LAWN AND GARDEN GREENHOUSE

Similar documents
LAWN AND GARDEN GREENHOUSE

8 x 10 GREENHOUSE. Visit our website at:

Gardman Lean-to Greenhouse Assembly Instructions

Greenhouse Assembly Instructions


GREENHOUSE 6'x8' ASSEMBLY INSTRUCTIONS. (Internal Dimensions) Overall Dimensions (Approx.) L 193 W 200 H cms 97.5" L 76" W 78.

IMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)

Walk-in Greenhouse. Assembly instructions. 8x6. 8x8. 8x10. 8x12. Model GH1399A Model GH1400A. Model GH1402A Model GH1403A. Model GH1405A Model GH1406A

Greenhouse 05 Assembly Instructions 6 x8, 6 x6 and 6 x4

S H E D A S S E M B L Y I N S T R U C T I O N S

GrowSpan Estate Pro I Greenhouse

E N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS

Assembly instructions. 6x4. Model GH1354A. 6x6. Model GH1357A. 6x8. Model GH1360A. 6x10. Walk-in Greenhouse. Model GH1363A

GREENHOUSE EXTENSION 6 X4

Zero Threshold TM. Hints and Tips Handbook. Birdlip. Burford. Blockley. Bourton

Clopay Models 835/837 Sliding Door System Installation Guide

S H E D A S S E M B L Y I N S T R U C T I O N S

W6 series greenhouse

Walk-in Greenhouse. Assembly instructions. 6x4. 6x6. 6x8. Model GH0490 Model GH0491 Model GH1040. Model GH0492 Model GH0493 Model GH1041

Assembly Instructions 10 X 10 Aluminum Roof Support

Hip Roof Canopy Instructions

Cold Frame Instructions

Version 2016_1.1 VICTORIAN ASSEMBLY INSTRUCTIONS. Victorian Vi-23, 34, 36

Sliding Door Kit

English/French 06/04

Assembly Instructions

Extension Standard building 03/15

WARNING Please refer to all safety notices in the greenhouse manual before assembling any of the sections

Elite Home-Attached Greenhouse

JEEP JK ( 5 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT

GrowSpan Heavy-Duty Commercial Cold Frame

ClearSpan Mini Cold Frames

ClearSpan Mini Grab Bag Shelters

Premium Solar Star Greenhouse

12 Wide Evolution Cedar Partition Assembly Instructions

ClearSpan Mini Grab Bag Shelters

W1610 1/2 10 X 16 SOLARIUM ASSEMBLY INSTRUCTIONS Assembly by more than one person is suggested.

Model No. EP84-A, EP84AR-A, P84L

JEEP JK ( 5 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT

A (mm) B (mm) A (mm) B (mm) 12 x x x ft extension. 8ft extension ft extension ft extension 3720

Assembly Instructions

INSTALLATION INSTRUCTIONS

JEEP JK ( 3 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT

WPS crew Doors Installation instructions

ASSEMBLY INSTRUCTIONS FOR STORETTE STA42

TITAN INDUSTRIAL RACK 6-FOOT TALL / 4-SHELF

Pergola PR100N1. Assembly Instructions. Systems Trading Corporation Customer service: (877)

Taurean Sectional Garage Door INSTALLATION INSTRUCTIONS

8 Wide Evolution Cedar Partition Assembly Instructions

SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF

ASSEMBLY INSTRUCTIONS

W1209 1/2 10 X 12 SOLARIUM ASSEMBLY INSTRUCTIONS

Potting Store Assembly Instructions

ShorePort PWC Lift Instructions " x 138" Sandstone ShorePort " x 138" White ShorePort " x 138" Tan ShorePort

