HR175 Sash Replacement Kit Installation Instructions

Similar documents
Aluminum Clad Wood Window Field Mulling and Stacking Instructions

Wood Hinged Patio Door Installation Instructions

IMPORTANT: Please read completely before you begin.

Tilt and Slider Replacement Window Installation Instructions

Casement Replacement Window Installation Instructions

IMPORTANT: Please read this supplement and your unit installation instructions before you begin.

Fixed Upper Sash Replacement Guide for Andersen 400 Series Woodwright Springline Single-Hung Windows

Sash Replacement Guide for Andersen 400 Series Tilt-Wash Transom Windows

IMPORTANT: Please read before you begin installation.

All Window Installation Instruction

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION PELLA PRECISION FIT AND RENOVATION POCKET REPLACEMENT DOUBLE-HUNG VENT WINDOW

WINDOW REPLACEMENT INSTRUCTIONS FOR CASEMENT, DOUBLE-HUNG AND CLAD FRAME WINDOWS USING FRAME SCREWS

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

T he Double-Hung Replacement System replaces the sash and balance system of an older double-hung window. The

IMPORTANT: Please read before you begin.

Single Hung Tilt and Double Hung Tilt Window Installation Instructions

Installation Guide for E-Series/Eagle Clad Mechanically Fastened Windows

Eagle clad double-hung window installation instructions

INTERIOR. Checkrail. Flashing tape

Weather Shield Telescoping Sliding Patio Door Installation Instructions

Installation Guide for Andersen 400 Series Tilt-Wash Transom Windows with Stormwatch Protection (PG Upgrade) Manufactured After 2006

Sash Replacement Guide for Andersen Impact Resistant Casement Windows

Vinyl Windows and Doors

Vinyl Windows and Doors

INSTALLATION INSTRUCTIONS - INSTRUCCIONES PARA LA INSTALACIÓN CLAD WINDOWS WITH FLUSH FLANGE

Vinyl Hinged Door Installation Instructions Structure With Weather Resistant Barrier Applied Before Door Installation

Installation Guide for Andersen 400 Series Tilt-Wash Transom and 200 Series Narroline Transom Windows

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

INSTALLATION INSTRUCTION FOR CLAD BOW WINDOWS WITHOUT HEAD AND SEAT BOARD

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

INSTALLATION GUIDE WOOD PIVOTING CIRCLE/ OVAL

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR CLAD SLIDING PATIO DOOR PUERTA CORREDERA PARA PATIO

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Guide for Andersen Frenchwood Patio Door Sidelights and Transoms

INSTALLATION INSTRUCTION FOR WOOD DOUBLE-HUNG AND CASEMENT WINDOWS USING WOOD BRICKMOULD OR FLAT CASING

Panel Assembly and Installation

WOOD OUT SWING AWNING, CASEMENT, & HOPPER WINDOW

INSTALLATION INSTRUCTIONS FOR REPLACEMENT FORGENT WOOD GLASTRA WINDOWS RECOMMENDATIONS FOR COMMON INSTALLATION OF ALL REPLACEMENT WINDOWS.

NEW CONSTRUCTION PATIO DOOR INSTALLATION INSTRUCTIONS (WITH NAILING FLANGE)

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTION INSTRUCCIONES DE INSTALACIÓN FOR CLAD HINGED PATIO DOOR PUERTA DE BISAGRA PARA PATIO

Installation Guide. for Andersen 400 Series Tilt-Wash Picture Windows with Stormwatch Protection (High-Performance Impact Resistant Glass)

PREMIER V Picture Window Cast In Place

Read guide from beginning to end before starting installation. Read all warnings and cautions during unit installation.

