LUNDIN GOLD UNDERGROUND MINE DEVELOPMENT INTO HARD ROCK AT FRUTA DEL NORTE

Similar documents
Colossus Minerals Development Remains On Schedule for Initial Production In Second Half of 2013

Core Gold 2017 Gold Production

September 2017 PGM:TSX-V

SEMAFO: Good Reconciliation to Reserves Continues at Zone 9

NEW LIBERTY GOLD MINE: GOLD RECOVERIES IMPROVING

Kaizen Discovery prepares to commence exploration program at the Pinaya Copper-Gold Project in Peru. Update on exploration projects in BC and Nunavut

January 11, 2012 #

Fura Gems Flagship Colombian Emerald Mine Begins Production

SEMAFO: Construction of Boungou Mine 91% Complete. Commissioning Advancing to Plan

MASON GRAPHITE PROVIDES LAC GUERET PROJECT AND CORPORATE UPDATE

AMERICAS SILVER CORPORATION PROVIDES FIRST QUARTER PRODUCTION AND COST UPDATE INCLUDING RECORD LOW CASH COSTS AND ALL IN SUSTAINING COSTS

Corporate Presentation August 2015

Beleave Signs Agreement to Acquire 250,000 Square Feet of Greenhouse Space and 85 Acres of Land to Expand its Production Capabilities

Overview. One of Canada s largest integrated energy companies. Headquarters in Calgary, Alberta. Permanent Employees: ~5,000

Corvus Gold, Drills g/t Gold, West Zone Stepout Hole, Mother Lode Project, Nevada

Seabridge Gold Inc. News Release Trading Symbols: TSX: SEA FOR IMMEDIATE RELEASE NYSE: SA November 12, 2013

NEWS RELEASE SILVERMEX RESOURCES CORPORATE UPDATE AND 2011 BUDGET

Star Orion South Diamond Project

MEDIA RELEASE OCEANAGOLD REPORTS SIGNIFICANT INCREASE IN MINERAL RESOURCES AT WAIHI IN NEW ZEALAND

MEDIA RELEASE OCEANAGOLD REPORTS SIGNIFICANT INCREASE IN MINERAL RESOURCES FOR THE MARTHA PROJECT AT WAIHI

The Road to Production

HIGH GRADE INTERCEPTS FROM LISEIWI PROSPECT, BLOCK 14

Prophecy Returns Silver, Zinc, Lead Assays from Latest Pulacayo Chip Sampling Programs

MEDIA RELEASE OCEANAGOLD INTERSECTS SIGNIFICANT HIGH-GRADE MINERALISATION ON MARTHA AND EMPIRE VEINS AT WAIHI

Quarterly Review Yanfolila Gold Project Gearing up for Production

Delivering the Turnaround. Leigh Junk - Managing Director February 2018

ANNUAL & SPECIAL MEETING OF SHAREHOLDERS

For personal use only

A CANADIAN COMPANY SUCCESSFULLY OPERATING IN WEST AFRICA: THE ROXGOLD EXAMPLE

A Message from Excelsior Mining

African Mining INDABA Dave Schummer, Senior Vice President Africa Operations February 6, 2013

RAVENSTHORPE NICKEL OPERATIONS

Forward-Looking Information

FUGITIVE EMISSIONS AND TYPE TESTING OF VALVES

the Company and readers are cautioned that these statements may not be appropriate for any other purpose, including investment decisions.

Star Orion South Diamond Project

Excellent Metallurgical Recovery Results & Update on Priority Drilling at Great Western Gold Project

BISIE PROJECT UPDATE AND ALPHAMIN APPOINTS CHAIRMAN TO THE BOARD

Textron Reports First Quarter 2016 Income from Continuing Operations of $0.55 per Share, up 19.6%; Reaffirms 2016 Financial Outlook

Textron Reports Third Quarter 2018 Results; Narrows Full-Year EPS and Cash Guidance

TSX.V: SKE/OTCQX: SKREF. July 2018

( Horizonte or the Company ) HORIZONTE SUBMITS MINE PLAN TO BRAZIL S NATIONAL MINING AGENCY