Gazebo GZ620H. Assembly Instructions. Systems Trading Corporation

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

ASCENT & ASCENT XL AFTERMARKET INSTALLATION MANUAL SLIDE-OUT COVER

Spring Loaded All Season Roll-Up Doors

JEEP JK ( 3 DOOR ) SLIMLINE II - FULL TRAY EXTREME RACK KIT

Heavy Duty Ceiling Tilt Mount Installation Manual

Sliding Door Kit

100LB WEIGHT BENCH SET SF-BH6510 USER MANUAL

THE HANDY GARDEN SHED. SNSD-E Owner s Manual

O W N E R ' S M A N U A L

W1610 1/ X 16 SOLARIUM ASSEMBLY INSTRUCTIONS Two or more adults required for assembly

GRANDIO G R E E N H O U S E S. Model GRA-812BR-GR. 8x12 GRANDIO ELITE GREENHOUSE USER MANUAL

Double Truss Shelter Model# SST W9.14xL14.2xH4.88m Assembly Instructions

Parts list. Model:10400

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

Garden Room 2.4m BCGRSM2360 Assembly Instructions

DASHLEY COLLECTION GAZEBO

The Festival Assembly Instructions

Installation Instructions

Model 750 Illustrated Installation Instructions Contractors Wardrobe

Connect Transit Shelter

ASCENT SS & ASCENT SC

ASSEMBLY INSTRUCTIONS FOR "GA" MODULAR BUILDINGS ALL MODELS

Installation Instructions

** Do Not Contact the Store ** For Assistance, including missing or broken parts, Call Customer Service at:

Before Assembling the Storage Wall

x12 GAZEBO ASSEMBLY INSTRUCTIONS

PRODUCT MANUAL 5-IN-1 MITER SAW STATION *SAVE THIS MANUAL FOR FUTURE REFERENCE

Assembly Instructions 10 X 10 Aluminum Frame Building

ClearSpan End Frame Kit 26' Wide x 12' High

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

Extension Standard building 10/14

6 x 6 OCTAGONAL CEDAR GREENHOUSE

VYTEX PREMIUM SLIDING GLASS DOOR. Table of Contents. Precautions and Safety 2. Tools Required...3. Inspect and Prepare Door...4

Sonoma Hardtop Gazebo 10 X 12. Owner s Manual

ROUND TOP RV SHELTER

ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT.

GARAGE DOOR WITH TORSION SPRING

Assembly Instructions

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

Mount to the Wall INSTALLATION MANUAL

W X 12 SOLARIUM ASSEMBLY INSTRUCTIONS Two or more adults required for assembly

x12 GAZEBO ASSEMBLY INSTRUCTIONS

ClearSpan End Frame Kit 30' Wide x 11' High

SUMMERHOUSE PERGOLA ASSEMBLY INSTRUCTIONS. Toll-free: MODEL NO

12 X 18 SOLARIUM ASSEMBLY INSTRUCTIONS

Transcription:

MODEL# OGAL-66 OGrow Walk-in 6' x ' LAWN AND GARDEN GREENHOUSE With Heavy Duty Aluminium Frame

Let'sGrow Together! Thank you for purchasing the OGROW greenhouse Follow the assembly and safety instructions in this manual. If you have any questions, please contact our Customer Service Department Parts List... - Side Walls... 8 Back Wall... 0 Front Wall... Door Frame... Roof and Full Structure... 5 The Door... 7 The Vents... 9 The Panels... PAGE

PARTS LIST PART# PART NAME PART IMAGE QTY. PART# PART NAME PART IMAGE QTY. Corner Beam 7 Front Floor Bar Front Right Roof Beam 8 Vent Stopper Front Left Roof Beam 9 Vertical Door Rail Support Rear Right Roof Beam 0 Left Door Support 5 Rear Left Roof Beam Rear Horizontal Support 6 Right Doorway Support Diagonal Support 7 Left Doorway Support Front Horizontal Support 8 Rear Support Pole- Left Top Door Bar 9 Rear Support Pole- Right 5 Front Diagonal Support 0 Side Support Pole 6 Center Door Bar Roof Support Pole 7 Bottom Door Bar Top Doorway Beam 8 Right Door Support Corner Bracket 0 Vent Side Bar Door Rail Door Slider (Including Rollers) 5 Vent Support Bar Vent Bottom Bar 6 Rear Floor Bar Vent Top Bar PAGE

