ATTACHED PERGOLA ARBOR INSTALLATION INSTRUCTIONS

Similar documents
Recommended Tools: Before You Begin:

LAS VEGAS PATIO COVER INSTALLATION INTSRUCTIONS

4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS

ATTACHED DOUBLE HEADER PERGOLA ASSEMBLY INSTRUCTIONS

ATTACHED SINGLE HEADER PERGOLA ASSEMBLY INSTRUCTIONS

FREESTANDING DOUBLE HEADER PERGOLA ASSEMBLY INSTRUCTIONS

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS FOR AZTEC SHELTER

OZARK DOOR CANOPY ASSEMBLY INSTRUCTIONS

COURTYARD DOOR CANOPY INSTALLATION INSTRUCTIONS

COURTYARD PATIO COVER INSTALLATION INSTRUCTIONS

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

Open Lattice tube Patio Cover- Basic Installation Guidelines

Open Lattice tube Patio Cover- Basic Installation Guidelines

Open Lattice Tube Patio Cover- Basic Installation Guidelines

Level, Pliers, 3/8" Electric Drill, Carpenters Square, Tape Measure, Metal Hack Saw, Silicone Caulking, Screw Drivers (Regular & Phillips)

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

Pergola Installation Instructions

ALUMA-VENT AWNING REGULAR END STYLE INSTALLATION INSTRUCTIONS

CountryAccents Pergola Assembly Instructions

Dura-Lock Roof System

Double Beam Freestanding Pergola Installation Guide

Heavy Duty I-Beam Trolley

Installation Guidelines

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

INSTALLATION INSTRUCTIONS FOR ULTRA LATTICE AND ALUMAWOOD ARBORS

TREX PERGOLA INSTALLATION INSTRUCTIONS

Installation Guidelines

Wooden Rectangle Pergola Assembly Manual

Santa Fe Cover INSTALLATION GUIDE. Alumawood TM Newport with MAXX Panel TM Installation Guide

Heartland Pergola. Assembly Manual

12 x 12 Flat Top Pergola

Pergola Kits USA offers two different Premium Vinyl pergola kits

12 x 12 Flat Top Pergola

(TOLL FREE); 7am 7pm Pacific Time, Monday-Saturday ASSEMBLY INSTRUCTIONS FOR THE ATTACHED GARDEN PERGOLA WITH LEDGER BOARD

WINDLOAD POST WayneMark 8000, 8100 INSTALLATION INSTRUCTIONS

Austin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions

10 x 10 Arch Top Pergola

Heavy-Duty Bypass Track System

MODERN PERGOLA INSTALLATION GUIDE. When only the best will do.

ULTRA SPACE SAVER SQUARED Installation Instructions

ULTRA SPACE SAVER Installation Instructions

The Fairfield Deluxe Arbor

12 x 12 Flat Top Pergola

Pergola Installation Guide

ALL SEASON PATIO COVER

Independent Containment System (ICS)

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

KOLO SHELTER Installation Instructions Parts List

12 x 12 Flat Top Attached Louvered Pergola

10x10 Trellis Pergola

Pillar Hanger ASSEMBLY INSTRUCTIONS

USER AND INSTALLATION MANUAL FOR THE BALNEA ENCLOSURE

The Mirage Pergola ASSEMBLY GUIDE. OPTIONAL ACCESSORY Bolt Down Bracket Kit. Ver 3/2009

Titan Series Awning Assembly and Installation Instructions

Intex Engineered Pergola System Installation Instructions. NOTE: See Appendix for Foundation Requirements

10 x 10 Flat Top Pergola

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Pergolas Fax # PORCHES PERGOLAS CANOPIES DOOR AWNINGS METAL AWNINGS FABRIC SYSTEMS WALL ACCESS RAMPS MISC

Door Canopy. PDL Building Products Industrial Parkway, N. Olmsted, OH Phone:

BIKE FILE (301)

EZ-MATRIX I N S TA L L AT I O N I N S T R U C T I O N S EZ-MATRIX

Glue the ends onto the rafters following the instructions on the container of glue supplied with the kit.

LPR System Installation instructions

Artisan Vinyl Pergola

8 x 8 Flat Top Pergola

Pergola Installation Guide. When only the best will do.

10 x 10 Flat Top Two Tone Pergola

12 x 12 Flat Top Pergola

8 x 8 Flat Top Pergola

Windload Post 9100/9600/9900 Installation Instructions

Spoked GARRICK HANGER

Yardistry. External Display YP *Time required for assembly approximately 1.5-2hrs

THANK YOU FOR PURCHASING FROM HERITAGE PATIOS

Contour Hanger ASSEMBLY INSTRUCTIONS

Industrial Hanger ASSEMBLY INSTRUCTIONS

10x10 Trellis Pergola

Tools Needed. 8 per column: stainless steel or hot-dipped galvanized bolts. Mallet

V nyl Gazebo truct c it Assembly Instr ons

Box Track INSTALLATION INSTRUCTIONS

(TOLL FREE); 7am 7pm Pacific Time, Monday-Saturday ASSEMBLY INSTRUCTIONS FOR THE ATTACHED ARCHED PERGOLA KITS WITH WALL MOUNTED ANCHORS

