High Power Couplers for TTF - FEL

Similar documents
HIGH POWER COUPLER FOR THE TESLA TEST FACILITY

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh

TESLA RF POWER COUPLERS DEVELOPMENT AT DESY.

HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK

Couplers for Project X. S. Kazakov, T. Khabiboulline

Advance on High Power Couplers for SC Accelerators

RF thermal and new cold part design studies on TTF-III input coupler for Project-X

OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW*

RF power tests of LEP2 main couplers on a single cell superconducting cavity

Design and technology of high-power couplers, with a special view on superconducting RF

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS

KEK ERL CRYOMODULE DEVELOPMENT

LEP Couplers..a Troubled Story of a Success. HPC2002, Jefferson Lab, October 30 th, 2002 R. Losito, CERN 1

Coupler Electromagnetic Design

Superconducting RF cavities activities for the MAX project

QUARTER WAVE COAXIAL LINE CAVITY FOR NEW DELHI LINAC BOOSTER*

DEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT

3.9 GHz work at Fermilab

Mircea Stirbet. RF Conditioning: Systems and Procedures. Jefferson Laboratory

Report of working group 5

A few results [2,3] obtained with the individual cavities inside their horizontal cryostats are summarized in Table I and a typical Q o

THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING CAVITY

SUPERCONDUCTING PROTOTYPE CAVITIES FOR THE SPALLATION NEUTRON SOURCE (SNS) PROJECT *

Preparation of RF Power Couplers For the Tesla Test Facility

Cavity development for TESLA

Status of superconducting module development suitable for cw operation: ELBE cryostats

Yongming Li Institute of modern physics 31/07/2017

R.Bachimanchi, IPAC, May 2015, Richmond, VA

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM

THE CRYOGENIC SYSTEM OF TESLA

Tuning systems for superconducting cavities at Saclay

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint

Frequency Tuning and RF Systems for the ATLAS Energy Upgrade. Gary P. Zinkann

SUPPRESSING ELECTRON MULTIPACTING IN TTF III COLD WINDOW BY DC BIAS

THE PROTOTYPE FUNDAMENTAL POWER COUPLER FOR THE SPALLATION NEUTRON SOURCE SUPERCONDUCTING CAVITIES: DESIGN AND INITIAL TEST RESULTS*

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension

SNS CRYOMODULE PERFORMANCE*

Superstructures; First Cold Test and Future Applications

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute

LOW BETA CAVITY DEVELOPMENT FOR AN ATLAS INTENSITY UPGRADE

5.5 SNS Superconducting Linac

ACHIEVEMENT OF ULTRA-HIGH QUALITY FACTOR IN PROTOTYPE CRYOMODULE FOR LCLS-II

Evaluation of HOM Coupler Probe Heating by HFSS Simulation

Third Harmonic Superconducting passive cavities in ELETTRA and SLS

The transition for the Elettra Input Power Coupler to the standard WR1800

CAGE CAVITY: A LOW COST, HIGH PERFORMANCE SRF ACCELERATING STRUCTURE*

SC Cavity Development at IMP. Linac Group Institute of Modern Physics, CAS IHEP, Beijing,CHINA

ASSEMBLY PREPARATIONS FOR THE INTERNATIONAL ERL CRYOMODULE AT DARESBURY LABORATORY

Low-Level RF. S. Simrock, DESY. MAC mtg, May 05 Stefan Simrock DESY

CRAB CAVITY DEVELOPMENT

INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE

EXPERIMENTAL RESULT OF LORENTZ DETUNING IN STF PHASE-1 AT KEK-STF

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University

Current Status of cerl Injector Cryomodule

MULTIPACTING IN THE CRAB CAVITY

DEVELOPMENTS OF HORIZONTAL HIGH PRESSURE RINSING FOR SUPERKEKB SRF CAVITIES

KEYWORDS: ATLAS heavy ion linac, cryomodule, superconducting rf cavity.