PARTS LIST PART# PART NAME PART IMAGE QTY. PART# PART NAME PART IMAGE QTY. Side Floor Bar 5 Vent Screw 5 Top Roof Bar 6 Panel Clip 9 6 Gutter Bar 7 Beam End Cap 8 8 Long Door Support Bolt 8 Gutter End Cap 9 Door Frame Spacer 9 Rail End Cap- Right Spanner Wrench 50 Rail End Cap- Left Rubber Seal 5 Vent Brace Bolt 8 5 Nut 8 Door Screw 6 A-I Polycarbonate Panel (See page ) 9 PAGE PAGE

! NOTICE: Read the entire IMPORTANT SAFETY INFORMATION section at the beginning of this document including all text under subheadings before set up or use of this product. PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE. KEEP THEM IN A SAFE PLACE WHERE YOU CAN REFER TO THEM AS NEEDED. The warnings, precautions, and instructions discussed in this manual cannot cover all possible conditions and situations that may occur. The user must understand that common sense and caution are factors which cannot be built into this product, but must be supplied by the user. IMPORTANT SAFETY INFORMATION Assembly/Installation Precautions. Assemble only according to these instructions. Improper assembly can create hazards.. Wear ANSI-approved safety goggles and heavy-duty work gloves during assembly. We recommend that two people together assemble the greenhouse for a smooth and efficient assembly.. This unit contains pieces with sharp edges. The machined edges of the aluminium parts and the ends of the panel clips may be sharp. Handle all parts carefully.. Keep assembly area clean and well lit. 5. Keep bystanders out of the area during assembly. 6. Do not assemble when tired or when under the influence of alcohol, drugs or medication. 8. Build the Greenhouse on a flat and level surface. A concrete foundation is recommended for a high-quality installation. 9. WARNING: The brass bushings inside the Rollers of this product contain lead, a chemical known to the State of California to cause birth defects (or other reproductive harm). (California Health & Safety Code 59.5, et seq.) Use/Service Precautions. This product is not a toy. Do not allow children to play in or climb on this product. Although this greenhouse does include protective covers, there are still some exposed sharp edges. In addition, protective covers may fall off over time. Children must be supervised if allowed near the greenhouse.. SNOW/DEBRIS ACCUMULATION HAZARD. The heavy weight of accumulated snow or other debris can cause parts of this greenhouse to buckle suddenly. Do not allow debris to accumulate on top of the greenhouse. If snowfall is expected, place additional supports (not provided) underneath the Crown (5). NEVER enter a greenhouse with accumulated debris on top.. Use as intended only. The product capabilities only apply to a properly and completely assembled product.. Inspect periodically; replace damaged parts immediately and do not enter greenhouse if parts are loose or damaged. PAGE 5

STARTING TO BUILD! IMPORTANT: READ THE FOLLOWING CAREFULLY BEFORE PROCEEDING: Before you assemble this greenhouse, you must build a proper foundation. You may use your own base of bricks, concrete blocks or treated wood. Whatever foundation you use, ensure that it is square by checking that its diagonal measurements are equal and level, and that the greenhouse is fastened to it securely. If you have made your own base, you will need to drill through the sill of the greenhouse. Your greenhouse needs the proper support of a foundation to help prevent property damage and injury in the event of strong winds or inclement weather. Wind and ground conditions vary from site to site, and the characteristics of your site may affect the practicality and effectiveness of anchoring methods substantially. If you have any doubt regarding the stability of the foundation you are to use, consult a professional. It is always your responsibility to ensure that the greenhouse is properly anchored. Ogrow cannot be held responsible for personal injury, damage to the greenhouse, or other property damage that occurs as a result of improperly anchoring the greenhouse. Check with local authorities to obtain all required building permits and to familiarize yourself with any building codes that may apply. Decide on a location for the greenhouse. The location should optimally be a level, well lit area that is sheltered from the wind and free of overhanging branches. The door of the greenhouse should not open towards the prevailing wind, if possible. Try to locate your greenhouse near a convenient water source to aid you in watering your plants daily. Also, try to build your greenhouse in a location where the soil drains easily so that the greenhouse floor is pleasant to work on. PAGE 6

