DEVELOPMENTS AND PROGRESS WITH ESS ELLIPTICAL CRYOMODULES AT CEA-SACLAY AND IPN-ORSAY -

Similar documents
PROGRESS IN THE ELLIPTICAL CAVITIES AND CRYOMODULE DEMONSTRATORS FOR THE ESS LINAC

HIGH POWER PULSED TESTS OF A BETA=0.5 5-CELL 704 MHZ SUPERCONDUCTING CAVITY

Work Package Status Report

Tuning systems for superconducting cavities at Saclay

Design of the 352MHz, beta 0.50, Double- Spoke Cavity for ESS

SUPERCONDUCTING CAVITIES AND CRYOMODULES FOR PROTON AND DEUTERON LINACS

DEVELOPMENT OF A BETA 0.12, 88 MHZ, QUARTER WAVE RESONATOR AND ITS CRYOMODULE FOR THE SPIRAL2 PROJECT

HIGH POWER INPUT COUPLERS FOR THE STF BASELINE CAVITY SYSTEM AT KEK

Mechanical study of the «Saclay piezo tuner» PTS (Piezo Tuning System) P. Bosland, Bo Wu DAPNIA - CEA Saclay. Abstract

RF STATUS OF SUPERCONDUCTING MODULE DEVELOPMENT SUITABLE FOR CW OPERATION: ELBE CRYOSTATS

Frequency Tuning and RF Systems for the ATLAS Energy Upgrade. Gary P. Zinkann

SNS CRYOMODULE PERFORMANCE*

XFEL Cryo System. Project X Collaboration Meeting, FNAL September 8-9, 2010 Bernd Petersen DESY MKS (XFEL WP10 & WP13) 1 st stage. Possible extension

REVIEW OF HIGH POWER CW COUPLERS FOR SC CAVITIES. S. Belomestnykh

Packaging of Cryogenic Components

HIGH POWER COUPLER FOR THE TESLA TEST FACILITY

SPOKE CRYOMODULES CONCEPTUAL DESIGNS FOR ESS & MYRRHA

Progresses on China ADS Superconducting Cavities

Superconducting RF cavities activities for the MAX project

LARGE SCALE TESTING OF SRF CAVITIES AND MODULES

QUARTER WAVE COAXIAL LINE CAVITY FOR NEW DELHI LINAC BOOSTER*

Third Harmonic Superconducting passive cavities in ELETTRA and SLS

Current Status of cerl Injector Cryomodule

Status of the ESS Accelerator Workpackage

PROGRESS IN IFMIF HALF WAVE RESONATORS MANUFACTURING AND TEST PREPARATION

The European Spallation Source. Dave McGinnis Chief Engineer ESS\Accelerator Division IVEC 2013

OVERVIEW OF INPUT POWER COUPLER DEVELOPMENTS, PULSED AND CW*

Project X Cavity RF and mechanical design. T. Khabiboulline, FNAL/TD/SRF

ESS RF Development at Uppsala University. Roger Ruber for the FREIA team Uppsala University

TESLA RF POWER COUPLERS DEVELOPMENT AT DESY.

RF power tests of LEP2 main couplers on a single cell superconducting cavity

ACHIEVEMENT OF ULTRA-HIGH QUALITY FACTOR IN PROTOTYPE CRYOMODULE FOR LCLS-II

3.9 GHz System (AH1) XFEL WP46

High Power Couplers for TTF - FEL

THE CRYOGENIC SYSTEM OF TESLA

ASSEMBLY PREPARATIONS FOR THE INTERNATIONAL ERL CRYOMODULE AT DARESBURY LABORATORY

DEVELOPMENTS AND TESTS OF A 700 MH z CRYOMODULE FOR THE SUPERCONDUCTING PROTON LINAC OF MYRRHA*

Advance on High Power Couplers for SC Accelerators

Overview of ERL Projects: SRF Issues and Challenges. Matthias Liepe Cornell University

SLHiPP-2, Catania, Italy. A cryogenic system for the MYRRHA linac. Nicolas Chevalier, Tomas Junquera

Couplers for Project X. S. Kazakov, T. Khabiboulline

Current Industrial SRF Capabilities and Future Plans

Vibration studies of a superconducting accelerating

Commissioning of the ALICE SRF Systems at Daresbury Laboratory Alan Wheelhouse, ASTeC, STFC Daresbury Laboratory ESLS RF 1 st 2 nd October 2008

INFN- LASA MEDIUM BETA CAVITY PROTOTYPES FOR ESS LINAC

KEYWORDS: ATLAS heavy ion linac, cryomodule, superconducting rf cavity.

