PROJECT INSTRUCTIONS Roofing

Similar documents
ROOFING City of Grand Rapids Building Safety Division

1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights

Turada Hardwood Shingles and Shakes Installation instructions

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

RED DIAMOND SHINGLES Roof Installation Introduction:

DIRECTIONS FOR APPLICATION

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: IKO INDUSTRIES LIMITED

DIRECTIONS FOR APPLICATION

ICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013.

A P P L I C A T I O N I N S T R U C T I O N S

DIRECTIONS FOR APPLICATION

ESR-1129 Reissued June 1, 2011 This report is subject to renewal in two years.

SECTION SLATE SHINGLES. 1.1 SUMMARY A. Section Includes: 1. Slate shingles over underlayment nailed to roof sheathing.

Inspire Aledora Slate Application Guidelines

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION

eco-shake INSTALLATION INSTRUCTION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

Re-Roofing Policy SPECIAL REQUIREMENTS AND NOTES

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER:

SECTION WOOD SHINGLES

ROOFING APPLICATION STANDARD (RAS) No. 130

1.04 QUALITY ASSURANCE

b) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the

Slate Shingle Specifications

TECHNICAL BULLETIN NEW ICC ES EVALUATION REPORT

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: GAF 1 CAMPUS DRIVE PARSIPPANY, NEW JERSEY 07054

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

Wood shakes and wood shingles

B. Related Sections: The following Sections contain requirements that relate to this Section:

SECTION ASPHALT SHINGLES

REPORT HOLDER: ISAIAH INDUSTRIES, INC. EVALUATION SUBJECT:

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Asphalt Shingle Installation at Roof Edges, Intersections and Valleys

GlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing

4. Metal roof jacks at penetrations and attachments

ES Report GAF-Elk Shingle Roof Covering Systems ESR-1475

Oklahoma Uniform Building Code Commission 2401 NW 23 rd, Suite 2F Oklahoma City, OK Phone: Fax:

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

Installation Guide. Cedar Shake. Distributed by: BEST MATERIALS LLC, Phoenx AZ

Ekoroof LiteTile Dimensions

PREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD

COMPOSITE SIDING INSTALLATION GUIDE

Multi-Width Shake. Widths: 9", 8", 7", 6", 4" Length: 22" Thickness at butt: 5/8" Single-Width Shake. Widths: 9" Length: 22" Thickness at butt: 5/8"

ICC-ES Evaluation Report Issued February 1, 2011 This report is subject to re-examination in one year.

10 Steps to Performing a Roof Inspection Class. Ben Gromicko InterNACHI nachi.org/class

SECTION ASPHALT SHINGLES

Barrel Vault Counter Batten and Batten

SECTION ASPHALT SHINGLES

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: GAF 1 CAMPUS DRIVE PARSIPPANY, NEW JERSEY 07054

STORMMASTER SHAKE GENERAL INSTRUCTIONS

Brava Old World Slate Installation Guide

HERITAGE LAMINATED ASPHALT SHINGLES Tuscaloosa, AL

Installation Instructions for Old Mill Shingle and Designer Shake Lap Siding

StormMaster Shake GENERAL INSTRUCTIONS For Spanish Instructions Click Here (Para las Instrucciones Españolas Haga Clic Aquí)

BARRELL VAULT BATTENLESS

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: GAF EVALUATION SUBJECT:

Cambridge English Application Instructions

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL SHINGLES SECTION: METAL ROOF PANELS REPORT HOLDER:

PRODUCT EVALUATION Effective July 1, 2009 RC-204

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

AIA Specification. Section Slate Shingles PART 1 GENERAL

ENDUREED VIVA SERIES Specifications

Installation Instructions for Panel Siding and Soffit

LAMINATED SHINGLES CERTAINTEED SHINGLE APPLICATOR S MANUAL SUPPLEMENT

Application instructions

Application Guidelines - Shake General Information

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25

Capstone Application Instructions

Installation Manual. Future Roof Shingle / Slate Products

WOODSTART STARTER SHINGLE, STARTER STRIP PLUS, STARTER STRIP SHINGLE, AND TRI BUILT STARTER STRIP

Installation Guide. Titan Old World Slate REV Titan Manufacturing Phone: (407) Fax: (866)

