TOOLS REQUIRED. Recommended Adhesives Vinyl Bonding:

Similar documents
Installation Instructions for. Handrail Component System

Before You Begin IMPORTANT. Always wear safety glasses when cutting and drilling railing or decking products.

Installation Instructions for. Before You Begin TOOLS REQUIRED

Before You Begin IMPORTANT. Always wear safety glasses when cutting and drilling railing or decking products.

Before You Begin IMPORTANT. Always wear safety glasses when cutting and drilling railing or decking products.

Before You Begin IMPORTANT. Always wear safety glasses when cutting and drilling railing or decking products.

INSTALLATION INSTRUCTIONS GUIDE

INS TA L L AT I O N IN S T R U C T I O N S F O R BEF O R E YO U BE G I N TOOLS REQUIRED

The following instructions will guide you through the installation of your new vinyl railing stair kit.

2017 UPDATED INSTALLATION INSTRUCTIONS

Before You Begin IMPORTANT. Always wear safety glasses when cutting and drilling railing or decking products.

RAILING COLLECTION STEP-BY-STEP T OOLS YOU WILL NEED INSTALLATION INSTRUCTIONS TABLE OF C ONTENTS O PTIONAL MAY BE HELPFUL R EQUIRED FOR INSTALLATION

The following instructions will guide you through the installation of your new vinyl railing.

Before You Begin IMPORTANT. Always wear safety glasses when cutting and drilling railing or decking products.

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12

General Guidelines:

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

Before You Begin IMPORTANT. Always wear safety glasses when cutting and drilling railing or decking products.

PVC Composite Railing & Stair Kit

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

Chapter 17 - Porch Trim

COMPOSITE RAILING INSTALLATION

Vinyl Fence Products. Installation Guidelines. Hyde Park with H-Post Fence

PORCH RAIL INSTALLATION INSTRUCTIONS. Level Rail... 2 Stair Rail... 8 Care & Maintenance, Finishing... 15

CertainTeed. Decking & Railing Systems

A Step-by-Step How To Guide

TREX SELECT RAILING. Installation Instructions PARTS

Figure 1. RAILING INSTALLATION The following instructions describe the installation of three types of railing sections: Line, Stair, and Angled

DekPro Prestige Aluminum Rail System Level Railing Installation Instructions

Installation Instructions

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

Independent Containment System (ICS)

Dura-Lock Roof System

ATLANTIS RAIL Contact Information

Regency Railing. Rail Installation Instructions

42" Hybrid Composite Railing Installation Guide. v

SUREWOOD ~ LNL. How to build a staircase like a pro. Post-To-Post Staircase System. Identify Your Type of Post-to-Post Staircase: Landing Newel Post

TREX SELECT RAILING Installation Instructions

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

Continuous Handrail Kit Installation Instructions

FIXED SHOWER SCREEN For Wall Mount Hinges QCI5283

CertainTeed Panorama Composite Railing System. Sturdy good looks that offer lasting beauty.

Frameless Inline Door QCI5248

HANDRAIL HEIGHT PER LOCAL CODE AUTORITY

ALL SEASON PATIO COVER

Installation Instructions

Frameless Inline Door With Return QCI5263

2015 Feeney (8/15) # D. Aluminum Railing Systems

installation care & maintenance instructions moistureshield.com limited lifetime warranty

HANDRAIL HEIGHT PER LOCAL CODE AUTHORITY

DeckRail A Product of DeckRite LLC 3912 East Progress North Little Rock, AR Phone: (501) Fax: (501)

Straight Stringer Installation Instructions

TREX REVEAL RAILING Installation Instructions

INSTALLATION INSTRUCTIONS DECK AND RAILING T OOLS YOU WILL NEED

2013 Feeney (2/14) # B. Aluminum Railing Systems

Tools Needed. 8 per column: stainless steel or hot-dipped galvanized bolts. Mallet

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

HANDRAIL HEIGHT PER LOCAL CODE AUTORITY

SUREWOOD ~ LNL. How to build a staircase like a pro. Post-To-Post Staircase System. Identify Your Type of Post-to-Post Staircase: Landing Newel Post

