installation care & maintenance instructions moistureshield.com limited lifetime warranty

Similar documents
installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

COMPOSITE RAILING INSTALLATION

Customer Service: Installation, Care and Maintenance

CONTRACTOR CERTIFICATION COURSE

Build Outdoor Stairs. Stair Building Terms There are five basic design elements you'll need to consider when planning outdoor stairs:

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

Step 2 - Measure and install joist hangers every 16". See Figure "B" above. Fill every hole in each

Installation Instructions for. Before You Begin TOOLS REQUIRED

Installation Instructions for. Handrail Component System

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

DECKING INSTALLATION GUIDE

Chapter 1. Beam and Sill Plates

12ft Octagon Bayside Gazebo Assembly Manual

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

The following instructions will guide you through the installation of your new vinyl railing.

Installation Guide (888)

Installation Guide (888)

10ft Octagon Bayside Gazebo Assembly Manual

A Step-by-Step How To Guide

T r e x Art i s a n Se r i e s Railing

DuraLife Porch Collection Installation Instructions

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.

Now available at participating Feeney (2/14) AF# A. Stores. 1/8'' Stainless Steel Cable Assemblies to Enhance Any Railing and Any View!

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12

U. M. ARMY Texas Conference. Wheel Chair Ramp Manual

Vinyl Gazebo Instructions

2x2 Baluster Railings FPO REDWOOD. Naturally beautiful Easy to use Practical and economical Durable and stable Resistant to decay and insects

woodworkersjournal.com MATERIAL LIST

TREX TRANSCEND RAILING

Stair Parts Installation. Tricks

Deck Evaluation Checklist

ATLANTIS RAIL Contact Information

12ft Octagon (Precut) Creekside Gazebo Assembly Manual

4. Components and Stairs

A ledger/header board is the next step if you are attaching your deck to an existing structure.

Chapter 17 - Porch Trim

Installation Guide. 203 Chesterra Drive, Dahlonega, GA Toll-Free ~ Fax ~

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

Grand Garden Chalet 6X3 Assembly Manual - Costco

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

Aluminum Clad Wood Window 1/2 Reinforced Field Mulling and Stacking Supplement

Installation of Balustrade Systems

Curved Baluster Railing Systems

Call (770) STEP 6: Caulk bolt hole within the bracket for protection from the elements.

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

3. Use base plate as template (see FIG. 4-1) to mark location for fasteners.

The following instructions will guide you through the installation of your new vinyl railing stair kit.

10X12 Arched Breeze Pergola Assembly Manual Outdoor Living Today

RAILING R A IL ING 51

Balustrade Systems / Installation Instructions

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS

6X3 Patio Garden Shed Assembly Manual

INSTALLATION INSTRUCTIONS

UltraDeck. Decking & Railing Installation Guide.

INS TA L L AT I O N IN S T R U C T I O N S F O R BEF O R E YO U BE G I N TOOLS REQUIRED

DECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.

TREX SELECT RAILING Installation Instructions

TREX SIGNATURE (FORMERLY REVEAL) RAILING Installation Instructions

RAILING SYSTEM INSTALLATION INSTRUCTIONS

SIGMADEK BOARD TM SAFETY AND ASSEMBLY GUIDE

The Festival Assembly Instructions

COMPACT DECK. Compact Deck Project Plan #850 Sheet 1 of Riverside Dr., Suite 212 Metairie, LA SouthernPine.com SouthernPineDecks.

TREX SELECT RAILING. Installation Instructions PARTS

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

PORCH-LOC INSTALLATION INSTRUCTIONS

12ft X 12ft Attached Breeze Pergola Assembly Manual. Outdoor Living Today. (For Both 9 and 12 High Posts) June 1st/2012 Version #4

INSTALLATION INSTRUCTIONS PRAVOL DURA-SHIELD COMPOSITE DECK RAILINGS

Grand Garden Chalet 6X3 Assembly Manual

IMPORTANT: Read all sections before you start

Assembly Instructions 10 X 10 Aluminum Roof Support

CAUTION: Before opening the crate place it flat on its side (not up right as show in the photo) Hardware included for assembling your gazebo:

Log Railing Systems. Cedar Naturally Develops Cracks and Checks. This is an unavoidable process that enhances the rustic beauty.

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

ATLANTIS RAIL HandiSwage Installation Instructions ATLANTIS RAIL Contact Information Atlantis Rail Systems November, 2013

Create cable assemblies to fit your style

Gambrel Barn with Overhang Manual

RLP Flat Track Hardware sliding door hardware/ barn door track

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

PATIO INSTALLATION MANUAL

COMPOSITE SIDING INSTALLATION GUIDE

Sunrise Deck Assembly Instructions for Kingston Left

Double Beam Freestanding Pergola Installation Guide

12X20 Breeze Pergola Assembly Manual Outdoor Living Today

Chapter 23. Garage Construction

Garden Chalet 4X2 Assembly Manual

1/8 Stainless Steel Cable Assemblies to Enhance Any Railing and Any View!