INSTALLATION INSTRUCTIONS for Custom and Premium Pocket Windows (JII022) IMPORTANT INFORMATION AND GLOSSARY SAFETY AND HANDLING

Vinyl Windows and Doors

Installation Instructions

WINDOW REPLACEMENT INSTRUCTIONS FOR SINGLE-HUNG, DOUBLE-HUNG, CASEMENT, AWNING INTO EXISTING CASEMENT FRAME USING FRAME SCREWS

Installation Guide for Architectural Wood Hinged Windows

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

FOLDING DOOR - FOR FACTORY ASSEMBLED JAMBS WITH APPLIED SILL

INSTALLATION INSTRUCTIONS - INSTRUCCIONES DE INSTALACION FOR HURRICANESHIELD IMPACT-RESISTANT DOUBLE-HUNG, SINGLE-HUNG AND SIMULATED-HUNG

Contemporary 3 Panel Classic 5 Panel French Panel

Installation Instructions

VINYL WINDOWS (new construction or replacement) page 2. VINYL PATIO DOORS pages WOOD CLAD WINDOWS (new construction).page 5 WOOD CLAD WINDOWS

Installation Instructions

Installation Guidelines. Next Dimension. Single Hung / Single Hung Fixed / Double Hung / Sliding Window / Fixed Window

INSTALLATION INSTRUCTIONS IMPERVIA SLIDING PATIO DOOR WITH FINS

Installation Guide for Andersen 200 Series Tilt-Wash Picture, Transom and Circle Top Windows

Installation Instructions for Bifold Doors (JII103)

Sash may be heavy. Use a reasonable number of people with sufficient strength to lift, carry, remove and install. Tape broken glass with duct tape bef

Assembled Patio Door Installation Guide 2-Panel Patio Door with Non-Welded Frame

IMPORTANT: Please read completely before you begin.

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

Installation Guidelines For ALUMINUM M-SERIES 3 PANEL SLIDING DOOR

Installation Guide for E-Series/Eagle Ascent 2 or 4 Panel Gliding (Sliding) Patio Doors

Retractable Screen Installation Instructions For Vinyl and Aluminum Clad and Wood In-Swing Hinged Doors (See separate instructions for sliding doors)

INOVO 2-LITE SLIDING PATIO DOOR

Frameless Bypass Slider

for Andersen 400 Series Woodwright Transom over 400 Series Woodwright Double-Hung or 400 Series Woodwright Picture Window

Kinro Metal, Vinyl, Flush Mount and Recessed Fin Windows OEM INSTALLATION MANUAL

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

INSTALLATION INSTRUCTIONS FOR FORGENT SLIDING PATIO DOORS RECOMMENDATIONS FOR COMMON INSTALLATION OF SLIDING PATIO DOORS.

Frameless Inline Door With Return QCI5263

Installation Instructions

READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION

Sliding Glass Door Assembly and Installation Guide

6400, 8400 and 9400 Series Sliding Patio Door

Installation Guide for Andersen 400 Series Gliding Windows

Installation Materials Required: Tools Required: 6" self-adhesive flashing. Shims. 3-foot level 6-foot level Tape measure 1/8" drill bit

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Installation Guidelines For Quaker Window Products Aluminum flange fin sub sill & receptor system using a T mulled twin window unit.

Phone # La Jolla Doors. Block Frame Installation Manual Aluminum Frame with either Vinyl or Aluminum Panels

Double Frameless Swing Door QCI5247

Metal & Vinyl, Flush Mount and Recessed Fin Windows Recommended Installation Instructions

Frameless Inline Door QCI5250

Maintenance and other important non-personal injury and non-material damage instructions or statements that should be observed.

Frameless Heavy Glass Door with Wall Mount Hinges

Non-Reinforced Joining Guide (2-Way Horizontal and Vertical Joining) for Andersen 200 Series Tilt-Wash Double-Hung and Transom Windows

tile redi redi DOOR Redi Redi Swing Slide g TM TM...Opening Doors to Stunning Showers! TM TM SERIES: CONFIGURATION: MOUNTING PACKAGE:

Frameless Inline Door QCI5254

CAUTION - IMPORTANT. IMPORTANT: Please read before you begin installation.

INSTALLATION INSTRUCTION SINGLE PANEL, SINGLE PANEL WITH SIDELIGHT COMBINATION AND 20 MINUTE FIRE RATED WOOD FRAME ENTRY DOOR

Frameless Door QCI5284

3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS

8/7/ HP SWING DOOR INSTALLATION INSTRUCTIONS

Frameless Heavy Glass Door with Header

4-lite Patio Door. Installation Instructions

Frameless Fixed Panel Slider

Transcription:

HR175 Sash Replacement Kit Installation Instructions IMPORTANT: Please read before you begin.

