Mate Pilot Turret Calibration System

Similar documents
Mate Pilot. Turret Calibration System. Mate Tooling Lasts Longer

MATE PILOT TURRET CALIBRATION SYSTEM 2016 PN. Superior Solutions for Sheet Metal Fabricators

Motorized M3 AX7200 Rotary-Style Gasket Cutter Operating Instructions

BHJ Products, Inc. Parts List & Instructions

Tooltech Precision Reamers are designed to meet hole geometry requirements in the complex and demanding machining environment of today s manufacturing

Replacement of Pitch Link Retainer and Service Improvement of the Pitch Control System. Effectivity: Helicopters manufactured prior to January, 1981

Engineering Data Rail Lifters

Comp-DS Driveshaft. User Manual B

WILCAP ADJUSTABLE ALIGNMENT PIN

Signature Choral Riser Side Rail

SAFETY INSTRUCTIONS. Wear protective clothing, including safety glasses and steel toe boots.

GAGING AND INSPECTION

MODEL H9565 BALL BEARING GUIDE FOR G0513/G0514 INSTRUCTION SHEET

Removing Right-Side. Components. Right-Side. Components. Click Here to Go Back AT THIS POINT

Replacing the build plate clamps

ABM International, Inc.

1. VERIFY ALL COMPONENTS

INSPECTION AND CORRECTION OF BELLHOUSING TO CRANKSHAFT ALIGNMENT

STEVENS SUBPLATES. STEVENS ENGINEERING, INC. TOLL-FREE WEB FAX

Type XTSR71 Sizes

DIVIDING EQUIPMENT DIVIDING EQUIPMENT

AR-15 Lower Receiver Assembly Instructions

Instructions for Converting the LV/MB Joystick from A to A1

CRCODE-202. Mechanical Lock. Instruction and Programming Manual. Before Installing:

Delrin Cone T-Handle Spring Stop w/pad...9 Screw Jack Large Toggle Clamp w/pad...9 Adjustable Ball Positioner...14

Custom Wood Frame Overlay for Glass Doors Installation Instructions

BHJ Products, Inc. Parts List & Instructions

This manual will aid in the assembly of the FireBall V90 and FireBall X90. The assembly of both machines will be identical, unless specified.

Pro-Doweling Kit USER S MANUAL #840. Visit us at

1.0 Tool Components and Operation Instructions

the needle, the user must take sufficient care to avoid injury and observe the sewing area continuously while sewing.

OWNER S MANUAL. Safety. Please read this owner s manual before use and keep it at hand for reference. Warranty

DUO-TAPTITE. Fasteners DUO-TAPTITE. Thread Rolling Screws

PROFESSIONAL FLARING TOOL 001ERL 37 & ERL 37

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase

HAND SHEARS NO. 12 AND NO. 24

Tuf-Lite III Fans 5000K Series Hub

HARDINGE Installation booklet For: Dead-Length Collet Adaptation Chucks Stationary Collet

THE T-MAG II PRESS. Figure 6

Addendum for the Installation of the Lingenfelter 10 Bolt Supercharger Pulley Hub Kit

1.0 Tool Components and Operation Instructions

Installation Instructions for the Vltor CASV SCAR handguard.

OWNER S MANUAL. But that s just half the story. The fence INCRA Miter Gauge really does work

Replacing the Reciprocator on the SWF Compact Series Machine (601C and 1201C)

BHJ Products, Inc. Parts List & Instructions

Save Set-up Time... and More!

Tuf-Lite III Fans 5000K Series Hub

1. TABLE OF CONTENT 2. ASSEMBLY ATEX. PENCOflex Installation Instructions & Service Manual

LOW-PROFILE ACCU-LENGTH CNC COLLET CHUCKS

Preference Collection 5580 Treatment Console INSTALLATION GUIDE

BIFOLD FUTON FRAME TRINITY ARM. Seat Rails and Slats x 1. *Note: Use 4pc of 100mm Bolts and 4pc of 60mm Bolts to attach the arms to the Stretchers.

RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS

Preference Collection and Treatment Console INSTALLATION GUIDE

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

Thomas Disc Couplings Installation and Maintenance Series 54RDG Sizes (Page 1 of 13) DANGER!

SENC 150 Encoder Installation. SENC 150 Encoder Installation. Vertical Knee Mill X axis... First Steps: Mounting Information: Before proceeding:

BHJ Products, Inc. Parts List & Instructions

SENC 150. Longitudinal Installation... Mounting Information... Center reading head... First Steps...

Band-Master ATS Nano Pneumatic Banding Tool Operating Instructions

INSTALLATION MANUAL PBL-UMP

INSTALLATION INSTRUCTIONS / DODGE RAM CREW CAB 2500/3500

SLW 6 Channel Letter Brake. User Guide. Operation and Mounting Instructions

Thomas Disc Couplings Installation and Maintenance Series 71 Sizes (Page 1 of 11) DANGER!

Technical T-A & GEN2 T-A GEN3SYS APX. Revolution & Core Drill. ASC 320 Solid Carbide. AccuPort 432. Page CONTENTS. Set-up Instructions 256

REPAIR INSTRUCTIONS. Cat. No Cat. No MILWAUKEE ELECTRIC TOOL CORPORATION. SDS Max Demolition Hammer. SDS Max Rotary Hammer

AR15 SUPER SLIM AND ULTRA SLIM FREE FLOAT RAIL SYSTEMS

Chain Drive Vise. Installation Instructions. (revised 05/04/2016)

WARNING: Read all instructions before assembling this product. KEEP INSTRUCTIONS FOR FUTURE USE

ASSEMBLY AND ADJUSTMENT

TITAN-BIT KEY-CUTTING MACHINE INSTRUCTION MANUAL

ROYAL ULTRA-PRECISION ER COLLETS " TIR

SENC 150. Longitudinal Installation... Mounting Information... Center reading head... First Steps...

INSTRUCTIONS INSTRUCCIONES CONSIGNES

MOUNTING AND ZEROING RIFLESCOPES FOR SERVICE RIFLE SHOOTING By Marcus O'Dean

SPES Underwater Eddy Current Proximity Sensor User s Manual P/N M2A-107

ASSEMBLY GUIDE. Mia Narrow Bookcase

Why Use Guided Keepers

Installation Instructions Kit, Base Rail Bracket Part # 31413

adaptivemechanical adaptive

.01 undercut. Ø.187 locating dowel hole (Ø.1875 x.50 pin included)

APES HD-7700 Version Operator s Training Manual

Universal Projector Ceiling Mount Model: DPM-45

EPS Duct Fabrication and Installation Sheet

Quick-Release Front Vise 05G34.01


Thomas Disc Couplings Installation and Maintenance Series 71-8 Sizes (Page 1 of 10) DANGER!

MODEL 36 Di-Acro Hand Shear

Instruction Manual. Banner Grip -banner stretching frame. Manual Version Sept27, Any size made: by Graphic size, OD Size, Live Area -1 or 1,000!

INSTALLATION INSTRUCTIONS

Field Inspection Gage. Instruction Manual

Compact Router Ellipse/ Circle Jig Instructions

Dust RIGHT. Shop Vacuum Dust Hose Reel Instructions

COLLET CLOSERS, FIXTURES AND COLLETS FOR ROTATING AND FIXED APPLICATIONS

High Rise Adjustable Stand-Up Desk Converter

User's Guide for Tooling

JK TrailGate JK TrailGate

INCRA. Suggested Router Bit Speeds. pg Website:

SQ2 User Instructions SQ2 Overview:

Pow-R-Feed Systems Service Manual

Installation Guide. Mounting Kit for Mounting Philips Avalon CTS Cordless Fetal Transducer System on Wall, 2'' Post, Rail, or Slide-on Mounting Plate

Transcription:

Mate Pilot Turret Calibration System Introducing the Mate Pilot Turret Calibration System! PATENT PENDING The Mate Pilot Turret Calibration System is the most accurate system available today for ensuring precision concentric and angular alignment of your punch press turret. Superior piece part quality, extended machine life and longer tool life is achieved when the upper and lower turrets of a punch press are precisely aligned. New turrets are aligned by the factory technicians and are verified during installation. Over time, used turrets often require some realignment. Mate Pilot Thick Turret Calibration Instruments provide a simple and accurate way to verify the precise alignment of your punch press and perform turret alignment of your punch press when required. The Mate Pilot Turret Calibration System operates in two modes. Verification Mode Used to confirm the precise concentric and angular alignment of your turret to maintain high quality piece parts, extend machine life, improve tool life, and increase productivity. Alignment Mode Used to restore the concentric and angular alignment of each station with the same or better precision as the initial machine installation. Achieving precise alignment improves piece part quality, extends machine life, extends tool life, and increases productivity. The Mate Pilot Turret Calibration System is simply the best system available. Accurate: Each calibration instrument is machined from a single piece of high quality tool steel. The upper and lower halves are separated near the end of the production process, just prior to installation of the hardware. This eliminates the possibility of cumulative tolerances adversely affecting the accuracy of the finished instrument. Simple to Use: Install the two halves of the calibration instrument into the turret station to be aligned. Use the adjustment handle to draw the two halves of the calibration instrument together. The interlocking design of the interface between the two halves causes the loosened die holder to be drawn into concentric and angular alignment relative to the upper bore as the two halves of the calibration instrument engage. The tri-color LED indicator light will glow green to confirm accurate concentric and angular alignment of the tool station. Comprehensive: The Mate Pilot Calibration system with the interlocking design and tri-color LED indicator lights is available to suit 1-1/4" B, 2" C, 3-1/2" D, and 4-1/2" E stations. The alignment tools for 1/2" A stations and Finn-Power Multi-Tool stations use a twin dowel pin design. The Mate Pilot calibration system is also available in two packages to suit thick turret and Finn-Power punch presses. 1

Mate Pilot Turret Calibration System Features Matched Set: The upper and lower calibration instruments are produced from the same piece of tool steel. The two halves are separated near the end of the production process. This ensures both items are precisely matched. Interlocking Geometry: The interlocking geometry of the interface between the two halves causes the loosened die holder assembly, to be drawn into concentric and angular alignment relative to the upper turret bore or tool holder as the two halves of the calibration instrument engage. Concentricity Angularity Position Indicator Light: The Pilot Turret Calibration system is equipped with a tri-color LED indicator light to confirm when the two halves are fully engaged and the upper turret bore or tool holder and lower die holder are accurately aligned. Engaged, but not aligned Angularity and concentricity within 0.0012(0.030) Angularity and concentricity within 0.0003(0.008) - recommended for 0.078(2.00) material thickness or less. Adjustment Handle: Includes knurled tensioning knob to prevent over tightening in verification mode, and T-bar for use in alignment mode. Patent Pending 2

Mate Pilot Turret Calibration System Components A Station-1/2" (12.70) Two dowel pins on the upper assembly engage with two precision machined holes on the lower assembly for precise alignment. Integral lifter handle adds convenience. PN: MATE00670 B Station-1-1/4"(31.70) Interlocking design of interface between two halves draws lower turret into concentric and angular alignment with upper turret. Tri-color LED indicator confirms when precise alignment has been achieved. Integral adjustment handle adds convenience. Hardened and ground double-d shaped pin on lower assembly for precise engagement with keyway in lower turret. PN: MATE00666 C Station-2"(50.80) Interlocking design of interface between two halves draws lower turret into concentric and angular alignment with upper turret. Tri-color LED indicator confirms when precise alignment has been achieved. Precision ground keyways in upper and lower assemblies for precise engagement with alignment keys on turret. Integral adjustment handle adds convenience. PN: MATE00667 D Station-3-1/2"(88.90) Interlocking design of interface between two halves draws lower turret into concentric and angular alignment with upper turret. Tri-color LED indicator confirms when precise alignment has been achieved. Robust construction with hardened and ground surfaces for extended service life Integral adjustment handle adds convenience. PN: MATE00668 3

