Some Supplementary Review Information for ARMs

Similar documents
Application for Drive Technology

Transmission Substation Field Instructions

Claim Amalgamation. Getting Started. Amalgamate means to join 2 or more cell claims into one cell claim. Before you start:

Kennecott Utah Copper Corporation Safety and Health Standards

1.12 Equipment Manager

PRODUCT SAFETY ALERT

Standard Authorization Request Form

WiFi Lab C. Equipment Needs:

DXF2DAT 3.0 Professional Designed Computing Systems 848 W. Borton Road Essexville, Michigan 48732

SVT Tab and Service Visibility Tool Job Aid

PotashCorp Tier 1 Safety Standard FLAME RESISTANT CLOTHING (FRC)

TC 60 THERMOCOMPUTER TC 60. prog. start stop. Operating Instructions

Operating Instructions

NATF CIP Requirement R1 Guideline

Operating Instructions

SunGuide TM GUI Design Review Release 3.1 Express Lanes Meeting Minutes Date: March 10, 2008 Location: Video Conference

INSTALLATION INSTRUCTIONS

Victorian Student Number Data Quality and Process Guidelines for Victorian Government Schools

Radiation Standard Procedures Sealed Source. RSP-4 Page 1 of 12. Environmental Health and Safety Radiation Protection Committee

Biochemistry Laboratory II CHEM Course Syllabus

Dorsey s Search. Name Address Home Telephone Work. Address. Property Owner s Signature

AccuBuild Version 9.3 Release 05/11/2015. Document Management Speed Performance Improvements

PhotoVu Digital Picture Frame Service & Repair Guide

Application Package Checklist ITEMS MUST BE REVIEWED AND APPROVED BEFORE AUTHORIZATION IS GIVEN TO INTERCONNECT WITH UTILITY.

Dialectical Journals. o o. Sample Dialectical Journal entry: The Things They Carried, by Tim O Brien Passages from the text Pg#s Comments & Questions

TRANSPORTADORA DE GAS DEL PERU

C&E Mobility Policy (Standard)

How to Install a Slate Tile Floor By See Jane Drill TM Copyright 2014, All Rights Reserved

Big Kahuna Assembly Instructions

VILLAGE COORDINATOR AGREEMENT

Art I Woodside High School Ms. Julie Marten Course Syllabus

Dry Contact Sensor DCS15 User Manual

PAPER SPACE AND LAYOUTS

Figure 1: A Battleship game by Pogo

Excel Step by Step Instructions Creating Lists and Charts. Microsoft

Installing a Squeak-Free Nascor Floor System

DynaRound Hatch Guard System Installation Instructions

Photoshop Elements: Color and Tonal Correction Basics

You Be The Chemist Challenge Official Competition Format

Acceptance and verification PCI tests according to MIL-STD

Effective Presentations

Reliability Coordinator Procedure

.,Plc..d,~t l~ucjio PA300 DIGITAL BASS PROCESSOR USER'S MANUAL. 2 Why use the DIGITAL BASS PROCESSOR? 2 About the PWM Subsonic Filter

Tension meter dynaline HF45/LPT

King Saud University. College of Engineering. IE 341: Human Factors Engineering

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST CITY OF NOVI Community Development Department (248)

IONIA COUNTY Public Summary of FOIA Procedures and Guidelines

Pulse Width Modulation (PWM) Cornerstone Electronics Technology and Robotics II

ROSCOMMON COUNTY Public Summary of FOIA Procedures and Guidelines

21 st Century Shooting

Introduction to Life Cycle Risk Management Help Page

idcv Isolated Digital Voltmeter User Manual

Specification for Learning and Qualifications for Physical Intervention Skills

This app uses callas pdftoolbox server as the imposition engine and consequently you have to have that program installed on your Switch server.

American Association of State Highway and Transportation Officials

Radiofrequency Radiation Assessment Report

PS PLANT & EQUIPMENT ISOLATIONS & LOCKOUTS

Security Exercise 12

2015 Chevrolet Corvette Corvette Service Manual Body Systems Vehicle Access Repair Instructions Document ID:

COMP 110 INTRODUCTION TO PROGRAMMING WWW

Troubleshooting Guide StarFire Satellite Changes

Pre-Installation Preparation Job Aid

Experiment 4 Op-Amp Circuits

The demand for a successful flaw analysis is that the test equipment produces no distortion on the echos no noise. I _... I i.j J...