Build Like a Pro: Building a Deck

GROUND-LEVEL DECK. Ground-Level Deck Riverside Dr., Suite 212 Metairie, LA SouthernPine.com SouthernPineDecks.com

8X10 Breeze Pergola Assembly Manual Outdoor Living Today

SECTION 19: Endwood Fusion Welded Gate Installation Guide

Calistoga Spa Surround

Chapter 16. Underlayment and Finish Stairs

Aluminum Railing Installation. Glass Railing Spindle Railings Intimacy Railings and Panels

INSTALLATION INSTRUCTIONS GUIDE

Post & Rail Crossbuck

Sawn Baluster Sizing and Installation Guide

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

E-Z BUILD STEEL BARN 12' 12' 12' 16' 12' 20'

TREX REVEAL RAILING Installation Instructions

Transcription:

installation care & maintenance instructions 866.729.2378 moistureshield.com limited lifetime warranty

It s comforting to know that you re about to build a deck that gives you every possible advantage. You ll be creating an outdoor space constructed with tremendous strength and versatility, and you ll be doing it without sacrificing beauty. Building a MoistureShield deck results in the creation of a living area that complements the look and feel of any home. Installation Instructions Easy step-by-step instructions for decking, railing and stairs. As with any building project, use proper eye and ear protection and follow local building codes. MoistureShield composite decking is for decking and accessories only. It is not to be used as structural material. Warranty MoistureShield Composite Decking is manufactured by Advanced Environmental Recycling Technologies, Inc. (A.E.R.T.) and warrants MoistureShield products against rot, decay and insect damage with a limited warranty from 20 years to a lifetime, depending on the product. For complete warranty details, please visit our website or call Customer Service. General Cleaning & Maintenance Instructions In an outdoor environment, periodic cleaning will help keep your deck looking new. As with any flooring surface, periodic cleaning is recommended. The following are suggested cleaners for occasional maintenance: Olympic Premium Deck Cleaner Behr 63 Deck Wash Jomax Deck Cleaner Concrobium XT Eco-Wash (non-bleach) For specific cleaning issues, please visit our website www.moistureshield.com or call Customer Service at 866.729.2378.

Decking Systems 1" 5" Essential 1.0" 5.0" LENGTH: 12, 16 and 20 feet 1" 6" Vantage 1.0" 5.5" LENGTH: 12, 16 and 20 feet 2" 4" Board 1.5" 3.5" LENGTH: 12 and 16 feet 2" 6" Board 1.5" 5.5" LENGTH: 12 and 16 feet Trim Board 0.65" 11.25" LENGTH: 12 feet 5/4" x 6" FR 1.1" 5.4" LENGTH: 12, 16 and 20 feet Railing Systems Our railing systems and accessories are designed to naturally complement your MoistureShield deck or porch. 4" 4" Post 4.265" 4.265" LENGTH: 51 inches Post Collar 5.5" 5.5" Post Cap 5.5" 5.5" Baluster 1.5" 1.265" LENGTH: 38 inches and 12 feet Magnum Railing 2.92" 3.95" LENGTH: 6 feet To view our railing systems on completed decks, please visit the photo gallery at www.moistureshield.com. NEED HELP? CALL 866.729.2378

Installation Tools Fasteners All you ll need is a hammer and screw gun, circular saw (carbide-tipped blade with fewer than 20 teeth is recommended), level, tape measure, rasp and blue chalk line. Manufacturer recommends blue chalk since other colored chalk may stain the deck. Each post requires two, 1/2-inch, carriage bolts 8-inches minimum length with 1-1/4-inch flat washer on back with nut. For deck board fasteners, we recommend #7, 2-1/4-inch stainless steel trim head screws for the decking and railing. If you do not want the screw heads to show on the deck boards use the following technique: Using a #7, 2-1/4-inch stainless steel trim head screw, countersink the screw into the decking material approximately 1/4 of an inch. Carbide-tipped blade with fewer Carbide-tipped than 20 teeth. blade with fewer than 20 teeth. Carbide-tipped blade with fewer than 20 teeth. Using your thumb, lightly push the displaced decking material over the hole left by the trim head screw. Carbide-tipped blade with fewer than 20 teeth. Tap with a hammer, this will cover the trim head screw with decking material. *Installation tips: Using a 2-inch driver bit allows you to better gauge screw depth. Tap hole with edge of hammer for best results. Hidden Fasteners Our products are compatible with most hidden fastener systems. Please consult the installation instructions provided by the hidden fastener manufacturer, or contact our Customer Service department at 866-729-2378. For your convenience, some common building code requirements are reprinted here: Residential minimum handrail height is generally 36-inches. Multi-family minimum handrail height is sometimes 42-inches. Baluster maximum spacing is generally 4-inches (clear distance between balusters**). Maximum gap between bottom rail and deck surface is generally 4-inches.** Some codes require a 2-inch maximum gap for multi-family applications. *For additional cleaning tips contact Customer Service at 866.729.2378 or visit w w w.moistureshield.com. ** Spacing note: The precise language is generally do not allow passage of a sphere 4-inch in diameter. Be sure to check on the tolerance requirements of your local building code.

