlotte County Utilities DESCRIPTION

CITY OF DES MOINES, IA PERMIT AND DEVELOPMENT CENTER 602 Robert D Ray Drive Des Moines, IA Phone:

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

APPENDIX K DEPARTMENT OF PLANNING AND CODE ENFORCEMENT SUBDIVISION APPLICATION CENTER SUBMITTAL CHECKLIST

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Oil-Water Separator Design Checklist

DRAFTING STANDARDS 9.00 DRAFTING STANDARDS

1 MUNICIPAL INFRASTRUCTURE

Town of Skowhegan Application For Development Review

Site Plan/Building Permit Review

SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS

Babcock Ranch Water Utilities as operated by Town & Country Utilities and Babcock Ranch Irrigation

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

Section 101. Street Design

PART 4 STANDARD DRAWINGS FOR CONSTRUCTION

Major Site Plan Application

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

DEPARTMENT OF COMMUNITY DEVELOPMENT SITE PLAN INFORMATION

MINOR SUBDIVISION. [ ] [ ] [ ] [ ] B. Dimensions, bearings and curve data for all property lines and easements.

September 21, Mannik Smith Group 1771 North Dixie Highway Monroe, Michigan RE: LA Fitness City File No.: CVLP

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

Lincoln County Public Works Water and Sewer Submittal Application

Mailing Address: Fax number: City: State: Zip: Property Owner: City: State: Zip: City: State: Zip:

Planning Permit Application LAND USE PRELIMINARY APPLICATION (LUP)

MILL HILL ARTS VILLAGE

Transcription:

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION (please print neatly) NAME OF APPLICANT: EMAIL: SUBJECT PROPERTY INFORMATION ADDRESS OF PROPERTY: In order to construct or extend utilities, you must submit a completed permit application and all items on this checklist unless modified or waived by Staff. A. APPLICATION N/A Provided Staff 1. Provide a complete and signed (by owner or authorized representative) application and applicable fee. Note: Payment of the plan check fee is required at the time of application. 2. Provide three copies of all plans and two copies of all specifications. Draw plans to scale of 1 = 10 to 60. Plan sheet size shall be 24 x36. All notations and drawings must be clear and legible. B. ENGINEERING PLAN REQUIREMENTS N/A Provided Staff 1. Show: a. Vicinity map. b. Legend (APWA standard symbols). c. North arrow. d. Scale bar. e. Datum (NVGD 29) Bench mark elevation and location (on all sheets where elevations are referenced). f. Title block: - Title: - Design by: - Drawn by: - Date: - Checked by: - Signature approval block (see example at end): - Sheet number of total sheets (all sheets, i.e., 1 of 20, 2 of 20, etc). g. Section, township and range (every plan/profile sheet) ¼, ¼ section. h. Engineer s stamp (signed and dated). i. Project title (cover sheet). Updated 12/29/2014

B. ENGINEERING PLAN REQUIREMENTS (CONTINUED) N/A Provided Staff j. Utility system plan (showing all proposed utilities on one drawing). k. Revision block. l. Site plan and Grading Permit TUM #, all sheets. m. Centerline, stations and offsets. n. Proposed survey monumentation locations and details. o. Sidewalk and width. p. Roadway sections with dimensions (existing and proposed). q. Existing utilities (above and below ground). r. Adjacent property lines, ownership, parcel number and street address. 2. Identify street names, right-of-way, lots. 3. Provide match lines. 4. Show easements, width and type. 5. Please note on the plans that the PLS responsible for the surveying of the project must obtain a permit from DNR before any monuments are disturbed. 6. Show right-of-way dimensions (existing and proposed). 7. Define survey baseline. 8. Show: a. Stations and offsets for structures. b. Flow direction arrows. 9. Show on profile portion: a. Profile grades (decimal FT/FT) (percent). b. Existing ground. c. Scale (horizontal and vertical) (matching grid lines). d. Stationing. e. Vertical elevation increments. f. Existing utilities (if available). 10. Provide: a. Detail sheet(s). b. General notes. c. Sheet index. d. Field verify note on DWG Expose connection points and verify fittings 48 hours prior to distributing shut-down notices. e. Call Before You Dig note: 800-424-555 or 811 (cell). C. SANITARY SEWER REQUIREMENTS N/A Provided Staff 1. Show on plan view: a. Station at each manhole (300-foot maximum spacing). b. Manholes numbered. Updated 12/29/2014 Page 2 of 8