Mate Pilot Turret Calibration System Care Instructions E Station 4-1/2" (114.30) Interlocking design of interface between two halves draws lower turret into concentric and angular alignment with upper turret. Tri-color LED indicator confirms when precise alignment has been achieved. Integral adjustment handle adds convenience. PN: MATE00669 Multi-Tool Station (Finn-Power) Two pins on the upper assembly engage with two holes on the lower assembly for precise alignment. Precision ground surfaces ensure convenient and accurate installation into turret furniture. Integral lifter handle adds convenience. PN: MATE00671 Accessory Kit Operation of the Mate Pilot Calibration system requires the use of an accessory kit which is sold separately. Note the same kit can be used for each station. Accessory Kit (PN: MATE00662) Comprises: Alignment Bar precision ground bar mounted to the upper assembly. Used in conjunction with dial-test-indicator (not included) to indicate alignment of upper turret with punch press frame. Adjustment Bar used in conjunction with the Alignment Bar to adjust the alignment of the upper turret. Complete Mate Pilot Calibration Systems Two complete Mate Pilot calibration systems are available to suit thick turret and Finn-Power punch presses for added ordering convenience. Station A Station 1/2 (12.70) B Station 1-1/4 (31.80) C Station 2 (50.80) D Station 3-1/2 (88.90) E Station 4-1/2 (114.30) Multi-Tool Station Accessory Kit Part Number MATE00670 MATE00666 MATE00667 MATE00668 MATE00669 MATE00671 MATE00662 Package A MATE00665 Package F MATE00672 Patent Pending 4

Mate Pilot Turret Calibration System Instructions Alignment Mode Step 1 Loosen the retaining bolts of the upper and lower tool holder of the station to be aligned. This will allow the upper and lower holders to move to achieve alignment with the machine axis, and with each other.* Step 2 Install the lower calibration instrument into the die holder and tighten the clamp screw(s) as you would for a die. Step 3 Install the upper calibration instrument into upper holder. Gently lower the upper instrument until the threaded end of the adjustment handle rests on the top of the lower. Caution: Do not allow the upper instrument to drop through the turret as this may damage the instrument. Step 4 Loosely join the two halves of the instrument together by turning the adjustment handle five turns in a clockwise direction. The upper and the lower halves must not be clamped together. The indicator light should not be illuminated. Rotate the turret until the station to be aligned is positioned under the machine ram. * Some turrets have fixed upper tool holders. Thus only the lower tool holders can be loosened. Follow operating instructions supplied with each Mate Pilot Calibration Instrument. 5

Mate Pilot Turret Calibration System Instructions Step 5 Reach into the machine and tighten the adjustment handle using the T-bar until the interlocking teeth of the upper and lower instruments are fully engaged. The tri-color LED indicator light will change color from red, to yellow, and then to green. During this process the upper and lower tool holders will be adjusted into precise concentric and angular alignment. Step 6 Attach the alignment bar to the upper calibration instrument. Insert the adjustment rod. Use the manual jog mode on the machine control to move a dial-test-indicator (DTI) attached to a piece of sheet metal along the full length of the alignment bar. The total indicator reading (TIR) will be <0.001(0.02) when the tool holder is correctly aligned. Step 7 Loosely tighten the fastening bolts on the lower and upper* turret where appropriate. Re-check the alignment of the holders, using the DTI. If the TIR is greater than 0.001(0.02), then repeat step 6. Once the alignment is confirmed, loosen the T-handle by five turns, and return the turret to the tool load position. Fully tighten the upper and lower tool holder. Follow the verification mode to confirm nothing has moved during tightening. Verification Mode (Follow steps 2 to 4 above) Reach into the machine and rotate the tensioning knob on the adjustment handle until the interlocking teeth of the upper and lower instruments are fully engaged and the tensioning knob starts to click. View the color of the tri-color LED indicator light. Red Alignment is not confirmed. Perform an alignment as described in steps 1 to 7. Yellow Alignment is confirmed to within 0.0012(0.030) Green Alignment is confirmed to within 0.0003(0.008) - recommended for 0.078(2.00) material or less. 6