I N S T A L L A T I O N I N S T R U C T I O N S. RailEasy MARINER

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

Aluminum Railing Installation. Glass Railing Spindle Railings Intimacy Railings and Panels

Installation Instructions 800/800W/855/G2-800 Continuous Bracket Handrails

Installation Instructions

Multi-Stage ASSEMBLY INSTRUCTIONS ST-8100 SERIES. 125 TAYLOR PARKWAY ARCHBOLD, OH PHONE: (419) FAX: (419)

PREPARATION & TOOL CHECK LIST

Installation Instructions

FIXED PANEL SLIDER QCI5241

36" Hybrid Composite Railing Installation Guide. v

Qwik-Fence Installation Instructions

Country Estate Railing Installation Guide

Installation Instructions

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

CountryAccents Pergola Assembly Instructions

T r e x Art i s a n Se r i e s Railing

AWNING / PATIO COVER INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Harmony 1/4 Glass Railing Installation Instructions - Deck Application

VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS

ENDURANCE PRODUCT LINE

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Deck Mount Installation with Bench

1.9 round ADA compliant railing for Residential & Commercial applications

METALWORKS TARTAN PANELS General Installation Instructions

Fireball Fab Welded Baluster Insert Panel System Installation Instructions

#11179 Wellington ARBOR

Call (770) STEP 6: Caulk bolt hole within the bracket for protection from the elements.

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

Chalk Line. #4 Phillips Driver Bit. Cable Cutters

INSTALLATION MANUAL. 2. Check with local utility companies for locations of underground cables or pipe lines.

Frameless Inline Door QCI5250

Assembly Instructions

Installation Guide (888)

Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE. Patterson Sauna Installation & Owner s Manual

INSTALLATION MANUAL. 2. Check with local utility companies for locations of underground cables or pipe lines.

Full Line Catalog STRUCTURAL VINYL RAILINGS

Transcription:

Assembly Instructions STEP-BY-STEP HANDRAIL INSTALLATION for 1-1/2" vinyl handrail component system Rise in Inches Run in Inches 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15 8.5 47 45 43 42 40 39 38 36 35 34 33 32 31 30 30 8 45 43 42 40 39 37 36 35 34 33 32 31 30 29 28 7.5 43 41 40 38 37 36 34 33 32 31 30 29 28 27 27 7 41 39 38 36 35 34 32 31 30 29 28 27 27 26 25 6.5 39 37 36 34 33 32 31 29 28 27 27 26 25 24 23 6 37 35 34 32 31 30 29 28 27 26 25 24 23 22 22 Calculated Angle in Degrees BEFORE YOU BEGIN HELPFUL HINTS Read these instructions thoroughly before beginning the assembly. Donotlayvinylcomponentson abrasivesurfaces. Donotuseexcessiveforcewhile assemblingcomponents. Ifanycomponentsaremissing ordefective,pleasecallusat 800-380-5323. IMPORTANT: ALWAYS WEAR SAFETY GLASSES WHEN CUTTING OR DRILLING VINYL PRODUCTS. TOOLS REQUIRED HacksaworChop/MitreSaw withcarbide-tippedcuttingblade Drill PhillipsHeadScrewdriverorBit 3/8"MasonryDrillBit (for concrete installation) 3/4"DrillBit TapeMeasure Angle Finder Quick-Clamps Pencil Adhesive Recommended Adhesives Vinyl Bonding: -Christy swhitehotvinylcement Aluminum Bonding: -Loctite Metal/ConcreteEpoxy -Gorilla Epoxy-ImpactTough -J-BWeld -2PartEpoxy -Loctite ExtraTimeEpoxy HANDRAIL APPLICATIONS Stringer lay-out for Handrail Transition Bends Itisrecommendedthateachofthehandrail componentsbedryfitbeforefinalinstallationto eliminate cutting and gluing errors. Whencuttinghandraillineals,alwayscutthevinyland aluminum together to the same length using a miter sawwithacarbide-tippedbladewithatleast60teeth. 34-38" Commercial and Residential Determinelayoutofhandrailandtherequirementsat terminationpoints,transitionalbendsand/orreturns towallsorposts.spacingofbracketsshouldbea maximumof6'oncenter. Determinedesiredhandrailheight.Finishedhandrail heightshouldbe34"to38"forcommercialand residentialapplicationsmeasured from the leading edgeofthestairtreadorlandingtothetopofthe handrail. Thefollowinginstructionswillpositionthehandrail atapproximately35"abovethelandingorstairtread. Youmayneedtomakeadjustmentsforyourspecific applicationortomeetlocalbuildingcodes. Refertothe SuggestedLayout insideforhelpful information to get organized.