For personal use only

Red Eagle Mining Colombia s Premier Emerging Gold Producer

Q ARAGUAIA OPERATIONAL UPDATE

Mining Indaba 2010 Russell Ball Executive Vice President & CFO February 2, 2010 Cape Town, South Africa

Shell Project Delivery Best Practices Dick L. Wynberg, GM NOV Projects Integrated Gas Shell Global Solutions International B.V

Confirms 2013 Financial Guidance

The following highlights and developments have been made to date:

MAVERIX METALS TO ACQUIRE SIGNIFICANT ROYALTY PORTFOLIO THROUGH STRATEGIC PARTNERSHIP WITH NEWMONT

TSX.V: TXR OTC: TRXXF Frankfurt: TXO. Exploring Canada s Highest Grade Gold District

BJÖRKDALSGRUVAN MINING. Aire Fredlund Mining Engineer

In the quarter, Textron returned $344 million to shareholders through share repurchases, compared to $186 million in the first quarter of 2017.

Assist & Assure. Embedding our Safety Agenda

Ascot Resources Ltd Annual Information Form

April Developing Zinc, Gold & Silver Projects in Nevada and Ontario

Scoping Study Commences on Nyanzaga Gold Project in Tanzania

Red Eagle Mining Colombia s Premier Emerging Gold Producer

Textron Reports Second Quarter 2014 Income from Continuing Operations of $0.51 per Share, up 27.5%; Revenues up 23.5%

Acquisition of GEODynamics. December 13, 2017

New Ruby Mining Corp.

FORM 8-K. MCORPCX, INC. (Exact name of registrant as specified in its charter)

PyroGenesis Announces Receipt of AS9100D Certification for Aviation, Space, and Defense Industries; Provides Update on AM Business Line

Acquire ǀ Execute ǀ Operate. Q1, / TSX.V: BZ

PACIFIC DRILLING S.A.

For personal use only

Textron Reports Third Quarter 2014 Income from Continuing Operations of $0.57 per Share, up 62.9%; Revenues up 18.1%

Investor Presentation. Kevin Joyce Managing Director

Electrical Products Group Conference

Castlemaine Goldfields Limited. AGM Presentation by Matthew Gill MD & CEO. April

For personal use only

Kirkland Lake Gold Announces Management Appointments

SHELL CANSOLV AT THE TCM DEMONSTRATION PLANT Delivering the CANSOLV DC-201 enhanced solvent

Barrick and Newmont Forge Nevada Joint Venture Agreement

Drilling commences at Sertão following review of historical data

Managing Ageing Infrastructure

PRODUCING AND EXPLORING Q WEBCAST

Sanford Bernstein Strategic Decisions Conference. May 2014

A Seasoned Project Generator with a World Class Partner Newmont Plateau $53M Arrangement with Newmont

Investor Update. April 14, 2015

Operational Intelligence to Deliver Smart Solutions. Copyright 2015 OSIsoft, LLC

ORCA GOLD S ROBUST INITIAL RESOURCE AND SUCCESSFUL EXPLORATION SUPPORT PRELIMINARY ECONOMIC ASSESSMENT AT BLOCK 14 NEW CFO APPOINTMENT

July Developing Zinc, Gold & Silver Projects in Nevada and Ontario

Carrapateena project update. Myles Johnston, General Manager Carrapateena

PyroGenesis Additive Announces the Development of New Plasma-Based Process to Produce Metal Powders; Production of MIM Cut in Quantity; Ramp-Up Update

SOUTHERN HEMISPHERE SECURES US$25M FARM-IN OPTION AGREEMENT WITH ANGLO AMERICAN IN CHILE

KELSO TECHNOLOGIES INC.

QUARTERLY REPORT FOR THE THREE MONTHS ENDING 30 JUNE 2018 HIGHLIGHTS

$3.5 Billion Acquisition of Nation s No. 2 Company in Growing Moist Snuff Category. Deal at a Glance

Operational Intelligence to deliver Smart Solutions

GE OIL & GAS ANNUAL MEETING 2016 Florence, Italy, 1-2 February

Policy Documents Decisions & Orders. Settlements (Without a Hearing)

CLIFFS NATURAL RESOURCES INC.