GETTING READY Construct a base first so that the greenhouse can be immediately mounted and secured when it is completed Find someone to assist you in the assembly. The work is light and should suit any able-bodied person, who can speed up and ease assembly by assisting you. Note that the construction takes time. Work slowly and methodically so that assembly is more accurate and with fewer errors; rushing only leads to needing to undo and repeat steps done erroneously. If this is your first time building a greenhouse it may take a good chunk of a day to complete the construction properly. Prepare the tools you will need: A Drill A Screwdriver A Spanner Part Lay out all the greenhouse parts around the base to ensure that nothing is missing. (See image below.) If any parts are missing, contact us at once so that we can send you the missing parts right away. VENTS BACK WALL ROOF DOOR SIDE WALL FRONT WALL SIDE WALL When you assemble the greenhouse, secure parts loosely where possible and then tighten only when everything is in place. This allows for easy minor adjustments during construction. PAGE 7

ASSEMBLING THE GREENHOUSE PART SIDE WALLS Lay out all the parts needed for the side wall, following the layout shown below. The grooves in the support poles should be facing you. The floor bar and gutter bar should be perpendicular to the floor, with the wider end at the top. Part# Part Name Part Image Qty. 0 6 5 Side Support Pole Diagonal Support Side Floor Bar Gutter Bar Bolt Nut 0 0 5 0 6 6 PAGE 8

Follow the steps below to assemble the Side Walls. NOTE: Each step applies to both relevant wall supports. 0 5 5 0 Slide three bolts into the groove of the support poles part 0. Bolt the support poles to the outside of the floor bar. Bolt the bottom of the diagonal support poles to the inside of the floor bar. 0 6 6 5 5 5 0 5 6 Bolt the top of the side support poles to the outside of the gutter bar. Bolt the top of the diagonal support poles to the inside of the gutter bar. Use the extra bolt in the outer support poles to attach the diagonal support pole across the outer support poles. Repeat the above steps to make the second side wall. PAGE 9

ASSEMBLING THE GREENHOUSE PART BACK WALL Lay out all the parts needed for the back wall, following the layout shown below. Make sure that the roof beams are on the correct sides as the left and right differ; the grooves in the support poles are facing you; and that the floor bar is perpendicular to the floor, with the wider end at the top. Part# Part Name Part Image Qty. Corner Beam Rear Right Roof Beam 5 Rear Left Roof Beam 8 Rear Support Pole- Left 9 Rear Support Pole- Right Corner Bracket Rear Horizontal Support Diagonal Support Bolt 6 5 Nut 6 6 0 05 & 5 9 8 6 PAGE 0

Follow the steps below to assemble the Back Wall. NOTE: Each step applies to both relevant corners/supports. 0 8 0 5 6 5 6 5 Attach the corner brackets to the corner and roof beams. Lay the bracket above the two beams and secure loosely. Bolt the floor bar to the inside of the corner beams, securing at each corner. Secure the support poles to the outer side of the floor bar. Attach the diagonal supports to the inside of the floor bar and support poles, all with the same bolt. 05 8 8 05 5 5 8 5 6 Slide an extra bolt into the groove of the support pole. Then bolt the top of the support poles to the outside of the roof beams using another bolt. On the inside of each corner bracket, attach the diagonal supports to the lowest bolt and the horizontal support to the second-to-lowest bolt. Open the bolts, position the supports, and refasten the bolts. Lastly, use the extra bolt in the grooves of the support poles to secure the horizontal support across the two support poles. PAGE