Weather Shield HR175 Sash Replacement Kits Important: Thoroughly read and follow these instructions, failure to install as recommended will void any warranty, expressed or implied. The following instructions are based on typical frame construction. For installation other than shown, contact your dealer. Tools Required: Safety Glasses Tape Measure Carpenter s Level Hammer Screwdrivers (Flat and Phillips) Pliers Putty Knife or Pry Bar Hand Saw Gloves Materials Required: High-quality Exterior Silicone Caulk Finish Nails #8 x 2¹/₂" Phillips Pan Head Screws (If installing sash lugs) Recognize this symbol. This is the Safety-Alert symbol. When you see this symbol be alert to the potential for personal injury or product damage. SAFETY INSTRUCTIONS Read installation instructions completely before beginning a procedure. CAUTION Wear gloves, safety glasses, goggles or eye shields appropriate to procedure. DANGER Falling from window openings may result in severe injury or death. Do not leave openings unattended when children are present. WARNING Weight of window and door unit(s) and accessories will vary. Use a reasonable number of people with sufficient strength to lift, carry and install window or door unit(s) and accessories. Always consider site conditions and use appropriate techniques when lifting. WARNING WARNING CUT HAZARD Non-safety glass. May cause serious injuries if broken. Do not install where tempered safety glass is required. Screen will not stop child from falling out window. Keep child away from open window. Weather Shield reserves the right, as necessary, to change product specifications, installation procedures, materials, prices and terms of purchase without notice. Check building codes for the area in which the windows are being installed before installation to insure proper compliance.

6 1 8 9 11 20 23 17 12 19 5 13 14 15 18 16 22 4 24 10 7 3 2 21 Parts List: 1. (1) - Top Sash Stationary 2. (1) - Bottom Sash 3. (2) - Cam Pivot Pin (Attached) 4. (1) - Left Vinyl Jamb Liner 5. (1) - Right Vinyl Jamb Liner 6. (1) - Head Stop 7. Vinyl Jamb Liner Bracket (Qty. Varies Per Unit Size) 8. (2) - Vinyl Sash Stop 9. (2) - Top Jamb Liner Foam Gaskets 10. (2) - Bottom Jamb Liner Foam Block 11. (2) - Sash Filler Block 12. (2) - Bottom Sash Filler Block 13. (6) - Stationary Sash Bracket 14. (18) - #8 x ⁷/₈" Phillips Pan Head Screw 15. (1) - Check Rail Weather Strip 16. (2) - Sash Retainer Plates (Attached) 17. (2) - Sash Lug 18. (6) - #7 x ³/₄" Phillips Flat Head Screw 19. (1) - Screen 20. (1) - Screen Channel with (3) - #4 x ¹/₂" Phillips Flat Head Screw (Attached) 21. (2) - Finger Pull 22. (2) - Sash Lock 23. (2) - Sash Keeper 24. #8 x 7/8" Phillips Pan Head Screw (Qty. Varies Per Unit Size) 1

FIGURE 1 Inside Stop Moldings Removing Existing Sash 1. Remove the inside stop mouldings from the side jambs using a putty knife or pry bar. Do not break or damage these pieces as they may be reused (FIGURE 1). 2. Cut out all cords and weights (or spring balances) and lift out bottom sash. Pry Bar FIGURE 2 Top Parting Stop Pry Bar 3. After removing bottom sash, slide the top sash down to the sill and remove the parting stop from the head jamb (FIGURE 2). 4. Remove the parting stops from both side jambs (FIGURE 2). 5. Cut cords and remove the top sash. Side Parting Stop 6. Remove weights and insulate cavity, if desired. FIGURE 3 7. Check the sill of the opening, in which you are installing the window, for level and measure the opening diagonally from corner-to-corner to check for square (FIGURE 3). Check frame for squareness. Be sure head, jambs and sill are not bowed. 2