Post & Decking Installation 1. Layout and install joists at either 16-inch on-center (OC) when decking will be installed perpendicular to the joists, or 12-inch (OC) when deck boards will be installed diagonally or at an angle to the joists. Joists must be level. 2. Attach posts to decking frame. DO NOT NOTCH POSTS. The maximum distance from center of post to center of post is 72-inches. Square and level posts. A. Block posts and attach to rim joists with two bolts (1/2-inch carriage bolts 8-inch - minimum length with 1-1/4-inch flat washer and nut on back). Corner Post Blocking Interior View Corner Post Blocking Exterior View Bolt positions: The top bolt to be no more than 3-inches below the finished deck surface and the bolt spacing to be no less than 4-inches on-center. NEED HELP? CALL 866.729.2378

3. Install MoistureShield decking using 2-1/4-inch, #7 stainless steel trim head screws, two screws per board per joist recommended. Screws should be a minimum of 1/2-inch from the board end. A. Allow 1/4-inch side-to-side spacing between deck boards. Allow 1/8-inch (or greater) end-to-end spacing between ends of boards (butt joints). If installing in freezing weather, leave 1/4-inch (butt joints). B. Cut deck boards to fit around post. Leave 1/8-inch gap between board and post. *Installation tips: Double joist at butt joint to ensure plenty of room for fasteners. Pre-drill using a 7/64-inch bit when too close to the edge to prevent splitting. Drive screw at a slight angle into joist. C. Staggering the butt joints on long decks usually improves the overall appearance of the finished deck. Some people also prefer a distinctive pattern for the deck boards. To achieve an interesting design, install a pattern board, which eliminates butt joints. D. Once the boards are in place, adjust the blade depth of your saw to match the thickness of your deck boards. Use a blue chalk line to mark your cut and go. To avoid staining the deck boards, use blue carpenter s chalk. Rasp the edges to finish. 4. Slip post collar over post onto deck if installing. *Installation tips: Router or rasp end of deck board using 1/4-inch round for a finished look. Allow 3/16-inch overhang for any rim joist imperfections (straight). If you choose not to use the trim board, maximum recommended overhang is 1-1/2-inches.

Railing Installation Railing Orientation - Magnum Railing: To use the magnum railing, the top magnum rail must be installed with the long leg (4-inch) in the horizontal orientation. The balusters sit on the ledge of the bottom leg of the bottom magnum rail and are covered by the top magnum rail leg. The top and bottom magnum rails allow the balusters to face either toward or away from the deck depending on which way the consumer prefers the rail system to be installed. For ease of installation, your railing kit comes with the following pieces: 2 6-foot magnum railings (one top and one bottom rail) 14 balusters 1 post 5. Cut two temporary blocks from scrap material to the height you want the toe sweep (no less than 2-inches nor greater than 4-inches). Place on inside of posts sitting on decking. 4" 3" A. Set bottom magnum rail on blocks (with the 4-inch leg resting on the blocks) and center on post. B. Place baluster against post and sit it on the bottom magnum rail (1-1/4-inch side against the post). Baluster 1-1/4" Temporary Blocks *Installation tip: Use clamps to secure for easier installation. C. Using 2-1/4-inch, #7 stainless steel trim head screws, secure baluster to post, two screws at each end, and three additional screws evenly spaced between the end connections. D. Place second baluster against opposite post and repeat step C. NEED HELP? CALL 866.729.2378

6. 7. Secure bottom magnum rail to each post baluster using two, 2-1/4-inch, #7 stainless steel trim head screws, repeat on other end of bottom magnum rail. Place top magnum rail on balusters (see railing orientation for details) and repeat fastening as in step 6. In addition, angle (toe nail) two, 2-1/4-inch, #7 stainless steel trim head screws from top magnum rail directly into each post. 8. Place a support block every two feet between bottom rail and decking for support. Secure support block with one, 2-1/4- inch, #7 stainless steel trim head screw through the bottom rail into the support block.