STANDARD INSTALLATION ATTACHMENT TO CERTAINTEED VINYL POST SUPPORT SYSTEM For ramp applications, we recommend using CertainTeed FLAT post support kits and FLAT routed posts. ATTACHMENT TO CERTAINTEED VINYL SLEEVE-OVER SYSTEM Oncepost supports areinplace, replace one of the standardez Setbrackets from the upperlocationwithaspecialhandrailez Setbracketandattachatapproximate heightposition.installasaminimumthe postsandtoprail(s)guardrailsystem. For each post,draw a horizontal pencilline across the postatthe pointonthe downward sidewherethe(lower)railmeetsthepost. For the bottom end postatthe base of the stairs or ramp,you ll need to transfer the angle of the guardrail diagonally across the postandthenconnectwithahorizontalline. 4-1/4 for 36" 10-1/4 for 42" Mark bracket attachment pointin center of eachpost downward from line. Locationofhandrailbracketwhenusedwith 36"guardrailingis4-1/4"belowline;for42" guardrailing,itis10-1/4"belowline. Repeattheaboveprocessforall remainingposts. Remove postfrom assembly. Drill3/4"hole through side ofvinylpostat mark. Placevinyl postnextto steelpipe to transfer this height andposition upperezset bracket. Replacepost and guardrail section. (Ensurethat 3/4"hole alignswith hole in center ofhandrailez Setbracketfor eachpost). Attach handrail bracketswith 3/8"-16x 1-1/2"bolts. Donottighten completely at this time toallowfor adjustment. Usingalevel andatape measure, lightly mark the location ofthetopof the handrail ontothewall orpost,at the mounting positionand snapachalk linefromtop to bottom. Note: For most applications, thetopof the handrail wouldbe 34"-38" abovethe nose of the stair tread or standing surface. Markthe mounting locations for the brackets on the postatthe appropriate height using ascrapsampleofhandrailasaguide.make thetopofthehandrailconsistentatall locationsmarkedabove. Installthemountingbrackettothe postwithfastenersbestsuitedforyour application. NOTE:Vinylpostsalonedonotprovide adequatefastenerretention.ifnotusing aspecialezsetbracket,youmustprovide awoodorcompositeblockinsidepost atbracketlocationsforproper fastening retention.

ATTACHING HANDRAIL TO BRACKETS ATTACHMENT TO CONCRETE WALL ATTACHMENT TO WOOD WALL ATTACHING HANDRAIL TO BRACKETS Marka point 31-1/4" upward vertically from the leading edgeoftop and bottom stair tread. Snapa chalk line between marks. Mark locations for brackets along line (6 maximumspacingand1 maximum overhangbeyondlastbracket). Usinga3/8" masonry drillbit, drill holes 2-3/4"deep at each location. Insert concrete wall anchors and attach handrail brackets (Donot tighten completelyatthistimetoallowfor adjustment). Ensurethatwallisstructurallysound. Followinstructionsforconcretewallexcept bracketattachmentpoint(s)mustbeona studwherethestringlinecrosses.mark bracketattachmentlocations(6 maximum spacing). Substitute3/8"x2-1/2"longlagscrew(not included)inplaceoftheconcreteanchorto attach handrail brackets. Y X alongangle(distance X ). Measure the distance from center oftop bracket to center of bottom bracket Add any needed additional length to this measurementforhandrailextension beyondbracketsorpostsatboththetop andbottomofthesection(1ft.maximum overhangperend;distance Y ). Note:Allsplicesofhandrailmustoccur within6"ofbrackets(nosplicesbeyond the last bracket in a run). Cutandfit the1-1/2" vinylto followyour layout. Startingat thetopof the handrail installation andworkingtowardsthebottom, dry assemblethevariousvinylhandrail componentsaccordingtoyourdiagram. Componentscanbetemporarilyclamped inplacetothemountingbrackets installedtothepostorwall,untilallfinal adjustmentsaremade.markandtrim allvinylhandrailcomponentstoproper length and test for tight fit. Whencuttinghandraillineals,alwayscut thevinylandaluminumtogethertothe samelengthusingamitersawwitha carbide-tippedbladewithatleast60teeth.