ASSEMBLING THE GREENHOUSE PART FRONT WALL Lay out all the parts needed for the front wall, besides for parts and 9. Follow the same layout as for the rear wall. (The image below is the outside view, so you must lay the pieces out in mirror image to start with.) Make sure that the roof beams are on the correct sides as the left and right differ; the floor bar is perpendicular to the floor, with the wider end at the top; and that the door frame parts are below the frame parts on the outside. Part# Part Name Part Image Qty. 6 7 7 9 5 8 9 5 Corner Beam Front Right Roof Beam Front Left Roof Beam Right Doorway Support Left Doorway Support Top Doorway Beam Corner Bracket Door Rail Front Floor Bar Vertical Door Rail Support Front Horizontal Support Front Diagonal Support Long Door Support Bolt Door Frame Spacer Bolt Nut 0 9 0 7 6 0 07 06 5 0 & 5 5 7 NOTE: PAGE OUTSIDE VIEW

Follow the steps below to assemble the Front Wall. NOTE: Each step applies to both relevant corners/supports. Note: 0 5 0 Steps - 5 follow the same steps used for the back wall. 0 5 7 Attach the corner brackets to the side and roof beams. Lay the bracket above the two beams and secure loosely. Bolt the floor bar to the inside of the corner beams, securing at each corner 07 5 0 7 07 5 0 5 07 5 5 Secure the support poles to the outer side of the floor bar. Attach the diagonal supports to the inside of the floor bar and support poles, all with the same bolt. Slide an extra bolt into the groove of the support pole. Then bolt the top of the support poles to the outside of the top roof beams using another bolt. On the inside of each corner bracket, attach the diagonal supports to the lowest bolt and the horizontal support to the second-to-lowest bolt. Open the bolts, position the supports, and refasten the bolts. 06 0 6 7 5 07 Bolt the two short horizontal supports to the insides of the support poles. Attach the top doorway beam to the outside of the roof beams, using the top hole in the beam. Next insert a bolt from the outside into the lower hole at each end, securing loosely with a nut. PAGE

Follow the steps below to assemble the Door Frame. Turn the assembled wall over so that the outside is now facing you, to make attaching the door frame easier. 0 0 06 06 Slide the door rail onto the bolt heads, starting on the left until it reaches the right end of the top doorway beam. (Note: when you stand the wall up, the rail will extend on the left of the greenhouse.) When the rail is in place, tighten the two bolts. Insert a bolt into the hole at the end of the door rail, securing with a nut. This will act as a door stop. 5 0 9 9 8 9 5 Attach the vertical door rail support to the end of the door rail that is jutting out of the structure. Secure the bottom of the vertical door rail support to the outside of the roof beam, using the long door support bolt. Slide the door spacer onto the bolt between the two poles, securing the joint with a nut on the inside of the roof beam. PAGE

ASSEMBLING THE GREENHOUSE PART FULL STRUCTURE AND ROOF This section completes the greenhouse frame by joining the walls and completing the roof. At this stage it is best if two people work together. Collect all the parts needed for the roof and keep on the side until necessary. Part# Part Name Part Image Qty. 5 7 8 5 Roof Support Pole Top Roof Bar Beam End Cap Gutter End Cap Bolt Nut 8 5 7 5 8 PAGE 5

Follow the steps below to assemble Full Structure and Roof. NOTE: Each step applies to all relevant corners/supports. 5 6 8 7 5 7 6 5 Attach the gutter end and beam end plastic caps to the ends of the appropriate poles, covering the exposed edges for your protection. Lift the walls and bolt the side floor bars to the inside of the corner beams at each corner. Attach the ends of the gutter bars to the inside of the corner sections on the adjoining walls. The four walls are now connected in a rectangular formation. 5 5 6 5 Bolt the top roof bar to the underside of the roof beams, securing with two bolts - one through each of the roof beams. Repeat at the other end of the roof. 5 0 Attach the roof support poles to the outside of the top roof bar and the gutter bars. Slide an extra bolt into each pole before securing. 6 Lift the greenhouse structure onto the prepared base and secure loosely. Check the frame is square by measuring the diagonals to be equal. Tighten all nuts after making sure the greenhouse is sitting securely on the base. PAGE 6