FIGURE 1 FIGURE 2 Blind Stop Lower Sash Filler Block Installing Stationary Sash 1. Caulk along entire length of blind stop and cross head (FIGURE 1). 2. Butt lower sash filler block against blind stop and attach to jambs with finishing nails (FIGURE 2). FIGURE 3 Height of Stationary Sash Caulk Along Blind Stops and Head Top of Lower Sash Filler Block Mark on Jamb Blind Stop Lower Sash Filler Block Sill 3. Measure the height of the stationary sash. (FIGURE 3). Lower sash filler blocks must hold stationary sash tight against head when installed. Compare the top of the lower sash filler block to the measurement taken from stationary sash. Any difference must be made up at the top of the stationary sash (FIGURE 3). Compare the width of the stationary sash to the width of the frame. Any difference between the sash and the frame must be made up at the sides of the stationary sash, with equal amounts on each side (FIGURE 3). Width of Frame FIGURE 4 2" From Bottom 4" From Top Upper Sash Filler Block #8 x 7/8" Screws Sash Bracket FIGURE 5 4. Stationary sash brackets are to be installed to each upper sash filler block. Locate one bracket 4" below top of sash, or lower to be sure not to interfere with existing rollers. Then locate second bracket 2" above bottom of sash and space the remaining brackets evenly between the two (FIGURE 4). Drill pilot holes and attach brackets to upper sash filler block with #8 x ⁷ ₈" phillips pan head screws (FIGURE 5). 5. Caulk top ends of both lower sash filler blocks (FIGURE 2). 3

FIGURE 6 Stationary Sash Sash Lug #8 x 7/8" Screws 6. Position top sash above lower sash filler blocks. Butt top sash against blind stop and attach to jambs with #8 x ⁷ ₈" screws through sash brackets (FIGURE 6). 7. Install sash lug flush with screen channel on lower sash filler block and tight against stationary sash. Fasten using one #8 x 2¹/₂" screw (FIGURE 6). Lower Sash Filler Block #8 x 7/8" Screws Jamb FIGURE 1 1" Below Head Jamb Side Jamb 2" Above Sill 1-1/8" Centerline From Recessed Section of Filler Block #8 x 7/8" Screws Vinyl Jamb Liner Brackets Installing Operating Sash Hardware 1. Butt the extended foot of jamb liner bracket against filler blocks (FIGURE 1). Locate one 1" below the head jamb, one 2" above the sill, and space the remaining brackets evenly along jamb making sure not to position vinyl jamb liner brackets over stationary sash brackets. Attach vinyl jamb liner brackets to jamb using #8 x ⁷ ₈" phillips pan head screws (FIGURE 1). The centerline of each jamb liner bracket must be located 1¹/₈" from and parallel with the recessed section of the filler blocks. FIGURE 2 Foam Gasket Sash Stop 2. Place the sash stop and foam gasket at the top of each vinyl jamb liner. Place bottom jamb liner foam block into the bottom of each vinyl jamb liner (FIGURE 2). Vinyl Jamb Liner Top Vinyl Jamb Liner Bottom Foam Block 4

FIGURE 3 3. Place vinyl jamb liner against brackets and snap into place (FIGURE 3). Snap Vinyl Jamb Liners Into Place 4. Place the head stop into the head jamb and secure with small finishing nails (FIGURE 4). FIGURE 4 Head Stop FIGURE 2 Sash Retainer FIGURE 1 Installing The Operating Sash 1. Sash retainers must be disengaged before the sash can be installed. Remove the two outermost screws (one per retainer). Loosen four innermost screws (two per retainer) and slide retainer toward center of sash. Retighten four screws to secure the retainer to the sash (FIGURE 1). 2. Engage left corner pivot pin (FIGURE 2) into cam then lift right corner until pivot pin can clear jamb liner and move right corner of sash toward frame until pivot pin enters cam (FIGURE 3). FIGURE 3 90 5

FIGURE 4 3. Grasp top of sash and pivot toward frame. Gently push sash into vinyl track while sliding sash down. Sash is now in vinyl tracks and should operate smoothly (FIGURE 4). FIGURE 5 Important: When operating sash, sash retainers must be engaged into jamb liner. Sash Retainer 4. Loosen four innermost screws of sash retainers and slide retainers outward until they enter vinyl jamb liner (FIGURE 5). 5. Retighten four innermost screws and replace outermost screws to secure sash into track (FIGURE 5). Operating Sash Tilt and Removal WARNING When removing or tilting sash in and returning to closed position while standing on a ladder or step stool, be careful not to lose your balance. Important: Sash retainers must be disengaged before the sash can be tilted. Sash retainers must be engaged into jamb liner before operating sash. 1. To tilt or remove the operating sash, reverse the steps in Installing The Operating Sash on page 5. Disengage the sash retainers Pull top corner of sash out on one side while pushing the vinyl jamb liner away from sash. Repeat for the opposite side. Caution! The tilt window allows for the complete removal of the sash from the frame. Sash are heavy and caution should be used when removing. For large sash it is recommended that the sash be removed with two (2) people. 6