A201 3 PROPOSED SOUTH ELEVATION SCALE: PROPOSED EAST ELEVATION SCALE: EXISTING EAST ELEVATION EXISTING SOUTH ELEVATION WEST WORKSHOP

Timberline and Sovereign Expanded Fastener Placement Area

RESIDENTIAL ROOFS ADDENDUM NUMBER ONE. August 28, 2017

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: CERTAINTEED CORPORATION EVALUATION SUBJECT:

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1

Ash Brook Golf Course Scotch Plains, New Jersey

ENGINEERED SLATE 2018 INSTALLATION GUIDE

6 STEP INSTALLATION GUIDE BY DCI

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL SHINGLES SECTION: METAL ROOF TILES REPORT HOLDER:

The proposal includes the replacement of the roof on the entire house (historic massing and later additions) and detached garage.

IRONWOOD SHAKE & FLASHING SPECIFICATIONS

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL SHINGLES SECTION: METAL ROOF TILES REPORT HOLDER:

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

Installation Manual. Future Shingle Products

INSTALLATION GUIDE LEARN MORE AT DECRA.COM

SECTION 9: ROOF STRUCTURE, ROOFING MATERIALS AND FLASHING, GUTTER, DOWNSPOUTS, AND SKYLIGHTS. Background

ASPHALT T E C H N O L O G I E S

Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side

FASTENERS BUILDING DEPARTMENT

1 Roof Substrate (Deck) OWENS CORNING BERKSHIRE SHINGLES INSTALLATION INSTRUCTIONS

Laminated Shingles. Landmark Series and Landmark TL. CertainTeed Shingle Applicator s Manual

The new steep-slope manual

Application Guidelines - Slate General Information

Transcription:

PROJECT INSTRUCTIONS Roofing This handout outlines some basic regulations contained within the 2015 Minnesota State Building Code, as well as other good building practices. However, this handout is not intended to be all inclusive. It is the permit holder s responsibility to comply with all applicable regulations. Please refer to the complete 2015 Minnesota State Building Code or contact the Building Inspections Division with specific questions regarding your project. PERMITS, LICENSES and INSPECTIONS Building permits are required for all roofing projects and are issued at the time of application. Permits may be obtained in-person at Minnetonka City Hall or online at eminnetonka.com. All contractors doing roofing work must hold a state contractor's license and submit proof of this license at the time of permit application. Please refer to the Minnesota Department of Labor and Industry at 651-284-5012 with specific regarding licensure. Unless otherwise required, one inspection will be conducted when the roofing work is completed. At the time of inspection, the permit holder must provide pictures of the required ice barrier underlayment. The pictures must include property identification. GENERAL REQUIREMENTS All roof covering materials must be delivered in packages bearing the manufacturer s identifying marks and approved testing agency labels when required. All asphalt shingles must be either self-sealing or interlocking. Roof decks must be solidly sheathed for asphalt shingles or mineral-surfaced roll roofing. Solid sheathing may be plywood, OSB, or 1-inch nominal boards with no greater than 1/8-inch gaps. Wood shingles and shakes may be applied over solid or spaced sheathing. Roof decks that are rotted or unsound must be repaired prior to reroofing. WIND RESISTENCE REQUIREMENTS All buildings to meet a 90 mph 3 second gust standard. Manufactures may use one of any three standards to test their shingles, as outlined in the following: WIND SPEED UL 997 or ASTM D3161 ASTM D7158 CODE ACCEPTABLE? 60 mph Class A NO 90 mph Class D Class D YES 110 mph Class F YES 120 mph Class G YES 150 mph Class H YES