ASSEMBLING THE GREENHOUSE PART 5 THE DOOR Lay out all the parts needed for constructing the door, following the layout shown. The open sides of parts, 6 and 7 should be facing down. Part# Part Name Part Image Qty. 0 6 7 8 9 50 5 Left Door Support Top Door Bar Center Door Bar Bottom Door Bar Right Door Support Door Slider (Including Rollers) Door Screws Rail End Cap- Right Rail End Cap- Left Bolt Nut 6 8 6 6 7 0 PAGE 7

Follow the steps below to assemble the Door. 0 7 0 Screw through the door side supports into the top door bar, on each side. Repeat for the two center door bars. Attach the bottom door bar as in step. Make sure that the double edge of the bar is the lower edge. 0 8 7 7 8 0 5 Make sure the door seals are in place in the two door side support bars, and trim any rubber that sticks out. Right 9 7 Lift the door into an upright position and ease the bottom bar onto the door track on the front floor bar. Left 50 0 9 Bolt the door slider to the outside of the top door bar. The curved end with the door rollers should stand above the top door bar, with the rollers visible. 06 7 Attach the plastic rail end caps on each end of the door rail. Tighten all the bolts in the door structure so that the door is held firmly and cannot wobble PAGE 8 6 9 8 Slide the door slider onto the door rail, sliding the rollers onto the track.

ASSEMBLING THE GREENHOUSE PART 6 THE VENTS Lay out all the parts needed for constructing the vents, following the layout shown. The greenhouse has two window vents, but instructions are for a singular vent as the procedure for installation is the same. Pay particular attention to the way that each bar should be laid, using the images for guidance. Part# Part Name Part Image Qty. 5 8 0 A-I 5 5 5 Vent Support Bar Vent Stopper Vent Side Bar Vent Bottom Bar Vent Top Bar Vent Panels Vent Screw Vent Brace Bolt Nut 0 0 0 0 PAGE 9

Follow the steps below to assemble the Vents. 0 Slide the vent top bar into the vent side bars, just over the outermost layer. The top bar should be positioned in the lower groove of the side bars. 0 0 0 Insert bolts into the bottom of the two vent side bars, securing loosely. Slide polycarbonate panel E into the slot between the two narrow sheets of the bars, after removing the protective film on both sides. E E 0 0 Attach the vent bottom bar to the outside of the vent side bars, using the bolts inserted in the previous step. The top lip of the bottom bar should slide over the polycarbonate panel, securing it in place. E 0 0 5 0 5 8 5 0 5 5 Turn the vent over and attach the brace to the vent bottom bar, screwing it into the pre-drilled holes. 5 Check that the vent is square by measuring that the diagonals are the same, and then tighten the bolts in each corner. Slide the completed vent into the top roof bar to the space between the two roof support poles. 6 Attach the two vent stoppers to the vent support bar, screwing into the pre-drilled holes. Attach the stoppers so that the projecting piece will stick up into the space of the vent. 7 0 5 Attach the vent support bar under the vent, using the extra bolts in the roof support poles. Check that the bar is flushwith the vent before securing. Repeat the above steps for the second greenhouse vent. PAGE 0

ASSEMBLING THE GREENHOUSE PART 7 INSERTING THE PANELS One at a time, place each transparent panel in its place within the greenhouse frame. Remove the protective film from each side of the panel as you position it. Secure each panel with panel clips, placing a clip wherever there is a marking on the diagrams below. TO ATTACH THE PANEL CLIPS: Using two fingers, apply pressure to the two rounded points of the clip, positioning them under the polycarbonate panel. Make sure the wide center portion of the clip remains visibly on top of the panel. Push the two ends of the clip into the groove in the greenhouse frame. The panel should now be securely in place.

INSERTING THE PANELS ) Start by inserting the roof panels, putting the panels in place on both sides of the roof before moving forward to the next row of roof panels. 5 6 5 Slide the panels into the lowest groove of the top roof bar. Slide the panels below the window vents into the groove of the vent support bar. Make sure the bottom of all the roof panels are positioned above the lip of the gutter bars. ) Continue by inserting the side wall panels, securing each panel with clips before continuing to the next panel. Next insert the back and front panels, and lastly insert the panels of the door. Your greenhouse is now fully secure and functional. Happy Planting!