ATTACHING HANDRAIL TO BRACKETS (CONTINUED) STRAIGHT JOINER- F74070 NOTE:Formaximumstrength,allhandrail jointsshouldbesupportedbyahandrail bracketatthejoint,oratthenearest possiblelocation. 1.Cuthandraillinealstolength. 2.Permanentlyattachthefirsthandraillineal. 3.Applyaluminumadhesiveandslidethe internaljoinerhalfwayintothevinyllineal. TIP:Ifpreferred,thehandrailjointringcan be installed to conceal the joint using a dabofvinyladhesivebeforesecondlineal isinstalled.refertothefirstpageofthis guide for more information. 4.Applyadhesivetothesecondhandrail lineal.slidehandraillinealontojoiner. Mountinplace. ADJUSTABLE JOINER- F74062 NOTE:All adjustable joiners should besupported by a handrail bracket as closely as possibleto each side of the joint. 1.Measuretheangleofthejointandcut linealsaccordingly.dryfitbothhandrail lineals,makingsurethatthemitercuts matchproperly. TIP:Whilelinealsareinplace,reference marks can be made on the lineals and mountinghardware,toensureproper alignment during final installation. 2.Positiontheadjustablejoineronthe outside of the handrail and tighten the boltattheappropriateangle. 3.Dryfittheassemblyandadjustif necessary. TIP:Usethejoinerboltasareferencetokeep themitercutsinproperalignment,aligning thecenteroftheboltwiththemitercut. Once all components are glued and temporarily clamped to brackets secure your finished handrail assembly to the brackets by using two#10-16x1"screwsprovided. Pre-drill and insert screws frombelow. Repeatat all bracket locations. Check handrail foroverallstrength,addingadditional aluminumbrackets,asneeded,toachieve desired strength. 4.Apply aluminum adhesiveand assemble the joint. 5.Permanently attach the handrail lineals to the mounting support. 6.Inserttheadjustablejoinerintothe attachedhandraillineal.slidethesecond handrail onto the adjustable joiner and permanentlyattach. NOTE:Jointshouldbeclampedinplaceuntil adhesivehashadtimetocure.

SUGGESTED LAYOUT VINYL HANDRAIL COMPONENT SYSTEM ComplieswithADA(AmericanswithDisabilitiesAct) requirementsforgrippablehandrails 1-1/2"diametergrippingarea Continuoushandrailruns Safeforstairandrampapplications Aluminumreinforcedconstructionreducesbowingand providesenduringstrength Functionalfinishingtouches:postandwallreturns,end capsandloops Uniqueadjustableinternaljoineraccommodatesany transition 0 to90 bends Installseasilyonsitewithnopreformedfittings IdealforusewithEverNew railing systems Virtuallymaintenancefree Lifetimelimitedwarranty EZSetbracketkitavailableforattachmenttoroutedsystem 1.1-1/2"diametervinylendcap 2.Straightaluminumjoiner 3.Straightwallreturn(includesvinyltrim) 4.Adjustablealuminuminternaljoiner 5.1-1/2"ODADA180 returnloop 6.1-1/2"OD-90 corner-includestwo3"aluminumjoiners 7.1-1/2"OD-90 wallreturn-includes3"aluminumjoiner 8.1-1/2"ODx80"vinylhandrailwithaluminuminsert 9.1-1/2"ODx104"vinylhandrailwithaluminuminsert 10.1-1/2"ODx120"vinylhandrailwithaluminuminsert 11.Handrailbracketassembly 12.HandrailEZPostattachkit 7 10 11 7 Note:handraildepictedisnotfreestandingandmustbeanchoredtowallsorguardrailusinghandrailbracketassembly(E74028/E74029). Spaceamaximumof6'oncenterandascloseaspossibletobothsidesofanyjoint.