Performance of Superconducting Cavities for the European XFEL. Detlef Reschke DESY for the EU-XFEL Accelerator Consortium

Motivation: ERL based e linac for LHeC

SRF Advances for ATLAS and Other β<1 Applications

Tests of the Spoke Cavity RF Source and Cryomodules in Uppsala

Engineering Challenges and Solutions for MeRHIC. Andrew Burrill for the MeRHIC Team

ADVANCES IN CW ION LINACS*

To produce more powerful and high-efficiency particle accelerator, efforts have

R.Bachimanchi, IPAC, May 2015, Richmond, VA

JRA1 SRF partner meeting Zeuthen Jan. 22, Michelato, INFN Milano LASA

C100 Cryomodule. Seven cell Cavity, 0.7 m long (high Q L ) 8 Cavities per Cryomodule Fits the existing Cryomodule footprint

Completion of the first SSR1 cavity for PXIE

PERFORMANCE OF THE TUNER MECHANISM FOR SSR1 RESONATORS DURING FULLY INTEGRETED TESTS AT FERMILAB

KEK ERL CRYOMODULE DEVELOPMENT

DESIGN STUDY OF A 176 MHZ SRF HALF WAVE RESONATOR FOR THE SPIRAL-2 PROJECT

Cavity development for TESLA

two pairs of dipole steering windings that t inside the quadrupole yoke an RF beam position monitor (BPM) consisting of a pill box RF cavity,

3.9 GHz work at Fermilab

THE MULTIPACTING STUDY OF NIOBIUM SPUTTERED HIGH-BETA QUARTER-WAVE RESONATORS FOR HIE-ISOLDE

PIP-II Superconducting RF Linac Status and Challenges" Leonardo Ristori! ICEC-ICMC Conference, New Delhi! 9 March 2016!!

THE HIGH LUMINOSITY PERFORMANCE OF CESR WITH THE NEW GENERATION SUPERCONDUCTING CAVITY

INSTRUMENTATION AND CONTROL SYSTEM FOR THE INTERNATIONAL ERL CRYOMODULE

Recent Progress in the Superconducting RF Program at TRIUMF/ISAC

Aurélien Ponton. First Considerations for the Design of the ESS Cryo-Modules

Liquid Helium Heat Load Within the Cornell Mark II Cryostat

Industrialization of E-XFEL string and module assembly at CEA- Saclay. Preparation work Lessons learnt Cost reduction

SRF EXPERIENCE WITH THE CORNELL HIGH-CURRENT ERL INJECTOR PROTOTYPE

A few results [2,3] obtained with the individual cavities inside their horizontal cryostats are summarized in Table I and a typical Q o

Status of the European XFEL Accelerator Construction Project. Reinhard Brinkmann, DESY

5.5 SNS Superconducting Linac

A New 2 K Superconducting Half-Wave Cavity Cryomodule for PIP-II

CEBAF waveguide absorbers. R. Rimmer for JLab SRF Institute

Cryogenics for Large Accelerators

RENASCENCE * PERFORMANCE AND PROBLEMS ON FIRST TEST Feedthrough leaks sub 70 K. End group quenching

Superconducting 1.3 GHz Cavities for European XFEL

ESS RF Source and Spoke Cavity Test Plan

INSTALLATION AND FIRST COMMISSIONING OF THE LLRF SYSTEM

HIGH Q CAVITIES FOR THE CORNELL ERL MAIN LINAC

DEVELOPMENTS OF HORIZONTAL HIGH PRESSURE RINSING FOR SUPERKEKB SRF CAVITIES

LEP Couplers..a Troubled Story of a Success. HPC2002, Jefferson Lab, October 30 th, 2002 R. Losito, CERN 1

Mircea Stirbet. RF Conditioning: Systems and Procedures. Jefferson Laboratory

TESTS AND DESIGNS OF HIGH-POWER WAVEGUIDE VACUUM WINDOWS AT CORNELL

Coupler functions. G.devanz CEA-Saclay CAS Bilbao may

Physics Requirements Document Document Title: SCRF 1.3 GHz Cryomodule Document Number: LCLSII-4.1-PR-0146-R0 Page 1 of 7

ERL Prototype at BNL. Work supported by Brookhaven Science Associates, LLC under Contract No. DE-AC02-98CH10886 with the U.S. Department of Energy.