9. Use the formula below to determine the amount of balusters you need and the spacing between them. Measure the distance in inches between the inside of one post baluster to the inside of the other post baluster. This is your total space. 10. Attach baluster to top and bottom magnum rails using one, 2-1/4-inch, #7 stainless steel trim head screws. (4-inch maximum distance between balusters, visible opening check local building code). A. Divide the total space by 5, and round it off to a whole number. This is the number of additional balusters you need. B. Multiply the value in (A) by 1.5 and subtract it from your total space. *Installation tip: 3-1/2-inches between balusters is always a good starting point. C. Divide the value in (B) by the value of (A+1). This is the spacing between the balusters. You may want to cut two spacer blocks from scrap material or a baluster, the same width as answer C, and use these two spacers at top and bottom to place each baluster. 11. Attach post caps to top of post. 12. Additionally, for a finished look, install trim boards over the rim joists. Position flush with the top of the decking. *Installation tip: Quality outdoor adhesive can be used for caps. A. Attach using 2-1/4-inch, #7 stainless steel trim head screws. One screw through the end or side of the decking, and three screws into the rim joist vertically. Repeat this step every 10-12 inches horizontally through the length of the trim board. B. We recommend putting the screw through the thickest part of the deck board (center between the top of the board and the bottom of a rib) when attaching the trim board, then the other three into the rim joist. NEED HELP? CALL 866.729.2378

45 Degree Railing 13. Attach posts to decking frame. Square to straight side of rim joist and level. Follow procedures 2-4 to install posts and decking. 14. Determine the angle of the top magnum rail. A. Lay a top magnum rail centered on top of the two posts and mark angle (see railing orientation) and cut. B. Mark and cut the bottom magnum rail the same way, making sure to lay the 4-inch leg on the posts. 15. A. Place bottom magnum rail on blocks that are cut to the toe sweep height desired (no less than 2-inches nor greater than 4-inches) 4-inch leg lying on blocks. B. Place baluster with 45-degree cut side against the post positioned at the 45-degree corner and sit on the bottom magnum rail. Attach it to the post using procedure #5C. C. Place a regular baluster against the diagonal baluster, sitting on bottom magnum rail and attach with three, 2-1/4- inch, #7 stainless steel trim head screws, evenly spaced top to bottom. 16. Finish with steps #5D through #11 with the exception of the post baluster that has been installed already in this 45-degree section (step #14).

Stair Railing 17. Attach posts to stair stringers (stringers should be placed 12-inch OC or less). Square posts to stringers and level. Be sure posts measure no more than 72-inches from outside to outside at the angle of the stairway when using as a stair rail. Guard rail sections are sold in 72-inch lengths and must be trimmed to fit between the posts. Allow for decrease in length from angle cuts. A. Follow step #2 to install posts to stair stringers (use corner post blocking method). 72" Maximum 18. Install deck boards. Boards may be flush with riser or extend past the riser by 1-inch. Use two, 2-1/4-inch, #7 stainless steel trim head screws per board per stringer. A. Optional: Cut and install kick boards (deck boards) along each stair rise. B. Install post collars if desired. C. Cut and install trim board on stringers if desired. Use procedures in step #12. NEED HELP? CALL 866.729.2378

19. Lay a top and bottom magnum rail along the edges of the steps and up next to the post. A. Position both rails for marking with the 2-5/8-inch leg lying on the steps. 72" B. Mark the rails on the inside faces of the two upright posts. C. Cut each rail along this mark (line). 20. Position bottom magnum rail 1/2- inch above edges of steps (check local code) support on blocks cut from scrap material. 21. Cut ends of two balusters at the same angle as the top and bottom magnum rails and use them as the post balusters. 22. To complete stair railing follow steps #5B through #11.

Contact Customer Ser vice at 866.729.2378 for more information or visit w w w.moistureshield.com

NEED HELP? CALL 866.729.2378

Your Authorized Dealer: For more information on our products, visit www.moistureshield.com or call 866.729.2378. These railing system components are to be installed with strict accordance with the procedures described in these MoistureShield Installation instructions. Testing these railing systems has shown that they meet the requirements of the major model building codes in the U.S. Colors shown are as close to actual as printing reproduction will allow. MoistureShield professional grade decking and MoistureShield railing systems and accessories are manufactured by Advanced Environmental Recycling Technologies and covered under ESR-2388. It s always better when you work with nature. Remember to recycle. 2011 Advanced Environmental Recycling Technologies, Inc. All trademarks are property of Advanced Environmental Recycling Technologies, Inc., unless otherwise noted. All rights reserved. February 2011.