To verify code compliance, check the wind resistance classification printed on the packaged bundle of roof covering material. The example the right is Class F; it is acceptable. REROOFING All old roof coverings must be removed before installing any new roof coverings. Existing flashing in good condition may be reinstalled. Any sheathing that is replaced must be installed and fastened according to the code. ICE AND WATER BARRIERS An ice and water barrier is required on all roofs except for detached accessory buildings. The barrier may be at least two layers of underlayment cemented together or a selfadhering polymer modified bitumen sheet. There are several manufacturers who make materials specifically for this requirement that are marketed under differing trade names. The ice and water barrier must extend from the edge of the eaves to a point 24 inches inside the exterior wall line of the building. Ice and water barriers are not required along the rakes or in valleys. VENTILATION Ventilation of enclosed attics and enclosed rafter spaces is required. Ventilating openings must be provided with corrosion-resistant mesh with openings of 1/8 inch to 1/4 inch. For attics without ceiling vapor barriers, 1 square foot of net free ventilating area should be provided for each 150 square feet of attic area. For attics with vapor barriers or without ceiling vapor barriers and having at least 50% but not more than 80% of the ventilating area provided by ventilators located in the upper portion of the space to be ventilated and at least 3 feet above the eave vents and the balance of the ventilation provided in the eave vents, ventilation may be 1 square foot of net free ventilating area for each 300 square feet of attic area. ROOF EDGING, GUTTERS, DRAINAGE Figure R905.2.7.1(2) Protective Ice Barrier Roof edging and gutters are not required by code. Application of roof edging must be in accordance with the shingle manufacturers written instructions. Gutters may be useful in directing water away from buildings reducing erosion, settlement, and wet basements. Lead-outs on downspouts should extend far enough from the building to result in positive drainage. Page 2 of 6

FLASHING Flashing is required at all wall and roof intersections, wherever there is a change in roof slope or direction, and around roof openings. When flashing is metal, it must be corrosion resistant metal with a thickness of not less than 0.019 inch No. 26 galvanized sheet. (R903.2.) Kick-out flashing must be installed in new construction where the lower portion of a sloped roof stops within the plane of an intersecting wall cladding, in such a manner as to divert or kick out water away from the assembly. Kick-out flashing may be either factory made or field fabricated. Kick-out flashing is not required for reroofing. However, its installation is good building practice. Figure R905.2.8.3 FLASHING AT SIDE WALL Flashing against vertical front walls, soil stacks, vent pipes, and chimney flashing must be in accordance with the asphalt shingle manufacturer's printed instructions. Sidewall flashing must be installed by the step flashing method and is required whenever wall and roof intersections occur. Crickets or saddles are required on the ridge side of any chimney greater than 30 inches wide. Cricket or saddle coverings must be of sheet metal or of the same material as the roof covering. Figure R905.2.8.4 CHIMNEY FLASHING DETAIL Figure R905.3.8(3) TILE ROOF CHIMNEY FLASHING DETAIL Page 3 of 6

Asphalt Shingles Fasteners for asphalt shingles must be galvanized steel, stainless steel, aluminum, or 12 gauge shank with a minimum 3/8 diameter head and of a length to penetrate through the roofing materials and a minimum of 3/4 into roof sheathing or when roof sheathing is less than 3/4 thick, the fastener shall penetrate through the sheathing. FASTENER SCHEDULE FOR ROOFING Mineral-Surfaced Wood Shingles Roll Roofing Roll roofing must be Fasteners for wood installed in shingles must be accordance with the corrosion-resistant manufacturer s with a minimum of installation 1/2 into the instructions. sheathing. For sheathing less than1/2 in thickness, the fastener shall extend through the sheathing. A minimum of two fasteners per shingle are required. Wood Shakes Fasteners for wood shakes must be corrosion-resistant with a minimum penetration of 1/2 into the sheathing. For sheathing less than 1/2 in thickness, the fastener shall extend through the sheathing. A minimum of two fasteners per shake are required. ASPHALT SHINGLES, R905.2 Asphalt shingles may only be used on roof slopes of two units vertical in 12 units horizontal (2:12) or greater. For roof slopes from 2:12 to 4:12, double underlayment is required. Underlayment must conform to ASTM D 226, Type I; ASTM D 4869, Type I; or ASTM D 6757. For slopes of 4:12 and greater, underlayment must be applied shingle fashion. Laps must be a minimum of 2-inches. End laps must be offset by at least 6 feet. For normal application, strip shingles must be fastened with a minimum of four nails. For interlocking shingles, two nails are required. See the manufacturer's installation instructions. Valleys must be lined in accordance with the shingle manufacturers written instructions. Valleys may be of any of the following: For open valleys lined with metal, the valley lining must be at least 24 inches wide and of galvanized steel of at least 26 gage or other approved materials. For open valleys, two plies of roll roofing may be permitted. The bottom layer must be at least 18 inches wide and the top layer at least 36 inches wide. For closed valleys (valleys covered with shingles), valley lining of one ply of smooth roll roofing complying with ASTM D 224 Type II or Type Ill and at least 36 inches wide or one of the two methods previously listed may be used. MINERAL SURFACED ROLL ROOFING, R905.5 Mineral surfaced roll roofing may only be applied on roofs with a slope of 1:12 or greater. Mineral surface roll roofing must conform to ASTM D 3909 or ASTM D 6380, Class M. Mineral surface roll roofing must be installed in accordance with the manufacturer's installation instructions. Page 4 of 6