THE PROTOTYPE FUNDAMENTAL POWER COUPLER FOR THE SPALLATION NEUTRON SOURCE SUPERCONDUCTING CAVITIES: DESIGN AND INITIAL TEST RESULTS*

BESSY VSR: SRF challenges and developments for a variable pulse-length next generation light source

Institut für Kernphysik, TU Darmstadt Darmstadt, 64289, Germany

Grounding for EMC at the European XFEL

TESLA Quad Package With BPM

Report of working group 5

S. Ghosh On behalf of Linac, IFR, Cryogenics, RF and beam transport group members. Inter University Accelerator Centre New Delhi India

OVERVIEW OF REGIONAL INFRASTRUCTURES FOR SCRF DEVELOPMENT

SUPERCONDUCTING RESONATORS DEVELOPMENT FOR THE FRIB AND ReA LINACS AT MSU: RECENT ACHIEVEMENTS AND FUTURE GOALS

Strategy for the engineering integration of the ESS accelerator

Transcription:

DEVELOPMENTS AND PROGRESS WITH ESS ELLIPTICAL CRYOMODULES AT CEA-SACLAY AND IPN-ORSAY - F. Peauger, C. Arcambal, F. Ardellier, S. Berry, P. Bosland, A. Bouygues, E. Cenni, JP. Charrier, G. Devanz, F. Eozénou, A. Gaget, D. Gevaert, A. Gomes, T. Hamelin, X. Hanus, P. Hardy, V. Hennion, T. Joannem, C. Marchand, O. Piquet, J.P. Poupeau, B. Renard, P. Sahuquet, T. Trublet, Irfu, CEA, Université Paris-Saclay, F-91191 Gif-sur- Yvette, France G. Olivier, IPN Orsay, France C. Darve, ESS, Lund, Sweden -

OUTLINE Introduction and context ESS elliptical cryomodule description Medium beta cryomodule demonstrator M-ECCTD Cavities and couplers individual performances Cryomodule assembly High beta cryomodule demonstrator H-ECCTD Series cryomodule production preparation Procurement plan Series power couplers RF conditioning Series cryomodules integration plan Conclusion 20/07/2017 F. Peauger - SRF2017 - THYA05 2

ELLIPTICAL CRYOMODULES IN THE ESS LINAC MEDIUM-β HIGH-β β 0.67 0.86 # CM 9 21 Cav. /CM 4 4 #Cav. 36 84 CM L [m] 6.584 6.584 Sector L [m] 77 179 elliptical cavity cryomodules = 55% of the linac length Proton Beam 20/07/2017 F. Peauger - SRF2017 - THYA05 3

COLLABORATIONS Cryomodule requirements and interfaces Cryomodule transport Cryomodule test stand Tunnel installation and operation Cryomodule and cavity design M-ECCTD and H-ECCTD construction and test Series cryomodule components procurement and assembly Series couplers Cryomodule test stand Cryomodule engineering design M-ECCTD cryostat components procurements Medium Beta Cavity design Medium Beta Cavity procurements Medium Beta Cavity vertical tests High Beta Cavity procurements High Beta Cavity vertical tests Cavity horizontal test 20/07/2017 F. Peauger - SRF2017 - THYA05 4

ELLIPTICAL CRYOMODULE MAIN FEATURES 704 MHz, 3.6 ms RF pulse at 14 Hz Eacc = 16.7 MV/m (MB) and 19.9 MV/m (HB) (Epeak = 40/44 MV/m) Q0 > 5e9 at 2 K Fundamental power coupler: 1.1 MW peak, 55 kw avg. Qext = 7.5e5 Coaxial type, single window, fixed coupling Mechanical slow tuner (600 khz range, 1 Hz resolution) 1+1 Piezo fast tuner No HOM couplers P. Bosland G. Olivier G. Devanz 6.6 m long 20/07/2017 Spaceframe concept (JLAB/SNS) Segmented design Similar design for medium and high beta cavities F. Peauger - SRF2017 - THYA05 5

M-ECCTD CAVITIES PERFORMANCES IN VERTICAL CRYOSTAT P. Michelato et al, IPAC2017 & SRF2017 All cavities chemically treated with BCP Three cavities reach the ESS specification Very good Q0 at low field for CEA cavities, very good accelerating gradient for LASA cavity Origin of this Q drop is not fully understood, but probably due to field emission and secondary emission effect inside inner cells (triggered by surface quality obtained after chemical treatment) E. Cenni T. Hamelin 20/07/2017 F. Peauger - SRF2017 - THYA05 6

M-ECCTD POWER COUPLER RF CONDITIONNING Coupler pairs mounted on stainless steel air cooled coupling boxes in clean room Baking at 170 C 1.2 MW peak Multipactor regions found at 100, 300 and 900 kw during power ramping but easily conditioned without the use of the DC bias system Three pairs have been successfully tested for now C. Arcambal 20/07/2017 F. Peauger - SRF2017 - THYA05 7