6 1/2 x 6 1/2 Wood Grain Flat Top Pergola

12x12 Pavilion. Assembly Manual

STRATUS SHELTER. Take bike parking to new heights

8 x 8 Flat Top Pergola

Cellar Hanger ASSEMBLY INSTRUCTIONS

TWIG Hanger ASSEMBLY INSTRUCTIONS

The Festival Assembly Instructions

ClearSpan Twist-of-the-Wrist Assembly Instructions

12 x 24 Flat Top Pergola

ROCKWELL. Two Panel Door. Half X Door. Double X Door. Z Combination Door

96 (Standard Length)

Assembly Instructions

Leveling Foot RB210. Leg Extender RLT66

Installation Instructions

Connect Transit Shelter

Setup. The Faraday Cage is available in two types of configurations. Cage for mounting to a full perimeter enclosure on series tables.

Transcription:

ATTACHED PERGOLA ARBOR INSTALLATION INSTRUCTIONS Recommended Tools: Before You Begin: Saftey Glasses, Tape Measure, Carpenters Level, Framing Square, Hex Head Nut Drivers, Chalk Line Elec. Drill w/ Bits (Masonry Drill, Bits. & Anchors maybe required if securing to Stone, Concrete, or any other masonry unit.) 1.) Please read all instructions carefully. Check the Bill of Materials for any missing parts, and gather necessary tools. To prevent scratching of painted materials, place on a tarp, paper, or protective material. 2.) You may be required to obtain a building permit for this structure from your local building authority. This product should only be installed in 10, 20, or 30 psf (pounds per square foot) snow load and 90 mph or less wind speed zone (Custom models can be designed for heavier loads). This product is listed under ICBO Evaluation Report #2621P. You may have to submit two copies of your plot plan and also a copy of the evaluation report to your local building authority for a building permit. Contact your local building department for details and your area's snow & wind loads. 3.) Note that this Pergola Kit is not designed to carry additional loads such as hanging heavy plants, swings, people, or other objects. Orig. - 10/15/09

STEP 1 Determine the location for your pergola. Mark the location of the headers to project from the building. Be sure to keep headers level, snap a level chalk line along the wall if necessary. Pre-drill 2-5/16" holes in the wall, being sure to hit a solid anchor point (see Fig. 1-2). Place 2 - lag screw inserts into holes and attach header-wall hanger w/ 1-1 1/2" lag screw through top hole but do not tighten. Use a level or framing square to straighten the brackets and insert bottom screw and tighten top. Install the remainder of the brackets (see Fig. 1-2). NOTE: If a solid anchor such as a wall stud cannot be located, a 2" x 8" ledger board may be required (Ledger Board Not Supplied By Manufacturer) Lag Bolt Pattern In Face of Bracket Mark desired location of headers Lag Bolt Insert Keep level Be sure any door/window can open under awning Level Line Fig. 1-1 Header Hanging Bracket 1 1/2" Lag Screw Fig. 1-2 Be Sure to Square Bracket to Level Line STEP 2 Place a header, seam side up, on a header-wall hanger. Anchor the header to the header hanger with 4 - (see Fig. 2-1). The other end of the header may need to be supported until the side plates are attached. Use a ladder or similar means if necessary (see Fig. 2-2). Set a header in place on the opposite side of the unit using the same prodedure. Install any remaining headers. 3" x 8" Header 3" x 8" Header Use a ladder to support front end if necessary Fig. 2-1 Header -Wall Hanger Fig. 2-2

STEP 3 Determine and mark the mounting location of the posts. Attach a post bracket at each location following the same procedure as in Step 1. Anchor the side plate to the rafter hanger with 4 - (see Fig. 3-1). Attach the other end of the post to the header with another post bracket. 3" x 3" Post Post Bracket Post Bracket Fig. 3-1 Fig. 3-2 STEP 4 Attach the rafter mounting brackets to the header at the desired locations using 4 - #8 x 3/4" Tek screws (see Fig. 4-1). Position the rafters in the rafter mounting brackets with an equal amount of overhang on both ends. Attach the rafters to the rafter mounting brackets using 4 - #8 x 3/4" Tek screws (see Fig. 4-2). Rafter Bracket Rafter Bracket 2" x 6" Rafter Header Beam Header Beam Fig. 4-1 Fig. 4-2

STEP 5 If the lattice tubes require splice, insert the splice into the end of two tubes and attach with 2 - #8 x 3/4" Tek screws (see Fig. 5-1). Layout lattice on rafters seam side up. Position with an equal amount of overhang on both ends. The standard lattice spacing is 4-1/2" on center. Attach the lattice to each rafter using the 2" sheet metal screws (see Fig. 5-2). #8 x 3/4" Tek Screw Lattice Rafter Lattice Splice Lattice Tube Header Fig. 5-1 Fig. 5-2

CONGRATULATIONS! ASSEMBLY COMPLETED Other Products Available from AMERICANA BUILDING PRODUCTS: Fabric Window Awnings, Aluminum Patio Covers and Window Awnings, Glass Enclosures, Screen Enclosures, Park Shelters, Aluminum Railings & Columns, Retractable Fabric Awnings & More! NOTES