CAMPBELL COUNTY GILLETTE, WYOMING. Electrical Inspector Senior Electrical Inspector

INSTALLATION INSTRUCTIONS

Cleveland Public Theatre. Catapult. Request for Proposals. Deadline for submissions is Monday, June 12 th, 2017

Automated Meters Frequently Asked Questions

Experiment 7 Digital Logic Devices and the 555-Timer

Upgrading to PlanetPress Suite Version 5

Guidelines for Preparation of Accepted Papers (Full Length) / Posters

Switch to Save Program. Frequently Asked Questions

Communication Protocol Procedure

(DRAFT) ENCINITAS COMMUNITY EMERGENCY RESPONSE TEAM (ECERT) Communications Plan. ECERT Communications Plan Rev. 0.2 Page 1 of 12

SISTEMA ELEVATÓRIO ETV 460A

Experiment 7 Digital Logic Devices and the 555-Timer

TUTORIAL I ECE 555 CADENCE SCHEMATIC SIMULATION USING SPECTRE

6 th Grade Jingle Composition Project

Using the Laser Cutter

3: Community Gathering Space

Using the Register of Swiss Surnames

Laser Equipment Companion Manual

RiverSurveyor S5/M9 & HydroSurveyor Second Generation Power & Communications Module (PCM) Jan 23, 2014

Martel LC-110H Loop Calibrator and HART Communications/Diagnostics

Consciousness Shifting

RZ251W. Remote Sensing & Zoning Installation Guide. Quick Reference. Wireless Range

RIG SOLAR FILM. High quality clear 48 gauge Polymer material \V;th excellent transmission qualities.

ASSEMBLE ALUMINUM TOOLBOX

The UNIVERSITY of NORTH CAROLINA at CHAPEL HILL

ACA Standard Measurement One-time program

MISSOURI S&T SPORTS MEDICINE. CONCUSSION MANAGEMENT PROGRAM (Updated May 2017)

Application for Registration of Designated Radiation Equipment Class 3b and 4 Lasers

LANGUAGE ARTS MATH. See you in September! Eighth Grade Teachers

Producing Research Posters

Meaningful Use Stage 2- Menu Measure 3 Imaging Results Configuration Guide

Light Activated Programmable Digital Thermostat

BILLING POLICIES AND PROCEDURES FOR ALL PROVIDERS

Information Article. Relevance

Unit 123 STAC Conditions of Contest Aug 2016

E-Jobsheet Tablet Application Functionality

Transcription:

General Infrmatin Regarding Radilgical Areas Sme Supplementary Review Infrmatin fr ARMs As a class f areas, Radilgical Areas are designated in 10CFR835. This has a different meaning than ur use f the designatin Radilgically Cntrlled Area. Radilgical Areas include the fllwing: Radiatin Area High Radiatin Area Cntaminatin Area/High Cntaminatin Area Airbrne Radiactivity Area Of these, ARMs are nly respnsible fr psting and managing Radiatin Areas. Discvery f, r suspicin that anther radilgical area exists shuld result in ntificatin f RadCn. The definitin f and psting requirements fr Radiatin Areas are specified in 10CFR835. N deviatin frm these requirements is permitted. This means that a Radiatin Area must be psted unless yu have adequate direct cntrl ver entry t the area. Specifically, the 835 requirements fr the psting include: - Clear and cnspicuus psting f signs - Magenta r black n yellw radiatin trefil symbl, and the wrds Cautin, Radiatin Area Psting may be excepted under the fllwing cnditin: - Areas may be excepted frm the psting requirements f 835.603 fr perids f less than 8 cntinuus hurs when placed under cntinuus bservatin and cntrl f an individual knwledgeable f, and empwered t implement, required access and expsure cntrl measures [i.e., an ARM]. The abve applies t accessible areas. If areas are inaccessible, they are nt required t be psted. Practical Implicatins f Abve - Remember, the definitin f Radiatin Area is: radiatin level abve 5 mrem/hr at a pint 30 cm (1 ft) frm any surface frm which radiatin is emitted. - Use cnservative measures when psting Radiatin Areas place bundaries as reasnably far beynd the actual pint where the dse rate drps belw 5 mrem/hr as practicable. - Make sure signage has at least the minimum verbiage required. - Failure t identify and prperly pst a Radiatin Area (r ther Radilgical Area) is an infractin n 10CFR835. ARMs are directly respnsible fr meeting the regulatry requirements during perfrmance f entry surveys. Additinal verbiage n signs is required by JLab prcedures. In general, fllw these guidelines. - If 30 cm dse rate is < 25 mrem/hr, use Cntact RadCn Prir t Entry insert. Cnditinal insert Walkthrugh Permitted can be used - If 30 cm dse rate > 25 mrem/hr, use RWP Required fr Entry insert.