CRYOMODULE ASSEMBLY TRAINING USING A MOCK-UP CAVITY Oct. 2016 First validation of assembly toolings and assembly procedures Integration until the vacuum vessel 20/07/2017 F. Peauger - SRF2017 - THYA05 8

M-ECCTD CRYOMODULE CLEAN ROOM ASSEMBLY S. Berry J.P. Poupeau A. Bouygues March 2017 Jan. 2017 Performed in the ISO4 Saclay clean room Nitrogen venting and slow pumping during assembly process, XFEL type aluminium gaskets Cavities pre-aligned, under vacuum before rolling out of the clean room 20/07/2017 F. Peauger - SRF2017 - THYA05 9

CAVITY STRING DRESSING April 2017 J.P. Charrier J. Plouin G. Devanz Welding of the titanium diphasic line Assembly of the MLI, magnetic shields, cold tuners and cryogenic piping 20/07/2017 F. Peauger - SRF2017 - THYA05 10

CAVITY STRING INSERTION INSIDE THE SPACEFRAME May 2017 Thermal shield preliminary prepared with MLI and instrumentation, and fixed on the spaceframe Spaceframe aligned with cavity string before insertion 20/07/2017 F. Peauger - SRF2017 - THYA05 11

CAVITY STRING MASS TRANSFER ON THE SPACEFRAME June 2017 4 Cavity alignment steps in Y plane 3 DY [mm] 2 1 0-1 -2-3 8 9 10 11 17 18 19 2.73 0.84 2.88-0.02 2.67 0.68 1.25 0-0.15-0.06 0.48 2.46-2.27-0.6 Y cav 2 in 2.33 1.27 2.4-0.5 1.25 0 0.06 Y cav 2 out -0.05 0.02 0.33 0.44 2.39-1.87-0.4 Y cav 3 in 0.59-0.27 0.59-0.22 1 0.1-0.19 Y cav 3 out -0.41-0.51 0.35-0.56 1.21-1.51-0.51 Y cav 4 in -1.24-2.13-1.45-0.5 0.1 0 0.15 Y cav 4 out -1.1 1.27-0.92-0.68 1.02-0.62-0.02 Y cav 1 in Y cav 1 out 20/07/2017 M. Fontaine 12 F. Peauger - SRF2017 - THYA05 Assembly of the cavity tie rods Cavity alignment The clean room cavity posts can be removed 12

SPACEFRAME INSERTION INSIDE THE VACUUM VESSEL July 2017 Jumper connection assembly cryogenic connections at the cryomodule extremities Leak check of all the cryogenic circuits 20/07/2017 F. Peauger - SRF2017 - THYA05 13

CRYOMODULE INSTALLED INSIDE THE TEST STATION AT SACLAY Last assembly operations: atmospheric compensation system on coupler flanges, doorknob transitions Beam line and insulating vacuum pumping Instrumentation cabling, cryogenic and waveguide connections First cooldown to 2K and warm conditioning of couplers are planned in July / August 2017 now 20/07/2017 F. Peauger - SRF2017 - THYA05 14

H-ECCTD CRYOMODULE PROCUREMENT STATUS Five new high beta cavities ordered at Research Instrument GmbH (deep drawing of half cells and RF controls in progress) Four RF windows and antenna already available. New external conductors (copper plated) recently manufactured Magnetic shields, cold tuners, motors, piezo-actuators, internal RF cables and titanium bellows available Titanium diphasic tubes procurement anticipated Inter-cavities bellows and cold warm transitions, 2K heat exchanger, cryogenic piping and the internal instrumentation procurements to be launched All the other cryomodule components are procured as pre-series of the series cryomodule contracts. The vacuum vessel, spaceframe and thermal shield have been ordered, with deliveries expected for the first quarter of 2018. Cryomodule design improvements, limited to minor changes after lessons learnt from M-ECCTD assembly 20/07/2017 F. Peauger - SRF2017 - THYA05 15

HIGH BETA PROTOTYPES TESTED IN 2014 20/07/2017 F. Peauger - SRF2017 - THYA05 16

STRATEGIC DECISIONS ON THE SERIES PHASE Cryomodule components procurement: Divided in several procurement contracts adapted to the skills of the companies Cryomodule assembly : Assembly rate of one cryomodule per month Will be performed in the former XFEL Village which becomes officially now the ESS Village Fully dedicated to the ESS cryomodule (no interference with other projects at Irfu) Will be done by an industrial partner on CEA Saclay site, under the supervision of CEA team The contract include an industrialization phase and training on the first cryomodules Include clean room cavity string assembly, rool out activities, alignment and cryostating (XFEL like) Cryomodule tests at CEA: Will be done on the three first series MB and HB cryomodules only These tests are mandatory to have a fast feedback on the quality of the cryomodule assembly 20/07/2017 F. Peauger - SRF2017 - THYA05 17