ALICE SRF SYSTEM COMMISSIONING EXPERIENCE A. Wheelhouse ASTeC, STFC Daresbury Laboratory

LC Technology Hans Weise / DESY

SRF Advances for ATLAS and Other β<1 Applications

The TESLA Linear Collider. Winfried Decking (DESY) for the TESLA Collaboration

S. Ghosh On behalf of Linac, IFR, Cryogenics, RF and beam transport group members. Inter University Accelerator Centre New Delhi India

On behalf of: Sang-hoon Kim Zack Conway Mark Kedzie Tom Reid Ben Guilfoyle

The European Spallation Source. Dave McGinnis Chief Engineer ESS\Accelerator Division IVEC 2013

DEVELOPMENTS AND PROGRESS WITH ESS ELLIPTICAL CRYOMODULES AT CEA-SACLAY AND IPN-ORSAY -

Packaging of Cryogenic Components

DESIGN OPTIONS FOR CEBAF ENERGY UPGRADE

Status and Plans for the 805 MHz Box Cavity MuCool RF Workshop III 07/07/09 Al Moretti

Power Coupling. David Alesini. (LNF, INFN, Frascati, Italy)

TESLA Progress on R1 & R2 issues

RF test benches for electron cloud studies

Vibration studies of a superconducting accelerating

3.9 GHz System (AH1) XFEL WP46

Status of the superconducting cavity development at RISP. Gunn Tae Park Accelerator division, RISP May 9th. 2014

Mechanical study of the «Saclay piezo tuner» PTS (Piezo Tuning System) P. Bosland, Bo Wu DAPNIA - CEA Saclay. Abstract

Structures for RIA and FNAL Proton Driver

Waveguide Arc Restrike Test Results Abstract Background

Processing and Testing of PKU 3-1/2 Cell Cavity at JLab

COUPLER DESIGN CONSIDERATIONS FOR THE ILC CRAB CAVITY

Fabrication Techniques for the X-band Accelerator Structures. Juwen Wang WORKSHOP ON X-BAND RF TECHNOLOGY FOR FELs March 5, 2010

2008 JINST 3 S The RF systems and beam feedback. Chapter Introduction

To produce more powerful and high-efficiency particle accelerator, efforts have

High average power fundamental input couplers for the Cornell University ERL: requirements, design challenges and first ideas

2 Theory of electromagnetic waves in waveguides and of waveguide components

Status of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY

LARGE SCALE TESTING OF SRF CAVITIES AND MODULES

SRF in Storage Rings. Michael Pekeler ACCEL Instruments GmbH Bergisch Gladbach Germany

4 XFEL accelerator. 4.1 Overview. XFEL accelerator Introduction Overall layout and choice of parameters

On the RF system of the ILC

Liquid Helium Heat Load Within the Cornell Mark II Cryostat

RENASCENCE * PERFORMANCE AND PROBLEMS ON FIRST TEST Feedthrough leaks sub 70 K. End group quenching

Design and RF Measurements of an X-band Accelerating Structure for the Sparc Project

Development Status of KSTAR LHCD System

Behavior of the TTF2 RF Gun with long pulses and high repetition rates

two pairs of dipole steering windings that t inside the quadrupole yoke an RF beam position monitor (BPM) consisting of a pill box RF cavity,

CHALLENGES IN ILC SCRF TECHNOLOGY *

QWR Nb sputtering. Anna Maria Porcellato. MoP04. S. Stark, F. Stivanello, V. Palmieri INFN Laboratori Nazionali di Legnaro

HIGH POWER PULSED TESTS OF A BETA=0.5 5-CELL 704 MHZ SUPERCONDUCTING CAVITY

Status and Future Perspective of the HIE-ISOLDE Project

Demonstration of exponential growth and saturation at VUV wavelengths at the TESLA Test Facility Free-Electron Laser. P. Castro for the TTF-FEL team

Transcription:

High Power Couplers for TTF - FEL 1. Requirements for High Power Couplers on superconducting Cavities 2. Characteristics of pulsed couplers 3. Standing wave pattern in the coaxial coupler line 4. Advantages of pulsed coupler operation 5. Design of the TTF Coupler 6. Coupler pumping 7. Technical coupler interlock 8. e- problem during operation 9. Conclusion 1

1. Requirements for Couplers on SC Cavities - transfer the power to the beam - strong mismatch in absence of beam between cavity and generator Q cavity, no beam = 10 10 = 10 4 Q cavity + beam = 10 6 Q extern = 10 6 = 1 - cold warm transition, low heat loads are necessary - it has to be cleaned to the standard of the sc cavity surfaces (usually by dustfree water) - clean assembly of coupler to the cavity in the class 10 clean room - protection of the clean cavity surface during assembly to the module - safety against window failures during operation - diagnostic 2