ASIAN MINERAL RESOURCES CONTINUES STRONG OPERATIONAL PERFORMANCE; STRONG EM CONDUCTORS IDENTIFIED AT KINGSNAKE EXPLORATION PROSPECT

UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C FORM 8-K. TEXTRON INC. (Exact name of Registrant as specified in its charter)

WELLVANTAGE REMOTE OPERATIONS DEEPWATER

Deep Panuke Project Update CORE 2009 Dave Kopperson, Vice President, Atlantic Canada

2009 BCSECCOM 45. Settlement Agreement. Canadian Rockport Homes Int l, Inc., William Malone and Nelson Riis. Securities Act, RSBC 1996, c.

There s good reason why it s called Goldstrike.

Sanford Bernstein Strategic Decisions Conference. May 2013

Transcription:

NEWS RELEASE LUNDIN GOLD UNDERGROUND MINE DEVELOPMENT INTO HARD ROCK AT FRUTA DEL NORTE January 10, 2018 (Vancouver, Canada) Lundin Gold Inc. ("Lundin Gold" or the "Company") (TSX: LUG, Nasdaq Stockholm: LUG) is pleased to announce that soft tunneling was completed in December 2017 and mine development is now into hard rock at its Fruta del Norte gold project ( Fruta del Norte or the Project ) in Ecuador. Further Highlights Award of all major process plant equipment packages Mobile equipment packages, including underground mine scoop trams and haul trucks, have been awarded Process plant excavation is progressing ahead of schedule 1,000-person construction camp is nearing completion Approval of powerline Environmental Impact Assessment ( EIA ) Tunneling through soft clay was a significant risk factor to underground mine development due to the potential for ground failure. We were able to get through this challenging task, and the mine development is now advancing at a quicker pace, said Ron Hochstein, President and CEO of Lundin Gold. We are also ramping up other major projects, including the process plant and powerline. Mine Development The Company transitioned from soft tunneling to hard rock tunneling in December 2017, working through 77 metres of saprolite (soft clay) in the first decline and 69 metres in the second. Drilling and blasting in hard rock commenced on December 7 th in the first decline and December 17 th in the second, and currently the advance in hard rock reached 100 metres and 78 metres, in the first and second declines, respectively. Process Plant Equipment Procurement In October 2017, Lundin Gold awarded the long-lead time grinding equipment packages, including the SAG and ball mills (complete with motors) and the flotation and filtration packages to Outotec Chile S.A. The gravity mill, CIL and detox tanks, and ADR plant and gold room packages were recently awarded to FLSmidth USA Inc. TelSmith Inc. will provide the crushing packages for both the process plant and aggregate quarry crushers. ABB Inc. has been awarded switchgear and substation equipment and transformers packages.

Mobile Equipment Most of the mobile mine equipment orders have been placed. Importadora Industrial Agricola S.A./Caterpillar will provide the underground mine scoop trams and trucks, as well as the surface earthworks and quarry equipment. Orders for the mine jumbos and bolters are expected to be awarded this quarter. Powerline The EIA for the powerline received final approval at the end of 2017. Easement agreements have been reached with 91% of affected landholders, and the Company expects the remaining easements to be obtained this quarter. Detailed engineering and procurement is well underway, and the engineering, procurement and construction contractor is on track to begin building the powerline this quarter. Major Earthworks Regardless of difficult ground conditions, site earthworks are on schedule. Earthworks on the process plant is 13% complete with concrete mill foundations planned to start this quarter. The North Access Road is progressing well, and 32% of the road has been built. A second earthworks contractor was mobilized at El Pindal, where the North Access Road will link to the national highway system. Approximately six kilometres needs to be built to connect the North Access Road from either side. Construction Camp All other construction disciplines are actively working on the 1,000-person construction camp which is nearing completion, with over 60% of the units currently available for occupancy. Combined with the existing camp, there are more than 1,200 beds available. During the last month, approximately 800 people were at site, including contractors. About Lundin Gold Lundin Gold, headquartered in Vancouver, Canada, is developing its wholly-owned Fruta del Norte gold project in southeast Ecuador. Fruta del Norte is one of the highest-grade and largest gold projects currently under construction. The Company s board and management team have extensive expertise in mine construction and operations, and are dedicated to advancing this project through to first gold production in 2019. The Company operates with transparency and in accordance with international best practices. Lundin Gold is committed to delivering value to its shareholders, while simultaneously providing economic and social benefits to impacted communities, fostering a healthy and safe workplace and minimizing the environmental impact. The Company believes that the value created through the development of Fruta del Norte will benefit its shareholders, the Government and the people of Ecuador. 2