PROCUREMENT PLAN Procurement plan deals with 40 contracts of ~1 M average for the cryomodule workpackage 32 contracts dedicated to components procurement -> with 19 contracts for specific machining/ manufacturing systems 60 % of the tenders have been published and 20 % awarded Some critical tenders are in stand by and wait for the first cryomodule testing Order placed Tendering launched Tendering in stand by Shared procurement with ESS Tendering process in preparation Contract title Qty Company 1 Vacuum vessel 30 + 2 ACPP 2 RF Couplers 120 PMB 3 Tuners (mechanical parts) 120 4 Stepper motors for tuners 120+2 PHYTRON 5 2K Heatexchangers 31 Coupling boxes for coupler 6 conditioning 12 + 3 SDMS 7 Diphasic pipes, cryogenic circuits 31 Intercavity belows / cold warm 8 transitions 31 9 Titanium belows for diphasic lines 31 10 Cryomodule assembly at CEA Saclay 30 11 Spaceframe 30 + 2 SDMS 12 Magnetic shieldings 120. 13 Thermal shieldings 30 + 2 SDMS 14 Multi Layer Insulation 31 15 Screws set (for clean room assembly). 16 Piezo for tuners 240 17 Cavity supports 31 18 RF cable 120 19 RF feedthrough 62 20 Aluminium gaskets 21 Copper gaskets 300 GAVARD 22 Internal instrumentation 31 23 Vacuum gauge for couplers 120 24 Cryogenic valves 62 25 Thermal sensors (Cernox) 325 + 480 26 Safety valve 31 27 Pressure sensor 64 28 Controled safety valve 31 29 Rupture disks 62 30 Vacuum components 31 31 Helium level sensor 62 32 Thermal braids 31 20/07/2017 F. Peauger - SRF2017 - THYA05 18

POWER COUPLER RF CONDITIONING STANDS 120 couplers shall be RF conditioned at CEA in the next 3 years Two coupler pairs will be powered in parallel in a clean testing area (except when a cryomodule is under test) Baking system Coupler test stand #2 Cable trays Coupler test stand #1 704 MHz 1.6 MW Klystrons (new) Vacuum pumping group Acquisition racks T. Hamelin 704 MHz 1.1 MW klystrons (existing) Waveguide to cryomodule test station 20/07/2017 F. Peauger - SRF2017 - THYA05 19

NEW 704 MHZ RF SOURCE FOR POWER COUPLERS RF CONDITIONING Contract launched in July 2016 with THALES Installation of components will start in July 2017 Fully operationnal in October 2017 ESS067-P02 1.6 MW 704 MHz klystron Modulator capacitor bank RF pre-amplifier Pulse transformer Control rack 20 20/07/2017 F. Peauger - SRF2017 - THYA05 20

CRYOMODULE ASSEMBLY WORKSTATIONS AT SACLAY Workstations definition is finalized Assembly tooling design upgrade is in progress Ultra-sonic bath cleaning Industrial washer Cavity - coupler assembly Cavity string assembly Cavity string dressing / spaceframe insertion Spaceframe preparation / cryostating Coupler dressing Cryomodule loading Bld 124 T. Trublet 20/07/2017 F. Peauger - SRF2017 - THYA05 21

CONCLUSION CEA Saclay and IPN Orsay are developing together high gradient / high power / long pulse cryomodules for the ESS elliptical cavities Important effort to conduct four activities in parallel : first prototyping phase : final assembly and RF tests of the medium beta demonstrator will occur this summer 2017 fabrication of a second high beta cryomodule demonstrator in progress Anticipation of the series component procurement with more than 60% of contracts launched Preparation of the industrialization phase of the series cryomodules assembly with an industrial partner 20/07/2017 F. Peauger - SRF2017 - THYA05 22

Thank you F. Peauger - SRF2017 - THYA05 PAGE 23 Commissariat à l énergie atomique et aux énergies alternatives Centre de Saclay 91191 Gif-sur-Yvette Cedex T. +33 (0)1 69 08 76 11 F. +33 (0)1 69 08 30 24 Etablissement public à caractère industriel et commercial RCS Paris B 775 685 019