WOOD SHINGLES, R905.7 Wood shingles must be installed on slopes that are at least 3:12 or greater. They must be made of a naturally durable wood of grades 1, 2, or 3 approved by the Cedar Shake and Shingle Bureau. A label of an approved grading or inspection bureau or agency must identify each bundle of shingles. Wood shingles must be installed in accordance with the manufacturer's instructions and the following. Wood shingles must be laid with a side lap of not less than 1 1/2 between joints in courses and no two joints in any three adjacent courses" shall be in direct alignment. Spacing between shingles may not be less than 1/4'' nor more than 3/8". Weather exposure may not exceed what is specified in the accompanying table. Wood shingles must be attached to the root with two fasteners per shingle. Fasteners should be not more than 3/4 from the edge of the shin Material Shingles of naturally durable wood WOOD SHINGLE WEATHER EXPOSURE AND ROOF SLOPE Exposure in Inches Length in Grade 3:12 pitch to less 4:12 pitch Inches than 4:12 pitch or greater No. 1 3 ¾ 5 16 No. 2 3 ½ 4 No. 3 3 3 ½ No. 1 4 ½ 5 ½ 18 No. 2 4 4 ½ No. 3 3 ½ 4 No. 1 5 ¾ 7 ½ 24 No. 2 5 ½ 6 ½ No 4 5 5 ½ Figure R905.7.5(1) WOOD SHINGLE APPLICATION Figure R905.7.6 WOOD SHINGLE FLASHING APPLICATION Page 5 of 6

WOOD SHAKES, R905.8 Wood shakes must be installed on roof slopes of 3:12 or greater and must be installed in accordance with the manufacturer's installation instructions and the code. Wood shakes must be laid with a side lap of not less than 1 1/2 inches between joints in adjacent courses. Spacing between shakes in the same course must be between 1/8 inch and 5/8 inch for shakes and taper sawn shakes of naturally durable wood and 1/4 inch and 3/8 inch for preservative taper sawn shakes. Fasteners for wood shakes must be corrosion resistant. Shakes must be attached with two fasteners per shake. Fasteners must be positioned not more than 1 inch from each edge and not more than 2 inches above the exposure line. The starter course at the eaves must be doubled and the bottom layer may be 15 inch, 18 inch, or 24inch wood shakes or shingles. Fifteen-inch or 18 inch wood shakes may be used for the final course at the ridge. Shakes must be interlaid with 18 inch wide strips of No. 30 felt shingled between each course in such a manner that no felt is exposed to the weather by positioning the lower edge of each felt strip above the butt end of the shake it covers a distance equal to twice the weather exposure. Underlayment must comply with ASTM D 226, Type I. WOOD SHALE WEATHER EXPOSURE AND ROOF SLOPE Material Length in Inches Grade Exposure in Inches 4:12 pitch or greater Shakes of naturally durable wood 18 No. 1 7 ½ 24 No. 1 10 18 No. 1 7 ½ Preservative -treated taper sawn shakes 24 No. 1 10 natural durable wood 18 No. 2 5 ½ 24 No. 2 7 ½ Taper-sawn shakes of naturally durable southern yellow pine 18 No. 1 7 ½ 24 No. 1 10 18 No. 2 5 ½ 24 No. 2 7 ½ Page 6 of 6