2. Characteristics of pulsed couplers Forward and reflected power at a cavity (long pulse, Q load = 3e6, >>1, no beam) P 1 SW P 2 TW SW: Pref 1 = Pfor TW: Pref 2 = 4 x Pfor U 2 = 2 x U 1 Denis Kostin 3

Forward and reflected power at a cavity (1.3 ms pulse, no beam, steady state not reached) SW: Pref 1 = Pfor P 1 SW P 2 TW TW: Pref 2 < 4 x Pfor U 2 < 2 x U 1 depends from the pulse length Denis Kostin 4

Forward and reflected power at a cavity without beam and reduced Pfor during Flat Top P 1 P 2 SW TW SW: Pref 1 = Pfor TW: Pref 2 << 4 x Pfor Flat top U 1 > U 2 Denis Kostin 5

Cavity with beam SW TW SW: Pref 1 = Pfor only filling time TW: Pref 2 = Pfor beam U 1 = 2 x U 2 6

3. Standing wave pattern in the coaxial coupler line End of RF pulse End of filling time Distance along the coupler [cm] Nikolay Sturm 7

What could go wrong during operation? Frequency of cavity Phase of cavity Beam current (beam loss) Lorenz force detuning (change of frequency due to the high field forces between the walls of the cells) Tuning of Q ext with a stub tuner in the wave guide causes additional field enhancement All this leads to a change of the standing wave pattern in the coupler. Areas with low electric fields during normal operation are then in the high fields. 8

Standing wave pattern without Lorenz Force detuning End of RF pulse End of filling time Distance along the coupler [cm] Nikolay Sturm 9

Standing wave pattern with Lorenz Force detuning at 25MV/m -The standing wave pattern is changing due to the Lorenz Force detuning - the high field areas are moved to areas with normally lower fields Distance along the coupler [cm] Nikolay Sturm 10

4. Advantages of pulsed coupler operation Low average power Easy handling of coupler events: Most dangerous events are gas discharge in the coupler (it can cause destruction of the coupler, has to be detected and interrupted). At cw a reduction of power is not sufficient -> power switch off is needed (the voltage to ignite the discharge is much bigger than the voltage needed to keep the discharge). At pulsed operation we get a power off for free (can start the next pulse at lower power and increase power slow). 11

A Possible interlock event handling during operation of a pulsed accelerator 12

5. Design of the TTF Coupler coaxial is easy for: two windows for: cold coax: warm coax: suppress multipacting : flexibility: copper plating: -variable coupling -fabrication -assembly -clean assembly of the high gradient cavity -save against window rupture -at 70 Ohm, 40 mm diameter -at 50 Ohm, 60 mm diameter -Al 2 O 3 with TiN coating - bias on inner conductor -bellows in the warm and cold coax -20 m -high thermal conductivity (RRR 30) -high purity, Hydrogen free 13

big pump port (CF35) not in use only the small one (CF16) beam pipe 14

Fermi Lab coupler 15

TTF 2 coupler 16

TTF 2 coupler 17

TESLA Coupler TTF 3 18

TTF 3 coupler 19

70 K shield coupling tuning 2 K beam pipe 4 K shield module vessel 20

6. Coupler pumping beam line Coupler Module Penning common pumping line Ti evaporation pump Ion getter pump 21

7. Technical Coupler Interlock 3 times e - (charged particles) light in coupler vacuum light in wave guide (air side) temperature cold ceramic temperature warm ceramic vacuum coupler vacuum cavity bias voltage cryogenic OK low level RF gate on klystron (connection to BIS foreseen) all thresholds are hardware and have to be set in hall 3 22

8. e - Problem during operation No beam, but Pfor not reduced by 6 db high reflected power peak at the end of the pulse this causes a gas discharge detected with the e- probe 23

Change of the forward power pulse form reduced the e- signal The shape of the power pulse can be optimized to reduce the reflected power peek 24

9. Conclusion Pulsed couplers have a standing wave pattern Standing wave pattern can change during operation by: Frequency change, e.g. Lorenz Force detuning Beam loss or wrong beam compensation Low and high field areas can change and cause gas discharge (interlock events) Therefore: a very good Lorenz Force detuning compensation at high cavity gradients is essential 25