VICINITY MAP LOCATION MAP GI-01
LEGEND TABLE OF CONTENTS CONSTRUCTION SEQUENCE NOTES GENERAL NOTES SEDIMENTATION & EROSION CONTROL ABBREVIATIONS GI-02
M P P P P M EXISTING HYDRAULIC PROFILE AND DEMOLITION PLAN D3 P P NEW HYDRAULIC PROFILE M A3 LEGEND EXISTING PIPE NEW PIPE VALVE CHECK VALVE M METER P PUMP TO BE DEMOLISHED NORMALLY OPEN NORMALLY CLOSED WATER LEVEL WATER LEVEL OVERFLOW ELEVATION FROM RECORD DRAWINGS AND ADJUSTED PER TOPOGRAPHIC SURVEY (FIELD VERIFY WHERE NEEDED) GI-03
S S TWT CONTROL POINT #5 CONCRETE MONUMENT FOUND N: 457,646.50' E: 2,769,816.58' ELEVATION: 6.66' TWT CONTROL POINT #3 5/8" REBAR GRID N: 457,672.717' GRID E: 2,769,958.895' ELEVATION: 5.10' TWT CONTROL POINT #3 5/8" REBAR GRID N: 457,672.717' GRID E: 2,769,958.895' ELEVATION: 5.10' TIE LINE (MONUMENT #5 TO TWT REBAR #3) N 79 33'42" E 144.71' TIE LINE (BUILDING CORNER TO TWT REBAR #3) S 67 58' E 139' LINE LEGEND S SYMBOL LEGEND S E N C Grid - NAD 83 (2011) EXISTING CONDITIONS GI-04 TWT CONTROL LINE (TWT REBAR #3 TO TWT REBAR #2) N 58 06'51" W 485.07' NOTES
NOTES: S S DEMOLITION AND EROSION CONTROL PLAN C-01
LEGEND: 1 OPERATION SEQUENCE: 3 M 2 1 5 4 NOTES: S S NEW WORK AND PIPING PLAN C-02
C2 C-03 B4 C-03 WALL SECTION DEMOLITION C2 C2 C-03 PLAN SECTION DEMOLITION PLAN HOLDING BASIN B4 M DEMOLITION WORK PIPING AT HOLDING BASIN B1 LEGEND TO BE DEMOLISHED C-03
A1 C-04 FLOOR STAND DETAIL C1 NEW WORK PIPING AT HOLDING BASIN B4 SECTION NEW EFFLUENT METER A1 SECTION DISTRIBUTION BOX A4 C-04
A4 C-05 A4 C-04 A4 C-05 PIPE ANCHOR DETAIL B1 SECTION PERFORATED PIPE B2 NEW WORK PLAN VIEW C4 NEW WORK SECTION A2 NEW WORK SECTION A4 C-05
A1 C-05 A1 C-05 A4 C-06 B3 C-06 NEW STORAGE TANKS PLAN VIEW C4 TYPICAL FOOTING PROJECTION B1 SECTION B3 SECTION A1 SECTION A4 C-06
NOTES: EXISTING FILTER RECIRCULATION PUMP EXISTING FILTER RECIRCULATION PUMP STATION PUMP REPLACEMENT DEMOLITION PLAN B2 STATION PUMP REPLACEMENT NEW WORK B5 LEGEND TO BE DEMOLISHED C-07
A4 C-08 A4 C-08 RECIRCULATING SAND FILTER PLAN VIEW B4 RECIRCULATING SAND FILTER SECTION A4 C-08
TOP VIEW DEMOLITION AND NEW WORK EXISTING SPRINKLER SECTION B1 DEMOLITION PLAN EXISTING SPRINKLER PUMP STATION B5 LEGEND TO BE DEMOLISHED DEMOLITION PLAN EXISTING SPRINKLER FLOW METER SECTION A1 C-09
CONCRETE BLOCKING DETAIL FOR STANDARD FITTINGS C2 EMERGENCY PUMP CONNECTION SECTIONAL VIEW B5 TRENCH, BEDDING AND BACKFILL A2 C-10
SEDIMENTATION AND EROSION CONTROL NOTES LEGEND: CONSTRUCTION SEQUENCE PERMANENT SEEDING SILT FENCE DETAIL A4 C-11
ABBREVIATIONS ONE-LINE SYMBOLS MOTOR CONTROL CENTER PLAN SYMBOLS PANEL BOARDS E-01
M S S TWT CONTROL POINT #5 CONCRETE MONUMENT FOUND N: 457,646.50' E: 2,769,816.58' ELEVATION: 6.66' TWT CONTROL POINT #3 5/8" REBAR GRID N: 457,672.717' GRID E: 2,769,958.895' ELEVATION: 5.10' TIE LINE (MONUMENT #5 TO TWT REBAR #3) N 79 33'42" E 144.71' TWT CONTROL POINT #3 5/8" REBAR GRID N: 457,672.717' GRID E: 2,769,958.895' ELEVATION: 5.10' E-02 TIE LINE (BUILDING CORNER TO TWT REBAR #3) S 67 58' E 139' TWT CONTROL LINE (TWT REBAR #3 TO TWT REBAR #2) N 58 06'51" W 485.07' PLAN NOTES:.
PLAN NOTES:. PANEL SCHEDULE LP1 SPRAY PUMP STATION ONE LINE DIAGRAM RECIRCULATION PUMP STATION ONE LINE DIAGRAM CONTROL PANEL MOUNTING DETAIL EQUIPMENT RACK MOUNTING DETAIL E-03