C. SANITARY SEWER REQUIREMENTS (CONTINUED) N/A Provided Staff c. Manhole type designation and size. d. Flow direction (with arrow on pipe). e. Distance from water mains. f. Service to each lot (station laterals). 2. Show on profile view: a. Manholes numbered. b. Invert elevation showing direction, in and out. c. Rim elevation. d. Grades shown (decimal from FT/FT) (minimum slopes). e. Type of pipe. f. Size of pipe. g. Length of pipe (in LF). h. Existing utilities. 3. Provide: a. Detail sheet(s). b. General notes. D. WATER MAIN REQUIREMENTS N/A Provided Staff 1. Provide system map (1 = 300 ) showing existing and proposed with line size, valves, and hydrants. 2. Show on plan view: a. Existing utility conflicts. b. Fixtures (need horizontal and vertical control). c. Fire hydrants (per Building Official). d. Blow-off (at end of line). e. Tees, crosses, elbows, adapters and valves need coupling type, meter locations, stationing, offsets. f. Valves (2 each tee, 3 each cross). g. Fire Department connection. h. Thrust blocking required at all PIV, DCVA fittings. i. Distance from sewer main. j. Service to each lot (include open tracts), irrigation meters. 3. Show on profile view: a. Existing utility crossings. b. Show fixtures (tees, crosses, valves, couplings, hydrants) (stationing and offsets). c. Size and material type of water main. d. Length of water main (in LF). Updated 12/29/2014 Page 3 of 8

D. WATER MAIN REQUIREMENTS (CONTINUED) N/A Provided Staff e. Cover over pipe (42-inch standard). f. Street design to insure sufficient cover of future street. 4. Provide: a. Detail sheet(s). b. Water general notes. E. STORM SEWER REQUIREMENTS N/A Provided Staff 1. Provide the following for Drainage and Erosion Control Plan Report: a. Cover sheet. b. Table of contents. c. Section 1 Proposed project description. d. Section 2 Existing conditions. e. Section 3 Infiltration rates / soils report. f. Section 4 Wells. g. Section 5 Fuel tanks. h. Section 6 Sub-basin description. i. Section 7 Analysis of the 100-year flood. j. Section 8 Aesthetic considerations for facilities. k. Section 9 Downstream analysis. l. Section 10 Covenants, dedications, easements. m. Project engineer s certificate. n. Facility summary form. 2. Provide the following for the Erosion Control Plan Report: a. Section 1 Construction sequence and procedure. b. Section 2 Trapping sediment. c. Section 3 Permanent erosion control and site restoration. d. Section 4 Geotechnical analysis and report. e. Section 5 Inspection sequence. 3. Show on drawings and specifications: a. Sub-basin boundaries. b. Off-site area tributary to project. c. Contours. d. Flow path. 4. Show on site map: a. Existing topography at least 50 feet beyond site boundaries. b. Finished grades. c. Existing structures within 100 feet of project boundary. Updated 12/29/2014 Page 4 of 8

E. STORM SEWER REQUIREMENTS (CONTINUED) N/A Provided Staff d. Utilities. e. Easements, both existing and proposed. f. Environmentally sensitive areas. g. 100-year floodplain boundary. h. Existing and proposed wells within 200 feet of proposed storm facility. i. Existing and proposed fuel tanks. j. Existing and proposed on-site septic systems within 100 feet of storm facilities. k. Proposed structures including roads and parking surfaces. l. Proposed drainage facilities and sufficient cross-section details and dimensions to build. 5. Show on conveyance system plan view: a. Station and number at each manhole/catch basin. b. Manhole/catch basin type and size. c. Manhole/catch basin rim elevation. d. Flow direction with arrow on pipe/channel. e. Type and size of pipe. f. Length of pipe in lineal feet. 6. Show on conveyance system profile view: a. Station, offset and number at each manhole/catch basin. b. Rim elevation c. Invert in and out. d. Length of pipe in lineal feet. e. Grades (FT/FT) (percent). f. Design velocity. 7. Show on work map: a. Unit areas (including off-site contributing areas). b. Percentage impervious. c. Average slope. d. Conveyance date, identifier (for reference to model output), length, slope, inverts. e. Overland flow paths and distances. f. Soil types. 8. Show on erosion control drawing: a. Soil types. b. Location of soil pits and infiltration tests. c. Construction entrance detail. Updated 12/29/2014 Page 5 of 8