FIGURE 1 Aluminum Screen Channel Bottom Sash Filler Blocks To remove the bottom sash, tilt sash in so it is at right angles to the window frame. Do not rotate past 90. Grasp the sash firmly on both sides near the bottom and lift one side straight up to disengage the sash pin. Lift the opposite side up and out of the liner. To re-install the sash back into the frame, follow the steps in Installing The Operating Sash. Half Screen Installation Instructions Note: Half screens are attached to the bottom sash filler blocks with plungers located on the vertical sides of the screen. While disengaging plungers, tilt the top of the screen up into the aluminum screen channel and position screen tight against bottom sash filler blocks and sill (FIGURE 1). 7

Recommended Finishing Instructions Exterior Clean the exterior surface with mild soap and water. Hard to remove stains and mineral deposits may be removed with mineral spirits. Do NOT use abrasives. Do NOT scrape or use tools that might damage the surface. Do NOT paint, stain or varnish any vinyl or aluminum surface or weather stripping. Interior For best results, the interior wood should be sealed within 30-days of installation. Remove all construction residue before finishing. 1. Lightly sand surfaces being finished with 180 grit or finer sandpaper. Be careful not to scratch the glass. 2. After sanding, clean-off sanding dust from surface using lacquer thinner applied to a cloth so the cloth is slightly damp. Let surface dry. 3. If painted surface is desired, use only oil-based primer coats. Use compatible oil- or water-based finish coats. Refer to the manufacturers instructions. 4. Prime the products on all sides of the wood components not permanently installed at the factory. This helps prevent end splitting, warping or checking. 5. Once primed, apply two (2) coats of paint (again on all exposed sides) to each item. 6. If a stained surface is desired, use only oil-based stain and sealer for the first coat. Clear top coats may be oil- or water-based. Apply desired stain to the manufacturers instructions and let dry. 7. Apply one (1) coat of sealer to the surface and let dry. Caution! If no sealer is applied over the stain, the wood will weather very rapidly and defects will occur. 8. Lightly sand with 180 grit sandpaper. Clean off sanding dust and wipe with a tack cloth. 9. Apply one (1) coat of desired finish to surface and let dry. 10. For any additional coats of finish, repeat steps 8 and 9. 8

Exterior Insulation and Finish Systems (EIFS) and Similar Systems: Serious concerns have been raised about excessive moisture problems in houses and other buildings that have Exterior Insulation Finish Systems, commonly referred to as EIFS or Synthetic Stucco. Many experts agree that some amount of water or moisture can be expected to enter almost any building exterior system. The building system should allow such water and moisture to escape or weep to the exterior, so no harm is done. However, some EIFS systems may not allow water or moisture that penetrates the wall system to weep to the exterior. This can cause excessive moisture to accumulate within the wall system, which can cause serious damage to wall and other building components. It has been reported that so-called barrier EIFS systems are particularly prone to this problem. Moisture problems in any type of building structure can be reduced by proper design and construction with appropriate moisture control considerations, taking into account prevailing climate conditions. Examples of moisture control considerations include proper flashing and/or sealing of all building exterior penetration points, use of appropriate materials and construction techniques, adherence to applicable building codes, and general attention to proper design and workmanship of the entire building system, including allowances for management of moisture within the wall system. Determination of proper building design, components and construction, including moisture management, are the responsibility of the building designer, the contractors, and the manufacturer of the exterior wall finish products. Questions and concerns about moisture management issues should be taken up with these professionals. Weather Shield Mfg., Inc. is not responsible for problems or damages caused by deficiencies in building design, construction or maintenance, failure to install our products properly, or use of our products in systems that do not allow for proper management of moisture within the wall system. 9

Form No. 011050 Rev. 2 01/17 Printed in U.S.A. 2017 Weather Shield Mfg., Inc.