CARE AND MAINTENANCE CARE & MAINTENANCE Exteriorvinylbuildingmaterialsrequire verylittlemaintenance.nevertheless, common sense dictates that builders and suppliersofvinylproductsstore,handle, andinstallvinylmaterialsinamanner thatavoidsdamagetotheproductor structure. CertainTeeddeckandrailingisnot difficulttoworkwith,buttherearea fewprecautionsthatyoushouldknow about before you begin to unload and installtheproduct.alwaysplaceplanks, posts,rails,andaccessoriesonanonabrasivesurface,suchasadropclothor cardboard,toavoidscratches.protect allcomponentsduringtransport.finally, whenassemblingthedeckandrailing, avoidover-tighteningthescrews. CLEANING CertainTeedvinyldeckandrailingresists mostcommonhouseholdstains,including oilandgrease.but,likeanyotherproduct, itwillgetdirtywhenitisexposedtothe atmosphere.chalkmayalsoaccumulateon thesurface.thisisanormalconditionfor allpigmentedmaterialsthatareconstantly exposedtosunlightandtheelements.soil, grime,andchalkcanberemovedwitha gardenhoseandabucketofsoapywater. Insomeareas,mildewmaybeaproblem. Mildewappearsasblackspotsonsurface dirt and is usually first detected in areas not subjectedtorainfall,suchaseavesandporch enclosures.youcanremovemildewfrom vinyldeckandrailingwiththesolutionbelow. CAUTION:CLEANINGSOLUTIONMIXEDAT GREATERCONCENTRATIONSMAYHARM THEVINYL. Mixtogether: 1 3cupdetergent(Tide,forexample) 2 3cuptrisodiumphosphate (Soilex,forexample) 1qt.5%sodiumhypochlorite (Clorox,forexample) 3qt.water Iftheabovesolutiondoesnotreadilyremove themildewspots,purchaseamildewcleaner fromyourlocalhardwarestore.beforeyou useanycommercialcleaner,testitonan inconspicuousarea. Thechemicalagentsmentionedabovemaybe hazardoustotheuserortotheenvironment. Besuretofollowallprecautionsandwarnings ontheproductlabel,particularlythosethat maybenecessarytopreventpersonalinjury. PleaseDISCARDthesechemicalagentsinthe mannerprescribedbythemanufacturer.if youareunsurehowtouseordisposeofthese chemicalagents,contactthemanufacturer. IMPORTANT FIRE INFORMATION Rigid vinyl deck and railing are made from organic materials that will not burn on their own but melt or burn when exposed to a significant source of flame or heat. Consequently, owners and installers should take a few simple steps to protect vinyl building materials from fire. Building owners, occupants, and outside maintenance personnel should always take normal precautions to keep sources of fire, such as barbecues, and combustible materials like dry leaves, mulch and trash, away from vinyl deck and railing. Christy swhitehotvinylcementisaregistered trademarkoft.christyenterprises,inc. Loctiteisaregisteredtrademarkof HenkelCorporation EpoxyImpactToughisregisteredatrademark ofthegorillagluecompany ASK ABOUT OUR OTHER CERTAINTEED PRODUCTS AND SYSTEMS: EXTERIOR: Roofing Siding WindoWS fence Railing TRiM decking foundations PiPe INTERIOR: insulation gypsum ceilings CertainTeed Corporation P.O. Box 860 Valley Forge, PA 19482 Professional: 800-233-8990 Consumer: 800-782-8777 www.certainteed.com Code No. 40-70-828B, 1/10 CertainTeed Corporation