E. STORM SEWER REQUIREMENTS (CONTINUED) N/A Provided Staff d. Silt fences and traps. e. Mulching and vegetation plan. f. Clearing and grubbing limits. g. Existing and finished grade. h. Details and locations of all BMPs recommended. i. Location and details of temporary sediment ponds. F. STREET REQUIREMENTS N/A Provided Staff 1. Show on plan view: a. Flow direction arrows at curb returns showing grade. b. Spot elevations on curb returns. c. Station PC, PT, PI and intersections. d. Curve information delta, radius, length and tangent. e. BCR and ECR (Begin Curb Radius, End Curb Radius) station/offsite. f. Identify all field design situations. g. Typical sections. h. Pavement marking details with station and offset. i. Sidewalks: - Driveway entrances/station/width, material (AC,PCC)/driveway type. - Handicap ramps detail and type. 2. Show on profile view: a. Vertical information VPI, BVC, EVC, AP, low point, high point. b. Show grades in decimal form or percent with (+ or -) slope. c. Super elevated roadways: - Detail show transitions. - Special detail showing gutter flowing adequately. 3. Provide: a. Detail sheet. b. Street general notes. c. AASHTO Street Design Worksheet, with soils report, if applicable: d. Signing temporary and permanent. e. Channelization. f. Location of cluster mailboxes. g. Location of school bus (and/or IT) bus shelter/pad. G. STREET LIGHTS N/A Provided Staff 1. Provide: a. Station and offset to fixtures. Updated 12/29/2014 Page 6 of 8

G. STREET LIGHTS (CONTINUED) N/A Provided Staff b. Pole type, including manufacturer and model number. c. Mounting height, arm length, anchor bolt size and pattern. d. Power source: - Wire size, type, conduit. - Line loss calculations. e. Luminaire type, lamp wattage. f. Location of service disconnects (five-percent max voltage drop from source to farthest luminaire). g. J-Box location (include station and offset). h. Detail sheet. i. Lighting general notes. H. STREET SIGNALS N/A Provided Staff 1. Provide: a. Station and offset to signal base, cabinets, ped lead loops, etc. b. Wiring schedule: - Signal heads and mounting assembly. - Detection loops. - Opticom. - Control cabinet, size and layout. - Power source. - Conduit. - Wire size and type. c. Construction notes. d. J-Box schedule. e. Pedestrian signal type with push button. f. Controller type, configuration, and wiring schematic. g. Detail sheets. h. Lighting general notes. I. COMMUNITY DEVELOPMENT ENGINEERING PLAN CHECK FEES - ON-SITE AND OFF-SITE Streets, curbs, sidewalks, # of linear feet: Street lighting, # of linear feet: Street signal, # of intersections: Water main, # of linear feet: Sewer main, gravity, # of linear feet: Updated 12/29/2014 Page 7 of 8

I. COMMUNITY DEVELOPMENT ENGINEERING PLAN CHECK FEES - ON-SITE AND OFF-SITE (CONTINUED) Sewer main, pressure, # of linear feet: Sewer pump station, public, # of stations: Storm pipe, # of linear feet: # of Storm water systems:, # of acres: and # of Storm Water Reports: J. ADDITIONAL ITEMS N/A Provided Staff 1. Submit Right-of-Way permit application and checklist. 2. Submit Latecomer s Agreement permit and application and checklist. 3. Submit existing Easement (public or private) documents. 4. Provide cost of improvements in right-of-way. 5. Complete bond process. K. ELECTRONIC SUBMITTAL N/A Provided Staff 1. Compact disc (CD) or USB drive containing all of the plans, reports, etc. as outlined under A through J above, in PDF-file format. Maximum format shall be 300 dpi. Note: Please do not include the application or submittal checklist in electronic format. EXAMPLE OF SIGNATURE APPROVAL BLOCK FOR THE CITY OF TUMWATER By: CITY ENGINEER Date: EXPIRES ONE YEAR FROM ACCEPTANCE DATE I verify that all required documents associated with this application have been submitted. Signature of Applicant/Representative Date Updated 12/29/2014 Page 8 of 8