RCAs The designatin Radilgically Cntrlled Area RCA, is a JLab-specific psting, and is implemented fr purpses f administering ur radilgical prgram (threshld fr training and dsimetry requirements, etc.). Sme flexibility exists (with RadCn manager cncurrence) in psting f RCAs, based n ccupancy and ther issues. The default definitin is any area in which a persn might be expected t exceed 100 mrem in a year. We implement this based n the assumptin f 40 hurs/week ccupancy. Essentially all areas in which ARMs perfrm surveys shuld already be psted as RCAs. RWPs RWPs are written wrk authrizatins fr purpses f cmpliance with 835. The regulatin says the fllwing: Written authrizatins shall be required t cntrl entry int and perfrm wrk within radilgical areas. These authrizatins shall specify radiatin prtectin measures cmmensurate with the existing and ptential hazards. This means that all entry t Radiatin Areas requires an RWP. Remember that yu are n an RWP that specifically allws yu t enter and survey within Radiatin Areas. Hwever, yu are nt authrized t enter High Radiatin Areas. One reasn this restrictin is in place is that yu must als have self-reading dsimetry fr entry t HRAs. Questin: when yu pst a Radiatin Area as Walkthrugh Permitted (see page 1), why is this nt a vilatin f 835, regarding written wrk authrizatin? Answer: the general access RWP prvides written authrizatin fr entry t the enclsure fr general wrk, inspectins, etc., and specifies cmmensurate prtectin measures. The cmbinatin f that RWP, RadWrker training, wrk-area familiarizatin training, and the specific instructin n the sign allwing walkthrugh is sufficient authrizatin fr the particular task - passing thrugh. General Infrmatin Abut Survey Dcumentatin This is a cmpilatin f material that has been distributed befre, with sme updates. Survey maps are (1) the recrd f the survey event and (2) the tl fr cmmunicating radilgical cnditins in an area t peple wh are wrking there. Neatness cunts. A survey sheet which leaves a reader unsure f the nature f the radilgical envirnment is nt wrth the time yu spend t d it. If necessary, yu can always re-cpy the survey when yu return frm the field. The infrmatin needs t be legible and clear. Bundaries need t be clear. The extent f the survey (fr partial surveys) needs t be clearly shwn. Sme recurring issues with survey recrds 1. The presence f dashed lines indicating psted areas, but nthing shwing what kind f area it is. In sme cases, abbreviatins are used, but the abbreviatins are nt explained. All full surveys are expected t have all psted areas indicated and labeled (this is nt critical fr partial surveys). If yu want t use abbreviatins, that is fine, but please use a legend. The latest sheets have sme predesignated nes.

2. On partial surveys, always put a reasn fr the access and indicate the wrk area clearly n the map. Sme survey maps may nt cntain blank spaces fr "reasn", but yu shuld write it in. The reasn shuld indicate rughly what equipment was wrked n and what the extent f the wrk was, fr instance "diagnse Q1 magnet pwer supply". That cmment, alng with graphic indicatin n the map f the areas surveyed and entered, prvides a reasnably cmplete picture. 3. Lack f clarity regarding whether the bundaries are prperly placed. Smetimes it is difficult t clearly shw the readings at bundaries r inside the bundary due t space limitatins. We have seen surveys that shw 5 just utside a psted Radiatin Area. This indicates an imprperly psted area (nly allwable if it s an escrted survey). If necessary, use sme kind f indicatr with a ftnte t prvide explanatin if there isn't enugh rm. It's especially imprtant t be clear if there is a cnditin that is unusual. 4. N survey data within psted areas, and n cntact dse rates. Imprtant pints: - Particularly in the case f a full survey, it is imprtant t shw data within the psted areas, and sme indicatin at the bundaries that the psting is apprpriate t the cnditins. - Just shwing a bundary with n infrmatin des nt imply that the bundary cnditins are crrect. - Prviding data within psted areas gives us the infrmatin necessary fr fllw-up surveys r guidance t wrkers. - If smene has a need t enter the area fr a shrt perid, if there's n infrmatin n the survey, anther survey will have t be dne - this slws dwn wrk and is nt ALARA. - Use the guidance in the ARM training guide fr when t btain cntact dse rates and dse rates inside psted areas. - At least ne data pint - cntact and whle bdy - in each psted area (including High Radiatin Areas) needs t be shwn n a full survey t verify that the pstings are crrect and the area desn't exceed levels fr physical cntrls (remember, HRA data is t be btained frm utside the area). - If yu can't reach what yu think might be the highest dse rates due t the presence f a High Radiatin Area bundary, call RadCn immediately t have them finish the survey, r keep the area in Cntrlled Access and d partial surveys fr entry. 5. Use f the "highest area psting and whle bdy dse rate" bx. This has been revised t include nly ne entry. Apprpriate entry wuld be HRA, 140 mrem/hr, r Rad Area, 50 mrem/h. We are lking fr at a glance highest whle bdy dse infrmatin. If the highest dse rate is in a Radiatin Area, but there is a psted High Radiatin Area in the regin (and it has lwer readings), then just put in the dse rate frm the Radiatin Area. Issues Regarding FEL Surveys We cntinue t see sme prblems with surveys in the FEL vault. These invlve nt nly the survey sheets, but the physical cnditin f psted areas. 1. Duble-psting f RCAs. D nt pst RCAs within the vault. The vault is an RCA at all times, and whle bdy dse rates belw 5 mrem/hr d nt require any additinal pstings r bundaries.