This press release has been reviewed and approved by Ron Hochstein, P. Eng., a metallurgical engineer and the Company's President and CEO, who is a Qualified Person under Canadian National Instrument 43-101. Additional Information The information in this release is subject to the disclosure requirements of Lundin Gold under the EU Market Abuse Regulation and the Swedish Securities Markets Act. This information was publicly communicated at 5:00 am Pacific Time on January 10, 2018. For more information, please contact: Lundin Gold Inc. Ron F. Hochstein President and CEO +593-2-299-6400 +1-604-806-3589 Lundin Gold Inc. Sabina Srubiski Manager, Investor Relations +1-604-806-3089 info@lundingold.com www.lundingold.com Follow Lundin Gold on Twitter Caution Regarding Forward-Looking Information and Statements Certain of the information and statements in this press release are considered forward-looking information or forward-looking statements as those terms are defined under Canadian securities laws (collectively referred to as forward-looking statements ). Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, identified by words or phrases such as believes, anticipates, expects, is expected, scheduled, estimates, pending, intends, plans, forecasts, targets, or hopes, or variations of such words and phrases or statements that certain actions, events or results may, could, would, will, should might, will be taken, or occur and similar expressions) are not statements of historical fact and may be forward-looking statements. By their nature, forward-looking statements and information involve assumptions, inherent risks and uncertainties, many of which are difficult to predict, and are usually beyond the control of management, that could cause actual results to be materially different from those expressed by these forward-looking statements and information. Lundin Gold believes that the expectations reflected in this forward-looking information are reasonable, but no assurance can be given that these expectations will prove to be correct. Forward-looking information should not be unduly relied upon. This information speaks only as of the date of this press release, and the Company will not necessarily update this information, unless required to do so by securities laws. This press release contains forward-looking information in a number of places, such as in statements pertaining to the timing of first gold production, the timing and progress of the development, construction and operation of FDN, the timing and progress of the development and construction the powerline, the timing and success of permitting and regulatory approvals and the award of certain purchase orders and contracts and the acquisition of easements. Lundin Gold s actual results could differ materially from those anticipated. Management has identified the following risk factors which could have a material impact on the Company or the trading price of its shares: the ability to arrange financing and the risk to shareholders of dilution from future equity financings; risks related to carrying on business in an emerging market such as possible government instability and civil turmoil and economic instability; 3

volatility in the price of gold; the timely receipt of regulatory approvals, permits and licenses; risks associated with the performance of the Company s contractors; risks inherent in the development of an underground mine; deficient or vulnerable title to mining concessions and surface rights; shortages of resources, such as labour, and the dependence on key personnel; risks associated with the Company s community relationships; unreliable infrastructure and local opposition to mining; volatility in the market price of the Company s shares; uncertainty with the tax regime in Ecuador; measures required to protect endangered species; difficulty complying with changing government regulations and policies, including without limitation, compliance with environment, health and safety regulations, and the cost of compliance or failure to comply with applicable laws; exploration and development risks; the accuracy of the Mineral Reserve and Resource estimates for FDN and the Company s reliance on one project; the Company s lack of operating history in Ecuador; illegal mining; uncertainty as to reclamation and decommissioning; adverse global economic conditions; risks associated with the Company s information systems; the inadequacy of insurance; risks of bribery or corruption; the potential for litigation; limits of disclosure and internal controls; and the potential influence of the Company s largest shareholders. There can be no assurance that such statements will prove to be accurate, as Lundin Gold's actual results and future events could differ materially from those anticipated in this forward-looking information as a result of the factors discussed in the "Risk Factors" section in Lundin Gold's Annual Information Form for the financial year ended December 2016 and the Prospectus dated December 21, 2017, both of which are available on SEDAR at www.sedar.com. Figure 1. Hard rock tunneling at Fruta del Norte underground mine 4

Figure 2. Process plant earthworks Figure 3. 1,000-person construction camp 5