2. We have nted signage that is incmplete, des nt meet basic requirements in 835, r is unclear as t what the psting level is. 3. Bundary rping that is nt rbust enugh t ensure that the bundary is prperly defined. 4. Use f the exclusin area at the back f the vault. We have nted n several ccasins after a full survey t Restricted Access that the signs have nt been recnfigured, r that sme but nt all the signs were changed, etc. During Rapid Access f the vault, this area shuld nt be entered. Only upn a survey can persns make entry t this zne. At that time, if it is a full survey, the psting level f the area needs t be crdinated with FEL peratins. If the vault is staying in Cntrlled Access, and the status might g back t Beam Permit, the exclusin zne shuld remain psted. If the vault is ging t Restricted Access, the exclusin zne shuld be de-psted. Mre specifics can be fund here http://www.jlab.rg/accel/radcn/surveys/felrapidaccess.pdf NOTE: As f this writing, the FEL is being expanded t perate a UV beamline. The Rapid Access prbes have been recnfigured t prvide mre cverage f the area. During the transitin, we are evaluating the sensitivity f the system in the new cnfiguratin. The Rapid Access system shuld nt t be used fr entries i.e. all entries require a survey. FEL Operatins is implementing this requirement. Physical Bundaries/Psting We have augmented access t materials such as signs, rpes, etc. in mst f the acceleratr enclsure areas. The halls have cabinets with psting/rping materials, and bth hall A and C are cntinuing t assist and imprve prvisins fr rpe bundary flexibility. In general, keep the fllwing in mind: FAQs - Dn t rpe t anything that mves in the halls, there are rpe reels and magnetic rpe terminatins s that yu can apply a break-away cnnectin if yu must hk t a spectrmeter. - Make sure yu use an adequate number f signs, pst all access appraches t an area (fr instance, if the Radiatin Area is in the verhead, pst access pints at flr height, and give instructins n the nature f the are n the psting. - Avid hand written inserts if pssible. There have been questins frm time t time as t whether an ARM can cnduct certain surveys. Here is a list f cmmn questins: - Can an ARM de-pst a Radiatin Area? Yes. Assuming yu can cnduct a survey thrugh enugh t verify the absence f the cnditin. But it may be mre efficient in many cases t leave it psted if yu have reasn t believe the cnditin will reappear shrtly. - Can an ARM de-pst High Radiatin Areas? N. This is mainly a matter f cnsistency. Since ARMs are nt allwed t rutinely pst HRAs, they shuld nt de-pst them either. Call RadCn n-call fr assistance (case-basis apprval may be given).

- Can an ARM cnduct the beamline surveys necessary in Hall B and FEL in the event hands-n beamline wrk is t be cnducted during a Cntrlled Access (during a "Rapid Access "entry)? Yes. There is n reasn an ARM can't assess these wrk areas. The same limitatins as nrmal apply - if a Radiatin Area r ht spt is fund, the same triggers apply. - Can an ARM cnduct the area survey needed if the Rapid Access system beacn is n in hall B r FEL? Yes. - Can an ARM cnduct surveys fr disassembly f cntrlled shielding cnfiguratins? Yes, if apprved by RadCn. RadCn must check the cnfiguratin after the shielding is restred.